| Ap Line- Jogoo- Market Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
|
N/A |
Kapkugerwet |
Feedback |
| Leberer-Kamachungwa-coffee factory road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
|
3,941,891.12 |
Chepseon |
Feedback |
| Construction of 938- 938 Girls Road; Chepsir- Kipkeremwo Road; Monori- Sailo Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
|
2,490,816.96 |
Chepseon |
Feedback |
| Tulwapmoi Water Project Phase 1 |
To initiate the phased development of the Tulwapmoi Water Project with the aim of expanding access to safe, reliable, and sustainable water for the Tulwapmoi community through Phase 1 infrastructure works |
Water, Environment, Energy and Natural Resources |
|
2,500,000.00 |
Chilchila |
Feedback |
| Construction of Culverts at 946 |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
|
4,493,817.26 |
Kapkugerwet |
Feedback |
| Kipsitet Water Supply Project |
To enhance access to safe, affordable, and sustainable water for the Kipsitet community through solarisation of the pumping system and extension of distribution pipelines |
Water, Environment, Energy and Natural Resources |
|
1,500,000.00 |
Soin |
Feedback |
| Kapkondor/Cheusi/Setek/United Water Project |
To strengthen water storage capacity and ensure reliable supply for Kapkondor, Cheusi, Setek, and United communities through the supply and installation of eight UPVC storage tanks. |
Water, Environment, Energy and Natural Resources |
|
1,500,000.00 |
Londiani |
Feedback |
| Mogoriot Water Project |
To expand access to safe and reliable water for the Mogoriot community through the construction of a water distribution pipeline. |
Water, Environment, Energy and Natural Resources |
|
10,000,000.00 |
Soliat |
Feedback |
| Baregeiywet Dispensary Road (Twin 900mm Culvert 14M); Chepkembe B (7m, 900mm); Ainaptibik Culvert (7m, 900mm) Menjo River (7m 900mm) Arap Oriango (14m, 900mm) |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
|
2,098,500.00 |
Soliat |
Feedback |
| Kapcheplanga Borehole Water Project |
To enhance sustainable access to safe and reliable water for the community through test pumping, solarisation of the water system, installation of a UPVC storage tank, and fencing for source protection. |
Water, Environment, Energy and Natural Resources |
|
2,851,694.00 |
Londiani |
Feedback |
| Routine Maintenance of Kaplelartet chiefs' office-Tabaita center road |
Potholes patched, ,surface grading completed. |
Public Works, Roads and Transport |
|
2,996,699.92 |
Kaplelartet |
Feedback |
| Kiptere/Simbamoo Water Project |
To improve sustainable access to safe and reliable water for the community through spring protection, bulk storage, and efficient conveyance via a gravity main pipeline |
Water, Environment, Energy and Natural Resources |
|
234,970,538.00 |
Sigowet |
Feedback |
| Motokyimet and Kabarus Water Project |
To enhance access to clean and sustainable water supply by constructing pipelines ensuring reliable water delivery to the target community |
Water, Environment, Energy and Natural Resources |
|
2,565,000.00 |
Ainamoi |
Feedback |
| Routine Maintenance of Kamasega SDA- Kapsegut- Kiptugumo Pry School Road 4Km, Kitugumo Dispensary- Tamarson Road 2.5Km |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
|
3,397,816.32 |
Soliat |
Feedback |
| Construction of Kap Kutu- Kapsenda Quarry Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
|
2,140,221.34 |
Londiani |
Feedback |
| Construction Of Independence-Subukia Road 5.2Km, Kinyere Independence Road 2.1Km, Tumaini Secondary School-Nominated MCA Road 1.4Km |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
|
4,493,817.26 |
Tendeno/Sorget |
Feedback |
| Proposed Construction of 600mm 28m of culverts at 938 complex-Keta Academy Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
On-Going
|
1,039,934.20 |
Chepseon |
Feedback |
| Proposed Construction of Kaptebengwet- Cheptangulgei River Box Culvert |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
On-Going
|
1,409,706.24 |
Kapkatet |
Feedback |
| Proposed construction of storm water drainage facilities (Phase 2 – World Bank Funded) |
To reduce and manage flooding in the project area by channeling storm water through an effective and well-designed drainage system. |
Lands, Housing and Physical Planning |
On-Going
|
1,487,440.80 |
Kapkugerwet |
Feedback |
| Kabartegan-Ainapkoroitik Water Project |
To provide sustainable, safe, and reliable water supply to the Kabartegan–Ainapkoroitik community through equipping and solarisation of the spring source, construction of a masonry storage tank, rising main and distribution pipelines, and associated infrastructure |
Water, Environment, Energy and Natural Resources |
On-Going
|
1,292,385.00 |
Chemosot |
Feedback |
| Enginit Borehole Water Project |
To increase access to safe and reliable water supply for the Enginit community through borehole drilling, development, and associated infrastructure |
Water, Environment, Energy and Natural Resources |
On-Going
|
1,424,526.40 |
Londiani |
Feedback |
| Construction of Off B1-Kaitui bridge-kiptugumo pry sch Road; Kamasenga-Soliat Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
On-Going
|
3,695,760.00 |
Soliat |
Feedback |
| Jagoror Borehole Water Project |
To provide a safe, reliable, and sustainable source of water for domestic, institutional, and community use through borehole drilling and development. |
Water, Environment, Energy and Natural Resources |
On-Going
|
N/A |
Londiani |
Feedback |
| Segetet-Siranga Road (7m, 900MM); Chebirir-Sachangwan Road (7m, 600MM); Kaula-Kapsoton Road (14m, 600MM) |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
On-Going
|
616,804.48 |
Kipkelion |
Feedback |
| Supply, Delivery, And Installation Of Kivuno-Korori Road;Mugumoini-Centre Road;Subukia-Centre Road;Centre One -Gwitu Farm Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
On-Going
|
2,007,746.56 |
Tendeno/Sorget |
Feedback |
| Proposed Culverts Installation To Bosuben Junction-Tanguret Road,Kipteran-Kapsinendet Church Of Christ Road,Kap Petero-Kapsimbiri Dip Road,Kapsimbor-Kap Mosonik Shops,Arokyet Tinga-Kap Cape Town Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
On-Going
|
1,900,928.54 |
Cheplanget |
Feedback |
| Supply,delivery and installation of culverts at Chebinyiny-Kenene rd,Mobet-tabut rd,mobet-keregut road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
On-Going
|
1,847,972.80 |
Cheplanget |
Feedback |
| Routine Maintenance of Silva junction-Siongi-Kampala road |
Potholes patched, ,surface grading completed. |
Public Works, Roads and Transport |
On-Going
|
3,640,590.40 |
Tebesonik |
Feedback |
| Kaminjeiwa Borehole Water Project |
to supply, deliver, install, test, and commission a submersible pump set to enhance water extraction and distribution from the designated water source |
Water, Environment, Energy and Natural Resources |
Completed
|
3,179,333.44 |
Cheplanget |
Feedback |
| Nyaberi Junction- Kap Nyakitari Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
820,875.00 |
Soin |
Feedback |
| Kaptegere- Chepsoo Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,300,000.00 |
Kapsoit |
Feedback |
| Cherire - Kisabei Pry- Kiptegan Nursery Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,880,704.00 |
Kapsoit |
Feedback |
| Extension Kenya 1 - Cattle dip - Quarry Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
5,182,888.00 |
Soliat |
Feedback |
| Construction of Iraa Pry-School of Excellency- Masare Market Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,295,500.03 |
Kaplelartet |
Feedback |
| Chepterwo/kipsitet |
Improve access, quality of learning and care in ecde centers |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
3,143,600.00 |
Sigowet |
Feedback |
| Tabet/sosur |
Ensure Hygiene and Sanitation, Promote Health and Disease Prevention |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
1,473,900.00 |
Kaplelartet |
Feedback |
| Mulkelwet Dispensary |
To enhance the safety, security, and operational environment of Mulkelwet Dispensary by constructing a perimeter fence that protects health infrastructure, staff, and medical supplies, while providing a conducive atmosphere for service delivery |
Health Services |
Completed
|
1,665,945.60 |
Ainamoi |
Feedback |
| Litein Water Supply |
To enhance access to clean and sustainable water supply by constructing and installing water infrastructure such as pipelines, water tanks, spring protection systems, and associated fittings, ensuring reliable water delivery to the target community |
Water, Environment, Energy and Natural Resources |
Completed
|
1,348,680.00 |
Cheplanget |
Feedback |
| Tuiyobei pry - Sukutek Primary School Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,884,952.68 |
Soliat |
Feedback |
| Mortgage - Kericho Primary Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,482,248.00 |
Kipchebor |
Feedback |
| Kap Eli - Off B1 - Koiyet - Chesanga -Hass Petrol Station- Emanuels Agc Chucrh- Kiboko- Off B1 Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
5,411,600.00 |
Kipchebor |
Feedback |
| Kapchemirmir TBC - Cherire TBC - Kapsewe Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,696,476.00 |
Sigowet |
Feedback |
| Construction of Kapsomboch- Chepkosa Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,084,742.72 |
Kaplelartet |
Feedback |
| Kondamet |
Improve access, quality of learning and care in ecde centers |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
3,670,704.00 |
Sigowet |
Feedback |
| Kaplelartet |
Ensure Hygiene and Sanitation, Promote Health and Disease Prevention |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
4,899,080.00 |
Kaplelartet |
Feedback |
| Mulkelwet Dispensary |
To improve access to quality primary healthcare services for the residents of Mulkelwet and surrounding areas through the establishment of a fully functional dispensary equipped to offer preventive, promotive, and curative health services |
Health Services |
Completed
|
2,137,500.00 |
Ainamoi |
Feedback |
| Kaminjeiywa Borehole –Tegat |
To enhance access to clean and sustainable water supply by constructing and installing water infrastructure such as pipelines, water tanks, spring protection systems, and associated fittings, ensuring reliable water delivery to the target community |
Water, Environment, Energy and Natural Resources |
Completed
|
2,119,039.00 |
Cheplanget |
Feedback |
| Soko huru kapsegut pry kubinkok rd |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
7,927,648.80 |
Soliat |
Feedback |
| Satelite - Matobo Primary-Nyagacho - Nursery Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,552,629.00 |
Kipchebor |
Feedback |
| Satelite - Matobo Primary-Nyagacho - Nursery Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
911,900.00 |
Kipchebor |
Feedback |
| Kapchanga - Taiwet - Centre Juu Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,520,910.00 |
Sigowet |
Feedback |
| Proposed Routine Maintenance of Tamboiyot TBC - Kiptenden TBC - Kebeneti Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,398,378.61 |
Sigowet |
Feedback |
| Chemildagei |
Improve access, quality of learning and care in ecde centers |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
2,591,668.00 |
Kaplelartet |
Feedback |
| Kamolok |
Ensure Hygiene and Sanitation, Promote Health and Disease Prevention |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
675,905.00 |
Kaplelartet |
Feedback |
| Kimeswon Dispensary. |
To improve facility functionality, sanitation, and utility access through installation of shelves, sanitation facilities, water harvesting, and electricity connection. |
Health Services |
Completed
|
2,006,970.00 |
Kipchimchim |
Feedback |
| Kaminjeiywa- Mobwo Borehole Water Project |
To enhance access to clean and sustainable water supply by constructing and installing water infrastructure such as pipelines, water tanks, spring protection systems, and associated fittings, ensuring reliable water delivery to the target community |
Water, Environment, Energy and Natural Resources |
Completed
|
1,796,770.40 |
Cheplanget |
Feedback |
| Ngeny-green leaf academy |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
7,155,866.00 |
Tebesonik |
Feedback |
| Baraka Kipsotet-Kimeswon Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,432,423.00 |
Kipchimchim |
Feedback |
| Baraka Kipsotet-Kimeswon Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
566,575.00 |
Kipchimchim |
Feedback |
| Kapchemirmir TBC - Cherire TBC - Kapsewe Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
822,094.32 |
Sigowet |
Feedback |
| Construction of Kaplaiba-Chesunet-Kapsigowo Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,938,716.12 |
Soliat |
Feedback |
| Cheramor |
Improve access, quality of learning and care in ecde centers |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
2,991,474.00 |
Kaplelartet |
Feedback |
| Kibirirgut |
Ensure Hygiene and Sanitation, Promote Health and Disease Prevention |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
673,000.00 |
Sigowet |
Feedback |
| Seretut dispensary |
To provide adequate and safe staff housing to improve staff retention and service delivery at Seretut Dispensary. |
Health Services |
Completed
|
872,238.80 |
Cheptororiet/Seretut |
Feedback |
| Kipsonoi/Cheplanget Water Project |
To enhance water supply reliability, storage efficiency, and infrastructure security through the construction and electrification of a control panel house, rehabilitation of a 100 m3 water tank, installation of a rising main, and fencing of critical installations |
Water, Environment, Energy and Natural Resources |
Completed
|
1,589,077.04 |
Cheplanget |
Feedback |
| Kapkisiara junction- chesamisiet road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,912,518.00 |
Tebesonik |
Feedback |
| Taiwet - Kipsutet Primary School Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,149,630.00 |
Kipchimchim |
Feedback |
| Taiwet - Kipsutet Primary School Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
140,000.00 |
Kipchimchim |
Feedback |
| Kakibei-KMC - Kuche - Kiptenden - Rwandit - Kapchanga Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,616,416.00 |
Sigowet |
Feedback |
| Construction of Soliat Dispensary-Mongojet Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
4,532,475.88 |
Soliat |
Feedback |
| Kaplamboi |
Improve access, quality of learning and care in ecde centers |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
900,651.84 |
Chepseon |
Feedback |
| Kondamet. Ecde toilet |
Ensure Hygiene and Sanitation, Promote Health and Disease Prevention |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
668,830.00 |
Sigowet |
Feedback |
| Seretut Dispensary |
To improve sanitation and waste management at the facility. |
Health Services |
Completed
|
1,461,298.40 |
Cheptororiet/Seretut |
Feedback |
| Kapkatet springs and Litein water supply |
to enhance water storage capacity, improve distribution efficiency, and increase community access to clean water, |
Water, Environment, Energy and Natural Resources |
Completed
|
1,408,258.56 |
Kapkatet |
Feedback |
| Cherote cheptagum pry kapelex kobologong |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,128,175.00 |
Tebesonik |
Feedback |
| Routine Maintenance of Arap Mangei- Nyaga Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,410,391.00 |
Cheboin |
Feedback |
| Kap Joseah- Kipsakwa Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,021,000.00 |
Kipchimchim |
Feedback |
| Sigowet - Kaplieli - Sisionik (3Km); Cherote - Kigomba Road (4.1km) |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,080,000.00 |
Sigowet |
Feedback |
| Construction of Kapsorok Market- Chepyegon Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,647,239.52 |
Soliat |
Feedback |
| Barotion |
Improve access, quality of learning and care in ecde centers |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
1,516,265.00 |
Londiani |
Feedback |
| Kileges ECDE |
Ensure Hygiene and Sanitation, Promote Health and Disease Prevention |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
680,725.00 |
Sigowet |
Feedback |
| Merto Dispensary |
To enhance sanitation and hygiene standards at Metro Dispensary by providing adequate and gender-sensitive sanitation facilities for patients, staff, and visitors, thereby promoting a healthy and safe healthcare environment |
Health Services |
Completed
|
1,747,859.00 |
Ainamoi |
Feedback |
| Litein water supply |
To enhance access to clean and sustainable water supply by constructing and installing water infrastructure such as pipelines, water tanks, spring protection systems, and associated fittings, ensuring reliable water delivery to the target community |
Water, Environment, Energy and Natural Resources |
Completed
|
1,853,100.00 |
Kapkatet |
Feedback |
| Nigeria - Kabusienduk rd |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
4,221,640.00 |
Tebesonik |
Feedback |
| Routine Maintenance of Cheptendeniet- Cheboin Centre Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,945,687.00 |
Cheboin |
Feedback |
| Kapango- Simotwet Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
632,000.00 |
Kipchimchim |
Feedback |
| Sigowet - Kaplieli - Sisionik (3Km); Cherote - Kigomba Road (4.1km) |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,337,300.00 |
Sigowet |
Feedback |
| Construction of Prime Steel Junctions-Boroiywek Road; Munara Canteen-ATC Road; Chebirir centre-Chebirir River Bridge Road; Kileges main Road-Prime steel gate Road; prime steel gate - Karap Towett Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,698,397.84 |
Soin |
Feedback |
| Kongasis |
Improve access, quality of learning and care in ecde centers |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
1,146,950.00 |
Tendeno/Sorget |
Feedback |
| Chebirir ECDE |
Ensure Hygiene and Sanitation, Promote Health and Disease Prevention |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
2,634,905.00 |
Sigowet |
Feedback |
| Ainamoi Sub County Hospital |
To strengthen the county’s health response capacity by upgrading and modifying existing hospital infrastructure to provide a safe, well-equipped, and functional COVID-19 recovery ward for effective management of post-COVID and infectious disease patients. |
Health Services |
Completed
|
2,410,468.40 |
Ainamoi |
Feedback |
| Kapkatet (Segerwer) Hospital Water Project |
To enhance access to clean and sustainable water supply by constructing and installing water kiosk, 200m3 water tanks, and associated fittings, ensuring reliable water delivery to the target community |
Water, Environment, Energy and Natural Resources |
Completed
|
1,273,146.40 |
Kapkatet |
Feedback |
| Kamwingi II Kimageri rd |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
5,623,072.74 |
Tendeno/Sorget |
Feedback |
| Routine Maintenance of Koborus- Kesengit- Kipagenge-Chepkulgong- Arap Barchile Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,415,325.00 |
Cheboin |
Feedback |
| Routine Maintenance of Kapsegut- Jerusalem Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,645,020.00 |
Cheboin |
Feedback |
| Orgong - Kaplieli - Kalelbusienduk - Kapchanga Road; Tamboiyot - Kitenden - Kebeneti Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,030,540.00 |
Sigowet |
Feedback |
| Kipsirichet |
Improve access, quality of learning and care in ecde centers |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
1,119,186.56 |
Londiani |
Feedback |
| Kaplelach ECDE |
Ensure Hygiene and Sanitation, Promote Health and Disease Prevention |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
2,306,192.00 |
Sigowet |
Feedback |
| Ainamoi Sub County Hospital |
To improve the functionality, safety, and aesthetic condition of Ainamoi Sub-County Hospital by undertaking exterior renovation and modification works that support the conversion of the facility into a fully operational COVID-19 recovery ward. |
Health Services |
Completed
|
1,795,383.62 |
Ainamoi |
Feedback |
| Segerwer extension pipeline |
To enhance access to clean and sustainable water supply by constructing and installing water infrastructure such as pipelines, water tanks, , and associated fittings, ensuring reliable water delivery to the target community |
Water, Environment, Energy and Natural Resources |
Completed
|
1,189,694.00 |
Kapkatet |
Feedback |
| Chepkoin - Chemororoch road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
820,875.00 |
Waldai |
Feedback |
| Routine Maintenance of Moburu- Chemunye- Ririat Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,250,761.00 |
Cheboin |
Feedback |
| Routine Maintenance of Ngororga 08 tbc- cheptigit- Sahangwan Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,671,200.00 |
Cheboin |
Feedback |
| Orgong - Kaplieli - Kalelbusienduk - Kapchanga Road; Tamboiyot - Kitenden - Kebeneti Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,918,972.00 |
Sigowet |
Feedback |
| Construction Of Quarry- Cheboror River- Kiprengwe Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
554,767.68 |
Kedowa/Kimugul |
Feedback |
| Londiani farmers |
Improve access, quality of learning and care in ecde centers |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
1,306,345.60 |
Londiani |
Feedback |
| Nyaberi ECDE |
Ensure Hygiene and Sanitation, Promote Health and Disease Prevention |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
794,600.00 |
Sigowet |
Feedback |
| Mulkelwet Dispensary |
To enhance access to quality outpatient healthcare services by completing the construction of the OPD block at Mulkelwet Dispensary, thereby improving service delivery capacity and patient flow within the facility. |
Health Services |
Completed
|
15,600,000.00 |
Ainamoi |
Feedback |
| Chebirirbei water project |
To improve access to safe and sustainable drinking water for the community by protecting natural springs and establishing reliable water points. |
Water, Environment, Energy and Natural Resources |
Completed
|
1,133,426.72 |
Kisiara |
Feedback |
| Highway- Maraba- Cattle Dip Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,370,374.00 |
Waldai |
Feedback |
| Maintenance of Kabarus junction-Chabasta River-Ngeny River Spencon- Kapchebo Pry School Road |
To enhance the safety, accessibility, and all-weather usability of rural roads |
Public Works, Roads and Transport |
Completed
|
1,879,201.00 |
Cheboin |
Feedback |
| Routine Maintenance of Maburo- Malinja- Bakoiyot Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
560,000.00 |
Cheboin |
Feedback |
| Sinendet Cherire TBC Road; Kapchemirmir Road; Centre juu - Taiywet - Kapchanga Road; Kiptere market Roads. |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
5,528,300.00 |
Sigowet |
Feedback |
| Kabarak |
Improve access, quality of learning and care in ecde centers |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
2,301,016.60 |
Londiani |
Feedback |
| Ndonyomare ECDE |
Ensure Hygiene and Sanitation, Promote Health and Disease Prevention |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
779,800.00 |
Sigowet |
Feedback |
| Ainamoi Sub County Hospital |
To improve water supply reliability and efficiency at Ainamoi Sub-County Hospital by upgrading the existing submersible pump and undertaking associated works to ensure uninterrupted water access for hospital operations and patient care. |
Health Services |
Completed
|
1,535,527.00 |
Ainamoi |
Feedback |
| Koituk Borehole Water Project |
To procure and deliver high-quality drilling materials that meet the technical and operational requirements of the project. |
Water, Environment, Energy and Natural Resources |
Completed
|
2,291,348.00 |
Kisiara |
Feedback |
| Ainamoi centre -Ainamoi pry- Itibet rd |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,174,524.40 |
Ainamoi |
Feedback |
| Routine Maintenance of Kabarus junction-Chabasta River-Ngeny River Road |
To improve the condition, safety, and accessibility of an existing road |
Public Works, Roads and Transport |
Completed
|
1,530,306.00 |
Cheboin |
Feedback |
| Routine Maintenance of Off C23- ChemosIt- Chebarema- Kabitungu TBC Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
8,607,424.00 |
Chemosot |
Feedback |
| Sisionik - Chemegong - Kapndege Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
6,434,200.00 |
Sigowet |
Feedback |
| Construction of Kaptirbet River (Semi Box Culvert (21m, 900MM) |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,993,154.40 |
Kapkatet |
Feedback |
| Chepcholiet |
Improve access, quality of learning and care in ecde centers |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
708,992.00 |
Chepseon |
Feedback |
| Kebimbir ECDE |
Ensure Hygiene and Sanitation, Promote Health and Disease Prevention |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
1,560,600.00 |
Sigowet |
Feedback |
| Ainamoi Social Hall |
To expand access to primary healthcare services for the Ainamoi community by converting the existing social hall into a functional dispensary with essential service rooms and providing adequate sanitation facilities for both staff and patients. |
Health Services |
Completed
|
3,356,170.00 |
Ainamoi |
Feedback |
| Koituk Primary School Borehole |
To equip an existing borehole with all necessary components to enable a sustainable and efficient water supply system. |
Water, Environment, Energy and Natural Resources |
Completed
|
1,603,824.68 |
Kisiara |
Feedback |
| Potholes pavement repairs of Town roads |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
5,380,356.08 |
Kipchebor |
Feedback |
| Routine Maintenance of Kapchelogoi- Soet Pry- Kipsereti River- Ps Cheruiyot- Maria Joy- Kap Than You Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,957,183.00 |
Chemosot |
Feedback |
| Routine Maintenance of Off C23- Chemosot Centre- Arap Irongi- Chebulu Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,920,000.00 |
Chemosot |
Feedback |
| Kaplelartet-Tililbei Road;Chepkemel-Sumeek Road; Sumeek-Tililbei Road. |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,958,163.00 |
Kaplelartet |
Feedback |
| Proposed Construction and Rehabilitation of Off E22- Kabarus Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,122,741.00 |
Ainamoi |
Feedback |
| Cheboror |
Improve access, quality of learning and care in ecde centers |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
2,028,240.00 |
Chepseon |
Feedback |
| KapkisaiECDE |
Ensure Hygiene and Sanitation, Promote Health and Disease Prevention |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
596,200.00 |
Sigowet |
Feedback |
| Ainamoi Sub County Hospital |
To enhance power reliability and safeguard hospital electrical infrastructure by constructing a secure generator house to protect the standby generator and ensure uninterrupted power supply for critical health services |
Health Services |
Completed
|
3,199,950.00 |
Ainamoi |
Feedback |
| Roret Pineapple Processing Plant |
To enhance access to clean and sustainable water supply by constructing and installing water infrastructure such as pipelines, water tanks, , and associated fittings, ensuring reliable water delivery to the target community |
Water, Environment, Energy and Natural Resources |
Completed
|
1,316,850.56 |
Kisiara |
Feedback |
| Sachangwan kapkiam pry kapsigori rd |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
501,600.00 |
Kipchimchim |
Feedback |
| Routine Maintenance of Ngoina Road- Pastor Weldon Chumo- Kipkerieny Pry- Chebarema Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,549,915.00 |
Chemosot |
Feedback |
| Routine Maintenance of Off C23- Kaminjeiwet- Chebulu Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,279,000.00 |
Chemosot |
Feedback |
| Mutwot - Kokwasoi - Emdit Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
6,645,260.00 |
Kaplelartet |
Feedback |
| Proposed Construction and Rehabilitation of Bundalangi-
Bechulelach Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,302,700.00 |
Ainamoi |
Feedback |
| Chepchabai |
Improve access, quality of learning and care in ecde centers |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
1,693,085.89 |
Chepseon |
Feedback |
| Kapkigoro ECDE |
Ensure Hygiene and Sanitation, Promote Health and Disease Prevention |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
1,426,070.00 |
Sigowet |
Feedback |
| Laliat Dispensary |
To improve staff welfare and enhance service delivery at Laliat Dispensary by completing the staff house to provide suitable accommodation for health workers and constructing a two-door pit latrine to promote sanitation and hygiene within the facility |
Health Services |
Completed
|
4,142,072.00 |
Ainamoi |
Feedback |
| Koituk Primary School Borehole Water Project |
To enhance access to clean and sustainable water supply by constructing and installing water infrastructure such as pipelines, water tanks, , and associated fittings, ensuring reliable water delivery to the target community |
Water, Environment, Energy and Natural Resources |
Completed
|
1,479,754.14 |
Kisiara |
Feedback |
| Simotwet -Nyakacho-Kwa Sambu-Matobo Agc Church -Chesanga Rd |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
498,400.00 |
Kapsaos |
Feedback |
| Routine Maintenance Off C23 - Cheborus - Kapcario - Salvation ECDC Main -Kipsisin TBC - Kapsenetwet - Sugutek TBC- Chelilis CD Getarwet |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,379,948.76 |
Chemosot |
Feedback |
| Routine Maintenance of Nairobi Ndogo- Kimauto Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
910,000.00 |
Cheplanget |
Feedback |
| Chepkemel Centre - Arap Cheruiyot - Sumeek Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
6,633,960.00 |
Kaplelartet |
Feedback |
| Proposed Construction and Rehabilitation of Ainapsosiot- Binyiny Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
177,040.00 |
Kapsaos |
Feedback |
| Irerma |
Improve access, quality of learning and care in ecde centers |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
1,711,238.96 |
Kedowa/Kimugul |
Feedback |
| Kamogon ECDE |
Ensure Hygiene and Sanitation, Promote Health and Disease Prevention |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
695,000.00 |
Sigowet |
Feedback |
| Chepkoiyo Dispensary -Phase1 |
To improve maternal and child health services by initiating the construction of a maternity block at Chepkoiyo Dispensary, thereby expanding the facility’s capacity to provide safe delivery, antenatal, and postnatal care services |
Health Services |
Completed
|
4,196,010.00 |
Ainamoi |
Feedback |
| Tulwet Borehole water Project |
To equip an existing borehole with all necessary components to enable a sustainable and efficient water supply system. |
Water, Environment, Energy and Natural Resources |
Completed
|
1,153,282.90 |
Kisiara |
Feedback |
| Baraka - Chepyose-Kimeswon Rd |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,982,600.00 |
Kapkugerwet |
Feedback |
| Routine Maintenance of Kitaiit-Kimonjuk Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,915,308.48 |
Cheplanget |
Feedback |
| Routine Maintenance of Tabaita- Kap Johna Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,598,400.00 |
Cheplanget |
Feedback |
| Kaplelartet - Arap Cheruiyot - Sumeek Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
6,553,340.00 |
Kaplelartet |
Feedback |
| Proposed Construction and Rehabilitation of Muiywek- Kipsamoi Pry- Kiptegan Pry School Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,504,206.00 |
Kapsoit |
Feedback |
| Tiriita |
Improve access, quality of learning and care in ecde centers |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
1,041,448.00 |
Kedowa/Kimugul |
Feedback |
| Kapsomboch ECDE |
Ensure Hygiene and Sanitation, Promote Health and Disease Prevention |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
1,577,948.00 |
Sigowet |
Feedback |
| Ainamoi sub county hospital |
To ensure reliable and adequate water supply throughout Ainamoi Sub-County Hospital by installing an efficient water reticulation system that supports clinical operations, sanitation, and patient care. |
Health Services |
Completed
|
3,198,004.00 |
Ainamoi |
Feedback |
| Chebwagan-Kalacha Dispensary Water Project |
To enhance access to clean and sustainable water supply by constructing and installing water infrastructure such as pipelines, water tanks, and associated fittings, ensuring reliable water delivery to the target community |
Water, Environment, Energy and Natural Resources |
Completed
|
1,501,622.78 |
Kisiara |
Feedback |
| Kapkatet Hospital - Link cheplanget -Off mainroad Sosit |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,979,443.80 |
Kapkatet |
Feedback |
| Routine Maintenance of Kaldit TBC- Tegat UPEC/Arokyet- Tinga Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,957,183.01 |
Cheplanget |
Feedback |
| Routine Maintenance of Twoliot- Church Of Christ- Tangit- Sebetet- Ainapkarik Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,800,000.00 |
Cheplanget |
Feedback |
| Mutwot - Kokwasoi - Emdit Road; Chepkemel Center - Karap Cheruiyot Road; Kapmorok - Chepkemel TBC - Centre Road; Chepchelalemit - Sime Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,014,000.00 |
Kaplelartet |
Feedback |
| Proposed Construction and Rehabilitation of Kenegut Market- Cheplel Pry-
Cherire Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,231,298.00 |
Kapsoit |
Feedback |
| Chepkongony |
Improve access, quality of learning and care in ecde centers |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
1,052,087.52 |
Kedowa/Kimugul |
Feedback |
| Kapwos ECDE |
Ensure Hygiene and Sanitation, Promote Health and Disease Prevention |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
4,982,420.00 |
Sigowet |
Feedback |
| Municipal Health Centre |
To improve sanitation and hygiene standards at the Municipal Health Centre by constructing a modern ablution block that adequately serves patients, visitors, and healthcare staff, thereby promoting a clean and healthy healthcare environment. |
Health Services |
Completed
|
3,193,480.00 |
Kapkugerwet |
Feedback |
| Litein Water Supply |
To enhance access to safe, reliable, and sustainable water supply through improved storage, infrastructure rehabilitation, and expanded distribution. |
Water, Environment, Energy and Natural Resources |
Completed
|
1,561,202.00 |
Kisiara |
Feedback |
| Kiptere Market Roads |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,967,154.40 |
Kaplelartet |
Feedback |
| Routine Maintenanve of Kenene Dispensary- Tiritap Moita- Chebinyiny Junction Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,349,500.00 |
Cheplanget |
Feedback |
| Routine Maintenance of Nuru- Meturi Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
865,000.00 |
Kapkatet |
Feedback |
| Mutwot - Kapkawa- Kiplekwa pry School Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,498,000.00 |
Kaplelartet |
Feedback |
| Proposed Construction and Rehabilitation of Kipchimchim Sec School- Kipsakwa Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,502,113.00 |
Kipchimchim |
Feedback |
| Tumaini |
Improve access, quality of learning and care in ecde centers |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
1,368,233.92 |
Tendeno/Sorget |
Feedback |
| Emdiit ECDE |
Ensure Hygiene and Sanitation, Promote Health and Disease Prevention |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
682,578.00 |
Sigowet |
Feedback |
| Binyiny Dispensary. |
To enhance the functionality, safety, and service delivery environment of Binyiny Dispensary through renovation works aimed at upgrading existing infrastructure and improving working and patient conditions |
Health Services |
Completed
|
4,986,757.00 |
Kapsaos |
Feedback |
| Sachangwan Cheribo Line Extension |
To enhance access to clean and sustainable water supply by constructing and installing water infrastructure such as pipelines, water tanks, spring protection systems, and associated fittings, ensuring reliable water delivery to the target community |
Water, Environment, Energy and Natural Resources |
Completed
|
1,956,125.31 |
Kisiara |
Feedback |
| Kipwastuyo - Kenene Kaminjeiwa rd |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
960,016.00 |
Sigowet |
Feedback |
| Routine Maintenance of Bossman Road- Kap Josea Sang - Marisin -Kap Josea gate Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,852,103.00 |
Kapkatet |
Feedback |
| Routine Maintenance of Chebitet- Kap Tebengwet Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
6,183,180.00 |
Kapkatet |
Feedback |
| Kaplelartet - Kapsomboch Primary School Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,753,400.00 |
Kaplelartet |
Feedback |
| Proposed Construction and Rehabilitation of Kimungen Bridge-
Kamasian AGC Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,495,043.00 |
Kipchebor |
Feedback |
| Mugumoine |
Improve access, quality of learning and care in ecde centers |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
525,303.68 |
Tendeno/Sorget |
Feedback |
| Chebirech ECDE |
Ensure Reliable Water Supply, Promote Hygiene and Health |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
697,780.60 |
Sigowet |
Feedback |
| Kapsaos Dispensary |
To enhance the security and safety of Kapsaos Dispensary by constructing a perimeter fence to protect health infrastructure, medical supplies, staff, and patients, while creating a conducive environment for healthcare service delivery |
Health Services |
Completed
|
4,076,124.00 |
Kapsaos |
Feedback |
| Chemitan Water Project |
To establish a sustainable and efficient water supply system that secures natural water sources, enhances storage capacity, and improves community access through effective distribution. |
Water, Environment, Energy and Natural Resources |
Completed
|
1,427,681.60 |
Kisiara |
Feedback |
| Musaria -kapkatet TBC road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,995,882.60 |
Sigowet |
Feedback |
| Routine Maintenance of Chemoiben- Egisiek- kapcheluch Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,650,440.00 |
Kapkatet |
Feedback |
| Routine Maintenance of Chebitet Sign Post- Sachangwan Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,650,000.00 |
Kapkatet |
Feedback |
| Kona Sita - Sumeek Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,975,000.00 |
Kaplelartet |
Feedback |
| Proposed Construction and Rehabilitation of Kwa Zablon- Kipchebor Pry
School Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,188,246.00 |
Kipchebor |
Feedback |
| Morao bakery/kapluso |
Improve access, quality of learning and care in ecde centers |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
1,028,651.12 |
Kamasian |
Feedback |
| Nyalilbuch ECDE |
Ensure Reliable Water Supply, Promote Hygiene and Health |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
1,400,000.00 |
Sigowet |
Feedback |
| Kipsolu Dispensary |
To enhance sanitation and hygiene for patients and staff at Kipsolu Dispensary. |
Health Services |
Completed
|
2,829,814.00 |
Cheptororiet/Seretut |
Feedback |
| Chemitan Solarisation |
To establish a sustainable and efficient water supply system that secures natural water sources, and improves community access through effective distribution. |
Water, Environment, Energy and Natural Resources |
Completed
|
1,259,540.76 |
Kisiara |
Feedback |
| OffB1/A1 - chepkolon - greenhighlands rd |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
970,000.00 |
Kipchebor |
Feedback |
| Routine Maintenance of 954DC Junction- Soy Palza- 954East- MP Hom- Upper Hill Acadeny- Off C23- Morit Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,474,119.00 |
Kapkatet |
Feedback |
| Routine Maintenance of Sachangwan- Mabasi TBC- Ketingoi Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
5,987,000.00 |
Kisiara |
Feedback |
| Rehabilitation and Construction of Lelagoi- Yanja- Karap Maina Road 4.5Km |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
8,578,680.00 |
Sigowet |
Feedback |
| Proposed Construction and Rehabilitation of Annex Prison- Kwa Silvan Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,252,030.00 |
Kapkugerwet |
Feedback |
| Kawangware |
Improve access, quality of learning and care in ecde centers |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
862,877.60 |
Kamasian |
Feedback |
| Ngendalel ECDE |
Ensure Reliable Water Supply, Promote Hygiene and Health |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
875,000.00 |
Sigowet |
Feedback |
| Kipsolu Dispensary. |
To complete and operationalize the dispensary by providing basic utilities and fittings. |
Health Services |
Completed
|
1,862,960.00 |
Cheptororiet/Seretut |
Feedback |
| Cheptenybei Spring Protection |
To improve access to safe and sustainable drinking water for the community by protecting natural springs and establishing reliable water points. |
Water, Environment, Energy and Natural Resources |
Completed
|
1,379,003.36 |
Kisiara |
Feedback |
| site and service roads |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,549,680.80 |
Kapkugerwet |
Feedback |
| Routine Maintenance of Ngesumiin Girls- Nyambolosa Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,747,264.00 |
Litein |
Feedback |
| Routine Maintenance of Keregut- Sikongo Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
4,964,800.00 |
Kisiara |
Feedback |
| Rehabilitation of Drainage Structures and access roads in Kapkatet Market |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,614,856.00 |
Kapkatet |
Feedback |
| Proposed Construction and Rehabilitation of Mangweni Academy-
Satelight Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,427,190.00 |
Kapkugerwet |
Feedback |
| Laliat |
Improve access, quality of learning and care in ecde centers |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
1,833,426.40 |
Kamasian |
Feedback |
| Kaptalamwa ECDE |
Ensure Reliable Water Supply, Promote Hygiene and Health |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
1,560,880.00 |
Sigowet |
Feedback |
| Seretut Dispensary. |
To improve living conditions for health personnel at Seretut Dispensary. |
Health Services |
Completed
|
1,335,392.00 |
Cheptororiet/Seretut |
Feedback |
| Kapkisiara Borehole Water Project |
To restore or enhance water pumping capacity for reliable water delivery through the supply and installation of a new pumpset. |
Water, Environment, Energy and Natural Resources |
Completed
|
1,231,889.00 |
Tebesonik |
Feedback |
| Town drainage culverts |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,732,360.00 |
Litein |
Feedback |
| Routine Maintenance of Chemitan- Chebwagan- 954Motuary Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,629,374.00 |
Litein |
Feedback |
| Routine Maintenance of Machorwa- Chomisian- Charera |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,730,000.00 |
Kisiara |
Feedback |
| Rehabilitation and Construction of Kapias- Timbilil-Kamotos Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
7,457,528.00 |
Kunyak |
Feedback |
| Proposed Construction and Rehabilitation of Kasheen Centre- Borowet- Kosongosho Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,500,445.00 |
Kamasian |
Feedback |
| Chepkongony |
Ensure Hygiene and Sanitation, Promote Health and Disease Prevention |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
2,379,570.64 |
Kedowa/Kimugul |
Feedback |
| Samisbei ECDE |
Ensure Reliable Water Supply, Promote Hygiene and Health |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
2,007,170.00 |
Sigowet |
Feedback |
| Chepkosilen Dispensary |
To improve sanitary disposal of medical waste and enhance hygiene within the facility. |
Health Services |
Completed
|
2,938,860.00 |
Cheptororiet/Seretut |
Feedback |
| Kapkisiara Water Project |
To enhance access to safe, reliable, and sustainable water supply through improved storage, infrastructure rehabilitation, and expanded distribution. |
Water, Environment, Energy and Natural Resources |
Completed
|
1,102,400.20 |
Tebesonik |
Feedback |
| Off C35-Chinese site - Barotion rd |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,269,300.00 |
Londiani |
Feedback |
| Routine Maintenance of Siritiet Junction- Siritiet Pry- Chepkoit- Ainapek Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,416,375.00 |
Tebesonik |
Feedback |
| Routine Maintenance of Kelelwa- Kimugul Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
4,672,480.00 |
Kisiara |
Feedback |
| Routine Maintenance of Kap Ezekiel Centre- Kipkwes Pry School-Kipchorian River- Kipchorian Bridge Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,113,000.00 |
Ainamoi |
Feedback |
| Proposed Construction and Rehabilitation of Kipkelion Sub County Office- KapLaban Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,408,704.00 |
Kipkelion |
Feedback |
| Chepchabai |
Ensure Hygiene and Sanitation, Promote Health and Disease Prevention |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
1,380,098.60 |
Chepseon |
Feedback |
| Kapkongoni ECDE |
Ensure Reliable Water Supply, Promote Hygiene and Health |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
596,060.00 |
Sigowet |
Feedback |
| Kaplutiet Dispensary |
To increase access to primary healthcare services in Kaplutiet area. |
Health Services |
Completed
|
2,800,565.00 |
Kabianga |
Feedback |
| Kapkisiara Water Project |
To enhance access to clean and sustainable water supply by constructing pipelines, water tanks, and associated fittings, ensuring reliable water delivery to the target community |
Water, Environment, Energy and Natural Resources |
Completed
|
1,346,017.60 |
Tebesonik |
Feedback |
| Dampsite cereal ring rd cemetry juakali rd |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,941,362.52 |
Kipchebor |
Feedback |
| Routine Maintenance of Kalya Junction-Chepnyogaa Centre Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,875,237.00 |
Kabianga |
Feedback |
| Routine Maintenance of Reresik Pry- Kiprichait- Roret Boys- Chebululu- Tulwet- Ngainet Bridge Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
4,608,880.00 |
Kisiara |
Feedback |
| Routine Maintenance of Yasomok-Kamelilo Coffee Factory-Kiburet Pry School Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,324,708.00 |
Ainamoi |
Feedback |
| Proposed Construction and Rehabilitation of Kamunyu- Songonyet-
Chepkitar Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,193,725.00 |
Chilchila |
Feedback |
| Kapkondoo |
Ensure Hygiene and Sanitation, Promote Health and Disease Prevention |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
544,214.00 |
Londiani |
Feedback |
| Kejiriet ECDE |
To provide a space where nutritious meals can be prepared and served, supporting the healthy growth and development of young children in the Early Childhood Development Education (ECDE) program. |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
1,550,000.00 |
Sigowet |
Feedback |
| Nyabangi Dispensary |
To provide accommodation for healthcare workers at Nyabangi Dispensary. |
Health Services |
Completed
|
2,907,958.00 |
Kabianga |
Feedback |
| Kibugat Borehole Water Project |
To procure and deliver high-quality drilling materials that meet the technical and operational requirements of the project. |
Water, Environment, Energy and Natural Resources |
Completed
|
2,200,056.00 |
Tebesonik |
Feedback |
| Construction of Quarry- Turguito Bridge Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,973,790.00 |
Waldai |
Feedback |
| Routine Maintenance of Kaplutiet- Kiptuigo- Ainabisarak Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,969,624.00 |
Kabianga |
Feedback |
| Routine Maintenance of America- Sinendet Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,151,160.00 |
Litein |
Feedback |
| Ainamoi centre-berea AIC Church-Pakao-Delivarance-Kap Jona |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,281,920.00 |
Ainamoi |
Feedback |
| Proposed Construction and Rehabilitation of Kaplelit- Kamotos- Kamiwa Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,156,845.00 |
Chilchila |
Feedback |
| Construction of a pit latrine at Koiyat ECDE Centre |
Ensure Hygiene and Sanitation, Promote Health and Disease Prevention |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
1,364,276.00 |
Kaplelartet |
Feedback |
| Asenwet ECDE |
To provide a space where nutritious meals can be prepared and served, supporting the healthy growth and development of young children in the Early Childhood Development Education (ECDE) program. |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
1,579,850.00 |
Kaplelartet |
Feedback |
| Kaplutiet Dispensary |
To improve sanitation facilities for patients and visitors. |
Health Services |
Completed
|
2,520,993.00 |
Kabianga |
Feedback |
| Kibugat borehole Water Project |
To equip a borehole, extend power supply, and develop key water infrastructure that supports reliable water extraction, storage, and distribution for the community. |
Water, Environment, Energy and Natural Resources |
Completed
|
1,662,032.22 |
Tebesonik |
Feedback |
| Construction of Kabartegan AIC- Kap Patrick Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,777,453.00 |
Chemosot |
Feedback |
| Routine Maintenance of Off Chepnyogaa-Mobengo-Kapchebet Signpost Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,052,000.00 |
Kabianga |
Feedback |
| Routine Maintenance of Bushmouth- Samuget- Kap Brown - TTC Valley Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,646,520.00 |
Litein |
Feedback |
| Grading Of Kipchimchim Sec-Kabotris Road, Kabotris-Kondamet Road,Kapcheptoror-Sirimdo Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,455,700.00 |
Kipchimchim |
Feedback |
| Proposed Construction and Rehabilitation of Kimugul- 951 Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
962,278.00 |
Kedowa/Kimugul |
Feedback |
| Construction of a pit latrine at Simbamoi ECDE Centre |
Ensure Hygiene and Sanitation, Promote Health and Disease Prevention |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
1,419,579.00 |
Kaplelartet |
Feedback |
| Simbi ECDE |
To provide a space where nutritious meals can be prepared and served, supporting the healthy growth and development of young children in the Early Childhood Development Education (ECDE) program. |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
658,048.00 |
Kaplelartet |
Feedback |
| Kaplutiet Dispensary |
To enhance service delivery and usability of the dispensary premises. |
Health Services |
Completed
|
4,471,800.00 |
Kabianga |
Feedback |
| Kiptome Borehole Water Project |
To procure and deliver high-quality drilling materials that meet the technical and operational requirements of the project. |
Water, Environment, Energy and Natural Resources |
Completed
|
1,139,510.92 |
Tebesonik |
Feedback |
| Construction of Chebitet- Kaptumbo Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,108,851.62 |
Kisiara |
Feedback |
| Routine Maintenance of Chepkutung Banda - Maseti – Kaplangacha Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,605,577.00 |
Kapsuser |
Feedback |
| Routine Maintenance of Kapkarin- Chesoen TBC Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,503,600.00 |
Litein |
Feedback |
| Construction of Kiptabo TBC-Chepkosilen sec-Ainap Isirek-Bondeni road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
5,329,016.00 |
Cheptororiet/Seretut |
Feedback |
| Proposed Construction and Rehabilitation of Itoik- Kaptich Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,772,596.00 |
Londiani |
Feedback |
| Construction of a classroom at Chemamul ECDE Centre |
Improve access, quality of learning and care in ecde centers |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
1,273,239.20 |
Kipkelion |
Feedback |
| Tabaita ECDE |
To provide a space where nutritious meals can be prepared and served, supporting the healthy growth and development of young children in the Early Childhood Development Education (ECDE) program. |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
923,130.00 |
Kaplelartet |
Feedback |
| Kiptome Dispensary |
To expand capacity and improve patient comfort and service delivery. |
Health Services |
Completed
|
3,957,953.00 |
Kabianga |
Feedback |
| Kaptaragon Borehole Water Project |
To procure and deliver high-quality drilling materials that meet the technical and operational requirements of the project. |
Water, Environment, Energy and Natural Resources |
Completed
|
1,613,832.88 |
Chepseon |
Feedback |
| Construction of Kaptumo – chankelek Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
524,041.60 |
Kisiara |
Feedback |
| Routine Maintenance of Chepkutung Hills - Kipngetuny - BAE - Arap Cheruiyot Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,366,405.00 |
Kapsuser |
Feedback |
| Routine Maintenance of Ainapset AIC- Kapbomwo- Rungut Pry- Chepsembe- Tendwet TBC Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,704,050.00 |
Litein |
Feedback |
| Construction of Chomisian- Ngariet Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,629,200.00 |
Kisiara |
Feedback |
| Proposed Construction and Rehabilitation of United Soi- Rosekebei-Arap Chuma Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,680,000.00 |
Londiani |
Feedback |
| Construction of a pit latrine at Kapsamoi ECDE Centre |
Ensure Hygiene and Sanitation, Promote Health and Disease Prevention |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
1,058,455.92 |
Sigowet |
Feedback |
| Kamolok ECDE |
To provide a space where nutritious meals can be prepared and served, supporting the healthy growth and development of young children in the Early Childhood Development Education (ECDE) program. |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
652,725.00 |
Kaplelartet |
Feedback |
| Nyabangi Dispensary |
To improve functionality and sanitation of the facility. |
Health Services |
Completed
|
4,034,306.00 |
Kabianga |
Feedback |
| Chepseon Polytechnic Borehole |
To procure and deliver high-quality drilling materials that meet the technical and operational requirements of the project. |
Water, Environment, Energy and Natural Resources |
Completed
|
1,624,649.60 |
Chepseon |
Feedback |
| Construction of Sikongo- Kondamet Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
599,176.40 |
Kisiara |
Feedback |
| Routine Maintenance of Kapchelibon - Kipngetuny – Kapkonyinyis Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,613,030.00 |
Kapsuser |
Feedback |
| Routine Maintenance of Chepkitach- Kipsagetet Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,279,860.00 |
Tebesonik |
Feedback |
| Construction Of Chepkitar Centre- Toroton Boundary- Yalla Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,516,740.00 |
Chilchila |
Feedback |
| Proposed Construction and Rehabilitation of Kamwingi Centre- Chiefs Office - Kwa Duncan- Dip- Maritim Forest
Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,097,569.00 |
Tendeno/Sorget |
Feedback |
| Construction of a classroom and pit latrine at Kimugul ECDE Centre |
Ensure Hygiene and Sanitation, Promote Health and Disease Prevention |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
2,341,434.40 |
Sigowet |
Feedback |
| Mindililwet ECDE |
Improve access, quality of learning and care in ecde centers |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
652,002.00 |
Sigowet |
Feedback |
| Kamawoi Dispensary |
To improve maternity services and ensure sustainable water supply. |
Health Services |
Completed
|
2,005,408.00 |
Kabianga |
Feedback |
| Kaplelachbei water project |
Increase Water Storage Capacity, Enhance Water Intake Efficiency, Improve Water Distribution |
Water, Environment, Energy and Natural Resources |
Completed
|
1,494,486.00 |
Chepseon |
Feedback |
| Kiptenden TBC- Kiptenden Pry sch road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
676,512.00 |
Litein |
Feedback |
| Routine Maintenance of Kesagetiet TBC-Kipchombul TBC - Seretut TBC Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,114,105.00 |
Cheptororiet/Seretut |
Feedback |
| Routine Maintenance of Kibaranji- Karapngerer Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,434,628.00 |
Tebesonik |
Feedback |
| Grading of Chilchila- Murgut Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,484,640.00 |
Chilchila |
Feedback |
| Proposed Construction and Rehabilitation of Kwa Kagathe- Cheres Road and Its
Environs |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,450,200.00 |
Tendeno/Sorget |
Feedback |
| Construction of a pit latrine at Chebirir ECDE Centre |
Ensure Hygiene and Sanitation, Promote Health and Disease Prevention |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
1,543,663.04 |
Soin |
Feedback |
| Kakiboch ECDE |
Improve access, quality of learning and care in ecde centers |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
620,000.00 |
Sigowet |
Feedback |
| Kakiptui Dispensary |
To upgrade and improve the physical condition of Kakiptui Dispensary for better service delivery. |
Health Services |
Completed
|
2,230,800.00 |
Kapsuser |
Feedback |
| Chilchilla Pan Rehabilitation |
Increase Water Storage Capacity, Enhance Water Intake Efficiency, Improve Water Distribution |
Water, Environment, Energy and Natural Resources |
Completed
|
1,386,788.17 |
Chepseon |
Feedback |
| Chebwagan- Lebekwet- Kolonget Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,896,846.00 |
Litein |
Feedback |
| Routine Maintenance of Cheptororiet Pri-Kaldit Tbc Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,823,287.00 |
Cheptororiet/Seretut |
Feedback |
| Routine Maintenance of Kibolgong-Tiritab Eito Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,326,050.00 |
Tebesonik |
Feedback |
| Kisumu Ndogo-TBC-Melit r, Kapsamba-Kamasian Road, Kimungen Road,Dispensary-KamasianRoad, maso Market-Maso sch Road; Maso Shopping -Maso Church Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
4,656,736.00 |
Kamasian |
Feedback |
| Proposed Construction and Rehabilitation of AGC Chepkemel- Chepkemel Pry- Ormarichok-
Tililbei TBC ML 50B-
Kapkendu Centre Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
N/A |
Kaplelartet |
Feedback |
| Chepkolon ECDE |
Improve access, quality of learning and care in ecde centers |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
791,045.35 |
Kipchebor |
Feedback |
| Kechiriet ECDE |
Improve access, quality of learning and care in ecde centers |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
1,484,950.00 |
Sigowet |
Feedback |
| Kapsuser Dispensary |
To provide a functional kitchen facility for staff and patients at Kapsuser Dispensary. |
Health Services |
Completed
|
2,870,745.00 |
Kapsuser |
Feedback |
| Chepsain Water Project |
Increase Water Storage Capacity, Enhance Water Intake Efficiency, ,Enhance Security and Reduce Contamination |
Water, Environment, Energy and Natural Resources |
Completed
|
1,893,521.36 |
Chepseon |
Feedback |
| Construction of Leldet-Kapluso Road-Kapkures-Nyasikia Road; Kamutego-Kapkures Road; Tngatela Road-Kamasian- tingatela farm Road; Borborwet Road; saoset church ; kebeneti- changei Road; lelu-bartera Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
314,824.00 |
Kamasian |
Feedback |
| Routine Maintenance of Kapsoroget AGC - Cheboseron Tbc-Milimani Junction Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,593,500.00 |
Cheptororiet/Seretut |
Feedback |
| Routine Maintenance of Silva Junction- Siongi- Kampala Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,697,305.00 |
Tebesonik |
Feedback |
| Kiprengwe Pry School- Miti Moja Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
4,189,694.00 |
Kedowa/Kimugul |
Feedback |
| Proposed Construction and Rehabilitation of Kapkongoni Pry- Nyaberi Primary School
-Kapkisai Pry School Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,495,043.00 |
Soin |
Feedback |
| Koisagat |
Improve access, quality of learning and care in ecde centers |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
3,447,308.88 |
Kapsoit |
Feedback |
| Kondamet ECDE |
Improve access, quality of learning and care in ecde centers |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
680,740.00 |
Sigowet |
Feedback |
| Kapsuser Dispensary |
To enhance diagnostic capacity and improve patient care. |
Health Services |
Completed
|
2,219,544.00 |
Kapsuser |
Feedback |
| Chepseon Water projects (Tugunon Water project) |
To enhance access to clean and sustainable water supply by constructing pipelines, , and associated fittings, ensuring reliable water delivery to the target community |
Water, Environment, Energy and Natural Resources |
Completed
|
1,138,236.54 |
Chepseon |
Feedback |
| Construction of Simboyon- Kandege Forest Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,009,800.00 |
Tendeno/Sorget |
Feedback |
| Routine Maintenance of Kapsuser Slaughter-Masiat Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,490,900.00 |
Cheptororiet/Seretut |
Feedback |
| Routine Maintenance of Chebirirbei Centre- Chepnagai Pry School Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
5,603,520.00 |
Kabianga |
Feedback |
| Masaita - Itoik - 936 farmers Road 5.4km |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
6,078,550.00 |
Londiani |
Feedback |
| Proposed Construction and Rehabilitation of Kapsigowo- Koibaino ECDE Centre- Koibaino FPPK- Chebaran Dip Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,289,060.00 |
Soliat |
Feedback |
| Kimeswon |
Improve access, quality of learning and care in ecde centers |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
1,194,478.80 |
Kipchimchim |
Feedback |
| Kabore ECDE |
Improve access, quality of learning and care in ecde centers |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
1,579,999.00 |
Sigowet |
Feedback |
| Kapsuser Dispensary |
To ensure reliable and sustainable water supply to the facility. |
Health Services |
Completed
|
2,208,060.00 |
Kapsuser |
Feedback |
| Londiani water supply |
To enhance access to clean and sustainable water supply by constructing pipelines, , and associated fittings, ensuring reliable water delivery to the target community |
Water, Environment, Energy and Natural Resources |
Completed
|
1,375,551.20 |
Kedowa/Kimugul |
Feedback |
| Construction of Ngariet bridge-Kalyongwet Booster |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,431,045.50 |
Kaplelartet |
Feedback |
| Routine Maintenance of Kesagetiet TBC-Kipchombul TBC - Seretut TBC Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,067,582.00 |
Cheptororiet/Seretut |
Feedback |
| Routine Maintenance of Kapsisiywa Pry- Kipseger TBC- Sinonin Pry Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
5,359,540.00 |
Kabianga |
Feedback |
| Routine Maintenance of Itibet - Bagao- Deliverance Church Road |
Potholes patched, ,surface grading completed. |
Public Works, Roads and Transport |
Completed
|
4,524,760.96 |
Ainamoi |
Feedback |
| Proposed Construction and Rehabilitation of Baregeiywet FPPK- Motonyi Believers
Church- Corner C Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,252,030.00 |
Soliat |
Feedback |
| St Patrick |
Improve access, quality of learning and care in ecde centers |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
522,208.00 |
Kapkugerwet |
Feedback |
| Kapasenwo ECDE |
Improve access, quality of learning and care in ecde centers |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
1,576,470.00 |
Kaplelartet |
Feedback |
| Sachoran Dispensary |
To improve access to diagnostic and testing services at Sachoran. |
Health Services |
Completed
|
3,985,528.00 |
Kapsuser |
Feedback |
| Rehabilitation of Tulwapsigis Pan |
Increase Water Storage Capacity, Enhance Water Intake Efficiency, Improve Water Distribution |
Water, Environment, Energy and Natural Resources |
Completed
|
1,725,152.00 |
Kedowa/Kimugul |
Feedback |
| Construction of Cheptarit-Ngariet Bridge road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
352,500.00 |
Kaplelartet |
Feedback |
| Routine Maintenance of Kabiwot - Chelalang Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,776,796.00 |
Waldai |
Feedback |
| Routine Maintenance of Mobego B TBC- Nyabangi Sec. School- Kolonget Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,951,040.00 |
Kabianga |
Feedback |
| Routine Maintenance of Kabias junction-Kapkoros primary-Sugut road |
Potholes patched, ,surface grading completed. |
Public Works, Roads and Transport |
Completed
|
1,101,658.00 |
Kunyak |
Feedback |
| Proposed Construction and Rehabilitation of Kebeneti- Mwebe SDA- Cheplosgei Dispensary- Tamboiyot
Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,299,306.00 |
Sigowet |
Feedback |
| Ainapkoror |
Improve access, quality of learning and care in ecde centers |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
1,236,267.68 |
Kapsaos |
Feedback |
| Kabokyek ECDE |
Improve access, quality of learning and care in ecde centers |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
590,170.00 |
Kaplelartet |
Feedback |
| Machorwa Dispensary |
To establish access to quality healthcare services in Machorwa area. |
Health Services |
Completed
|
2,955,637.00 |
Waldai |
Feedback |
| Kapkeri Water Project |
To enhance access to clean and sustainable water supply by constructing pipelines, , and associated fittings, ensuring reliable water delivery to the target community |
Water, Environment, Energy and Natural Resources |
Completed
|
1,129,751.40 |
Kedowa/Kimugul |
Feedback |
| Construction of Kalyongwet- kiptere Market Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
486,900.00 |
Kaplelartet |
Feedback |
| Routine Maintenance of Off Cheribo- Chebaibai Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,045,559.00 |
Waldai |
Feedback |
| Routine Maintenance of Kaplutiet- Kiptuigo- Ainabisarak Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,503,600.00 |
Kabianga |
Feedback |
| Routine Maintenance of Sireret-Kotetnik-Kabias Junction road |
Potholes patched, ,surface grading completed. |
Public Works, Roads and Transport |
Completed
|
N/A |
Kunyak |
Feedback |
| Proposed Construction and Rehabilitation of Chemongen
- Sosiot Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,219,970.00 |
Cheboin |
Feedback |
| Kiprotgorik |
Improve access, quality of learning and care in ecde centers |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
1,029,216.96 |
Kapsoit |
Feedback |
| Seronik ECD |
Improve access, quality of learning and care in ecde centers |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
773,762.00 |
Kaplelartet |
Feedback |
| Keben Dispensary |
To improve patient and staff sanitation facilities. |
Health Services |
Completed
|
3,866,000.00 |
Waldai |
Feedback |
| Katet Borehole Water project |
To provide sustainable and reliable water access through the drilling and equipping of a borehole, supported by power infrastructure and secure water storage |
Water, Environment, Energy and Natural Resources |
Completed
|
1,453,619.20 |
Londiani |
Feedback |
| Kalyongwet-Kimorogo road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
961,900.00 |
Kaplelartet |
Feedback |
| Routine Maintenance of Off Sondu Road - Mark Peter Pry. School Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,499,812.00 |
Waldai |
Feedback |
| Routine Maintenance of Bot Musa- Cheboin- Kimolwet- SBI- Kugerwet Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
7,882,712.00 |
Kapsuser |
Feedback |
| Construction Of Orgony-Kapleili-Kapelebusienduk-Kapchanga Road 2.5Km,Kapchanga TBC-Kapkeiyo TBC-Rwandet TBC-Kapkibbei Road 3.2Km,Kipranye-Chemindilil-Kipirigut Road 2.5Km,Tamboiyot TBC-Kiptenden TBC-Kebeneti Road 4Km |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
332,800.00 |
Sigowet |
Feedback |
| Proposed Construction and Rehabilitation of KapJoel - Kapcheboi - TBC - Panda Mpya TBC Access Culvert Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,219,970.00 |
Cheboin |
Feedback |
| Jordan/chemobei |
Improve access, quality of learning and care in ecde centers |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
1,162,784.00 |
Kapsoit |
Feedback |
| Kipkok ECDE |
Improve access, quality of learning and care in ecde centers |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
1,562,510.00 |
Kaplelartet |
Feedback |
| Machorwa Dispensary |
To provide adequate sanitation facilities for patients and visitors. |
Health Services |
Completed
|
3,508,443.00 |
Waldai |
Feedback |
| Kiptangit Water project Phase 1 |
To restore efficient water transmission from the source (e.g., borehole, treatment plant) to the storage facility or distribution network, minimizing losses and ensuring reliable water supply. |
Water, Environment, Energy and Natural Resources |
Completed
|
1,009,391.08 |
Londiani |
Feedback |
| Construction of Kapchebinyal- Chpekorot TBC- Taiywet Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
341,700.00 |
Sigowet |
Feedback |
| Rouitne Maintenance of 938- Leberer-Kamachungwa Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,397,635.00 |
Chepseon |
Feedback |
| Routine Maintenance of Cheptororiet- Arap Tanui Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
5,167,040.00 |
Kapsuser |
Feedback |
| Construction of Monget- Kapsinendet Road; Quarry- Cheramus Road; Chemutian- Baregeiywet SDA- Quarry Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,770,000.00 |
Soliat |
Feedback |
| Proposed Construction and Rehabilitation of Chebarema Pry - Kiptiliolit
- Kibatit - Off C23 Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
912,050.00 |
Chemosot |
Feedback |
| Kapcheptendeniet/mulgelwet |
Improve access, quality of learning and care in ecde centers |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
2,065,315.97 |
Ainamoi |
Feedback |
| Furnishing classrooms (county wide) |
Create a comfortable, safe, and conducive space for students to focus and engage |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
1,581,945.00 |
Kaplelartet |
Feedback |
| Kaborok Dispensary |
To restore and improve infrastructure for effective healthcare delivery. |
Health Services |
Completed
|
1,802,501.00 |
Waldai |
Feedback |
| Kiptangit Water Project Phase II |
to enhance water supply reliability and accessibility through the completion of the Rising Main Rehabilitation, Pipeline Extension, Establishment of Communal Water Points, and Installation of Water Meters |
Water, Environment, Energy and Natural Resources |
Completed
|
1,141,788.00 |
Londiani |
Feedback |
| Construction of Lutheran Church- Sachsomok Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,500,000.00 |
Sigowet |
Feedback |
| Routine Maintenance of Kamarus – Annex Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,495,763.00 |
Chepseon |
Feedback |
| Routine Maintenance of Kamungwana- Bae-kaplemeywet- Kapnandet Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
4,037,140.00 |
Kapsuser |
Feedback |
| Routine Maintenance of Salgaa-Kongeren river-Kaplaiba road |
Potholes patched, ,surface grading completed. |
Public Works, Roads and Transport |
Completed
|
1,206,407.28 |
Soliat |
Feedback |
| Proposed Construction and Rehabilitation of Sebetet - Sugutek Dip - AinapKarit Road and Off Sebetet/Sugute k dip road - Kasyongei -
Cheplanget Market Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,034,595.00 |
Cheplanget |
Feedback |
| Kaitamat |
Improve access, quality of learning and care in ecde centers |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
1,411,082.00 |
Ainamoi |
Feedback |
| Curriculum Designs |
Ensure learning activities and content are tailored to the developmental stages of 3–6-year-old children. Create consistency in teaching and learning across different schools and regions |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
1,584,725.00 |
Kaplelartet |
Feedback |
| Sosiot Health Centre |
To expand inpatient capacity and improve maternal healthcare services. |
Health Services |
Completed
|
4,278,445.00 |
Waldai |
Feedback |
| Masaita Borehole Water Projects |
To procure and deliver high-quality drilling materials that meet the technical and operational requirements of the project. |
Water, Environment, Energy and Natural Resources |
Completed
|
871,160.00 |
Londiani |
Feedback |
| Construction of Kamasega- Solait Junction Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,080,625.10 |
Soliat |
Feedback |
| Routine Maintenance of Kosovo – Sailo Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,952,891.00 |
Chepseon |
Feedback |
| Routine Maintenance of Changoi Road- Boito- Kapburkei- Mlimani Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,251,970.00 |
Cheptororiet/Seretut |
Feedback |
| Construction of AIC Chemorir - Kitoben pry - Koitabmat - Chebilat cattle dip Road 6.5km; Chebitet - Somo Coffee factory - Barsayain Lower - Kipseng rivers and its environs 2.9km; AIC church - Tolilit - Koisirat 1.4km; Kamelilo pry sch - Tolilit - Rongai Road 2.6km; Chepkoiyo quarrr - Bechunlelach 1km; Budalangi - Bechunlelach 1.3km |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,182,120.00 |
Ainamoi |
Feedback |
| Proposed Construction and Rehabilitation of Kaprongori - Kaprote -
Reresik Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,173,839.00 |
Kisiara |
Feedback |
| Dicece |
Improve access, quality of learning and care in ecde centers |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
1,025,370.40 |
Kapkugerwet |
Feedback |
| Recruitment of ECDE teachers |
Ensure learners are taught by qualified, skilled, and passionate educators |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
3,298,327.00 |
Kaplelartet |
Feedback |
| Kaborok Dispensary |
To improve maternal health services and provide safe delivery environment. |
Health Services |
Completed
|
1,990,189.00 |
Waldai |
Feedback |
| Barotion Water Project |
To provide communities with improved access to clean and safe water through the extension of the water distribution network. |
Water, Environment, Energy and Natural Resources |
Completed
|
1,559,712.80 |
Londiani |
Feedback |
| Construction of Kelunet-Kapkimoro Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
500,010.45 |
Tebesonik |
Feedback |
| Routine Maintenance of Kap Zakayo-Simotwet Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,805,412.00 |
Chepseon |
Feedback |
| Routine Maintenance of Cheswerta AGC- Chepkutbei Bridge Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,149,890.00 |
Cheptororiet/Seretut |
Feedback |
| Construction of Kaprongori- -Kaproret Road; Tulwet-Ngianet Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
4,925,328.00 |
Kisiara |
Feedback |
| Proposed Construction and Rehabilitation of Kap 57- Kipkeles Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,237,455.00 |
Tebesonik |
Feedback |
| Queentete |
Improve access, quality of learning and care in ecde centers |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
935,748.80 |
Kapkugerwet |
Feedback |
| Training of ECDE teachers.
on the New Basic Education Curriculum
|
To ensure every ECDE center has skilled personnel capable of implementing the new curriculum. |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
1,571,905.00 |
Kaplelartet |
Feedback |
| Sosiot Health Centre |
To ensure continuous and adequate water supply to the facility. |
Health Services |
Completed
|
4,188,702.00 |
Waldai |
Feedback |
| Kamwingi II Water Project |
To ensure reliable water extraction and supply through the Supply and Installation of a Borehole Pump. |
Water, Environment, Energy and Natural Resources |
Completed
|
2,621,429.48 |
Tendeno/Sorget |
Feedback |
| Construction of Taiywet- Kakiboch- Kapchanga ROad |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,398,762.88 |
Sigowet |
Feedback |
| Routine Maintenance of Off B1 -ngatumek pry, and Kapchumo Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,152,100.00 |
Kedowa/Kimugul |
Feedback |
| Routine Maintenance of Kipsolu pry- Soweto TBC- Michingilwet- Cherigat Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,551,740.00 |
Cheptororiet/Seretut |
Feedback |
| Routine Maintenance of Darajet-Barekeiwet dinspensary-Arap Maina-Mungenik road |
Potholes patched, ,surface grading completed. |
Public Works, Roads and Transport |
Completed
|
6,423,960.00 |
Soliat |
Feedback |
| Proposed Construction and Rehabilitation of Kipkesombe River - Kimugul centre
- Ochi - Sakasatiet Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,151,490.00 |
Kapkatet |
Feedback |
| Township |
Improve access, quality of learning and care in ecde centers |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
995,686.00 |
Kapkugerwet |
Feedback |
| Bursary for needy Learners |
Ensure that children from low-income or vulnerable backgrounds can attend and stay in school. Alleviate financial burdens that cause learners to drop out due to inability to pay fees or buy learning materials. |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
1,587,630.00 |
Kaplelartet |
Feedback |
| Sosiot Health Centre |
To modernize and improve functionality of key service areas. |
Health Services |
Completed
|
2,548,520.00 |
Waldai |
Feedback |
| Benditai Water Project. |
To increase water collection, storage capacity, and distribution efficiency through the Expansion of Intake Works, Construction of a 100m Masonry Storage Tank, and Extension of the Distribution Pipeline. |
Water, Environment, Energy and Natural Resources |
Completed
|
2,613,029.92 |
Tendeno/Sorget |
Feedback |
| Construction of Kap Solomon- Chemegong Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,663,174.40 |
Sigowet |
Feedback |
| Routine Maintenance of Off Kedowa Pry. - Testai - Kabisoi Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,924,548.00 |
Kedowa/Kimugul |
Feedback |
| Routine Maintenance of Kosachmwai- Chemoset Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
4,098,550.00 |
Cheptororiet/Seretut |
Feedback |
| Routine Maintenance of Off D312-938 Girls Road |
Potholes patched, ,surface grading completed. |
Public Works, Roads and Transport |
Completed
|
1,288,392.00 |
Chepseon |
Feedback |
| Proposed Construction and Rehabilitation of Sosit dispensary -
Kolongei Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,177,040.00 |
Kapkatet |
Feedback |
| Kipsotet |
Improve access, quality of learning and care in ecde centers |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
1,664,072.20 |
Kipchimchim |
Feedback |
| Capital Grants Transfer |
Ensure that children from low-income or vulnerable backgrounds can attend and stay in school. Alleviate financial burdens that cause learners to drop out due to inability to pay fees or buy learning materials. |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
692,653.00 |
Kaplelartet |
Feedback |
| Kaptoboiti Dispensary |
To ensure the completion and operational readiness of Kaptoboiti Dispensary for improved access to healthcare. |
Health Services |
Completed
|
2,049,285.00 |
Waldai |
Feedback |
| Kivuno Borehole Water Project |
To procure and deliver high-quality drilling materials that meet the technical and operational requirements of the project. |
Water, Environment, Energy and Natural Resources |
Completed
|
2,114,104.64 |
Tendeno/Sorget |
Feedback |
| Construction of Kiptugumo- Kamasega Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,604,192.00 |
Soliat |
Feedback |
| Routine Maintenance of Cherote-Lelsotet Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,835,556.00 |
Kedowa/Kimugul |
Feedback |
| Routine Maintenance of Cheptenye Sign post- Off Sosiot- Keben Pry Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
7,801,748.00 |
Waldai |
Feedback |
| Excavation of Kalmelilo coffee farm-reresik Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,051,453.00 |
Ainamoi |
Feedback |
| Proposed Construction and Maintenance of Kamanamsin Centre - Cheptigit River
- Cheptigit Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,120,200.00 |
Litein |
Feedback |
| Ngenybare |
Improve access, quality of learning and care in ecde centers |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
976,262.00 |
Kipchimchim |
Feedback |
| Supply of ECDE Branded Chairs |
Enhance Learning Environment. Improve Classroom Organization and Efficiency: |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
2,262,045.00 |
Kaplelartet |
Feedback |
| Kaptoboiti Dispensary |
To promote hygiene and proper waste management at Kaplelach Dispensary. |
Health Services |
Completed
|
2,806,985.00 |
Waldai |
Feedback |
| Jagoror Water Project |
To secure and optimize water collection, storage, and distribution through the Spring Protection, Construction of a Distribution Pipeline, and Installation of a Masonry Water Tank. |
Water, Environment, Energy and Natural Resources |
Completed
|
1,618,340.32 |
Tendeno/Sorget |
Feedback |
| Construction of Soliat Boys Junction- Kabokyek Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
6,357,659.95 |
Soliat |
Feedback |
| Routine Maintenance of Off B1-Kapchumo Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,639,906.00 |
Kedowa/Kimugul |
Feedback |
| Routine Maintenance of Mark Peter- Off Kabianga- Chemumbe- Kaborok Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
11,192,013.00 |
Waldai |
Feedback |
| Construction of Koitabmat-Bondeni-Kiburet rd |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,144,000.00 |
Ainamoi |
Feedback |
| Proposed Construction and Rehabilitation of Kapsoit Police Station- Kiboito Pry Sch.- Arap Koima - Kiptulwa Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,140,430.00 |
Kapsuser |
Feedback |
| Kimeswon |
Improve access, quality of learning and care in ecde centers |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
1,242,384.36 |
Kipchimchim |
Feedback |
| Supply and Delivery of Learning Materials |
Ensure learning activities and content are tailored to the developmental stages of 3–6-year-old children. Create consistency in teaching and learning across different schools and regions |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
667,440.00 |
Kaplelartet |
Feedback |
| Keben Dispensary |
To enhance service delivery and improve water harvesting and storage capacity. |
Health Services |
Completed
|
4,860,209.00 |
Waldai |
Feedback |
| Kiploikyi water project- solar |
to enhance water supply reliability and accessibility through the completion of the intake weir, Pipeline Extension, |
Water, Environment, Energy and Natural Resources |
Completed
|
2,069,115.20 |
Tendeno/Sorget |
Feedback |
| Nyitnyitwet -Kapkwen- Koita Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,499,999.90 |
Ainamoi |
Feedback |
| Routine Maintenance of Arap Chepyoset-Job-Southrift Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,573,967.00 |
Londiani |
Feedback |
| Routine Maintenance of Off Cheribo- Ngariet Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
350,000.00 |
Waldai |
Feedback |
| Construction Of Chepsetyion Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,451,995.00 |
Kapkugerwet |
Feedback |
| Proposed Construction and Rehabilitation of Seretut Centre- Chemurwon
TBC- Chelule Shop Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,173,450.00 |
Cheptororiet/Seretut |
Feedback |
| Kipchebor |
Improve access, quality of learning and care in ecde centers |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
541,743.00 |
Kipchebor |
Feedback |
| Supply and delivery of Persons Living With Disability Assistive Devices |
Provide assistive devices (e.g., wheelchairs, crutches, hearing aids, white canes) to help PWDs move freely and live independently |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
677,750.00 |
Kaplelartet |
Feedback |
| Cheronget dispensary and Kibuastuiyo |
To improve maternal healthcare services and upgrade staff welfare facilities. |
Health Services |
Completed
|
1,535,410.00 |
Waldai |
Feedback |
| Fort Tenan Health Centre Water Project |
To enhance water storage, purification, and distribution through the Construction of 3 No. 25 m Ground Level Masonry Tanks, a Composite Filtration Unit, and a Gravity Pipeline. |
Water, Environment, Energy and Natural Resources |
Completed
|
2,898,190.40 |
Chilchila |
Feedback |
| Kaptongilo -Merto Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,795,071.00 |
Ainamoi |
Feedback |
| A Routine Maintenance of Arap Kogo-Lolongbei Road and Jagoror Quarry Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,338,591.00 |
Londiani |
Feedback |
| Routine Maintenance of Off D314- Mutanya Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
6,794,100.00 |
Chepseon |
Feedback |
| Construction Of Karap Kitur-Sumeiyon-Victor Academy-Orison Annex Road 4.8Km,Arap Kitur-Ainapbelek-Chelogoi Road 0.6Km |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,755,115.00 |
Kapkugerwet |
Feedback |
| Proposed Construction and Rehabilitation of Milit Nganiet- Chepnangai - Changware
Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,225,853.00 |
Kabianga |
Feedback |
| Kimultiony ecde centre |
Improve access, quality of learning and care in ecde centers |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
1,529,320.06 |
Kapsaos |
Feedback |
| Construction of a Cultural Hall Phase I |
Preserve and Promote Local Culture. Support Arts, Music, and Traditional Practices |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
1,479,410.00 |
Kaplelartet |
Feedback |
| Kiplalmat and Keben Dispensary |
To enhance security and hygiene at health facilities. |
Health Services |
Completed
|
2,851,889.00 |
Waldai |
Feedback |
| Ndubusat Water Project |
To restore and expand water supply infrastructure through the Rehabilitation of the Gravity Main, Construction of a 50 m (50,000 liters) Storage Tank at Nyairobi, and Extension of the Distribution Line. |
Water, Environment, Energy and Natural Resources |
Completed
|
2,800,472.00 |
Chilchila |
Feedback |
| Laliat- Barsayan- Koitamat- Primary Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,834,636.00 |
Ainamoi |
Feedback |
| Routine Maintenance of United Soy-Kiplangat Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,033,584.00 |
Londiani |
Feedback |
| Routine Maintenance of 938 - Central Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,420,780.00 |
Chepseon |
Feedback |
| Construction Bondeni- Kerego Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,144,017.00 |
Kapkugerwet |
Feedback |
| Proposed Construction of Kaplutitet Pry Sch- Terer Academy Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,120,000.00 |
Kabianga |
Feedback |
| Kipkaganit |
Ensure Hygiene and Sanitation, Promote Health and Disease Prevention |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
970,000.00 |
Ainamoi |
Feedback |
| Renovation of IK Dodi Office |
Create a safer, more comfortable, and functional office space for staff. |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
1,110,750.00 |
Kaplelartet |
Feedback |
| Kiplalmat Dispensary |
To improve sanitation and water supply at the facility. |
Health Services |
Completed
|
2,103,010.00 |
Waldai |
Feedback |
| Teldet Water Project |
To restore and enhance water transmission, storage, and distribution through the Rehabilitation of the Gravity Main, Construction of a 50 m Storage Tank, and Extension of the Distribution Line. |
Water, Environment, Energy and Natural Resources |
Completed
|
1,102,324.70 |
Chilchila |
Feedback |
| Annex Prison -Sumeiyon Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
6,081,960.00 |
Kapkugerwet |
Feedback |
| Routine Maintenance of Cheres-Orwasa Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,930,816.00 |
Londiani |
Feedback |
| Routine Maintenance of Kipyobob Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
4,214,000.00 |
Chepseon |
Feedback |
| Construction Of Arap Chepkoshom- Laibon Bridge- St. Joseph Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,791,139.00 |
Kapkugerwet |
Feedback |
| Proposed Construction and Rehabilitation of Kamondoi - Chemumbe Pri
- Cherargei Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,120,200.00 |
Waldai |
Feedback |
| Tabaita |
Ensure Hygiene and Sanitation, Promote Health and Disease Prevention |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
1,149,794.64 |
Ainamoi |
Feedback |
| Interior Design of the new office block for the Governor |
To design office interiors that promote productivity, smooth workflow, and ease of navigation for both staff and visitors. |
Lands, Housing and Physical Planning |
Completed
|
911,916.60 |
Kipchebor |
Feedback |
| Cheribo Dispensary |
To provide accessible primary healthcare services to the local community. |
Health Services |
Completed
|
2,047,168.00 |
Cheboin |
Feedback |
| Cherara-Kaplelit-Kapkese water project |
To Construct Gravity Main and enhance water transmission, |
Water, Environment, Energy and Natural Resources |
Completed
|
1,698,000.69 |
Chilchila |
Feedback |
| Mangweni- Kipsirichet- Chemugusu Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,962,013.00 |
Kapkugerwet |
Feedback |
| Routine Maintenance of OffD314 - Benjamin Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
N/A |
Tendeno/Sorget |
Feedback |
| Routine Maintenance of Chesinende Catholic- Koibarak Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,596,712.00 |
Chepseon |
Feedback |
| Chepsetyon Assorted Roads |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,929,080.00 |
Kapkugerwet |
Feedback |
| Proposed Construction and Rehabilitation of Off Sosiot - Ngariet Tbc - Ngariet Pri
Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,150,128.00 |
Waldai |
Feedback |
| Baraka kipsigory |
Ensure Hygiene and Sanitation, Promote Health and Disease Prevention |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
2,025,290.00 |
Kapsaos |
Feedback |
| Preparation of Land Use Development plans for Majengo Talai |
To guide orderly physical development through rational allocation of land for various uses |
Lands, Housing and Physical Planning |
Completed
|
1,501,394.00 |
Kapkugerwet |
Feedback |
| Malinja Dispensary |
To finalize facility works for operationalization. |
Health Services |
Completed
|
2,499,850.00 |
Cheboin |
Feedback |
| Kipsinende Water Project |
to enhance water storage capacity and supply reliability through the Construction of a 100 M3 (100,000 liters) Ground Level Masonry Water Tank. |
Water, Environment, Energy and Natural Resources |
Completed
|
972,010.40 |
Chilchila |
Feedback |
| Off E222-Chelogoi-Sumeyon Chepchwir Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,501,900.00 |
Kapkugerwet |
Feedback |
| Routine Maintenance of Off E254-Kamuingi-Kichagi-Gwitu Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,540,493.00 |
Tendeno/Sorget |
Feedback |
| Routine Maintenance of D314- 938 Girls Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
N/A |
Chepseon |
Feedback |
| Construction of Kisabei-Kenegut-Lemeiywet Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,790,690.00 |
Kapsoit |
Feedback |
| Proposed Construction and Rehabilitation of 938 Police Station- Crisco Church Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,169,698.00 |
Chepseon |
Feedback |
| Koisagat |
Ensure Hygiene and Sanitation, Promote Health and Disease Prevention |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
1,375,551.20 |
Kapsoit |
Feedback |
| Preparation of Land Use Development plans for Swahili Village |
To guide orderly physical development through rational allocation of land for various uses |
Lands, Housing and Physical Planning |
Completed
|
995,582.00 |
Kipchebor |
Feedback |
| Cheribo Dispensary |
To improve sanitation facilities for patients and staff. |
Health Services |
Completed
|
1,199,045.00 |
Cheboin |
Feedback |
| Ndubusat Water Project Phase 2 |
to enhance water storage capacity and supply reliability through the Construction of a 2no. 50M3 Ground Level Masonry Water Tank. |
Water, Environment, Energy and Natural Resources |
Completed
|
1,307,210.00 |
Chilchila |
Feedback |
| Off E222 - Chepstyon Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,705,722.00 |
Kapkugerwet |
Feedback |
| Routine Maintenance of Cheborge Junction-Center One Forest Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,141,488.00 |
Tendeno/Sorget |
Feedback |
| Routine Maintenance of Off B1- Ewat Kap Maxwel - Catholic- Kiplekwa Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,438,000.00 |
Kedowa/Kimugul |
Feedback |
| Construction Of Karap Tegerei-Gabriel Road ,Tilitrap Malit-Kirongisyet Road,Kap Timothy-Chelule Road,Rugut-Chemoibei Road, Chemoibei Primary-Koitabai Road,Arap Kenei-Kiptetoon-Lemeiywet-Tunga Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,500,004.00 |
Kapsoit |
Feedback |
| Kamelilo- Yasomok Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,802,524.00 |
Ainamoi |
Feedback |
| St Patrick |
Ensure Hygiene and Sanitation, Promote Health and Disease Prevention |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
833,041.70 |
Kapkugerwet |
Feedback |
| Acquisition of land |
To obtain legal ownership or rights to land for the development of public infrastructure, institutions, utilities, or investment purposes. |
Lands, Housing and Physical Planning |
Completed
|
1,900,520.00 |
Chaik |
Feedback |
| Kaborus Dispensary |
To expand outpatient services and improve patient flow. |
Health Services |
Completed
|
4,942,296.00 |
Cheboin |
Feedback |
| Leldet borehole Water Project |
To ensure reliable water extraction and supply through the Supply and Installation of a Borehole Pump. |
Water, Environment, Energy and Natural Resources |
Completed
|
1,561,202.00 |
Kamasian |
Feedback |
| Baraka Primary -Kamungen Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,152,450.00 |
Kapsaos |
Feedback |
| Routine Maintenance of Kapilot -Sorget Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,929,766.00 |
Tendeno/Sorget |
Feedback |
| Routine Maintenance of Off C35- Ndiwa Cattle Dip Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
5,194,000.00 |
Kedowa/Kimugul |
Feedback |
| Costruction Of Samutet-Engineer Bett Road 3.5km |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,189,997.00 |
Kapsoit |
Feedback |
| Ainamoi Pry- Chemila- Kapsigilai-Kap Zakayo Junction Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,494,130.00 |
Ainamoi |
Feedback |
| Ainapkoror |
Ensure Hygiene and Sanitation, Promote Health and Disease Prevention |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
1,857,461.60 |
Kapsaos |
Feedback |
| Proposed construction of non-motorized transport facilities |
To provide for parking and paths for safe movement by pedestrians within town |
Lands, Housing and Physical Planning |
Completed
|
3,000,000.00 |
Kapkugerwet |
Feedback |
| Cheribo Dispensary |
To enhance service delivery at the outpatient department. |
Health Services |
Completed
|
4,711,112.00 |
Cheboin |
Feedback |
| Kipsegi Borehole Water Project |
To procure and deliver high-quality drilling materials that meet the technical and operational requirements of the project. |
Water, Environment, Energy and Natural Resources |
Completed
|
3,715,070.00 |
Kamasian |
Feedback |
| Highway - Kaboloin Sec- Kaboloin Pri Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,599,770.00 |
Kapsaos |
Feedback |
| Routine Maintenance of Kokwet-Kapsinendet-Cherara |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,413,483.00 |
Chilchila |
Feedback |
| Routine Maintenance of Slaughter House- Towet Bridge- Maridany Forest Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,422,100.00 |
Tendeno/Sorget |
Feedback |
| Construction Of Off C35-Kisabei Pry - Kenegut- Lemeiywet Road 3.5Km, Off C35- Cherire Road 1Km |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,197,834.00 |
Kapsoit |
Feedback |
| Kap Thomas- Tabet Pry- Samoei Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,170,000.00 |
Kapsaos |
Feedback |
| Jordan/chemobei |
Ensure Hygiene and Sanitation, Promote Health and Disease Prevention |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
3,923,642.00 |
Kapsoit |
Feedback |
| Beautification of Uhuru gardens and construction of fire station |
Enhance Aesthetic Appeal, Improve Usability and Comfort |
Lands, Housing and Physical Planning |
Completed
|
4,739,902.68 |
Kapkugerwet |
Feedback |
| Cheboin Dispensary |
To improve maternal health services and sanitation systems. |
Health Services |
Completed
|
4,934,854.00 |
Cheboin |
Feedback |
| Lelu Water Project |
To enhance access to clean and sustainable water supply by constructing pipelines ensuring reliable water delivery to the target community |
Water, Environment, Energy and Natural Resources |
Completed
|
560,000.00 |
Kamasian |
Feedback |
| Kipsigori - Sachangwan Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,495,160.00 |
Kapsaos |
Feedback |
| Routine Maintenance of Sachangwan-Kipgeigei-Kapchorwa |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,859,120.00 |
Chilchila |
Feedback |
| Routine Maintenance of Kapkondoo Centre- Silibwet Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
717,950.00 |
Londiani |
Feedback |
| Constrution Of Ogirgir Sign Post-Ogirgir Tbc-Kisabei Road 2.9km,Off E222-Ketitui Pry-Ketitui Sec Sch Road 0.6km Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,694,477.00 |
Kapsoit |
Feedback |
| Chesumot- Kamukek- Kapkiam Seconadry Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,082,020.00 |
Kapsaos |
Feedback |
| Kaitamat |
Ensure Hygiene and Sanitation, Promote Health and Disease Prevention |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
1,236,491.56 |
Ainamoi |
Feedback |
| Refurbishment of the Deputy Governors' office |
Enhance Aesthetic Appeal, Improve Usability and Comfort |
Lands, Housing and Physical Planning |
Completed
|
1,350,054.12 |
Kipchebor |
Feedback |
| Kiptewit Dispensary |
To enhance sanitation and water access. |
Health Services |
Completed
|
3,075,000.00 |
Cheboin |
Feedback |
| Borowet Water Project |
To enhance water distribution efficiency and expand access through the Supply, Delivery, Excavation, and Laying of a Distribution Pipeline. |
Water, Environment, Energy and Natural Resources |
Completed
|
2,599,900.00 |
Kamasian |
Feedback |
| Buchenge-Chebigen Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,235,181.00 |
Kapsaos |
Feedback |
| Routine Maintenance of Off-C35-Ngomwo Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,016,622.88 |
Kamasian |
Feedback |
| Routine Maintenance of Kapcheplanga Centre- Martina Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,114,000.00 |
Londiani |
Feedback |
| Construction of Kenegut centre 1.4km-Kamorongo Road 2km, Kapmosit-Tembwab kenegut Road 2km, Karap Marindany-Cheptagum ROad 3km, Kamosit-Karap keino Road 2km |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,798,813.00 |
Kapsoit |
Feedback |
| Kipsamungut- Telanet Pry- Grassland Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,175,024.00 |
Kapsoit |
Feedback |
| Dicece |
Ensure Hygiene and Sanitation, Promote Health and Disease Prevention |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
2,890,931.12 |
Kapkugerwet |
Feedback |
| Proposed Construction perimeter wall |
To provide physical protection for the premises by preventing unauthorized access and reducing theft, vandalism, or encroachment. |
Lands, Housing and Physical Planning |
Completed
|
3,341,340.00 |
Kipchebor |
Feedback |
| Cheborge HC |
To improve medical waste management at the facility. |
Health Services |
Completed
|
1,831,176.00 |
Cheboin |
Feedback |
| Centa Juu Borehole Water Project |
To establish a sustainable and secure water supply system through the Supply and Delivery of Drilling Materials, Installation and Solarization of a Submersible Pump, Construction of a 50 m Masonry Tank, Rising Pipeline, Distribution Pipeline, and Fencing of the Borehole and Tank Area. |
Water, Environment, Energy and Natural Resources |
Completed
|
1,001,700.00 |
Kamasian |
Feedback |
| Kenegut Sign Post Pri. Sch. Lemeiwet Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,798,672.00 |
Kapsoit |
Feedback |
| Routine Maintenance of Kapkures-Kamtego Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,648,573.68 |
Kamasian |
Feedback |
| Routine Maintenance of Elite Primary School- Chebangang Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,288,730.00 |
Londiani |
Feedback |
| Construction of Kaboswa- Kiptenden- Cheptagum ROad |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,725,073.00 |
Kapsoit |
Feedback |
| Kenegut Quarry- Lemeiywet- Kenegut Market Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,116,001.00 |
Kapsoit |
Feedback |
| Queentete |
Ensure Hygiene and Sanitation, Promote Health and Disease Prevention |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
3,650,169.68 |
Kapkugerwet |
Feedback |
| Proposed construction of storm water drainage facilities (Phase 1 – World Bank Funded) |
To reduce and manage flooding in the project area by channeling storm water through an effective and well-designed drainage system. |
Lands, Housing and Physical Planning |
Completed
|
3,564,424.32 |
Kapkugerwet |
Feedback |
| Ngoina Road Dispensary |
To enhance access to health services in the area. |
Health Services |
Completed
|
1,700,033.00 |
Chemosot |
Feedback |
| Kipsegi Borehole Water Project |
To establish a sustainable and secure water supply system through the Installation of a Solar System, Equipping of Borehole, Construction of a Control House, Rising Main, Elevated Storage Tank, Distribution Pipeline, Communal Water Points, and Fencing of the Solar Structure Area. |
Water, Environment, Energy and Natural Resources |
Completed
|
2,904,400.00 |
Kamasian |
Feedback |
| Kipsamumgut Telanet Pri. Kipkutuny Cheribo Sign Post ACK Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,000,513.00 |
Kapsoit |
Feedback |
| Routine Maintenance of 390-Simotwet-Kipsirichet-Kerembe -KapedWard Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,470,527.36 |
Kipkelion |
Feedback |
| Routine Maintenance of Sachangwan- Kap Tilia Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
7,883,590.00 |
Londiani |
Feedback |
| Construction Of Off B1- FGCK Samutet- Market Road 0.7km, Off B1- JoRoadan Junction Road 1Km, Salgaa-Muguiywet-Oriango Road 1.6Km, Kiget Shop- Sunrise Academy- Sugutek Pry- River Road 2.5Km |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,004,881.00 |
Kapsoit |
Feedback |
| Arap Tegere – Kwa biwot – Korosek Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
883,966.00 |
Kapsoit |
Feedback |
| Township |
Ensure Hygiene and Sanitation, Promote Health and Disease Prevention |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
1,613,831.44 |
Kapkugerwet |
Feedback |
| Acquisition of land for expansion of water treatment works |
Increase Water Treatment Capacity, Secure Adequate Space for Infrastructure Expansion |
Lands, Housing and Physical Planning |
Completed
|
1,641,160.00 |
Kapkugerwet |
Feedback |
| Chemosot Dispensary |
To improve infrastructure and service environment. |
Health Services |
Completed
|
983,332.00 |
Chemosot |
Feedback |
| Kipkelion Water Supply |
To enhance access to clean and sustainable water supply by constructing pipelines, , and associated fittings, ensuring reliable water delivery to the target community |
Water, Environment, Energy and Natural Resources |
Completed
|
3,285,585.00 |
Kipkelion |
Feedback |
| Muiywek Tbc -Koisamoi Primary School |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,790,441.00 |
Kapsoit |
Feedback |
| Routine Maintenance of Eng. Fred - Soi Mingin Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,649,630.16 |
Kipkelion |
Feedback |
| Routine Maintenance of Barotion- Sawmill- Lelsotet Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,724,750.00 |
Londiani |
Feedback |
| Construction of Kenegut Centre- Lemeiywet Road 1.5Km; Kenegut AIC-Cherire Road 1Km |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,066,000.00 |
Kapsoit |
Feedback |
| Kenegut Centre- Lemeiywet Pry School - Worlwide Church Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,183,200.00 |
Kapsoit |
Feedback |
| Kimeswon |
Ensure Hygiene and Sanitation, Promote Health and Disease Prevention |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
1,198,187.20 |
Kipchimchim |
Feedback |
| Consultancy services for the preparation of Local Physical and Land Use Development plans |
To come up with plan to guide development and acquisition of ownership documents |
Lands, Housing and Physical Planning |
Completed
|
801,360.00 |
Kapkugerwet |
Feedback |
| Kapriret Dispensary |
To improve functionality and staff welfare. |
Health Services |
Completed
|
2,983,694.00 |
Chemosot |
Feedback |
| Kipkelion Pipeline Extension |
To enhance water distribution infrastructure by ensuring the supply and delivery of pipes and fittings for the following water projects:Kapkia Water Project,Jambo Kenya Siret Water Project,Maji Mazuri Water Project,Soil Conservation Line,Cherotuk Line,Kalyet Borehole Water Project |
Water, Environment, Energy and Natural Resources |
Completed
|
4,883,150.00 |
Kipkelion |
Feedback |
| Kapkwen - Keldabeliot Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,808,858.00 |
Kipchimchim |
Feedback |
| Routine Maintenance of Kabias Junction-Kapkoros Pry.-Sugut Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,048,890.22 |
Kunyak |
Feedback |
| Routine Maintenance of Burutu- Kamiwa- Kapkese Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,210,500.00 |
Chilchila |
Feedback |
| Construction of Telanet girls - Kaboswa TBC rd |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,879,200.00 |
Kapsoit |
Feedback |
| Sebetet- Kamatwere - Itibet Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,200,000.00 |
Kipchimchim |
Feedback |
| Kipchebor |
Ensure Hygiene and Sanitation, Promote Health and Disease Prevention |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
1,849,426.98 |
Kipchebor |
Feedback |
| Consultancy services for the preparation of Local Physical and Land Use Development plans |
To guide orderly physical development through rational allocation of land for various uses |
Lands, Housing and Physical Planning |
Completed
|
4,233,372.00 |
Kapsuser |
Feedback |
| Kabitungu Dispensary |
To improve outpatient facilities and water storage. |
Health Services |
Completed
|
2,105,887.00 |
Chemosot |
Feedback |
| Lelechwet Water Peroject |
To enhance access to clean and sustainable water supply by constructing pipelines, , and associated fittings, ensuring reliable water delivery to the target community |
Water, Environment, Energy and Natural Resources |
Completed
|
5,513,900.00 |
Kipkelion |
Feedback |
| Boito -Kapcheptoror -Kapnyoyo -Kipsirgong Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,799,972.00 |
Kipchimchim |
Feedback |
| Routine Maintenance of Sireret-Kotetnik-Kabias Junction Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,767,147.28 |
Kunyak |
Feedback |
| Routine Maintenance of Factory Junction- Kamiwa- Kapkese Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
5,642,380.00 |
Chilchila |
Feedback |
| Construction of Ogirgir sign post-Ogirgir tbc-kisabei Road 2.9km,Off E222-Ketitui pry-Ketitui sec sch Road 0.6km Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,174,000.00 |
Kapsoit |
Feedback |
| Boito- Kapcheptoror Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,294,304.00 |
Kipchimchim |
Feedback |
| sositecde toilet |
Ensure Hygiene and Sanitation, Promote Health and Disease Prevention |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
1,071,747.20 |
Kapsoit |
Feedback |
| Consultancy services for the preparation of Local Physical and Land Use Development plans |
To guide orderly physical development through rational allocation of land for various uses |
Lands, Housing and Physical Planning |
Completed
|
2,234,452.00 |
Cheboin |
Feedback |
| Chemosot Health Centre |
To enhance medical waste management. |
Health Services |
Completed
|
3,991,424.00 |
Chemosot |
Feedback |
| Maji Mazuri Pan |
Protect and sustain the water source (spring),Expand and improve water distribution to the community,Promote public health and environmental hygiene |
Water, Environment, Energy and Natural Resources |
Completed
|
2,731,400.00 |
Kipkelion |
Feedback |
| Kamatweri -Itibet Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,970,747.00 |
Kipchimchim |
Feedback |
| Kapchebwai-Koiyabei- Sideways Shop- Koitaburot Pry School Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,257,885.22 |
Soin |
Feedback |
| Routine Maintenance of Tunnel- Chumbeek Dispensary Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,783,630.00 |
Chilchila |
Feedback |
| Construction of NCPB- Mjini Road; Cereal BoaRoad- Owour Church- Nyagacho- Mjini Road, Slip Footh path-Church- River Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
4,837,715.00 |
Kipchebor |
Feedback |
| Off B1- Green Square Mall - Kericho Golf Club- Kericho Pry- Mortgage Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,289,591.00 |
Kipchebor |
Feedback |
| Koita ECDE |
Improve access, quality of learning and care in ecde centers |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
1,969,090.72 |
Kipchebor |
Feedback |
| Consultancy services for the preparation of Local Physical and Land Use Development plans |
To guide orderly physical development through rational allocation of land for various uses |
Lands, Housing and Physical Planning |
Completed
|
5,455,764.00 |
Kisiara |
Feedback |
| Kaldit Dispensary |
To improve sanitation and facility security. |
Health Services |
Completed
|
4,933,016.00 |
Cheplanget |
Feedback |
| Ngendalel Borehole Water Project |
To enhance water extraction and distribution efficiency through the Supply, Delivery, Installation, and Commissioning of a Multi-Stage Centrifugal Borehole Pump and Pipework. |
Water, Environment, Energy and Natural Resources |
Completed
|
4,598,010.00 |
Kipkelion |
Feedback |
| Chepsetyon - AGC Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
4,795,380.00 |
Kipchimchim |
Feedback |
| Ngomwet- Kap Mursoi Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,226,637.72 |
Soin |
Feedback |
| Routine Maintenance of Mutai- Lelei Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,314,020.00 |
Kamasian |
Feedback |
| Construction Of Jua Kali Rd,Mjini Hilands Rd,Kenya Highlands Roads,Kipchebor Pry Access Roads,Kimungen-Kamasian Agc Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,152,100.00 |
Kipchebor |
Feedback |
| Satelite- Matobo Pry School - Barabara Mpya- Taa Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,499,938.00 |
Kipchebor |
Feedback |
| Kiletien |
Improve access, quality of learning and care in ecde centers |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
3,036,162.20 |
Kabianga |
Feedback |
| Proposed Construction of modern market and installation of high mast flood lights |
To construct a modern, organized, and accessible market facility that meets current safety, hygiene, and commercial standards. |
Lands, Housing and Physical Planning |
Completed
|
4,397,676.00 |
Kipchebor |
Feedback |
| Kipwastuiyo Dispensary |
To improve outpatient service delivery. |
Health Services |
Completed
|
2,692,080.00 |
Cheplanget |
Feedback |
| Siret Pipeline |
to improve water conveyance efficiency and reliability through the design, and construction of a Rising Main for enhanced water supply to storage tanks or distribution points. |
Water, Environment, Energy and Natural Resources |
Completed
|
2,237,290.00 |
Kipkelion |
Feedback |
| Kapketienya Ochi, Kimugen Kwa Orinago – Kamasian Pry Kooma Chief Office Mombasa Ndogo Satelight Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
4,873,433.00 |
Kipchebor |
Feedback |
| Kenya One - Kabokyek Dip Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,200,000.00 |
Soliat |
Feedback |
| Routine Maintenance of Nyairobi- Songonyet Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,627,540.00 |
Kamasian |
Feedback |
| Construction of NCPB Cereals- Nyagacho Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,650,000.00 |
Kipchebor |
Feedback |
| Kwa Reuben- Cherote- Kimugen Dispensay- Kamasian Pry School Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,249,000.00 |
Kipchebor |
Feedback |
| Masaita |
Ensure Hygiene and Sanitation, Promote Health and Disease Prevention |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
1,503,401.20 |
Londiani |
Feedback |
| Kaldit Dispensary |
To improve health service space and usability. |
Health Services |
Completed
|
4,893,605.00 |
Cheplanget |
Feedback |
| Kalyet Water Project |
To enhance access to clean and sustainable water supply by constructing pipelines, , and associated fittings, ensuring reliable water delivery to the target community |
Water, Environment, Energy and Natural Resources |
Completed
|
3,800,856.00 |
Kipkelion |
Feedback |
| Kenya Power- Ochi Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,439,560.00 |
Kipchebor |
Feedback |
| Soliat Corner - Kaplengeny - Kiptugumo Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,992,503.00 |
Soliat |
Feedback |
| Routine Maintenance of Murau Centre- Bakery Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,101,700.00 |
Kamasian |
Feedback |
| Munai-Kipsot-Toror factory-Kimeswan Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,924,548.00 |
Kipchimchim |
Feedback |
| Chemugusu Junction- Chemugusu Pry-Kondamet- Satelight Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,249,535.00 |
Kapkugerwet |
Feedback |
| Jambo |
Ensure Hygiene and Sanitation, Promote Health and Disease Prevention |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
1,098,788.00 |
Tendeno/Sorget |
Feedback |
| Proposed repair and redecoration works at Mama Ngina Estate Phase II |
Enhance Aesthetic Appeal, Improve Usability and Comfort |
Lands, Housing and Physical Planning |
Completed
|
987,000.00 |
Kapkugerwet |
Feedback |
| Tiritab Moita Dispensary |
To enhance sanitation services for facility users. |
Health Services |
Completed
|
3,499,200.00 |
Cheplanget |
Feedback |
| Masibun Water Project |
To establish a sustainable and secure water supply system through the Installation of a Solar System, Equipping of Borehole, Construction of a Control House, Rising Main, Elevated Storage Tank, Distribution Pipeline, Communal Water Points, and Fencing of the Solar Structure Area. |
Water, Environment, Energy and Natural Resources |
Completed
|
3,988,767.30 |
Kipkelion |
Feedback |
| Maili Tatu- Ochi- Kap Ouma- Eagle Schools Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,950,426.00 |
Kipchebor |
Feedback |
| Konasita - Cheboptaa - Kona Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,075,880.00 |
Sigowet |
Feedback |
| Routine Maintenance of Off C35- Segetet- Murau Brige Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,180,000.00 |
Kipkelion |
Feedback |
| Construction Of Kabianga Tea Factory-Chepkutbei TBC 1.5Km, Tuiyobei Bridge-Kapchebet Agcroad 0.6Km,Kondamet AGC-Turkana Road 0.8Km,Arap Siele Mobego Primary 1Km |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
982,608.00 |
Kabianga |
Feedback |
| Londiani farmers |
Ensure Hygiene and Sanitation, Promote Health and Disease Prevention |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
1,465,692.48 |
Londiani |
Feedback |
| Proposed roof renovation at the Governor's office block |
Extend Roof Lifespan |
Lands, Housing and Physical Planning |
Completed
|
987,000.00 |
Kipchebor |
Feedback |
| Kipwastuiyo Dispensary |
To improve maternal healthcare infrastructure. |
Health Services |
Completed
|
4,245,136.00 |
Cheplanget |
Feedback |
| Simchorwet Water Project |
To enhance access to clean and sustainable water supply by constructing pipelines, , and associated fittings, ensuring reliable water delivery to the target community |
Water, Environment, Energy and Natural Resources |
Completed
|
7,251,100.00 |
Kipkelion |
Feedback |
| Site And Service Roads |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,988,827.00 |
Kipchebor |
Feedback |
| Kaitui - Kipkecheiyet Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,710,905.16 |
Soliat |
Feedback |
| Routine Maintenance of Kamore- Kap Sephania Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,268,400.00 |
Kipkelion |
Feedback |
| Construction Of Kaptumbo-Kipkeurit Road 1.6Km, Kibingei Girls-Ngainet Road 1.2Km,Kabianga-Market Road 0.6Km,Kaplong-Kamaso Primary School Road 1.4Km |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,455,079.68 |
Kabianga |
Feedback |
| Sumeiyon- Chelogoi Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
540,908.00 |
Kapkugerwet |
Feedback |
| Kabarak |
Ensure Hygiene and Sanitation, Promote Health and Disease Prevention |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
3,676,037.48 |
Londiani |
Feedback |
| Proposed refurbishment of County Court |
Modernize Court Facilities, Enhance Functionality and Efficiency |
Lands, Housing and Physical Planning |
Completed
|
1,308,945.00 |
Kipchebor |
Feedback |
| Kapkatet Hospital |
To provide sustainable water supply for hospital operations. |
Health Services |
Completed
|
2,861,567.00 |
Kapkatet |
Feedback |
| Chesonoi Water Project |
to enhance access to safe and reliable water for the target community through the construction, rehabilitation, and installation of critical water supply infrastructure,to improve water conveyance and storage by constructing a gravity main pipeline and a 100mł ground-level masonry storage tank |
Water, Environment, Energy and Natural Resources |
Completed
|
2,277,400.00 |
Kunyak |
Feedback |
| Routine Maintenance of Chakoror-Kamososet Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,625,184.00 |
Cheboin |
Feedback |
| Site Clearance, Desilting of Existing Culverts |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
4,798,658.32 |
Sigowet |
Feedback |
| Routine Maintenance of Kap Onyango-Kapkwen Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,423,800.00 |
Kunyak |
Feedback |
| Nyabangi Centre-Chesebet Road 1.9k ;itembe-stashine AGC-Link Kiptere Road 0.9km,Karap Cheriro-Kap D.O Road 1.3km;Sinonin-Itondo Bridge Road 2.5km |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,839,344.80 |
Kabianga |
Feedback |
| Chelogoi - Chepsetyon Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
540,094.00 |
Kapkugerwet |
Feedback |
| Chepcholiet |
Ensure Hygiene and Sanitation, Promote Health and Disease Prevention |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
3,922,478.60 |
Chepseon |
Feedback |
| Proposed repairs and redecoration to County houses at Belgut estate |
Restore Structural .Integrity |
Lands, Housing and Physical Planning |
Completed
|
3,284,036.69 |
Kapkugerwet |
Feedback |
| Chemoiben Dispensary. |
To provide staff accommodation and sanitation facilities. |
Health Services |
Completed
|
4,718,991.00 |
Kapkatet |
Feedback |
| Tendwet water Project |
to enhance access to safe and reliable water for the target community through the construction, rehabilitation, and installation of critical water supply infrastructure,to improve water conveyance and storage by constructing a gravity main pipeline and a 101mł ground-level masonry storage tank |
Water, Environment, Energy and Natural Resources |
Completed
|
4,536,000.00 |
Kunyak |
Feedback |
| Routine Maintenance of Cheborgei Boys-Kimolwet- Kimugul Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
4,300,011.00 |
Cheboin |
Feedback |
| Kapchemirmir TBC-Kimalal Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,680,560.48 |
Sigowet |
Feedback |
| Routine Maintenance of Sachangwan- Mariwa Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,211,800.00 |
Kunyak |
Feedback |
| Kiptule TBC-Kolonget tbc-kaphentry Road 2km, off momul factory-itindo AGC Chemamul SDA ROAD 2.8KM |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
5,208,281.68 |
Kabianga |
Feedback |
| Kalyet- Sachangwan- Kaula Center Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
522,475.00 |
Kipkelion |
Feedback |
| Cheboror |
Ensure Hygiene and Sanitation, Promote Health and Disease Prevention |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
2,871,238.20 |
Chepseon |
Feedback |
| Installation of cabro works at the County Government head quarters |
Enhance Accessibility and Mobility |
Lands, Housing and Physical Planning |
Completed
|
3,209,073.59 |
Kipchebor |
Feedback |
| Roret and Kapkatet Hospital |
To enhance water supply to hospital facilities. |
Health Services |
Completed
|
3,570,600.00 |
Kapkatet |
Feedback |
| Timbilil Water Project |
To enhance access to safe and reliable water supply for the community by upgrading the existing water infrastructure, including the replacement of the gravity main, construction of a new distribution pipeline, and installation of water storage facilities, with a specific focus on improving service delivery to key institutions such as the local dispensary |
Water, Environment, Energy and Natural Resources |
Completed
|
1,441,600.00 |
Kunyak |
Feedback |
| Routine Maintenance of Sachangwan -Cheboror Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,575,512.00 |
Cheboin |
Feedback |
| Kapsomboch-Kapkilel Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,242,411.12 |
Kaplelartet |
Feedback |
| Routine Maintenance of Chesino- Kapkormom- Koiyabei Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,420,720.00 |
Soin |
Feedback |
| Construction of Mereonik- Kigorwet- Chief’s Office- Cheboin Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,972,551.04 |
Kapsuser |
Feedback |
| Lesirwo Junction- Lesirwo Round Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
649,300.00 |
Kipkelion |
Feedback |
| Irerma |
Ensure Hygiene and Sanitation, Promote Health and Disease Prevention |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
5,600,000.00 |
Kedowa/Kimugul |
Feedback |
| Renovation works at the LHPP head quarters |
Enhance Working Environment |
Lands, Housing and Physical Planning |
Completed
|
3,196,994.65 |
Kipchebor |
Feedback |
| Kapsaos Dispensary |
To enhance the functionality and efficiency of healthcare service delivery at Kapsaos Dispensary by renovating the Outpatient Department (OPD) and installing proper shelving in the pharmacy room for improved drug storage and management |
Health Services |
Completed
|
2,842,893.20 |
Kapsaos |
Feedback |
| Timbilil Phase II |
To strengthen the community's water supply infrastructure through the construction of supportive tank platforms and valve chambers, and the installation of plastic water storage tanks and distribution pipework, ensuring reliable water access for domestic and institutional use |
Water, Environment, Energy and Natural Resources |
Completed
|
3,010,400.00 |
Kunyak |
Feedback |
| Routine Maintenance of Kap Reuben- Chepswerta- Changoi Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,950,960.00 |
Chemosot |
Feedback |
| Tililbei cattle dip-Toror Academy-Kap Aron Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,561,543.28 |
Kaplelartet |
Feedback |
| Routine Maintenance of Kipsitet Cattle Dip- Asenwet-Kap Musar Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,749,000.00 |
Soin |
Feedback |
| Construction of Seretut- Kamathayo- Chepngetuny- Pry- Arap Koech- Arap Mitei- Kap Oriango Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,692,341.47 |
Cheptororiet/Seretut |
Feedback |
| Kipkelion Girls Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
547,955.60 |
Kipkelion |
Feedback |
| Tiriita |
Ensure Hygiene and Sanitation, Promote Health and Disease Prevention |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
4,480,000.00 |
Kedowa/Kimugul |
Feedback |
| Preparation of development plans (Sosiot Local Physical and Land Use Development Plan |
Guide Orderly Land Use and Development, Promote Sustainable Urban and Rural Growth |
Lands, Housing and Physical Planning |
Completed
|
7,535,900.00 |
Waldai |
Feedback |
| Binyiny Dispensary |
To improve healthcare service delivery and security at Binyiny Dispensary by completing OPD works, fitting pharmacy shelves, constructing sanitation facilities, and fencing the compound. |
Health Services |
Completed
|
1,892,785.92 |
Kapsaos |
Feedback |
| Chepngosos Borehole Water Project |
To procure and deliver high-quality drilling materials that meet the technical and operational requirements of the project. |
Water, Environment, Energy and Natural Resources |
Completed
|
902,195.00 |
Kunyak |
Feedback |
| Routine Maintenance of Patrick- Simon- Sachangwan- Menet TBC Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
4,980,765.25 |
Chemosot |
Feedback |
| RC431-MI27B Cheptagum Pry Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,051,453.96 |
Kaplelartet |
Feedback |
| Routine Maintenance of Chemaluk- Gladys Canteen- Bokwo Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,352,400.00 |
Soin |
Feedback |
| Construction of Kuresiet-Happy church-kibaraa rd 1.5km,michilingwet TBC-chepngerer-mandela Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
5,202,516.48 |
Cheptororiet/Seretut |
Feedback |
| Murao High- Mutai Lelei Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
545,013.68 |
Kamasian |
Feedback |
| Ngatumek |
Ensure Hygiene and Sanitation, Promote Health and Disease Prevention |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
3,360,000.00 |
Kedowa/Kimugul |
Feedback |
| Preparation of development plan (Chelimo Local Physical and Land Use Development Plan) |
Guide Orderly Land Use and Development, Promote Sustainable Urban and Rural Growth |
Lands, Housing and Physical Planning |
Completed
|
608,000.00 |
Kapkugerwet |
Feedback |
| Maso Dispensary |
To enhance water availability for clinical use and sanitation through installation of a rainwater harvesting system. |
Health Services |
Completed
|
1,544,366.00 |
Kapsaos |
Feedback |
| Kichawir Water Project |
To improve access to safe, sustainable, and reliable water supply for the community through the protection and development of a spring source, construction of essential water infrastructure, and installation of adequate storage and distribution systems |
Water, Environment, Energy and Natural Resources |
Completed
|
1,533,200.00 |
Kunyak |
Feedback |
| Routine Maintenance of Ngoino Road TBC-Ngaram Primary-Kapkosum-Chebarema Tbc Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
4,851,173.36 |
Chemosot |
Feedback |
| Construction of Chemorin-Kapkwen Box Culvert |
To mitigate flooding risks, improve local infrastructure resilience |
Public Works, Roads and Transport |
Completed
|
1,795,228.68 |
Ainamoi |
Feedback |
| Routine Maintenance of Soliat Corner – Kaplengeny – Kiptugumo Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,363,060.00 |
Soliat |
Feedback |
| Construction Of Teldet-Menet Road 2.3Km, Milimani-Machorwa Road 2.1Km, |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
876,889.00 |
Waldai |
Feedback |
| Off E252 -
Kipkering- Arap Moso- Kipsinende Institute- Murgut
Junction Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
649,500.00 |
Chilchila |
Feedback |
| Tumaini |
Ensure Hygiene and Sanitation, Promote Health and Disease Prevention |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
2,240,000.00 |
Tendeno/Sorget |
Feedback |
| Proposed construction of LHPP offices |
Establish a Functional Office Facility for LHPP Operations, Enhance Service Delivery and Efficiency |
Lands, Housing and Physical Planning |
Completed
|
500,000.00 |
Kedowa/Kimugul |
Feedback |
| Kapsaos Disp |
To ensure consistent water supply for healthcare operations by installing a rainwater harvesting system. |
Health Services |
Completed
|
1,832,918.24 |
Kapsaos |
Feedback |
| Manyatta Water Project |
To expand and improve the existing water supply system through the extension of the distribution pipeline and rehabilitation of existing storage infrastructure, ensuring increased water access and reliability for the target population |
Water, Environment, Energy and Natural Resources |
Completed
|
6,013,800.00 |
Kunyak |
Feedback |
| Routine Maintenance of Off C23 Cheluget Road-Museset TBC-Kusumek Market-Chepngeny Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
4,972,398.00 |
Chemosot |
Feedback |
| Construction of Kaptongilo Cheplil-Metro Road Box Culvert |
To mitigate flooding risks, improve local infrastructure resilience |
Public Works, Roads and Transport |
Completed
|
1,082,913.36 |
Ainamoi |
Feedback |
| Routine Maintenance of R47- Chebaran Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,949,360.00 |
Soliat |
Feedback |
| Construction of Sosiot Centre Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,348,662.40 |
Waldai |
Feedback |
| Korosiot Centre- Tindiret Pry School Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
506,247.20 |
Chilchila |
Feedback |
| Mugumoine |
Ensure Hygiene and Sanitation, Promote Health and Disease Prevention |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
2,240,000.00 |
Tendeno/Sorget |
Feedback |
| Manyoror Dispensary |
To improve sanitation and ensure reliable water supply at Manyoror Dispensary through construction of sanitation and water facilities. |
Health Services |
Completed
|
1,512,176.00 |
Kapsaos |
Feedback |
| Chepkemel primary water project |
To expand and improve the existing water supply system through the extension of the distribution pipeline and rehabilitation of existing storage infrastructure, ensuring increased water access and reliability for the target population |
Water, Environment, Energy and Natural Resources |
Completed
|
2,713,500.00 |
Kaplelartet |
Feedback |
| Routine Maintenance of Cheplanget Market-Tembwo TBC-Kipkonyanit Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
4,383,000.00 |
Cheplanget |
Feedback |
| Construction of Kiptegan-Kapsaos Market Box Culvert |
To mitigate flooding risks, improve local infrastructure resilience |
Public Works, Roads and Transport |
Completed
|
1,500,488.61 |
Kapsaos |
Feedback |
| Routine Maintenance of Cheramor Centre- Kipkerer Bridge- Arap Bore Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
735,000.00 |
Soliat |
Feedback |
| Construction of Kipkoskei-Kapkolumbei Road, 0.5km, cheboin tbc-Kaprap joshua r 1.5km,arap koskei-Faith Church-Kapnyangai river-bot elijah corner tatu-Link Highway Road 2.7km |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,193,841.00 |
Cheboin |
Feedback |
| Barit- Kabao Upper / Lower Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
N/A |
Kedowa/Kimugul |
Feedback |
| Kamuogo |
Ensure Hygiene and Sanitation, Promote Health and Disease Prevention |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
2,240,000.00 |
Tendeno/Sorget |
Feedback |
| Kapkatet Sub- County Hospital |
To improve hospital utility systems. |
Health Services |
Completed
|
1,664,072.20 |
Kapkatet |
Feedback |
| Kameme water project |
To develop and protect a sustainable water source for both human and livestock use by implementing spring/intake development, constructing essential water collection and delivery infrastructure, and promoting environmental conservation through fencing and tree planting |
Water, Environment, Energy and Natural Resources |
Completed
|
3,635,450.00 |
Kaplelartet |
Feedback |
| Routine Maintenance of Mosubeti TBC-Tiritab Moita Sec Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
4,199,616.00 |
Cheplanget |
Feedback |
| Construction of Sebetet-Sirimdo Box Culvert |
To mitigate flooding risks, improve local infrastructure resilience |
Public Works, Roads and Transport |
Completed
|
3,478,384.87 |
Kipchimchim |
Feedback |
| Routine Maintenance of Tarajet- Baregeiwet Dispeensary- Karap Maina- Mungenik Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
667,800.00 |
Soliat |
Feedback |
| Construction of Kenene Quarry- Kenene TBC Road 0.9km; Cheplanget Market Roads 0.3Km; Twoliot TBC- Kapsogeruk Bridge Road 1Km, Kaldit TBC- Matureti Road 1Km; Cheplanget Market- Kapsiongei Road 1.4Km |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
937,092.08 |
Cheplanget |
Feedback |
| Quarry- Chebewor Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
536,850.00 |
Kedowa/Kimugul |
Feedback |
| Kapkondoo ECDE |
Improve access, quality of learning and care in ecde centers |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
1,680,000.00 |
Londiani |
Feedback |
| Kapkatet Hospital NBU |
To improve the functionality and privacy of the NBU unit. |
Health Services |
Completed
|
1,187,104.10 |
Kapkatet |
Feedback |
| Kwa Benjamin water project |
To develop and protect a sustainable water source for both human and livestock use by implementing spring/intake development, constructing essential water collection and delivery infrastructure, and promoting environmental conservation through fencing and tree planting |
Water, Environment, Energy and Natural Resources |
Completed
|
4,309,500.00 |
Kaplelartet |
Feedback |
| Routine Maintenance of Kolongei – Kimugul Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
4,959,991.00 |
Kapkatet |
Feedback |
| Construction of Torsogek Box Culvert |
To mitigate flooding risks, improve local infrastructure resilience |
Public Works, Roads and Transport |
Completed
|
1,749,578.06 |
Kapsoit |
Feedback |
| Routine Maintenance of Salgaa- Kongeren River- Kap Laiba Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,360,800.00 |
Soliat |
Feedback |
| Construction of Arap Kesoro-Tamboiyot Box Culvert Road 0.6Km,; Kap Petero-Kap Simbirir Dip Road 0.6Km, Kapsimbirir-Kap Mosonik Shop Road 1.1Km, Arokyet Tinga- Kap Cape Town Road 1.1Km |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,448,076.80 |
Cheplanget |
Feedback |
| Batat- Cheplobot- Cheboror Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
474,856.12 |
Chepseon |
Feedback |
| Chepkongony ECDE |
Improve access, quality of learning and care in ecde centers |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
2,240,000.00 |
Kedowa/Kimugul |
Feedback |
| kapkatet sub-county Hospital |
To enhance oxygen supply for critical units. |
Health Services |
Completed
|
1,150,213.31 |
Kapkatet |
Feedback |
| Tabaita water project |
To develop and protect a sustainable water source for both human and livestock use by implementing spring/intake development, constructing essential water collection and delivery infrastructure, and promoting environmental conservation through fencing and tree planting |
Water, Environment, Energy and Natural Resources |
Completed
|
4,199,852.00 |
Kaplelartet |
Feedback |
| Routine Maintenance of Sosit – Kaptirbet Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,813,614.00 |
Kapkatet |
Feedback |
| Construction Of Jordan Box Culvert |
To mitigate flooding risks, improve local infrastructure resilience |
Public Works, Roads and Transport |
Completed
|
1,551,079.44 |
Kapsoit |
Feedback |
| Routine Maintenance of Kakibei- Kapchemirmir- Mutata- Chepkochun Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
6,216,900.00 |
Sigowet |
Feedback |
| Construction of Mombwo Pry- Sugutek TBC Road 0.8Km; Arap Kesembe- Caterpillar Road 2km; Bosuben Junction- Tanguret Road 1.3Km; Kipteran-Kapsinendet Church of Chridst Road 1.3Km |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,670,678.40 |
Cheplanget |
Feedback |
| Kap Nondin- South Africa Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
536,732.00 |
Chepseon |
Feedback |
| Tulwap Kiplekwa ECDE |
Improve access, quality of learning and care in ecde centers |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
2,912,000.00 |
Kedowa/Kimugul |
Feedback |
| kapkatet sub-county Hospital |
To improve safety and aesthetics. |
Health Services |
Completed
|
1,074,606.60 |
Kapkatet |
Feedback |
| Upper Kautet Spring Protection |
To develop and protect a sustainable water source for both human and livestock use by implementing spring/intake development, constructing essential water collection and delivery infrastructure, and promoting environmental conservation through fencing and tree planting |
Water, Environment, Energy and Natural Resources |
Completed
|
2,276,680.00 |
Kaplelartet |
Feedback |
| Routine Maintenance of Tengecha Kapkatet Hospital – Daraja Sita Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,741,741.00 |
Kapkatet |
Feedback |
| Construction of Kapsogut Box Culvert |
To mitigate flooding risks, improve local infrastructure resilience |
Public Works, Roads and Transport |
Completed
|
1,266,466.50 |
Cheboin |
Feedback |
| Routine Maintenance of Sisionik- Tumoyot Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
4,600,412.00 |
Sigowet |
Feedback |
| Construction of Off Chesingoro TBC-Kapsumet TBC-Chililis-Morit bridge Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,287,129.12 |
Chemosot |
Feedback |
| Keringet Dispensary- Forest Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
540,093.68 |
Londiani |
Feedback |
| Ngatumek ECDE |
Improve access, quality of learning and care in ecde centers |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
1,680,000.00 |
Kedowa/Kimugul |
Feedback |
| Kapkatet Hospital |
To increase hospital water storage capacity. |
Health Services |
Completed
|
1,584,928.90 |
Kapkatet |
Feedback |
| Sigowet Water Project |
To enhance the reliability, safety, and sustainability of the community water supply system by upgrading key infrastructure components, protecting the water source, and ensuring efficient water distribution to end-users |
Water, Environment, Energy and Natural Resources |
Completed
|
3,498,000.00 |
Kaplelartet |
Feedback |
| Routine Maintenance of Kaproret –Charera Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,908,120.00 |
Kisiara |
Feedback |
| Construction of Chemosot-Ainaptibik box culvert |
To mitigate flooding risks, improve local infrastructure resilience |
Public Works, Roads and Transport |
Completed
|
1,360,872.00 |
Chemosot |
Feedback |
| Routine Maintenance of ML 10- Chebetet- Kalyongwet TBC Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,503,850.00 |
Kaplelartet |
Feedback |
| Construction Of Kaprongori-Kaprote Roads2.3Km,Tulwet-Ngainet Road 1.7Km |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,975,268.96 |
Kisiara |
Feedback |
| Miti Tatu- Kolongei Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
511,840.00 |
Tendeno/Sorget |
Feedback |
| Sailo ECDE |
Improve access, quality of learning and care in ecde centers |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
1,120,000.00 |
Chepseon |
Feedback |
| Sosit Dispensary. |
To expand outpatient services. |
Health Services |
Completed
|
1,242,384.36 |
Kapkatet |
Feedback |
| Chepoptaa water project |
To develop and protect a sustainable water source for both human and livestock use by implementing spring/intake development, constructing essential water collection and delivery infrastructure, and promoting environmental conservation through fencing and tree planting |
Water, Environment, Energy and Natural Resources |
Completed
|
6,191,460.00 |
Kaplelartet |
Feedback |
| Routine Maintenance of Kapsimit-Changkelek-Kondamet –Keregut Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
4,972,266.00 |
Kisiara |
Feedback |
| Construction of Chesingoro-Lalagin (Chepkochun) Box Culvert |
To mitigate flooding risks, improve local infrastructure resilience |
Public Works, Roads and Transport |
Completed
|
1,569,599.00 |
Chemosot |
Feedback |
| Routine Maintenance of Mutwot - Emdit Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,190,012.00 |
Kaplelartet |
Feedback |
| Construction of Chemeteget- Molyolok-Kimulwo Deliverance- Off C23 Roads; OFC Church- Shallai- Chelilis Primary School Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,897,196.32 |
Chemosot |
Feedback |
| Kimoson Dispensary- Sumeek Pry- Sumeek TBC Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
535,750.00 |
Kaplelartet |
Feedback |
| Chepchabai ECDE |
Improve access, quality of learning and care in ecde centers |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
2,240,000.00 |
Chepseon |
Feedback |
| Roret Hospital power supply |
To enhance electrical reliability. |
Health Services |
Completed
|
1,482,484.64 |
Kisiara |
Feedback |
| Kamaget water project |
To develop and protect a sustainable water source for both human and livestock use by implementing spring/intake development, constructing essential water collection and delivery infrastructure, and promoting environmental conservation through fencing and tree planting |
Water, Environment, Energy and Natural Resources |
Completed
|
3,964,450.00 |
Kaplelartet |
Feedback |
| Routine Maintenance of Sachangwan - Kapemit Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,335,569.00 |
Kisiara |
Feedback |
| Construction of Tamboyot box Culvert |
To mitigate flooding risks, improve local infrastructure resilience |
Public Works, Roads and Transport |
Completed
|
1,541,517.00 |
Cheplanget |
Feedback |
| Routine Maintenance of Kaplelartet Chief’s Office- Tabaita Centre Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,166,000.00 |
Kaplelartet |
Feedback |
| Construction Of Kaprongori-Kaprote Roads2.3Km,Tulwet-Ngainet Road 1.7Km |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,730,644.64 |
Kisiara |
Feedback |
| Kaplelartet SDA Church- Emdit Pry School Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
25,725.00 |
Kaplelartet |
Feedback |
| Jambo ECDE |
Improve access, quality of learning and care in ecde centers |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
896,000.00 |
Tendeno/Sorget |
Feedback |
| Mosore Dispensary |
To operationalize the facility. |
Health Services |
Completed
|
1,523,834.00 |
Kisiara |
Feedback |
| Ketigoi Water project |
To improve access to clean and reliable water for the target population by extending the water distribution network and rehabilitating existing water storage infrastructure |
Water, Environment, Energy and Natural Resources |
Completed
|
5,169,820.00 |
Kaplelartet |
Feedback |
| Routine Maintenance of AIC Chepwagan-Kipkuna Chepwagan Tbc Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,354,323.00 |
Litein |
Feedback |
| Construction of Koitabai-Mabwaita Pipe Culverts |
To mitigate flooding risks, improve local infrastructure resilience |
Public Works, Roads and Transport |
Completed
|
1,364,160.48 |
Kapkatet |
Feedback |
| Construction of Kerego Box Culvert at Kwa Silvan- Kids home - Kerego |
To improve road safety and accessibility |
Public Works, Roads and Transport |
Completed
|
2,082,900.00 |
Kapkugerwet |
Feedback |
| Construction of Keregut-Taach Centre Road 1km,Tinga-Tulwap Kipsigis Road 0.3km,Misoi-Chebirribei-Aroron Road 0,85km,Mongoita-Chemamanik Road 0.4km,Sunset Junction-Chepkoiyo Road 1km, Kelelwa-Chepkoiyo Road 0.7km,Kasebet-Chepkembe Road 1km |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,496,709.00 |
Kisiara |
Feedback |
| Seronik TBC-Seronik Pry- Chepkitwal TBC- Musaria Pry School Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
536,850.00 |
Kaplelartet |
Feedback |
| Construction of a Classroom at Leberer ECDE Centre |
Improve access, quality of learning and care in ecde centers |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
2,240,000.00 |
Chepseon |
Feedback |
| Tulwet Dispensary |
To improve diagnostic capacity. |
Health Services |
Completed
|
1,746,226.88 |
Kisiara |
Feedback |
| Sasuriet Water Project |
To enhance access to clean and sustainable water supply by constructing spring protection pipelines, water tanks & associated fittings ensuring reliable water delivery to the target community |
Water, Environment, Energy and Natural Resources |
Completed
|
6,549,900.00 |
Ainamoi |
Feedback |
| Routine Maintenance of Ketisyek -Church of Christ Kibaliach Bridge Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
4,816,144.00 |
Litein |
Feedback |
| Construction of Kipkosil River Pipe Culvert |
To mitigate flooding risks, improve local infrastructure resilience |
Public Works, Roads and Transport |
Completed
|
1,755,115.38 |
Kapkatet |
Feedback |
| Construction of Ainapkosobin 3X900mm cross culvert |
To improve road safety and accessibility |
Public Works, Roads and Transport |
Completed
|
1,441,600.00 |
Kapkugerwet |
Feedback |
| Shiners-Temuge r 0.4km, Kaptirbet-koros-ngesumin Road 2.5km, Kapkatet mortuary-Cementry Road 0.4km, Kapkatet Factory-Nganaset Road 0.6km, cherandas-sewerer Road 0.3km, kapkatet-AIC Holy Harvest church Road 0.5km,Kap mp-cherus tbc Road 0.6km, Off main Road-arap chepkwony Road 0.6km,off main Road-dcs residence Road 0.2, off main road kiko Road 0.2km matunda Road 0.2km, 954east-kipkosil pry sch Road 0.5km,mabwaita Aic -Catholic church Road 1km |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,495,316.64 |
Kapkatet |
Feedback |
| Kipsitet Primary- Karap Tele- Muhuroni Junction Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
463,478.00 |
Soin |
Feedback |
| Construction of an Administration Block and Library at 938 VTC |
Strengthen Institutional Management and Operations |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
2,912,000.00 |
Chepseon |
Feedback |
| Mabasi Dispensary |
To operationalize the facility. |
Health Services |
Completed
|
1,485,672.32 |
Kisiara |
Feedback |
| KMTC Sigowet Extension Line |
To facilitate the installation of new water pipelines through systematic excavation, laying of pipes, jointing, and backfilling, ensuring proper alignment, depth, and protection of the water supply infrastructure |
Water, Environment, Energy and Natural Resources |
Completed
|
2,272,993.00 |
Kaplelartet |
Feedback |
| Routine Maintenance of Kiptenden -AIC Maronget Kiptenden Pry Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
4,221,240.00 |
Litein |
Feedback |
| Construction of Arap Komuilong Ketengeret Box Culvert |
To mitigate flooding risks, improve local infrastructure resilience |
Public Works, Roads and Transport |
Completed
|
2,059,237.00 |
Litein |
Feedback |
| Construction of Twin 900mm cross culvert at Wema - Chemugusu Road |
To improve road safety and accessibility |
Public Works, Roads and Transport |
Completed
|
2,179,800.00 |
Kapkugerwet |
Feedback |
| Koiwa-Pefa church Road, chebagal tbc,ainapset river agc Road, Tendwet-Kaphilimon Road;Pefa Church-Cheptigit -Arap Maina Road, Kapkaren-Soet Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
5,845,379.00 |
Litein |
Feedback |
| Kamusar- Kipkombich- Kaptalamwa Pry School Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
558,728.90 |
Soin |
Feedback |
| Construction of pit latrine at Chesinende ECDE Centre |
Ensure Hygiene and Sanitation, Promote Health and Disease Prevention |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
672,000.00 |
Chepseon |
Feedback |
| Kaproret Dispensary. |
To operationalize the dispensary. |
Health Services |
Completed
|
1,268,049.36 |
Kisiara |
Feedback |
| Lebekwet Water project |
To develop and protect a sustainable water source for both human and livestock use by implementing spring/intake development, constructing essential water collection and delivery infrastructure, and promoting environmental conservation through fencing and tree planting |
Water, Environment, Energy and Natural Resources |
Completed
|
2,715,720.00 |
Kaplelartet |
Feedback |
| Routine Maintenance of Moroncho Chebagal Junction Moroncho Tbc Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
19,780,000.00 |
Litein |
Feedback |
| Construction of Rift Valley Culverts |
To enhance transportation infrastructure and improve drainage systems |
Public Works, Roads and Transport |
Completed
|
1,614,225.18 |
Litein |
Feedback |
| Construction of Torsogek Box Culvert |
To improve road safety and accessibility |
Public Works, Roads and Transport |
Completed
|
3,794,800.00 |
Kapsoit |
Feedback |
| Construction Of Kamiwa- Kamotos 4.1Km, |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
4,285,617.68 |
Chilchila |
Feedback |
| Cheptuiyet ML 018-Kap John- Nduma Junction- Lelagoi Pry- Lelagoi
Junction Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
580,000.00 |
Sigowet |
Feedback |
| Construction of pit latrine at Kapchemusian ECDE Centre |
Ensure Hygiene and Sanitation, Promote Health and Disease Prevention |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
1,120,000.00 |
Chepseon |
Feedback |
| Roret hospital |
To improve staff and patient catering services. |
Health Services |
Completed
|
1,241,680.24 |
Kisiara |
Feedback |
| Kipsitet borehole water project |
To enhance sustainable access to safe and reliable water for domestic use through the development and equipping of borehole-based water infrastructure and distribution systems |
Water, Environment, Energy and Natural Resources |
Completed
|
1,574,046.00 |
Soin |
Feedback |
| Routine Maintenance of Tombitret Bridge- Cheboror Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,336,800.00 |
Tebesonik |
Feedback |
| Construction of Tuiyobei- Nigeria Box Culvert |
To mitigate flooding risks, improve local infrastructure resilience |
Public Works, Roads and Transport |
Completed
|
1,200,291.10 |
Tebesonik |
Feedback |
| Construction of Jordan Box Culvert |
To improve road safety and accessibility |
Public Works, Roads and Transport |
Completed
|
1,816,604.00 |
Kapsoit |
Feedback |
| Construction Of Kapwanja- Chebisom Road 2.5Km |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,026,752.00 |
Chilchila |
Feedback |
| Kuche-Rwandit Dip- Kapkeburu Pry School Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
797,100.00 |
Sigowet |
Feedback |
| Construction of pit latrine at Kaptaragon ECDE Centre |
Ensure Hygiene and Sanitation, Promote Health and Disease Prevention |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
448,000.00 |
Chepseon |
Feedback |
| Roret sub-county hospital |
To expand surgical service capacity. |
Health Services |
Completed
|
1,225,699.62 |
Kisiara |
Feedback |
| Lelaitich IDP Camp Water Project |
To procure and deliver high-quality drilling materials that meet the technical and operational requirements of the project. |
Water, Environment, Energy and Natural Resources |
Completed
|
1,930,399.00 |
Soin |
Feedback |
| Routine Maintenance of Kiptome dispensary -itondo pry -off chebirirbei |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,299,250.00 |
Kabianga |
Feedback |
| Construction of Kapchebet Pipe Culvert |
To improve road safety and accessibility |
Public Works, Roads and Transport |
Completed
|
1,338,758.00 |
Kabianga |
Feedback |
| Construction of Mjini Box Culvert |
To improve road safety and accessibility |
Public Works, Roads and Transport |
Completed
|
2,609,944.00 |
Kipchebor |
Feedback |
| Construction Of Baseline Songonyet Kimandui Road , Rarinwet Sereng Road, Chegen Road Laboso Pry Siwot Factory Siwit Dispensary Road , Maarifa Pry Siwot Catle Dip Road, Museum Koiserem Pry Road, Leketetiot Road, Kapkures Road Laboso Academ Siwat Factory Siwot Dispesary Siwot Seconday Siwot Farm Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,853,706.72 |
Chilchila |
Feedback |
| ML 018-
Kululut River- Coffee Factory- Cattle Dip Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
598,995.00 |
Sigowet |
Feedback |
| Construction of pit latrine at Lamaiyat ECDE Centre |
Ensure Hygiene and Sanitation, Promote Health and Disease Prevention |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
2,240,000.00 |
Chepseon |
Feedback |
| Kaproret Dispensary |
To improve outpatient service delivery by completing the OPD, enhancing drainage, and expanding the pharmacy room |
Health Services |
Completed
|
1,087,616.00 |
Kisiara |
Feedback |
| Kipsitet Dip water project |
To improve access to reliable and sustainable water supply for livestock by developing and rehabilitating key water infrastructure, thereby enhancing animal health, agricultural productivity, and livelihoods of the local community |
Water, Environment, Energy and Natural Resources |
Completed
|
5,263,732.00 |
Soin |
Feedback |
| Routine Maintenance of Conner C -Kabianga Bridge Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,299,298.00 |
Kabianga |
Feedback |
| Construction of Matarmat Pipe Culvert |
To improve road safety and accessibility |
Public Works, Roads and Transport |
Completed
|
1,038,108.44 |
Kabianga |
Feedback |
| Construction of Gokul- Kamelilo Box Culvert |
To improve road safety and accessibility |
Public Works, Roads and Transport |
Completed
|
4,264,692.00 |
Ainamoi |
Feedback |
| Construction Of Kokwet Secondary School-Kapnguron-Kipsumei Road 2Km,Burutu Dip-Mugut Factory Road 1.6Km,Yala-Magire Secondary School-Teldet Road 2.8Km, |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
4,479,771.52 |
Chilchila |
Feedback |
| Kongeren SDA- Kimugul SDA- Kimugul Junction Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
491,364.00 |
Soliat |
Feedback |
| Construction of a pit latrine at Kimasian ECDE Centre |
Ensure Hygiene and Sanitation, Promote Health and Disease Prevention |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
N/A |
Kedowa/Kimugul |
Feedback |
| Mosore Dispensary |
To enhance sanitation and waste management infrastructure for improved public health standards. |
Health Services |
Completed
|
2,859,120.00 |
Kisiara |
Feedback |
| Koitaburot Borehole water project |
To improve access to safe water for both domestic and livestock use through the development of essential water storage and distribution infrastructure |
Water, Environment, Energy and Natural Resources |
Completed
|
4,252,782.00 |
Soin |
Feedback |
| Routine Maintenance of Mp/CS Road-Kabianga Tea Factory Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,157,183.00 |
Kabianga |
Feedback |
| Construction of Nyabangi Road Culverts |
To enhance road connectivity and improve drainage infrastructure |
Public Works, Roads and Transport |
Completed
|
3,144,017.14 |
Kabianga |
Feedback |
| Installation of 10 lines of 600mm along Arap Cheruiyot- Maberiat AGC Church Road, Budalangi-Totlilet- Mureret Road |
To improve road safety and accessibility |
Public Works, Roads and Transport |
Completed
|
1,015,000.00 |
Ainamoi |
Feedback |
| Construction of Tendwet-Malinja-Magire dispesary Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,946,746.88 |
Chilchila |
Feedback |
| Motero- Mongojet Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
558,041.20 |
Soliat |
Feedback |
| Construction of 2 Classrooms at Londiani Vocational Training Centre |
|
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
672,000.00 |
Londiani |
Feedback |
| Mabasi Dispensary |
To improve sanitation and hygiene for patients and staff. |
Health Services |
Completed
|
2,016,623.00 |
Kisiara |
Feedback |
| Kebimbir water Project |
To expand and improve the existing water supply system through the extension of the distribution pipeline and rehabilitation of existing storage infrastructure, ensuring increased water access and reliability for the target population |
Water, Environment, Energy and Natural Resources |
Completed
|
6,162,600.00 |
Soin |
Feedback |
| Routine Maintenance of Borborwet Tbc-Kapjokega-Kiboe Junction-Sachoran AGC Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,230,000.00 |
Kapsuser |
Feedback |
| Construction of Mereonik-Kapnandet mini bridge |
To improve Drainage Infrastructure |
Public Works, Roads and Transport |
Completed
|
1,238,554.82 |
Kapsuser |
Feedback |
| Construction of Koigaron Twin 900mm cross culvert |
To improve road safety and accessibility |
Public Works, Roads and Transport |
Completed
|
1,251,860.00 |
Kapsaos |
Feedback |
| Gravelling of Tendwet-Malinja-Magire dispesary rd |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,190,255.20 |
Chilchila |
Feedback |
| Chepkulgong Pry School - Barchilei - Chepkoiyet - Siriat Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
800,750.00 |
Cheboin |
Feedback |
| Construction of ECDE classroom at Kapkwen ECDE Centre |
Improve access, quality of learning and care in ecde centers |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
3,136,000.00 |
Londiani |
Feedback |
| Litein Dispensary |
To rehabilitate and upgrade existing health infrastructure for better service delivery |
Health Services |
Completed
|
N/A |
Litein |
Feedback |
| Laitigo School water Project |
To expand and improve the existing water supply system through the extension of the distribution pipeline and rehabilitation of existing storage infrastructure, ensuring increased water access and reliability for the target population |
Water, Environment, Energy and Natural Resources |
Completed
|
5,558,080.00 |
Soin |
Feedback |
| Routine Maintenance of Kapnandet-Kaplemeiywet-Bae River Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,125,200.00 |
Kapsuser |
Feedback |
| Construction of Kapmatayo box culvert |
To improve road safety and accessibility |
Public Works, Roads and Transport |
Completed
|
1,757,756.88 |
Cheptororiet/Seretut |
Feedback |
| Construction of Buchenge Deck for Bridge |
To improve road safety and accessibility |
Public Works, Roads and Transport |
Completed
|
4,696,800.00 |
Kapsaos |
Feedback |
| Factory-Chepkosa Road,Chepkosa-Legetiot Road,Legetiot-Chembek Road,Chumbek-Kiptenden Road,Sereng-Chepkendi Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,005,386.00 |
Chilchila |
Feedback |
| Lelach- Kapsogut TBC Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
682,900.00 |
Cheboin |
Feedback |
| Construction of a classroom at Kapsinendet ECDE centre |
Improve access, quality of learning and care in ecde centers |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
560,000.00 |
Londiani |
Feedback |
| Kalaacha Dispensary |
To operationalize the dispensary and enhance access to primary healthcare services |
Health Services |
Completed
|
2,682,394.00 |
Litein |
Feedback |
| Kapkatit water project |
To improve the safety, reliability, and accessibility of water supply by protecting the natural spring source, constructing a robust distribution pipeline, and establishing user-friendly water points for community access. |
Water, Environment, Energy and Natural Resources |
Completed
|
1,860,032.00 |
Soin |
Feedback |
| Routine Maintenance of Kimolwet -SBI juction - Surian Canteen Arap Seroney Arap Tonui – Kigorwet Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,920,074.00 |
Kapsuser |
Feedback |
| Construction of Kapstehano Pipe Culvert |
To improve road safety and accessibility |
Public Works, Roads and Transport |
Completed
|
1,791,139.49 |
Cheptororiet/Seretut |
Feedback |
| Construction of Kisabei Box Culvert |
To improve road safety and accessibility |
Public Works, Roads and Transport |
Completed
|
1,124,500.00 |
Kapsoit |
Feedback |
| Construction Of Seguton Santos Round-AIC Church Road 2.6Km,Pinus Tamarsang 1.5Km |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,154,624.64 |
Kipkelion |
Feedback |
| Off C23 -
Kabartegan - Chemamul TBC - Kimotyo Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
530,861.56 |
Chemosot |
Feedback |
| Construction of ECDE classroom at Jambo ECDE Centre |
Improve access, quality of learning and care in ecde centers |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
1,680,000.00 |
Tendeno/Sorget |
Feedback |
| Rungut Dispensary |
To expand healthcare access through the establishment of a new dispensary. |
Health Services |
Completed
|
2,162,737.00 |
Litein |
Feedback |
| Kebimbir Water Project 2 |
To expand and improve the existing water supply system through the extension of the distribution pipeline and rehabilitation of existing storage infrastructure, ensuring increased water access and reliability for the target population |
Water, Environment, Energy and Natural Resources |
Completed
|
4,844,568.00 |
Soin |
Feedback |
| Routine Maintenance of Kapkelek -chepseron -kipngetuny road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,299,298.00 |
Cheptororiet/Seretut |
Feedback |
| Construction of Kapkelek Cross Culvertd |
To improve Drainage Infrastructure |
Public Works, Roads and Transport |
Completed
|
1,929,080.00 |
Cheptororiet/Seretut |
Feedback |
| Construction of Sugutek Box Culvert |
To improve road safety and accessibility |
Public Works, Roads and Transport |
Completed
|
391,680.00 |
Kapsoit |
Feedback |
| Construction of Off C35-Chebululu Road,Mocheisok-Mumetet Road,Chemamul-kobiro Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,419,604.56 |
Kipkelion |
Feedback |
| Chepkonye TBC Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
530,758.00 |
Chemosot |
Feedback |
| Construction of a classroom at Kamuogo ECDE Centre |
Improve access, quality of learning and care in ecde centers |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
1,120,000.00 |
Tendeno/Sorget |
Feedback |
| Litein Health Centre |
To improve patient care and water access through OPD renovation and installation of a water tank base. |
Health Services |
Completed
|
2,570,898.00 |
Litein |
Feedback |
| Koitabrot,Kaptalamwa,Kechiriet,Kamalabu & Kaptalamwa Water Project |
To expand and improve the existing water supply system through the extension of the distribution pipeline and rehabilitation of existing storage infrastructure, ensuring increased water access and reliability for the target population |
Water, Environment, Energy and Natural Resources |
Completed
|
7,631,668.00 |
Soin |
Feedback |
| Routine Maintenance of Cherigat-Chepkutbei-Cheswerta Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,912,169.60 |
Cheptororiet/Seretut |
Feedback |
| Construction of Chepkutbei Pipe Culverts |
To improve road safety and accessibility |
Public Works, Roads and Transport |
Completed
|
1,737,186.72 |
Cheptororiet/Seretut |
Feedback |
| Construction of Kapsinei Mini Bridge |
To improve road safety and accessibility |
Public Works, Roads and Transport |
Completed
|
2,120,000.00 |
Kapsoit |
Feedback |
| Construction of Liloch Pry sch-Koisaet pry sch Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,673,199.12 |
Kamasian |
Feedback |
| Cheplanget High School - Singorwet TBC
- Off D226-
Cheplanget Pry Sign Post Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
672,382.40 |
Cheplanget |
Feedback |
| Completion and Renovation of ECDE classrooms at Chebaibai and Kamaua ECDE Centres |
Improve access, quality of learning and care in ecde centers |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
1,120,000.00 |
Tendeno/Sorget |
Feedback |
| Kaboeito Dispensary |
To enhance healthcare access by establishing a new dispensary. |
Health Services |
Completed
|
1,845,950.00 |
Tebesonik |
Feedback |
| Koyabei Water Project |
To expand and improve the existing water supply system through the extension of the distribution pipeline and rehabilitation of existing storage infrastructure, ensuring increased water access and reliability for the target population |
Water, Environment, Energy and Natural Resources |
Completed
|
2,472,000.00 |
Soin |
Feedback |
| Routine Maintenance of Seretut Pri. Sch.-Arap Kitur-Kesagetiet Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,777,598.00 |
Cheptororiet/Seretut |
Feedback |
| Construction of Kapkonga box culvert |
To improve road safety and accessibility |
Public Works, Roads and Transport |
Completed
|
1,189,997.66 |
Waldai |
Feedback |
| Construction of Kapsakwa Box Culvert |
To improve road safety and accessibility |
Public Works, Roads and Transport |
Completed
|
4,028,000.00 |
Kipchimchim |
Feedback |
| Construction Of Bartera-Murero Road,Irengeti-Changee Road,Kawangware-Mtaragon Road,Kaptepengwa-Tinga Farm Road,Kaptepengwo-Bartera-Murera Road,Singoi Road,Kaptego-Borowet Road,Kuakali Road,Kaplaba Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,475,605.00 |
Kamasian |
Feedback |
| Tendwet TBC - Kimaech Baptist Church
- Cheptembe Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
534,850.00 |
Cheplanget |
Feedback |
| Construction of a 3 door pit latrine at Sorget ECDE Centre |
Ensure Hygiene and Sanitation, Promote Health and Disease Prevention |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
1,680,000.00 |
Tendeno/Sorget |
Feedback |
| Kaboeito Dispensary |
To improve staff welfare and sanitation within the health facility |
Health Services |
Completed
|
3,506,065.00 |
Tebesonik |
Feedback |
| Bargeiwet Water Project phase 1 |
To enhance water supply capacity, quality, and sustainability by restoring dam storage volume, improving water intake infrastructure, constructing a gravity-fed pipeline system, and protecting the dam area from environmental degradation and encroachment |
Water, Environment, Energy and Natural Resources |
Completed
|
2,624,586.00 |
Soliat |
Feedback |
| Routine Maintenance of Chepkoin - Chemororoch Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,886,067.00 |
Waldai |
Feedback |
| Construction of Kapcheluch Foot Bridge |
To improve Drainage Infrastructure |
Public Works, Roads and Transport |
Completed
|
1,790,690.34 |
Chaik |
Feedback |
| Construction of Kimugen Box Culvert |
To improve road safety and accessibility |
Public Works, Roads and Transport |
Completed
|
6,360,000.00 |
Kipchebor |
Feedback |
| Construction Of Centre Juu-Kiringeti-Makanisa Road 4Km, Bartera-Centre Juu Road 1.5Km, Kapkures-Sirgoi Road 3Km |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,434,386.40 |
Kamasian |
Feedback |
| Charera - Kapsirwoi TBC
- Rwandit TBC
- Kaproret Centre - Tapnyole Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
719,020.00 |
Kisiara |
Feedback |
| Kokwet |
Improve access, quality of learning and care in ecde centers |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
1,680,000.00 |
Chilchila |
Feedback |
| Kericho Forest Dispensary |
To restore and improve existing infrastructure for quality service delivery |
Health Services |
Completed
|
1,988,890.00 |
Chepseon |
Feedback |
| Bargeiwet Water Project- Phase 2 |
To expand and improve the existing water supply system through the extension of the distribution pipeline and rehabilitation of existing storage infrastructure, ensuring increased water access and reliability for the target population |
Water, Environment, Energy and Natural Resources |
Completed
|
2,546,532.00 |
Soliat |
Feedback |
| Routine Maintenance of Kapchereren Shop Off sosiot highway -Kapsoit Police Station Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
999,712.90 |
Waldai |
Feedback |
| Construction of Kimaut-Karap Bangoror Culvert |
To improve road safety and accessibility |
Public Works, Roads and Transport |
Completed
|
3,500,004.20 |
Londiani |
Feedback |
| Construction of 600mm cross culvert to Kaborus - Chabasta road 2km |
To improve road safety and accessibility |
Public Works, Roads and Transport |
Completed
|
4,006,800.00 |
Cheboin |
Feedback |
| Construction of Centre Juu - Kerengeti - Makanisa Road 4.0km , Bartera- Centre Juu Road 1.5km and Kapkures - Sirgoi Road 3.0km |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,873,901.00 |
Kamasian |
Feedback |
| Mosore dip - Mosore Quarry Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
510,139.00 |
Kisiara |
Feedback |
| Kabirong/Kiptenden |
Improve access, quality of learning and care in ecde centers |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
1,120,000.00 |
Kunyak |
Feedback |
| Kamachungwa Dispensary |
To finalize construction for operational readiness of the dispensary. |
Health Services |
Completed
|
2,014,036.00 |
Chepseon |
Feedback |
| Kabokyek borehole water project |
To enhance sustainable access to safe and adequate water through the construction and installation of essential water infrastructure including storage, pumping, and distribution systems |
Water, Environment, Energy and Natural Resources |
Completed
|
2,651,808.00 |
Soliat |
Feedback |
| Routine Maintenance of Off Cheribo-Kiptaldal AGC-Ainapkoi Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,380,000.00 |
Waldai |
Feedback |
| Construction of Lelsotet-Saw mill Pipe Culverts |
To improve road safety and accessibility |
Public Works, Roads and Transport |
Completed
|
1,688,640.00 |
Londiani |
Feedback |
| Construction of 600mm cross culvert to Koitamat - Cheptenteniet road 3km |
To improve road safety and accessibility |
Public Works, Roads and Transport |
Completed
|
4,900,000.00 |
Cheboin |
Feedback |
| Chemosogon - Kipsegi - Kimologit rd |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,187,800.64 |
Kamasian |
Feedback |
| Kwa Chief- Siritiet- Kap Chumbo- Siongi Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
599,981.00 |
Tebesonik |
Feedback |
| Chesoen |
Improve access, quality of learning and care in ecde centers |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
1,120,000.00 |
Kipkelion |
Feedback |
| Kiletien Dispensary |
To operationalize the facility by completing outstanding construction works. |
Health Services |
Completed
|
2,680,560.00 |
Chepseon |
Feedback |
| Kapsorok Water Project |
To rehabilitate and expand existing water supply infrastructure to ensure safe, adequate, and accessible water for both domestic and livestock use in the target community |
Water, Environment, Energy and Natural Resources |
Completed
|
2,649,180.00 |
Soliat |
Feedback |
| Routine Maintenance of Sosiot Posta - Chemororoch Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,950,000.68 |
Waldai |
Feedback |
| Construction of Kap Jackson-Anderea Pipe Culverts |
To improve road safety and accessibility |
Public Works, Roads and Transport |
Completed
|
1,430,494.50 |
Londiani |
Feedback |
| Construction of Machorwa- Kapcheluch Box Culvert |
To improve road safety and accessibility |
Public Works, Roads and Transport |
Completed
|
4,256,960.00 |
Kisiara |
Feedback |
| Construction Of Njoro-Kapkoros Road 1.5km, Kapserem-Timbek Road 1.5Km, Tumoek-Kapkurin Road 2Km, Tumoek-Kabarak Road 3Km, |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,998,381.92 |
Kunyak |
Feedback |
| Off D226 -
Nyamanga - Chesamisiet - Kapsila Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
502,552.00 |
Tebesonik |
Feedback |
| Centre Juu |
Improve access, quality of learning and care in ecde centers |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
1,120,000.00 |
Kamasian |
Feedback |
| Kiletien Dispensary |
To improve patient flow and service efficiency through OPD completion |
Health Services |
Completed
|
3,242,411.00 |
Chepseon |
Feedback |
| Chesiche Water Project |
To improve sustainable access to clean water through spring protection, gravity-based conveyance, solar-powered pumping, and secure storage infrastructure |
Water, Environment, Energy and Natural Resources |
Completed
|
3,027,560.00 |
Soliat |
Feedback |
| Routine Maintenance of Tulwap Kibiywet-Tapsargoi/Off Sosiot Highway |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,102,500.00 |
Waldai |
Feedback |
| Construction of Kapkondoo-Binam pipe culvert |
To improve road safety and accessibility |
Public Works, Roads and Transport |
Completed
|
1,989,836.00 |
Londiani |
Feedback |
| Construction of Senetwet Box Culvert |
To improve road safety and accessibility |
Public Works, Roads and Transport |
Completed
|
8,492,300.00 |
Cheplanget |
Feedback |
| Construction of Kap DO - Njoro Kolonge Road 1.9km; Kapkwen - Kiptenden Road 8.5km; DO's - Kimoro Road 1km; Sireret - Mlango Road 8.6km; Kapis - Kamaragaa Road 1km - Kunyak Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,021,708.32 |
Kunyak |
Feedback |
| Tiriita - Kapchemoiben
- Chestit - Kapchemoiben Stream Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
529,284.80 |
Tebesonik |
Feedback |
| Ndubusat |
Improve access, quality of learning and care in ecde centers |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
2,240,000.00 |
Chilchila |
Feedback |
| Chepcholiet Dispensary phase 2 |
To complete the remaining construction works for full utilization of the dispensary |
Health Services |
Completed
|
1,271,443.00 |
Chepseon |
Feedback |
| Kabokyek Pipeline Extension water Project |
To enhance water access and optimize existing infrastructure through pipeline extension, construction of new water points, and strategic relocation of water storage tanks |
Water, Environment, Energy and Natural Resources |
Completed
|
6,557,540.00 |
Soliat |
Feedback |
| Rouitne Maintenance of Momoniat-Center-Kondamet Primary Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
940,655.60 |
Chepseon |
Feedback |
| Construction of drainage Structures at Barotion Road |
To improve road safety and accessibility |
Public Works, Roads and Transport |
Completed
|
1,945,686.56 |
Londiani |
Feedback |
| Construction of Kisiara -Kap nyongo Box Culvert |
To improve road safety and accessibility |
Public Works, Roads and Transport |
Completed
|
2,300,900.00 |
Chemosot |
Feedback |
| Construction of Cattle Dip- Ngepepo Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,110,802.16 |
Kunyak |
Feedback |
| Kap Rop Canteen- Kap David Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
N/A |
Tebesonik |
Feedback |
| Samolel |
Improve access, quality of learning and care in ecde centers |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
1,120,000.00 |
Chilchila |
Feedback |
| Proposed Construction of toilets and Final Paint Works at Kiletien Dispensary |
To improve sanitation and aesthetics through toilet construction and painting. |
Health Services |
Completed
|
1,296,274.00 |
Chepseon |
Feedback |
| Kapkenyoloi-Kikechiyet Water Project |
To expand and improve the existing water supply system through the extension of the distribution pipeline and rehabilitation of existing storage infrastructure, ensuring increased water access and reliability for the target population |
Water, Environment, Energy and Natural Resources |
Completed
|
6,013,795.00 |
Soliat |
Feedback |
| Routine Maintenance of Offd12-Sigowet-Cheboror Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
898,565.00 |
Chepseon |
Feedback |
| Construction of Jagoror Bridge and Maintenance of the abutments |
To improve road safety and accessibility |
Public Works, Roads and Transport |
Completed
|
1,551,765.17 |
Londiani |
Feedback |
| Construction of Kaptebengwet - Cheptangulgei Box Culvert |
To improve road safety and accessibility |
Public Works, Roads and Transport |
Completed
|
4,347,060.00 |
Kapkatet |
Feedback |
| Construction of Kapkilumben-Chagaranda road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,202,523.28 |
Kunyak |
Feedback |
| Off C23 -Nganaset - Tengecha Boys School - Kapkatet Morgue Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
N/A |
Kapkatet |
Feedback |
| Korosiot |
Improve access, quality of learning and care in ecde centers |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
1,120,000.00 |
Chilchila |
Feedback |
| Proposed Completion of OPD at Kamachungwa Dispensary |
To improve service delivery through completion of the outpatient unit |
Health Services |
Completed
|
2,003,440.00 |
Chepseon |
Feedback |
| Regerego-Mogoriot Water Project |
To expand and improve the existing water supply system through the extension of the distribution pipeline and rehabilitation of existing storage infrastructure, ensuring increased water access and reliability for the target population |
Water, Environment, Energy and Natural Resources |
Completed
|
5,818,356.00 |
Soliat |
Feedback |
| Rouitne Maintenance of Chepkongoni Kiptenten Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,693,020.00 |
Kedowa/Kimugul |
Feedback |
| Construction of Lelsotet- Sawmill Pipe Culverts |
To improve road safety and accessibility |
Public Works, Roads and Transport |
Completed
|
1,144,000.00 |
Londiani |
Feedback |
| Construction of Chematich-Kaptirbet Twin 900mm Cross Culverts |
To improve road safety and accessibility |
Public Works, Roads and Transport |
Completed
|
560,000.00 |
Kapkatet |
Feedback |
| Construction of Kapkurin- Kabirong- Chesonoi-Kapkwen Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,501,005.28 |
Kunyak |
Feedback |
| Sosit Centre- Sertwet Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
579,849.00 |
Kapkatet |
Feedback |
| Tuiyobei |
Improve access, quality of learning and care in ecde centers |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
1,120,000.00 |
Kipkelion |
Feedback |
| Proposed completion of OPD, construction of two door pit latrine and installation of 10, 000L water tank at Chepcholiet Dispensary |
To enhance service delivery and sanitation by completing OPD, pit latrine, and water storage system. |
Health Services |
Completed
|
3,904,800.00 |
Chepseon |
Feedback |
| Rehabilitation of Kabokyek Borehole Water Project |
To restore the functionality and efficiency of the existing borehole system to ensure continuous access to clean and safe water |
Water, Environment, Energy and Natural Resources |
Completed
|
4,844,568.00 |
Soliat |
Feedback |
| Rouitne Maintenance of Kahorora Ring Roads |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,979,589.00 |
Kedowa/Kimugul |
Feedback |
| Construction of Murazoi Box Culvert |
To improve road safety and accessibility |
Public Works, Roads and Transport |
Completed
|
1,792,349.04 |
Chepseon |
Feedback |
| Construction of Kabusienduk Twin 900mm Cross Culverts |
To improve road safety and accessibility |
Public Works, Roads and Transport |
Completed
|
4,197,600.00 |
Tebesonik |
Feedback |
| Constuction Of Kigora-Mosonik Road 3.5Km, |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
4,650,801.92 |
Chepseon |
Feedback |
| Valley - Valley Teachers College - Kipawui - Joyland Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
828,924.00 |
Litein |
Feedback |
| Barsiele |
Improve access, quality of learning and care in ecde centers |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
1,120,000.00 |
Kipkelion |
Feedback |
| Proposed completion of maternity room at Momoniot Dispensary |
To improve maternal healthcare by completing and equipping the maternity room |
Health Services |
Completed
|
2,700,200.00 |
Chepseon |
Feedback |
| Sombicho Water Project |
To expand and improve the existing water supply system through the extension of the distribution pipeline and rehabilitation of existing storage infrastructure, ensuring increased water access and reliability for the target population |
Water, Environment, Energy and Natural Resources |
Completed
|
1,198,521.00 |
Soliat |
Feedback |
| Rouitne Maintenance of C35-Jagoror Pri School Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
827,312.00 |
Londiani |
Feedback |
| Construction of Arap Soi Box Culvert |
To improve road safety and accessibility |
Public Works, Roads and Transport |
Completed
|
1,450,000.00 |
Kedowa/Kimugul |
Feedback |
| Construction of Chesebet Pipe Culverts |
To improve road safety and accessibility |
Public Works, Roads and Transport |
Completed
|
3,308,360.00 |
Kabianga |
Feedback |
| Chepsir-Kipkeremwo Road 5.7km, Monori- Sailo Road 2km |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,350,000.00 |
Chepseon |
Feedback |
| Off D226-
Centre 1 -
Centre 2- Lalagin Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
846,580.00 |
Litein |
Feedback |
| Tachasis |
Improve access, quality of learning and care in ecde centers |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
1,120,000.00 |
Kipkelion |
Feedback |
| Proposed completion of OPD, extension of a verandah and waiting bay, supply and installation of 5000 liters water tank at 938Dispensary |
To enhance patient comfort and water supply by extending waiting bay and installing water tank |
Health Services |
Completed
|
138,400.00 |
Chepseon |
Feedback |
| Chebilawa Spring Protection |
To enhance safe and sustainable access to clean spring water by protecting the water source and improving physical access through the construction of stairways |
Water, Environment, Energy and Natural Resources |
Completed
|
1,860,032.00 |
Soliat |
Feedback |
| Rouitne Maintenance of Nairobi Center -Langalanga -Tamarsat Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,799,130.00 |
Londiani |
Feedback |
| Construction of Chebwareng Box Culvert |
To improve road safety and accessibility |
Public Works, Roads and Transport |
Completed
|
1,037,760.81 |
Chepseon |
Feedback |
| Construction of Nyabangi Road Culverts |
To improve road safety and accessibility |
Public Works, Roads and Transport |
Completed
|
3,216,040.00 |
Kabianga |
Feedback |
| Construction Of Kipkeremwo- Ngasura Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
4,040,978.32 |
Chepseon |
Feedback |
| Tabet - Kipsomoi River Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
899,278.00 |
Litein |
Feedback |
| Maronget/lemeywet |
Improve access, quality of learning and care in ecde centers |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
2,240,000.00 |
Kipkelion |
Feedback |
| Sitotwet Dispensary |
To increase access to primary healthcare services for Sitotwet community by establishing a new dispensary. |
Health Services |
Completed
|
2,773,550.00 |
Kapsoit |
Feedback |
| Kererut Spring Protection |
To develop and protect a sustainable water source for both human and livestock use by implementing spring/intake development, constructing essential water collection and delivery infrastructure, and promoting environmental conservation through fencing and tree planting |
Water, Environment, Energy and Natural Resources |
Completed
|
2,065,620.00 |
Soliat |
Feedback |
| Rouitne Maintenance of Off d314-Masaita Hill-Kaptich Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,450,700.00 |
Tendeno/Sorget |
Feedback |
| Construction of Kamuogo-Independent Box Culvert |
To improve road safety and accessibility |
Public Works, Roads and Transport |
Completed
|
1,392,307.98 |
Tendeno/Sorget |
Feedback |
| Construction of twin 900mm cross Culvert at Arap Kitur - Arap Serem Road |
To improve road safety and accessibility |
Public Works, Roads and Transport |
Completed
|
6,701,830.00 |
Kapsuser |
Feedback |
| Construction of Momoniat Centre- Cheboror Pry- Kap Cherotich- Karap Malel- Sigowet Road 5Km |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
4,555,520.45 |
Chepseon |
Feedback |
| Sachoran- Kapnandet- Kaplemeiywet AGC- Off Tegat Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
850,000.00 |
Kapsuser |
Feedback |
| Kapias |
Improve access, quality of learning and care in ecde centers |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
1,120,000.00 |
Kunyak |
Feedback |
| Torsogeek Dispensary |
To enhance service delivery by completing the outpatient block for improved patient flow and healthcare access. |
Health Services |
Completed
|
5,992,860.00 |
Kapsoit |
Feedback |
| Kiplogoi Water Project |
To expand and improve the existing water supply system through the extension of the distribution pipeline and rehabilitation of existing storage infrastructure, ensuring increased water access and reliability for the target population |
Water, Environment, Energy and Natural Resources |
Completed
|
2,034,020.00 |
Soliat |
Feedback |
| Rouitne Maintenance of Kamwingi - Sanchangwan -D314 Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,182,636.00 |
Tendeno/Sorget |
Feedback |
| Construction of Morombit Box Culvert |
To improve road safety and accessibility |
Public Works, Roads and Transport |
Completed
|
1,451,994.99 |
Chilchila |
Feedback |
| Construction of Twin 900mm cross Culvert at Cheboin river |
To improve road safety and accessibility |
Public Works, Roads and Transport |
Completed
|
3,503,150.00 |
Kapsuser |
Feedback |
| Construction of AGC-Kobeiyot Road 0.5Km; Momoniat Pry Schl- Cllr Road 0.2Km, Kap Hezron Road 0.6Km |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,876,196.80 |
Chepseon |
Feedback |
| Masarian AGC- Borborwet
TBC- Kiboe TBC Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
534,240.00 |
Kapsuser |
Feedback |
| Chepngosos/sirgoi |
Improve access, quality of learning and care in ecde centers |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
4,480,000.00 |
Kunyak |
Feedback |
| Torsogeek Dispensary |
To improve sanitation facilities and enhance drug management through construction of toilets and pharmacy shelving. |
Health Services |
Completed
|
3,900,800.00 |
Kapsoit |
Feedback |
| Kongeren Spring Protection |
To develop and protect a sustainable water source for both human and livestock use by implementing spring/intake development, constructing essential water collection and delivery infrastructure, and promoting environmental conservation through fencing and tree planting |
Water, Environment, Energy and Natural Resources |
Completed
|
2,224,800.00 |
Soliat |
Feedback |
| Rouitne Maintenance of Subukia Independent Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,388,813.00 |
Tendeno/Sorget |
Feedback |
| Construction of Mogire Box Culvert |
To improve road safety and accessibility |
Public Works, Roads and Transport |
Completed
|
1,700,602.00 |
Chilchila |
Feedback |
| Construction of Twin 900mm cross Culvert at Arap Samityuk - Kap Christopher Road |
To improve road safety and accessibility |
Public Works, Roads and Transport |
Completed
|
2,226,000.00 |
Kapsuser |
Feedback |
| Construction of Kapmachungwa-Mutanya road;Off Kamachungwa-Leberer cattle dip road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,098,633.00 |
Chepseon |
Feedback |
| Susumwet AGC- Starehe Girls Sch.- Kapmungwan Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
520,594.00 |
Kapsuser |
Feedback |
| Lesonet/sirgoi |
Improve access, quality of learning and care in ecde centers |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
2,240,000.00 |
Kunyak |
Feedback |
| Kericho County Referral hospital |
To improve storage organization, security, and client comfort at the County Drug Store. |
Health Services |
Completed
|
3,499,700.00 |
Kipchebor |
Feedback |
| Chepkeikei Water Project |
To enhance access to safe, reliable, and sustainable water supply for households and institutions within Chepkeikei community through the equipping and solarisation of spring protection, construction of sump, installation of UPVC tanks, rising main and distribution pipelines |
Water, Environment, Energy and Natural Resources |
Completed
|
4,437,140.00 |
Soliat |
Feedback |
| Routine Maintenance of Sereng -Chemosogol Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,441,587.00 |
Chilchila |
Feedback |
| Construction of Murgut Bridge and 3km approach Road |
To improve road safety and accessibility |
Public Works, Roads and Transport |
Completed
|
1,592,276.72 |
Chilchila |
Feedback |
| Construction of Chepkutbei Pipe Culverts |
To improve road safety and accessibility |
Public Works, Roads and Transport |
Completed
|
2,249,000.00 |
Cheptororiet/Seretut |
Feedback |
| Kosachmwai Centre- Kuresiet- Chemoset Bridge Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
491,944.00 |
Cheptororiet/Seretut |
Feedback |
| Koisegem |
Ensure Hygiene and Sanitation, Promote Health and Disease Prevention |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
4,480,000.00 |
Chilchila |
Feedback |
| Kericho County Referral hospital |
To enhance security and safety of public health and blood bank premises. |
Health Services |
Completed
|
1,503,600.00 |
Kipchebor |
Feedback |
| Kimigik water Project (Pipeline Extension) |
To enhance access to clean and sustainable water supply by constructing pipelines, water tanks & associated fittings ensuring reliable water delivery to the target community |
Water, Environment, Energy and Natural Resources |
Completed
|
4,298,670.00 |
Ainamoi |
Feedback |
| Routine Maintenance of Off C35-Museum Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,151,286.00 |
Chilchila |
Feedback |
| Construction of Kawangware Box Culvert |
To improve road safety and accessibility |
Public Works, Roads and Transport |
Completed
|
1,569,543.43 |
Kamasian |
Feedback |
| Construction of Kipkeremwo twin 900mm Cross Culverts |
To improve road safety and accessibility |
Public Works, Roads and Transport |
Completed
|
5,992,400.00 |
Chepseon |
Feedback |
| Kesukyo - Chesagat TBC - Michingilwet Canaan AGC Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
817,600.00 |
Cheptororiet/Seretut |
Feedback |
| Tulwapmoi |
Ensure Hygiene and Sanitation, Promote Health and Disease Prevention |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
1,680,000.00 |
Chilchila |
Feedback |
| Kericho County Referral hospital |
To provide adequate and safe electrical connections for the new Comprehensive Care Centre (CCC) block. |
Health Services |
Completed
|
3,699,635.00 |
Kipchebor |
Feedback |
| Routine Maintenance of Sombo-Lelu-Sambu Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,658,755.00 |
Chilchila |
Feedback |
| Construction of Kapkwen Matarmat Box culvert |
To improve road safety and accessibility |
Public Works, Roads and Transport |
Completed
|
1,851,583.44 |
Kipkelion |
Feedback |
| Construction of twin 900mm cross culvert at 938 dip Road |
To improve road safety and accessibility |
Public Works, Roads and Transport |
Completed
|
3,428,720.00 |
Chepseon |
Feedback |
| Construction of Chebitet- Kiletien Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,845,441.00 |
Chepseon |
Feedback |
| Cheboseroi- Arap Kamoing- Kwenet TBC- Off-Cheptenye Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
773,683.00 |
Waldai |
Feedback |
| Chepkendi |
Ensure Hygiene and Sanitation, Promote Health and Disease Prevention |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
2,240,000.00 |
Chilchila |
Feedback |
| Kericho County Referral hospital |
To enhance functionality and usability of the CCC block through interior finishing works. |
Health Services |
Completed
|
2,023,540.00 |
Kipchebor |
Feedback |
| Routine Maintenance of Kipchorian Primary -Martha Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,314,220.00 |
Kipkelion |
Feedback |
| Construction of Matarmat Box culvert |
To improve road safety and accessibility |
Public Works, Roads and Transport |
Completed
|
1,910,372.33 |
Kipkelion |
Feedback |
| Construction of Silibonik-Kiplekwa Box Culvert |
To improve road safety and accessibility |
Public Works, Roads and Transport |
Completed
|
10,526,200.00 |
Kedowa/Kimugul |
Feedback |
| Construction of Kipkeremwo - Ngasura Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,562,309.50 |
Chepseon |
Feedback |
| Chemumbe- Off Kabianga- Makitem- Cheptarit Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
661,780.00 |
Waldai |
Feedback |
| Milimani |
Ensure Hygiene and Sanitation, Promote Health and Disease Prevention |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
2,240,000.00 |
Chilchila |
Feedback |
| Kericho County Referral hospital |
To enhance functionality and usability of the CCC block through interior finishing works. |
Health Services |
Completed
|
1,060,000.00 |
Kipchebor |
Feedback |
| Ainabon water project in Kipchebor ward |
To expand access to safe, reliable, and sustainable water supply for the Ainabon community in Kipchebor Ward through the supply and installation of a hydrum pump, construction of a 23.4m? steel elevated water tower, and laying of a 2 km distribution pipeline |
Water, Environment, Energy and Natural Resources |
Completed
|
1,488,973.00 |
Kipchebor |
Feedback |
| Routine Maintenance of Kipkelion Town Maguni -Police Station -Chongoti Bridge Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,895,080.00 |
Kipkelion |
Feedback |
| Construction of Kapkoros-Njoro Box Culvert in 940 |
To improve road safety and accessibility |
Public Works, Roads and Transport |
Completed
|
1,225,500.00 |
Kunyak |
Feedback |
| Construction of Off B1 - Lembel Culverts |
To improve road safety and accessibility |
Public Works, Roads and Transport |
Completed
|
7,120,904.00 |
Kedowa/Kimugul |
Feedback |
| Construction Of Deliverance-Ngatumek Road 3.4Km, Mathias- Kipyemit Road 1.2Km |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,816,435.73 |
Kedowa/Kimugul |
Feedback |
| Tabsargoi- Tulwap Kipiywet- Lelaitich AGC Church Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
793,150.00 |
Waldai |
Feedback |
| Imbaragai |
Ensure Hygiene and Sanitation, Promote Health and Disease Prevention |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
1,120,000.00 |
Kunyak |
Feedback |
| Chesanga Dispensary |
To improve stormwater management and environmental hygiene through proper drainage installation. |
Health Services |
Completed
|
2,421,720.00 |
Kipchebor |
Feedback |
| Kapkatet Water Spring Protection |
To improve access to safe and sustainable drinking water for the community by protecting natural springs and establishing reliable water points. |
Water, Environment, Energy and Natural Resources |
Completed
|
1,650,044.00 |
Kapkatet |
Feedback |
| Routine Maintenance of Tamarsat-Tingoro Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,043,953.89 |
Kipkelion |
Feedback |
| Construction of Kapkurin Cross Culverts |
To improve road safety and accessibility |
Public Works, Roads and Transport |
Completed
|
3,292,320.00 |
Kunyak |
Feedback |
| Construction of Cross Culverts to Chebitet- Kipyemit Road |
To improve road safety and accessibility |
Public Works, Roads and Transport |
Completed
|
1,590,000.00 |
Kedowa/Kimugul |
Feedback |
| Construction of Kimugul-Kimoson Primary School Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
4,253,729.28 |
Kedowa/Kimugul |
Feedback |
| Nyinyitiet - Kapkwen Pry School Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
773,762.00 |
Ainamoi |
Feedback |
| Talai farm |
Ensure Hygiene and Sanitation, Promote Health and Disease Prevention |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
5,600,000.00 |
Kunyak |
Feedback |
| Kimungen Dispensary |
To improve the physical environment and accessibility of Kimungen Dispensary through landscaping works. |
Health Services |
Completed
|
1,775,200.00 |
Kipchebor |
Feedback |
| Kibaraa Water Project |
To provide sustainable, reliable, and affordable access to safe water for the Kibaraa community through solarisation, pump set installation, pipework, and UPVC tank installation |
Water, Environment, Energy and Natural Resources |
Completed
|
1,372,402.00 |
Waldai |
Feedback |
| Routine Maintenance of Lelu- Bartera Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,395,492.80 |
Kamasian |
Feedback |
| Construction of Kapkesiro Box Culvert |
To improve road safety and accessibility |
Public Works, Roads and Transport |
Completed
|
2,004,881.00 |
Sigowet |
Feedback |
| Construction of precast culvertsat Nairobi - Saramek Road |
To improve road safety and accessibility |
Public Works, Roads and Transport |
Completed
|
3,969,330.00 |
Londiani |
Feedback |
| Construction of Free pentacost church-Kiprengwe-Kapchelule road; Cattle dip-Miti Moja road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,798,778.40 |
Kedowa/Kimugul |
Feedback |
| Off Highway - Kabuloin Secondary School Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
551,980.00 |
Kapsaos |
Feedback |
| Lelechwet |
Ensure Hygiene and Sanitation, Promote Health and Disease Prevention |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
2,240,000.00 |
Kipkelion |
Feedback |
| Kericho County Referral hospital |
To finalize construction and operationalize the comprehensive care clinic and administration block. |
Health Services |
Completed
|
1,113,000.00 |
Kipchebor |
Feedback |
| Kaitui Water Project |
To improve access to safe, reliable, and sustainable water supply for the Kaitui community in 964 through the construction of a water distribution pipeline |
Water, Environment, Energy and Natural Resources |
Completed
|
1,782,177.00 |
Soliat |
Feedback |
| Routine Maintenance of Murau - Centre - Tinga Farm Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,495,170.00 |
Kamasian |
Feedback |
| Construction of Kipranye Box Culvert |
To improve road safety and accessibility |
Public Works, Roads and Transport |
Completed
|
2,283,573.21 |
Sigowet |
Feedback |
| Construction of precast culvert to Chelalang - Kondamet Road |
To improve road safety and accessibility |
Public Works, Roads and Transport |
Completed
|
3,731,680.00 |
Londiani |
Feedback |
| Construction of Off B1-Barkechechek River Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,524,012.64 |
Kedowa/Kimugul |
Feedback |
| Chemosot - Simoton TBC - Chemosot Dip - Simoton Pry Sch Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
772,612.00 |
Chemosot |
Feedback |
| Chebirir |
Ensure Hygiene and Sanitation, Promote Health and Disease Prevention |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
1,120,000.00 |
Kipkelion |
Feedback |
| Kimungen Dispensary |
To improve sanitation standards by providing adequate toilet facilities for patients. |
Health Services |
Completed
|
1,272,000.00 |
Kipchebor |
Feedback |
| Mabasi Water Project |
To enhance access to safe, reliable, and sustainable water for the Mabasi community in Bureti’s Kisiara Ward through equipping and solarisation of the intake, installation of submersible motor, construction of rising main and distribution pipelines, and installation of UPVC storage tanks |
Water, Environment, Energy and Natural Resources |
Completed
|
1,476,427.00 |
Kisiara |
Feedback |
| Routine Maintenance of Kiptenten-Kapkurin Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,388,813.00 |
Kunyak |
Feedback |
| Construction of Muteta Box Culvert |
To improve road safety and accessibility |
Public Works, Roads and Transport |
Completed
|
2,564,526.08 |
Sigowet |
Feedback |
| Construction of precast culverts to Kafinch - Sotik Road |
To improve road safety and accessibility |
Public Works, Roads and Transport |
Completed
|
2,204,800.00 |
Londiani |
Feedback |
| Construction Of Kwa Chumo Rd,Kipsigori-Agc Church Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,069,131.16 |
Kedowa/Kimugul |
Feedback |
| Chesanga - Jonland Academy - Chesanga Church of Christ Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
766,876.00 |
Cheplanget |
Feedback |
| Borowet |
Ensure Hygiene and Sanitation, Promote Health and Disease Prevention |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
2,240,000.00 |
Kamasian |
Feedback |
| Chesanga Dispensary |
To enhance security and protect health infrastructure by constructing a perimeter wall |
Health Services |
Completed
|
2,003,400.00 |
Kipchebor |
Feedback |
| Mtaragon Water Project |
To increase access to safe, reliable, and sustainable water for the Mtaragon community in Kamasian Ward through construction of a masonry storage tank, installation of UPVC tank, distribution pipelines, communal water points, and fencing of the spring source. |
Water, Environment, Energy and Natural Resources |
Completed
|
1,381,574.00 |
Kamasian |
Feedback |
| Routine Maintenance of Mariwa – Singoiwek Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,492,180.20 |
Kunyak |
Feedback |
| Construction of Chebotot-Ngeremwo Box Culvert |
To improve road safety and accessibility |
Public Works, Roads and Transport |
Completed
|
4,837,715.40 |
Soin |
Feedback |
| Construction of Lelsotet Bridge |
To improve road safety and accessibility |
Public Works, Roads and Transport |
Completed
|
1,632,400.00 |
Londiani |
Feedback |
| Construction Of Kapkondoo-Kapisoi Road 3.8Km, |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,299,034.62 |
Londiani |
Feedback |
| Sachangwan - Kap Emit - Monoru - Kondamet Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
537,280.00 |
Kisiara |
Feedback |
| Centre juu |
Ensure Hygiene and Sanitation, Promote Health and Disease Prevention |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
1,120,000.00 |
Kamasian |
Feedback |
| Kericho County Referral hospital |
To strengthen infection prevention and control by converting an existing ward into a dedicated isolation unit. |
Health Services |
Completed
|
5,319,600.00 |
Kipchebor |
Feedback |
| Londiani Water Supply Intake and Gravity Mains Project |
To improve water supply reliability and coverage for the Londiani community through supply, delivery, and excavation of gravity main, construction of a weir, and fencing of intake works. |
Water, Environment, Energy and Natural Resources |
Completed
|
1,392,197.00 |
Kedowa/Kimugul |
Feedback |
| Routine Maintenance of Tektek- Talai Farm Road - Kapkwen Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
880,440.00 |
Kunyak |
Feedback |
| Construction of Kapkisai Box Culvert |
To improve road safety and accessibility |
Public Works, Roads and Transport |
Completed
|
1,630,209.12 |
Soin |
Feedback |
| Construction of Koisagat - Chilchila Boundary Box Culvert |
To improve road safety and accessibility |
Public Works, Roads and Transport |
Completed
|
3,460,060.00 |
Chilchila |
Feedback |
| Construction Of Kapkwen Pry School- Arap Kurgat Road 1.2Km, AIC Cheres- Kap Asariah Road 0.4km, Cheres Centre- Forest Road, Arap Choge- Ninja Road, SDA Cheres-Kap Zachariah Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
4,677,463.36 |
Londiani |
Feedback |
| Kelunet - Kimoro - Wochi Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
551,980.00 |
Tebesonik |
Feedback |
| Laliat |
Ensure Hygiene and Sanitation, Promote Health and Disease Prevention |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
1,120,000.00 |
Kamasian |
Feedback |
| County Referral Hospital |
To improve testing and sample handling capacity through construction of a designated COVID-19 sample collection area. |
Health Services |
Completed
|
2,353,600.00 |
Kipchebor |
Feedback |
| Sosur Borehole Water Project |
To increase access to safe, reliable, and sustainable water supply for the Sosur community in Kaplelartet Ward through drilling and development of a borehole. |
Water, Environment, Energy and Natural Resources |
Completed
|
623,565.00 |
Kaplelartet |
Feedback |
| Bokwo- Kapchebwai Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
753,338.00 |
Soin |
Feedback |
| Construction Of Kamaget Box Culvert |
To improve road safety and accessibility |
Public Works, Roads and Transport |
Completed
|
1,352,869.92 |
Soliat |
Feedback |
| Construction of Segetet - Kitobe Twin twin 900mm cross Culvert |
To improve road safety and accessibility |
Public Works, Roads and Transport |
Completed
|
3,325,250.00 |
Kipkelion |
Feedback |
| Construction of Kipsirichet-Boma-Jagoror Quarry Road 1.5km,Kapketin-Kigen-Academy Road 1.2km, Baba Noa -DC Road 1.1km |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,849,905.21 |
Londiani |
Feedback |
| Cheptarit AGC
- Ngariet bridge
- Kalyongwet Pry School Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
798,150.00 |
Kaplelartet |
Feedback |
| Ndubusat |
Ensure Hygiene and Sanitation, Promote Health and Disease Prevention |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
1,120,000.00 |
Chilchila |
Feedback |
| Proposed water tank base and water collection at Kiletien Dispensary |
To provide a reliable water harvesting and supply system. |
Health Services |
Completed
|
1,918,600.00 |
Chepseon |
Feedback |
| Chemutian Water Project |
To provide safe, reliable, and sustainable water supply for the Chemutian community in 964 through construction of a 50m? ground-level masonry storage tank, protection of two springs, and development of gravity mains and distribution pipelines. |
Water, Environment, Energy and Natural Resources |
Completed
|
686,210.00 |
Soliat |
Feedback |
| Kapkisai - Kapkigoro Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
376,450.00 |
Soin |
Feedback |
| Construction Of Chepkoson Box Culvert |
To improve road safety and accessibility |
Public Works, Roads and Transport |
Completed
|
1,879,200.00 |
Soliat |
Feedback |
| Construction of Mogire Box Culvert |
To improve road safety and accessibility |
Public Works, Roads and Transport |
Completed
|
7,624,000.00 |
Chilchila |
Feedback |
| Construction of Kapsenda quarry - Kipsotet Road 1.3km; Kapkondoo SB - Chebirir Road 2.0km and Kimout - Chepkoiyo Road 1.4km |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,075,343.20 |
Londiani |
Feedback |
| Sachangwan - Kipkeiyo TBC - KapChanga TBC Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
793,672.00 |
Sigowet |
Feedback |
| Samolel |
Ensure Hygiene and Sanitation, Promote Health and Disease Prevention |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
2,240,000.00 |
Chilchila |
Feedback |
| Facelift to Londiani Hospital |
To modernize the hospital environment and improve patient experience. |
Health Services |
Completed
|
2,224,800.00 |
Kedowa/Kimugul |
Feedback |
| Purchase of Land for Litein Municapal Water & Sewarage Treatment Plant |
To secure adequate land for the establishment of a modern water and sewerage treatment plant in Litein Municipality, aimed at improving access to safe water, sanitation, and hygiene services for residents, institutions, and businesses. |
Water, Environment, Energy and Natural Resources |
Completed
|
1,341,139.00 |
Kisiara |
Feedback |
| Kipsitet - Kabore Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
325,000.00 |
Soin |
Feedback |
| Construction of Chepyegon- Arap Tegere Bridge |
To improve road safety and accessibility |
Public Works, Roads and Transport |
Completed
|
2,129,520.00 |
Soliat |
Feedback |
| Construction of Soi Mingin - Blue Hills Cattle Dip Twin 900mm Cross Culvert |
To improve road safety and accessibility |
Public Works, Roads and Transport |
Completed
|
4,791,300.00 |
Kipkelion |
Feedback |
| Grading, gravelling and compaction of Lower Cheres Road, Kapkwen pry school - Arap Kurgat rd,AIC Cheres - Kap Asariah Road, Cheres Centre - Forestry Road; Arap Choge - Ninja Road; SDA Cheres -Kapzachariah Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,762,126.85 |
Londiani |
Feedback |
| Kipsitet Pry School - Kipsitet Dip - Kap Jeremiah Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
793,672.00 |
Soin |
Feedback |
| Korosiot |
Ensure Hygiene and Sanitation, Promote Health and Disease Prevention |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
1,120,000.00 |
Chilchila |
Feedback |
| Extension of laboratory blocks at Kapkatet and Londiani County Hospitals |
To strengthen diagnostic capacity by expanding laboratory facilities. |
Health Services |
Completed
|
2,764,850.00 |
Kedowa/Kimugul |
Feedback |
| Chepkosilen Secondary Borehole Water Project |
To improve access to safe, reliable, and sustainable water supply for Chepkosilen Secondary School and the surrounding community through borehole drilling and development. |
Water, Environment, Energy and Natural Resources |
Completed
|
1,104,543.00 |
Cheptororiet/Seretut |
Feedback |
| Kipsitet Pry- Kipsitet Dip Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
962,120.25 |
Soin |
Feedback |
| Construction Of Cheptembe Tililbei Box Culvert |
To improve road safety and accessibility |
Public Works, Roads and Transport |
Completed
|
3,174,000.00 |
Kaplelartet |
Feedback |
| Construction of Minihaha Box Culvert |
To improve road safety and accessibility |
Public Works, Roads and Transport |
Completed
|
743,900.00 |
Kunyak |
Feedback |
| Construction of Barno-Kimout pry sch-Kimout centre rd 3km,Sudan Kapraplimo rd 0.3km, Kiplangat-Chepkoiyo-Kapkiondo rd 1.3km, Kapsenda Dispesary-Kerich -Kutu rd 1.7km,Marindany-Lalangbek pry sch rd 1.6km Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,615,691.00 |
Londiani |
Feedback |
| Nyaberi bridge- Kap Pastor Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
841,561.00 |
Soin |
Feedback |
| Cherara |
Ensure Hygiene and Sanitation, Promote Health and Disease Prevention |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
2,240,000.00 |
Chilchila |
Feedback |
| Proposed construction of laboratory at Londiani Hospital |
To enhance diagnostic and testing services through new lab construction. |
Health Services |
Completed
|
3,954,800.00 |
Kedowa/Kimugul |
Feedback |
| Kipsolu Pipeline Water Project |
To expand and improve the existing water supply system through the extension of the distribution pipeline and rehabilitation of existing storage infrastructure, ensuring increased water access and reliability for the target population |
Water, Environment, Energy and Natural Resources |
Completed
|
1,019,845.00 |
Cheptororiet/Seretut |
Feedback |
| Koitaburot - Kejiryet Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
4,000,000.00 |
Soin |
Feedback |
| Kapzakayo-Ainamoi Poly Road 2.2km, Ainamioi Sec- Chemorir Road 1.9km ,Nyinyitwet-Kiburet Rd 1.9 Km,Merto-Kichorian Rd 4 Km |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,483,205.00 |
Ainamoi |
Feedback |
| Construction of Nunda Box Culvert |
To improve road safety and accessibility |
Public Works, Roads and Transport |
Completed
|
2,158,400.00 |
Soin |
Feedback |
| Construction Of Independet- Kamwogo Road 4.5Km |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,889,408.00 |
Tendeno/Sorget |
Feedback |
| Salgaa - Arap Chebochok - Arap Bilo Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
510,515.00 |
Soliat |
Feedback |
| Tuiyobei |
Ensure Hygiene and Sanitation, Promote Health and Disease Prevention |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
1,120,000.00 |
Kipkelion |
Feedback |
| Proposed construction of medical store at Londiani Hospital |
To improve medical storage and logistics efficiency. |
Health Services |
Completed
|
2,003,400.00 |
Kedowa/Kimugul |
Feedback |
| Maso-Kewasco Lastmile Connectivity Water Project |
To expand and improve the existing water supply system through the extension of the distribution pipeline and rehabilitation of existing storage infrastructure, ensuring increased water access and reliability for the target population |
Water, Environment, Energy and Natural Resources |
Completed
|
1,080,000.00 |
Kapkugerwet |
Feedback |
| Soko Huru Kapsegut Pry Kubinkok Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,172,101.00 |
Soliat |
Feedback |
| Chepkoyo Quarry- Sambula-Lelechwet Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,254,922.26 |
Ainamoi |
Feedback |
| Construction of Kapaiwo twin 900mm Culvert |
To improve road safety and accessibility |
Public Works, Roads and Transport |
Completed
|
2,595,000.00 |
Soliat |
Feedback |
| Grading Of Kaigai Road, Upc Road: 1km, Majani Sawmill- Awii Road: 1.2km,Amos- Saiz Road: 2.7km Independent Church- Dam Road: 1.2km, Ajaja Road:1.1km, Catholic- Main- Cherer Diversion Road: Madam Milka- Koigo Road: Cheres Road: Chebangang Road: Josh- Dam Road: 1.3km, Chane Road: 2km,Upendo Road:1.5km, Wakimani Road:1.1km Zakayo Road:1.2km, Mama Mike Road:1.2km, Mrs Langat- Forest Road: 1.3km, Botpla Road: 1.2km, Mama Wangari- Dam - Daniel Road: 2km, Speaker Kiprono Road:1.8km,Kwa Daniel Road:1.2km,Daniel - Forest Road:2km,Centaa Road: 3km,Kipkelion Works:2.1km, Barsiele Road:1.8km, Mau Road- Rowerr Road:00.8km,Towett-Guito Road:1.2km, Ngingo- Highway Road:1.8km,Peters- Gwitu Road:1.8km Bungoma Road- Isilii Road: Assembly Church Bridge- Cheres Road: Bridge Road: Assembly Church Bridge- Cheres -Bridge Road: Mama Chelimo- Al Shabaab Road: 0.8km |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,373,212.26 |
Tendeno/Sorget |
Feedback |
| Kamasega SDA
- Kamasega Central ECDE Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
853,890.00 |
Soliat |
Feedback |
| Barsiele |
Ensure Hygiene and Sanitation, Promote Health and Disease Prevention |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
2,240,000.00 |
Kipkelion |
Feedback |
| Construction of laboratory at Kedowa Health Center |
To improve laboratory capacity for patient testing and diagnostics. |
Health Services |
Completed
|
8,070,480.00 |
Kedowa/Kimugul |
Feedback |
| Kendabei Water Project Extension |
To expand and improve the existing water supply system through the extension of the distribution pipeline and rehabilitation of existing storage infrastructure, ensuring increased water access and reliability for the target population |
Water, Environment, Energy and Natural Resources |
Completed
|
500,000.00 |
Kabianga |
Feedback |
| Kapkara –Kap Cheruiyot Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
10,300,000.00 |
Soliat |
Feedback |
| Ainamoi Centre- Itibet Rd |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,223,988.38 |
Ainamoi |
Feedback |
| Construction of Kongeren twin 900mm Culvert |
To improve road safety and accessibility |
Public Works, Roads and Transport |
Completed
|
6,164,640.00 |
Soliat |
Feedback |
| Construction Of Sorget Chief's Office-Sorget Pry Sch Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,699,633.01 |
Tendeno/Sorget |
Feedback |
| Kaptembwa - Lelechonik Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
626,632.00 |
Kedowa/Kimugul |
Feedback |
| Maronget/lemeiywet |
Ensure Hygiene and Sanitation, Promote Health and Disease Prevention |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
1,120,000.00 |
Kipkelion |
Feedback |
| Construction of Testai Dispensary |
To expand primary healthcare coverage through new dispensary construction. |
Health Services |
Completed
|
2,843,800.00 |
Kedowa/Kimugul |
Feedback |
| Posta-Kaitui-Root Eleven-Chemutian Dip Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,298,676.00 |
Soliat |
Feedback |
| Budalangi - Kap CID -Bechulelach Road 2km, |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,794,746.48 |
Ainamoi |
Feedback |
| Construction of Sombicho Twin 900mm Culverts Box Culvert |
To improve road safety and accessibility |
Public Works, Roads and Transport |
Completed
|
5,117,200.00 |
Soliat |
Feedback |
| Construction Of Kakibe Primary-Chepkalo Coffee Factory-Catholic Church-Simotwet Primary-Tirita Bricks YaRoad Road 2Km |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,549,505.34 |
Sigowet |
Feedback |
| Kipteris Girls - Kipsinende Technical Institute Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
503,760.00 |
Chilchila |
Feedback |
| Kapias |
Ensure Hygiene and Sanitation, Promote Health and Disease Prevention |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
2,240,000.00 |
Kunyak |
Feedback |
| Proposed Completion of OPD/shelving of pharmacy and Construction of Four Door Toilets at Testai Dispensary |
To improve patient access and sanitation facilities within the dispensary. |
Health Services |
Completed
|
553,600.00 |
Kedowa/Kimugul |
Feedback |
| Matobo Kewasco Water Supply Project Last Mile Connectivity |
To expand and improve the existing water supply system through the extension of the distribution pipeline and rehabilitation of existing storage infrastructure, ensuring increased water access and reliability for the target population |
Water, Environment, Energy and Natural Resources |
Completed
|
2,500,000.00 |
Kipchebor |
Feedback |
| Soliat - Mogonjet Bridge Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,739,860.00 |
Soliat |
Feedback |
| Sambula-Lelechwet-Mureret Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,339,908.12 |
Ainamoi |
Feedback |
| Construction of Orgony Box Culvert |
To improve road safety and accessibility |
Public Works, Roads and Transport |
Completed
|
8,391,800.00 |
Sigowet |
Feedback |
| Construction Of Tabrasoi-Kiplogoi Pry-Saachangwan Road 3.6km,Sugutek-Tuiyobei Pry Sch Road 4km |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,810,000.00 |
Soliat |
Feedback |
| Toroton - Kokwet Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
681,168.00 |
Chilchila |
Feedback |
| Chepngosos/ koru farm |
Ensure Hygiene and Sanitation, Promote Health and Disease Prevention |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
2,240,000.00 |
Kunyak |
Feedback |
| Proposed completion of medical drug store at Londiani Sub County Hospital |
To strengthen drug management and supply chain efficiency. |
Health Services |
Completed
|
1,176,400.00 |
Kedowa/Kimugul |
Feedback |
| Kapkara –Kap Cheruiyot Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,339,903.00 |
Soliat |
Feedback |
| Openning Of Laliat Lower-Chesilyot-Lelboinet Rd 5km, Merto Chesilyot 2km, Grading Gravelling Compaction Of 0.3km Ainamoi Centre Rds., |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
982,608.00 |
Ainamoi |
Feedback |
| Construction of Sime Box Culvert |
To improve road safety and accessibility |
Public Works, Roads and Transport |
Completed
|
1,608,900.00 |
Kaplelartet |
Feedback |
| Construction of Siriat- Kamungesha Road; Moinget- Kapsinendet Road; Quarry- Cheramus Road; Chemutian- Baregeiywet SDA- Quarry Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
4,598,309.60 |
Soliat |
Feedback |
| Nyairobi - Jagoror Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
894,543.00 |
Kamasian |
Feedback |
| Leldet ECDE |
Improve access, quality of learning and care in ecde centers |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
5,600,000.00 |
Kamasian |
Feedback |
| Construction of OPD at Setek Hills Dispensary |
To improve healthcare access through the construction of a new OPD block. |
Health Services |
Completed
|
2,646,300.00 |
Londiani |
Feedback |
| Tegat Sachangwan,Choruet Water Project |
To expand and improve the existing water supply system through the extension of the distribution pipeline and rehabilitation of existing storage infrastructure, ensuring increased water access and reliability for the target population |
Water, Environment, Energy and Natural Resources |
Completed
|
800,000.00 |
Kapsuser |
Feedback |
| Chebulu -Taita Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,244,079.81 |
Kaplelartet |
Feedback |
| Kamelilo Cofee Factory-Gokul Quarry Rd |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,120,790.00 |
Ainamoi |
Feedback |
| Construction of School of Excellence Box Culvert |
To improve road safety and accessibility |
Public Works, Roads and Transport |
Completed
|
2,650,000.00 |
Kaplelartet |
Feedback |
| Sachangwan Corner- Mariwa Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
532,850.00 |
Kunyak |
Feedback |
| Borowet ECDE |
Improve access, quality of learning and care in ecde centers |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
3,360,000.00 |
Kamasian |
Feedback |
| construction of united Dispensary |
To expand access to healthcare services by constructing a new dispensary. |
Health Services |
Completed
|
1,425,700.00 |
Londiani |
Feedback |
| Borborwet Water Project |
To expand and improve the existing water supply system through the extension of the distribution pipeline and rehabilitation of existing storage infrastructure, ensuring increased water access and reliability for the target population |
Water, Environment, Energy and Natural Resources |
Completed
|
1,200,000.00 |
Kapsuser |
Feedback |
| Cheptagum-Cheptembe- Panda Tililbei Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,297,114.18 |
Kaplelartet |
Feedback |
| Merto Darajet-Kap Fredrick Road 3km, Kabarus-Kipchorian Road 2.5km, Completion Of Budalangi -Kap CID- Bechulelach 2km |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,605,056.16 |
Ainamoi |
Feedback |
| Budalangi-Bechulelach-Kipchorian rd; Kaptongilo-Cheplit rd |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,158,400.00 |
Ainamoi |
Feedback |
| Construction of Kabingok-Kongereen pry-Mirmiro Road 1.7km,Kapshiongiroi-Kaap Chepsengeny r 2.2.km;Seskaa-Ainap Itiik-Kapmathayo Road 1.4km Kapraptuei-Kamageso Road 1.5km |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,613,813.89 |
Soliat |
Feedback |
| Cherote- Samutet Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
720,328.00 |
Kunyak |
Feedback |
| Milimani ECDE |
Improve access, quality of learning and care in ecde centers |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
5,040,000.00 |
Chilchila |
Feedback |
| Proposed Completion of OPD /Shelving of pharmacy and Construction of Four Door Toilets for Patients at United Dispensary |
To enhance outpatient services, pharmaceutical storage, and patient sanitation facilities. |
Health Services |
Completed
|
2,120,000.00 |
Londiani |
Feedback |
| Cheptagum Borehole Water Project |
To provide a safe, reliable, and sustainable source of water for domestic, institutional, and community use through borehole drilling and development. |
Water, Environment, Energy and Natural Resources |
Completed
|
1,200,000.00 |
Kaplelartet |
Feedback |
| Koiyat-Iraa Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,690,900.00 |
Kaplelartet |
Feedback |
| Kapzakayo - Ainamoi Poly Rd; Ainamoi Sec – Chemor Road; Nyinyitwet - Kiburet; Metro - Kipchorian Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,834,702.00 |
Ainamoi |
Feedback |
| Kiburet-Factory- Yasomok Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,988,720.00 |
Ainamoi |
Feedback |
| Construction of Soliat boys sec-chepkoson river rd, karobetKamasenga Quarry rd; Korabei-Chesunet-Kapsigowo rd;Cheramor-siriat rd;sesagaa-kapchelemei-Kongereen |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
4,008,437.76 |
Soliat |
Feedback |
| Kabianga High Sch. Gate- Kaplong TBC ML20 Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
497,704.00 |
Kabianga |
Feedback |
| Chepkendi ECDE |
Improve access, quality of learning and care in ecde centers |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
7,280,000.00 |
Chilchila |
Feedback |
| Proposed Completion OPD at Setek Hills Dispensary |
To improve patient flow and operational capacity through OPD completion. |
Health Services |
Completed
|
2,350,560.00 |
Londiani |
Feedback |
| Kebimbir Borehole Water |
To provide a safe, reliable, and sustainable source of water for domestic, institutional, and community use through borehole drilling and development. |
Water, Environment, Energy and Natural Resources |
Completed
|
2,500,000.00 |
Soin |
Feedback |
| Ormarichok-Kapsomboch Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
898,953.60 |
Kaplelartet |
Feedback |
| Tabet Quarry(Cheribo Tbc-Kapsinei-Kapchumo Rd,Sound City-Telanet Tbc Road) |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,710,950.76 |
Kapsoit |
Feedback |
| Ketpyse rd;Kamelilo rd |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
224,774,768.60 |
Ainamoi |
Feedback |
| Construction of Kabokyek- Chesiche Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,270,053.84 |
Soliat |
Feedback |
| Off Tegat - Susumwet AGC - Starehe Girls Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
69,872.00 |
Kapsuser |
Feedback |
| Tulwap-Moi ECDE |
Improve access, quality of learning and care in ecde centers |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
7,840,000.00 |
Chilchila |
Feedback |
| Proposed completion of Laboratory at Londiani Sub County Hospital |
To strengthen diagnostic capacity by completing the laboratory block. |
Health Services |
Completed
|
1,590,000.00 |
Londiani |
Feedback |
| Nyairobi-Sogonyeti Pipeline |
To expand and improve the existing water supply system through the extension of the distribution pipeline and rehabilitation of existing storage infrastructure, ensuring increased water access and reliability for the target population |
Water, Environment, Energy and Natural Resources |
Completed
|
1,100,000.00 |
Kamasian |
Feedback |
| Construction of Tamboiyot Box Culvert |
To mitigate flooding risks, improve local infrastructure resilience |
Public Works, Roads and Transport |
Completed
|
2,658,198.00 |
Cheplanget |
Feedback |
| Karap Teregei - Gabel Rd; Tilrap Malit -Kirongisyet Rd; Kaptimothy - Chelule Rd; Chemoiben Pry; Chemoiben Pry - Koitabai Rd; Arap Kenei - Kiptetoon Rd; Kiptetoon - Lemeiywet - Tunga Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,655,503.96 |
Kapsoit |
Feedback |
| Ainamoi Polytechnic - Kapsengerini rd (2Km); Ainamoi Sub County Hospital (0.5Km); Kapjonah - Bagao rd (5Km); Ainamoi bridge – Maseriat AGC Rd (2km) |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
15,363,827.10 |
Ainamoi |
Feedback |
| Construction of Kapkormom Junction- Chesino Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,769,728.48 |
Soin |
Feedback |
| Off Cheptenye - Keben Secondary School - Teigaa TBC Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
688,194.00 |
Waldai |
Feedback |
| Chebirir ECDE |
Improve access, quality of learning and care in ecde centers |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
1,120,000.00 |
Kipkelion |
Feedback |
| Proposed construction of two doors at Kimaut Dispensary |
To improve sanitation for patients and staff. |
Health Services |
Completed
|
2,573,680.00 |
Londiani |
Feedback |
| Kipkelion Health Centre Borehole Distribution Pipeline |
To expand and improve the existing water supply system through the extension of the distribution pipeline and rehabilitation of existing storage infrastructure, ensuring increased water access and reliability for the target population |
Water, Environment, Energy and Natural Resources |
Completed
|
1,100,000.00 |
Kipkelion |
Feedback |
| Construction of Boreywek Box Culvert |
To mitigate flooding risks, improve local infrastructure resilience |
Public Works, Roads and Transport |
Completed
|
1,828,032.40 |
Cheplanget |
Feedback |
| Off B1 -Kaboswa-Cheptagum Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,808,646.12 |
Kapsoit |
Feedback |
| Ainamoi Shopping centre- Ainamoi pry- Itibet road; Senetwet - Arap Cheruiyot - Maberiat FGC rd; Kamelilo coffee factory - Kamelilo pry - Arap Ngeny rd; Kamelilo pry - Koisirat rd |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
46,884,040.00 |
Ainamoi |
Feedback |
| Construction Of Ngeremwo-Chobotot-Laitigo Road 6km,Kwa Michael-Laitigo Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,130,604.50 |
Soin |
Feedback |
| Off C25 - Posta
- Kaboson TBC Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
839,600.00 |
Waldai |
Feedback |
| Lelechwet ECDE |
Improve access, quality of learning and care in ecde centers |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
1,120,000.00 |
Kipkelion |
Feedback |
| Proposed completion of OPD, fencing and gate at United Dispensary |
To enhance service delivery and security through OPD completion and perimeter fencing. |
Health Services |
Completed
|
807,910.00 |
Londiani |
Feedback |
| Sasuriet Water Project Last Mile Connectivity |
To expand water supply coverage by connecting unserved households, schools, and institutions to the existing water distribution network under the Last Mile Connectivity initiative. |
Water, Environment, Energy and Natural Resources |
Completed
|
1,100,000.00 |
Ainamoi |
Feedback |
| Construction of Chemosot- Ainaptibik Box Culvert |
To mitigate flooding risks, improve local infrastructure resilience |
Public Works, Roads and Transport |
Completed
|
1,292,187.20 |
Chemosot |
Feedback |
| Kenegut-Itibet-Chepkuk Cheplel Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,403,502.56 |
Kapsoit |
Feedback |
| Lelechwet - Mureret rd; Ainamoi town |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
8,941,017.66 |
Ainamoi |
Feedback |
| Construction Of Ngeremwo-Chobotot-Laitigo Road 6km,Kwa Michael-Laitigo Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,590,290.40 |
Kapkugerwet |
Feedback |
| Proposed Construction and Rehabilitation of Mogo – Itibet – Chepkuk – Cheplel Pry
School Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
691,650.00 |
Kapsoit |
Feedback |
| Imbaragai ECDE |
Improve access, quality of learning and care in ecde centers |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
3,360,000.00 |
Kunyak |
Feedback |
| Proposed construction of 4 door pit latrine at Masaita Dispensary |
To improve sanitation and hygiene within the health facility. |
Health Services |
Completed
|
2,583,200.00 |
Tendeno/Sorget |
Feedback |
| Chepngobob-Kiptegan Water Project last Mile Connectivity |
To expand water supply coverage by connecting unserved households, schools, and institutions to the existing water distribution network under the Last Mile Connectivity initiative. |
Water, Environment, Energy and Natural Resources |
Completed
|
1,800,000.00 |
Kapsaos |
Feedback |
| Construction of Chesingoro- Lalagin (Chepkochun) Box Culvert |
To mitigate flooding risks, improve local infrastructure resilience |
Public Works, Roads and Transport |
Completed
|
2,695,631.30 |
Chemosot |
Feedback |
| Cheribo Tbc -Kapsinei Road 1.3Km, Kipkutung Cheribo Road 1.5Km |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,338,591.28 |
Kapsoit |
Feedback |
| Ainamoi Market - Ainamoi pry - Itibet rd |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
25,984,788.64 |
Ainamoi |
Feedback |
| Proposed Construction of Off B2- Saoset TBC- Chemugusu Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,826,637.19 |
Kapkugerwet |
Feedback |
| Proposed Construction and Rehabilitation of Off B1 – Chepkolon Green Highlands School –
Kipkeles Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
720,328.00 |
Kipchebor |
Feedback |
| Kotetni ECDE |
Improve access, quality of learning and care in ecde centers |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
3,360,000.00 |
Kunyak |
Feedback |
| Proposed construction of Kitchen at Kamwingi Dispensary |
To improve nutrition and patient meal preparation capacity. |
Health Services |
Completed
|
4,273,920.00 |
Tendeno/Sorget |
Feedback |
| Taiwet Water Project |
To expand water supply coverage by connecting unserved households, schools, and institutions to the existing water distribution network under the Last Mile Connectivity initiative. |
Water, Environment, Energy and Natural Resources |
Completed
|
1,370,993.00 |
Kipchimchim |
Feedback |
| Construction of Chematich- Kaptirbet Box Culvert |
To mitigate flooding risks, improve local infrastructure resilience |
Public Works, Roads and Transport |
Completed
|
1,981,260.00 |
Kapkatet |
Feedback |
| Tabet Quarry Excavation(Cheribo Tbc-Kapsinei-Kap Chumo Rd,2.0Km, Telanet-Chepkurbet Road 1.5Km |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,120,308.65 |
Kapsoit |
Feedback |
| Senetwet - Arap Cheruiyot - Maberiat FGK rd |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
242,660.00 |
Ainamoi |
Feedback |
| Proposed Construction and Rehabilitation of Off C23 – Kamungwana – Mogoma TBC Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
782,406.00 |
Kapsuser |
Feedback |
| Talai Farm ECDE |
Improve access, quality of learning and care in ecde centers |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
6,720,000.00 |
Kunyak |
Feedback |
| Proposed completion of Mugumoini Dispensary |
To finalize construction and operationalize the dispensary. |
Health Services |
Completed
|
1,001,700.00 |
Tendeno/Sorget |
Feedback |
| Kabarak Borehole Water Project |
To provide sustainable, safe, and reliable water supply to the target community through borehole equipping, solarisation, installation of storage infrastructure, and source protection |
Water, Environment, Energy and Natural Resources |
Completed
|
5,400,735.00 |
Londiani |
Feedback |
| Construction of Kipkosil River Pipe Culvert |
To mitigate flooding risks, improve local infrastructure resilience |
Public Works, Roads and Transport |
Completed
|
3,900,906.00 |
Kapkatet |
Feedback |
| Cheribo Tbc-Kap Sinei -Kapchumo Road 2.0Km,Telanet-Chepkurbet Road 1.5Km |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,283,802.58 |
Kapsoit |
Feedback |
| Kakobirit - Karapbii rd; Kapkeregu - Budalangi - Kapcosmas - Sitini rd |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,153,168.00 |
Ainamoi |
Feedback |
| Proposed Construction of Mjini Box Culvert |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
4,007,910.00 |
Kipchebor |
Feedback |
| Proposed Construction and Rehabilitation of Kaula – Quarry Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
769,281.00 |
Kipkelion |
Feedback |
| Kilengel ECDE |
Improve access, quality of learning and care in ecde centers |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
4,480,000.00 |
Kunyak |
Feedback |
| Renovation of Masaita Dispensary |
To restore and modernize the dispensary for improved service delivery. |
Health Services |
Completed
|
4,161,555.00 |
Tendeno/Sorget |
Feedback |
| Construction of Arap Komuilom- Ketengeret Box Culvert |
To mitigate flooding risks, improve local infrastructure resilience |
Public Works, Roads and Transport |
Completed
|
627,590.00 |
Litein |
Feedback |
| Murram Supply At Tabet Quarry(Cheribo Tbc-Kapsinei-Kap Chumo Road) |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,798,813.00 |
Kapsoit |
Feedback |
| Lelechwet - Arap cheboiyon rd; Kaptongilo - Kapchepngok rd |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,058,746.00 |
Ainamoi |
Feedback |
| Construction of Koisagat- Chilchila Boundary Box Culvert |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,439,286.70 |
Chilchila |
Feedback |
| Proposed Construction and Rehabilitation of Ormorijok – Kapsomboch Pry School
Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
729,814.00 |
Kaplelartet |
Feedback |
| Tabaita ECDE |
Improve access, quality of learning and care in ecde centers |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
4,480,000.00 |
Ainamoi |
Feedback |
| Proposed Completion of Staff house at Subukia Dispensary |
To improve staff accommodation and retention. |
Health Services |
Completed
|
986,860.00 |
Tendeno/Sorget |
Feedback |
| Construction of Koitabai- Mabwaite Pipe Culverts |
To mitigate flooding risks, improve local infrastructure resilience |
Public Works, Roads and Transport |
Completed
|
991,974.00 |
Kapkatet |
Feedback |
| Cheribo Tbc-Kapsinei- Kapjuma Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,725,073.12 |
Kapsoit |
Feedback |
| Kamelilo factory - Karapngeny rd; Kamelilo pry sch - Kapseremiot river rd; Kapkenat - Kapboniface Kilii rd |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
6,914,380.00 |
Ainamoi |
Feedback |
| Proposed Construction of Chesingoro- Lalagin Box Culvert |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,402,532.80 |
Chemosot |
Feedback |
| Proposed Maintenance of Itibet-Ngeny Bare-Bagao- Deliverance Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
515,650.00 |
Ainamoi |
Feedback |
| Chebigen Polytechnic |
To provide accessible, practical, and industry-relevant technical education and vocational training. |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
4,480,000.00 |
Ainamoi |
Feedback |
| Renovation /completion of maternity block at Kamwingi Dispensary |
To enhance maternal and newborn health services. |
Health Services |
Completed
|
5,854,097.00 |
Tendeno/Sorget |
Feedback |
| Construction of Kaboloin -Kapseger foot Bridge |
To mitigate flooding risks, improve local infrastructure resilience |
Public Works, Roads and Transport |
Completed
|
1,065,344.00 |
Chepseon |
Feedback |
| Offc35-Mbororu-Lemeywet Rd; Kapchetinget-Kamundui-Kachesik Rd; Offc35-Kipsoi-Kapnandet Rd |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,551,375.86 |
Kapsoit |
Feedback |
| Ainamoi Centre rd/Bagao |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,444,376.00 |
Ainamoi |
Feedback |
| Proposed Twin 900mm Cross Culverts to Cherara Bridge, Chebululu- Ng'erng'erwet Road and Kimugul- Ngainet TBC Road At Ngepchebyaat River |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,834,996.18 |
Kisiara |
Feedback |
| Samoei Academy-Kap Martin Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
507,012.00 |
Kapsaos |
Feedback |
| Construction of ECDE Classroom at Barsayan ECDE Centre |
Improve access, quality of learning and care in ecde centers |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
2,240,000.00 |
Ainamoi |
Feedback |
| Construction of generator house at Fort Ternan Hospital. |
To provide secure housing for power backup systems. |
Health Services |
Completed
|
4,999,650.00 |
Chilchila |
Feedback |
| Kenegut-Koisagat Water Project |
To enhance access to safe, reliable, and sustainable water supply for the Kenegut–Koisagat community through construction of a masonry storage tank, rising main, and distribution pipeline |
Water, Environment, Energy and Natural Resources |
Completed
|
1,408,270.00 |
Kapsoit |
Feedback |
| Construction of Kibulkany- Kuresoi Box culvert |
To mitigate flooding risks, improve local infrastructure resilience |
Public Works, Roads and Transport |
Completed
|
1,179,968.58 |
Chepseon |
Feedback |
| Offc35-Asurur-Cheribopryrd;Offc35-Kipteganpry Sch.Rd;Kiptegan-FGCK Rd;Kaporiango-Karachebochok-Tuiyobei Rd |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,246,269.68 |
Kapsoit |
Feedback |
| Keongo Pry School ground leveling |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,402,200.00 |
Kapkugerwet |
Feedback |
| Proposed Construction of Itibet-Cheptang Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
777,850.00 |
Kapsoit |
Feedback |
| Construction of a 6 door Pit Latrine at Poiywek ECDE Centre |
Ensure Hygiene and Sanitation, Promote Health and Disease Prevention |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
7,840,000.00 |
Ainamoi |
Feedback |
| Construction of Kipsinende Dispensary |
To expand access to healthcare services. |
Health Services |
Completed
|
2,502,800.00 |
Chilchila |
Feedback |
| Koitatui Water Project |
To expand water supply coverage by connecting unserved households, schools, and institutions to the existing water distribution network under the Last Mile Connectivity initiative. |
Water, Environment, Energy and Natural Resources |
Completed
|
840,980.00 |
Soin |
Feedback |
| Construction of Itoik Box culvert |
To mitigate flooding risks, improve local infrastructure resilience |
Public Works, Roads and Transport |
Completed
|
2,313,369.00 |
Londiani |
Feedback |
| Masaria TBC-Samituk Rd; Off C35 - Kondamet - Ainamoi Pry Sch Rd; Off C 35 - Itibet - Taturo Rd |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,821,705.20 |
Kapsoit |
Feedback |
| Keongo-Kapsigong Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,950,340.00 |
Kapkugerwet |
Feedback |
| Routine Maintenance Of Kap Josea-Kap Sakawa Road |
Potholes patched, ,surface grading completed. |
Public Works, Roads and Transport |
Completed
|
4,350,955.84 |
Kipchimchim |
Feedback |
| Proposed Construction and Rehabilitation of Baraka-Kap Maina Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
581,137.00 |
Kipchimchim |
Feedback |
| Construction of a Classroom at Chepkoiyo ECDE Centre |
Improve access, quality of learning and care in ecde centers |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
5,600,000.00 |
Ainamoi |
Feedback |
| Kericho Referral Hospital |
To improve patient comfort and service standards by renovating the existing ward. |
Health Services |
Completed
|
6,557,540.00 |
Kipchebor |
Feedback |
| Gwitu Borehole Water Project |
To provide a safe, reliable, and sustainable source of water for domestic, institutional, and community use through borehole drilling and development. |
Water, Environment, Energy and Natural Resources |
Completed
|
804,550.00 |
Tendeno/Sorget |
Feedback |
| Construction of 936 Farmers Bridge |
To improve accessibility for farmers, enhance transportation of agricultural produce, and support local economic development |
Public Works, Roads and Transport |
Completed
|
1,609,830.00 |
Londiani |
Feedback |
| Off C35-Kosisit Pry Sch Rd; |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,197,834.00 |
Kapsoit |
Feedback |
| Chemugusu rd; Laibon Town rds; Keongo - Sumeiyon Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
7,309,772.00 |
Kapkugerwet |
Feedback |
| Routine Maintenance of Cheptororiet-Arap Tonui road |
Potholes patched, ,surface grading completed. |
Public Works, Roads and Transport |
Completed
|
2,937,783.52 |
Kapsuser |
Feedback |
| Proposed Construction of Ngoina Road TBC –
Chebarema Primary – Chebarema
TBC – Bargiro Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
794,200.00 |
Chemosot |
Feedback |
| Construction of a classroom at Annex Prison ECDE centre |
Improve access, quality of learning and care in ecde centers |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
4,480,000.00 |
Kapkugerwet |
Feedback |
| Kimugen Dispensary |
To enhance outpatient service delivery by completing the OPD block. |
Health Services |
Completed
|
716,184.00 |
Kipchebor |
Feedback |
| Ainabon Water Project Phase 11 |
To provide sustainable, reliable, and safe water supply to the target community through construction of a sump, solarisation of the pumping system, installation of storage tanks, and development of a distribution pipelin |
Water, Environment, Energy and Natural Resources |
Completed
|
1,846,760.00 |
Kipchebor |
Feedback |
| Construction of Ndarungo Bridge |
To improve accessibility for farmers, enhance transportation of agricultural produce, and support local economic development |
Public Works, Roads and Transport |
Completed
|
2,857,972.69 |
Kedowa/Kimugul |
Feedback |
| Samutet-Kapkorio Rd |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,694,477.00 |
Kapsoit |
Feedback |
| Roads at Kapkurgwet ward |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
4,019,544.00 |
Kapkugerwet |
Feedback |
| Routine Maintenance of Kosachmwai-Chemoset road |
Potholes patched, ,surface grading completed. |
Public Works, Roads and Transport |
Completed
|
2,090,061.26 |
Cheptororiet/Seretut |
Feedback |
| Tendwet – Moronjo – Chebagal –Sosiot AIC Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
490,650.00 |
Litein |
Feedback |
| Construction of a Classroom at Tabain ECDE Centre |
Improve access, quality of learning and care in ecde centers |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
3,360,000.00 |
Kapsaos |
Feedback |
| Kimeswon Dispensary |
To increase access to healthcare by finalizing construction of Kimeswon Dispensary. |
Health Services |
Completed
|
1,549,354.00 |
Kipchimchim |
Feedback |
| Borowet-Kasheen Water Project |
To expand water supply coverage by connecting unserved households, schools, and institutions to the existing water distribution network under the Last Mile Connectivity initiative. |
Water, Environment, Energy and Natural Resources |
Completed
|
1,515,000.00 |
Kamasian |
Feedback |
| Construction of Kapkwen-Matarmat box culvert |
To mitigate flooding risks, improve local infrastructure resilience |
Public Works, Roads and Transport |
Completed
|
2,693,970.00 |
Kipkelion |
Feedback |
| Kapsoit Sec-Deliverance-Kapseriord |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,423,090.00 |
Kapsoit |
Feedback |
| Arap Bii - Chemugusu Rd (2km); TG 12TBC - Kapgregory (2km) |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
4,231,788.00 |
Kapkugerwet |
Feedback |
| Routine Maintenance of Chebitet-Kap Tebengwet road |
Potholes patched, ,surface grading completed. |
Public Works, Roads and Transport |
Completed
|
3,187,540.80 |
Kapkatet |
Feedback |
| Kamaget Dispensary- Tamboiyot Pry- Kapchanga Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
537,063.00 |
Sigowet |
Feedback |
| Construction of an ECDE Toilet at Kosisit ECDE Centre |
Improve access, quality of learning and care in ecde centers |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
3,360,000.00 |
Kapsaos |
Feedback |
| Kapcheptoror Dispensary. |
To enhance diagnostic services through the construction of a laboratory facility. |
Health Services |
Completed
|
2,334,682.00 |
Kipchimchim |
Feedback |
| Enhancement of Ngendalel, Kalyet, Masibun and Simchorwet water project |
To expand water supply coverage by connecting unserved households, schools, and institutions to the existing water distribution network under the Last Mile Connectivity initiative. |
Water, Environment, Energy and Natural Resources |
Completed
|
1,500,000.00 |
Kipkelion |
Feedback |
| Construction of Chemolo Box Culvert |
To mitigate flooding risks, improve local infrastructure resilience |
Public Works, Roads and Transport |
Completed
|
2,622,180.00 |
Sigowet |
Feedback |
| Kapsoit-Telanet Rd |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,640,000.00 |
Kapsoit |
Feedback |
| Arap Bii - Chemugusu Rd (2km); TG 12TBC - Kapgregory (2km); Keongo FGCK - Kapturungi rd (2km; Masengo - Laibon rd (2km); Kondamet - Agc - Ngororoga rd (2km); Nukiat - Catholic - Keongo rd (2km) |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,272,892.00 |
Kapkugerwet |
Feedback |
| Routine Maintenance of Reresik-Kiprichait-Roret boys-Chebululu-Tulwet-Ngainet bridge |
Potholes patched, ,surface grading completed. |
Public Works, Roads and Transport |
Completed
|
4,629,140.08 |
Kisiara |
Feedback |
| Proposed Maintenance of Chepsoo- Quarry- Kapkawa Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
710,152.00 |
Soliat |
Feedback |
| Construction of ECDE Classroom at Buchenge ECDE Centre |
Improve access, quality of learning and care in ecde centers |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
6,720,000.00 |
Kapsaos |
Feedback |
| Construction of Kapkures Dispensary |
To enhance healthcare access within the community. |
Health Services |
Completed
|
2,764,898.00 |
Chilchila |
Feedback |
| Jagoror - Kapsimotwo Water Project |
To improve access to safe, reliable, and sustainable water for the community through spring protection, construction of a clear water sump, solarisation, and development of a distribution pipeline. |
Water, Environment, Energy and Natural Resources |
Completed
|
2,987,603.00 |
Londiani |
Feedback |
| Construction of Kapkesiro box culvert |
To mitigate flooding risks, improve local infrastructure resilience |
Public Works, Roads and Transport |
Completed
|
920,810.00 |
Sigowet |
Feedback |
| Kenegut Mkt-Mongo-Itibetchepku-Cheplel,Kenegut Mkt-Cheplel Pry-Cheplel TB-Muratit,Kiboiybeislap Slaughter-Kimasian-Kaptoroi-Kaboswa-Kapsoit Mkt-Kiptenden TBC;Abrahamacademy Telanet-Kaboswa TBC Rd;Kap Job Mkt- Karap Mursoi ;Offe222-Chesilyotwater Project Intake Sugutekpry Rd;Cherandas-Kap Willion-Kapsaih Rd;Kapsoiyo Healthcentre-Kapsoiyo Sec School ;Kapsoiyo Healthcentre-Kapsoiyo Sec School ;Baraka Pry-Kapmungei Rd |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,955,739.20 |
Kapsoit |
Feedback |
| Keongo - Quentete - Sumeiyon Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
712,320.00 |
Kapkugerwet |
Feedback |
| Routine Maintenance of Kapkarin-Chesoen TBC road |
Potholes patched, ,surface grading completed. |
Public Works, Roads and Transport |
Completed
|
3,469,031.04 |
Litein |
Feedback |
| Proposed Mintenance of Kimugul- Kabokyek Junction - Chelogong- Chemaluk Church of Christ -Sesgaa Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,237,455.00 |
Soliat |
Feedback |
| Construction of an ECDE classroom and 2 door pit latrine at Koibeiyot ECDE Centre |
Improve access, quality of learning and care in ecde centers |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
7,840,000.00 |
Kapsaos |
Feedback |
| Construction of Magire Dispensary |
To expand primary healthcare infrastructure. |
Health Services |
Completed
|
4,655,260.00 |
Chilchila |
Feedback |
| Kapmelilo Coffee Factory- Kameliloc Pry- Gokul Quary Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,599,820.00 |
Ainamoi |
Feedback |
| Kapmosi-Kipmwokoi Itibet Rd,;Telanet Water Tank-Ngecherok Pry-Chekurbet-Kapmaso TBC Rd;Off C35-Kosisit Pry Rd;Chepkurbet Pry-Sachwan Rd;Ngecherok Pry-Keldapbelyot River;Sondu Cityncentre-Keldapbeliotriver ;Sonducity Centre-Grassland Academy;Ngecherok FGCK-Church-Sosit Pry-Karap Mase Rd;Off E222-Kiplukirikitriver-Cheribo Pry;Ogirgir Pry Sign Post- Ogirgir TBC--Cherandas;Kisabei Pry-Cherandas-Kapchesitgei-Kiptegan Nursery School;Off E222-Brilliant Academy;Kapsoitsec School-Kaboswa;Kwa Kiget Shop- Kiptegan Pry-Kiptegan FGCK;Kenegut Mkt-Kisabeipry-Kiptegan Pry |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,345,078.63 |
Kapsoit |
Feedback |
| Chemugusu - Satelite rd; Tea point - Paksonrd; Eland Academy - Majengo - St. Patrick rd; Site and Service- Kericho Academy - Talai rd; Tea Hotel - Kimugu Treatment works rd; Quintete - Talai rd; Off B1 - Duka Moja Junction rd |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,664,200.00 |
Kapkugerwet |
Feedback |
| Routine Maintenance of Ainapset A.I.C-kap Bomwo-Rungut primary-Chemsembe-Tenwet T.B.C road |
Potholes patched, ,surface grading completed. |
Public Works, Roads and Transport |
Completed
|
1,548,176.83 |
Litein |
Feedback |
| Proposed Maintenance of Kurabei- Kiptenden - Mogonjet Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
507,268.00 |
Soliat |
Feedback |
| Construction of a 3 door pit latrine at Cheplel ECDE Centre |
Improve access, quality of learning and care in ecde centers |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
2,240,000.00 |
Kapsoit |
Feedback |
| Extension of OPD at Makyolok Dispensary |
To improve patient handling capacity through OPD expansion. |
Health Services |
Completed
|
3,201,600.00 |
Chilchila |
Feedback |
| Kaptongilo- Kapchebisom- Rongai Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,179,200.00 |
Ainamoi |
Feedback |
| Constaruction of Ainapsosiot-Cheriroet Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,781,416.00 |
Chepseon |
Feedback |
| Kapsilangwa-Ainapsosiot rd;Kapoldoit-Kaprewet rd;Chesumot rd;Binyiny rd ;Mureret rd |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
600,600.00 |
Kapsaos |
Feedback |
| Routine Maintenance of Kibolgong-Tiriitab Eito road |
Potholes patched, ,surface grading completed. |
Public Works, Roads and Transport |
Completed
|
4,397,908.00 |
Tebesonik |
Feedback |
| Proposed Maintenance of Kurabei- Koibeyon- Kamaseka
Quarry Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
764,550.00 |
Soliat |
Feedback |
| Construction of a classroom at Cheplel ECDE Centre |
Improve access, quality of learning and care in ecde centers |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
1,680,000.00 |
Kapsoit |
Feedback |
| Proposed water works at Makyolok Dispensary |
To ensure reliable water supply for facility operations. |
Health Services |
Completed
|
2,753,660.00 |
Chilchila |
Feedback |
| Kapkatet Spring Rehabilitation |
To secure and improve access to clean, safe, and sustainable water for the community through construction of a spring protection system |
Water, Environment, Energy and Natural Resources |
Completed
|
102,000,000.00 |
Kapkatet |
Feedback |
| Tendwet-Kapsilangwa Primary School Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
700,000.00 |
Kapsaos |
Feedback |
| Construction of Binyiny- Sogobet Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,803,131.00 |
Chepseon |
Feedback |
| Kipsigori - Kapsaos Centte rd; Off C35 - Lamaiyat pry - Torochgaa brdige rd; Kapngetuny rd |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
6,017,604.00 |
Kapsaos |
Feedback |
| Routine Maintenance of Kibaranji-Karapngerer road |
Potholes patched, ,surface grading completed. |
Public Works, Roads and Transport |
Completed
|
4,162,824.00 |
Tebesonik |
Feedback |
| Proposed Construction of Soko Ndizi-Kap Simba-Off B1- Chesiche Pri.Junction Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
497,704.00 |
Soliat |
Feedback |
| Construction of a classroom at Kisabei ECDE Centre |
Improve access, quality of learning and care in ecde centers |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
2,240,000.00 |
Kapsoit |
Feedback |
| fencing of Makyolok Dispensary |
To enhance security and compound management. |
Health Services |
Completed
|
4,982,000.00 |
Chilchila |
Feedback |
| Kapkondor/Cheusi/Setek/Itoik Water Project |
To expand water supply coverage by connecting unserved households, schools, and institutions to the existing water distribution network under the Last Mile Connectivity initiative. |
Water, Environment, Energy and Natural Resources |
Completed
|
1,225,000.00 |
Londiani |
Feedback |
| Kapoldoit-Kaprimet Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,552,760.00 |
Kapsaos |
Feedback |
| Construction of Kamagaa-Sogobet Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,510,347.00 |
Chepseon |
Feedback |
| Tabet-Koigaron-Mureret-Kipsigori-Kamuungei road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,293,900.00 |
Kapsaos |
Feedback |
| Routine Maintenance of Mutwot-Emdit road |
Potholes patched, ,surface grading completed. |
Public Works, Roads and Transport |
Completed
|
3,996,587.60 |
Kaplelartet |
Feedback |
| Proposed Maintenance and Rehabilitation of Kipkelion
Town Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,140,430.00 |
Kipkelion |
Feedback |
| Construction of a classroom at Kinyose ECDE centre |
Improve access, quality of learning and care in ecde centers |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
1,120,000.00 |
Kipchimchim |
Feedback |
| Proposed Completion of Staff House Makyolok Dispensary |
To improve housing for medical personnel. |
Health Services |
Completed
|
3,434,400.00 |
Chilchila |
Feedback |
| Kapkongoni Water Project |
To expand water supply coverage by connecting unserved households, schools, and institutions to the existing water distribution network under the Last Mile Connectivity initiative. |
Water, Environment, Energy and Natural Resources |
Completed
|
51,782,168.00 |
Soliat |
Feedback |
| Ainapsosiot Pry- Ainapsosoit River Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
8,490,160.00 |
Kapsaos |
Feedback |
| Construction Maili Nne - Chepnoet Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,679,607.60 |
Chepseon |
Feedback |
| Kapsoit-Kaboswa- Kimasian-Kiboibei-Slaughter hse road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
4,135,256.00 |
Kapsoit |
Feedback |
| Off Sosiot – Mochongoi Junction – Lelaitich Agc Church – Kiptaldal Pry School – Off
Cheribo Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
780,912.00 |
Waldai |
Feedback |
| Construction of a pit latrine at Kerego ECDE Centre |
Ensure Hygiene and Sanitation, Promote Health and Disease Prevention |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
2,240,000.00 |
Kipchimchim |
Feedback |
| Proposed Laboratory Construction in Fort Tenan Hospital- Kericho County |
To expand diagnostic capacity through new lab infrastructure. |
Health Services |
Completed
|
3,800,000.00 |
Chilchila |
Feedback |
| Kapkwen Borehole Water Project |
To provide a safe, reliable, and sustainable source of water for domestic, institutional, and community use through borehole drilling and development. |
Water, Environment, Energy and Natural Resources |
Completed
|
N/A |
Londiani |
Feedback |
| Tendwet-Kapsilangwa Primary School Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
5,418,383.00 |
Kapsaos |
Feedback |
| Construction of Kamarus - Kamarus Annex - Kamarus school for Disability Ltd |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,999,999.00 |
Chepseon |
Feedback |
| mongo- Chepkut rd; Kenegut-Chepkel TBC-Chesire rd; Kenegut MKT-Kisabei Pry-Kiptegan Nursery rd; Kapsoit- Kaboswa-Kimasian-Kiboibei-Slaughter rd; Off b1-Ngecherok AGC-Chepkurbet Pry road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
5,483,160.00 |
Kapsoit |
Feedback |
| Construction Of Kapkawa Bridge-Chemutian Dip Road 2Km, Chemutian-Kapjonathan Road 1.2Km, Kapkawa Bridge-Kapkongoni Road 2Km |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,615,691.00 |
Soliat |
Feedback |
| TeaView2- Kaptongeno TBC-
Chepkutbei Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
530,103.00 |
Cheptororiet/Seretut |
Feedback |
| Construction of ECDE classroom at Kipsotet ECDE Centre |
Improve access, quality of learning and care in ecde centers |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
3,360,000.00 |
Kipchimchim |
Feedback |
| Supply, Delivery, Installation and Testing of Generator Cables at Fort Tenan Sub-County Hospital |
To enhance hospital power reliability and safety. |
Health Services |
Completed
|
2,810,349.00 |
Chilchila |
Feedback |
| Kapruben Water Project |
To enhance access to safe and reliable water supply for learners and the community through construction of distribution return lines to Kaplengeywo ECD and Kapriro Primary School. |
Water, Environment, Energy and Natural Resources |
Completed
|
3,906,180.00 |
Kabianga |
Feedback |
| Kipsigori- Baraka Primary Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,501,072.48 |
Kapsaos |
Feedback |
| Construction of Chilchila - Lamaiyat Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,949,930.00 |
Chepseon |
Feedback |
| Off B1-Chemobei rd;Off B1-Chepkurbet AGC;Off B1-Ngecherok AGC rd |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
4,201,828.00 |
Kapsoit |
Feedback |
| Construction of Kaplengeny- Kiptugumo Road:2.6km, Tabrasin-Kiptugumo dispensary Road:2.2km, Kamaneesoi-Highway-Moretiik-Arap Tuei Road: 2.2km, Soliat Boys-Kongeren river-Kapchelemei Road:0.5km, Kongereen pry-Mirmiro Road:1.3km, Siriat-Kaosisrwo Road:1.2km |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,707,324.00 |
Soliat |
Feedback |
| Proposed Construction of 21m of 900mm Cross Culverts and 7m of 600mm to Kamelilo- Koisirat- Tembwet Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
549,177.93 |
Ainamoi |
Feedback |
| Ochi |
Improve access, quality of learning and care in ecde centers |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
5,600,000.00 |
Tebesonik |
Feedback |
| Proposed Construction and Completion of Out-Patient Unit at Siwot Dispensary |
To improve outpatient services and access to healthcare. |
Health Services |
Completed
|
1,085,380.00 |
Chilchila |
Feedback |
| Fortenan-Koisagat water supply |
To expand water supply coverage by connecting unserved households, schools, and institutions to the existing water distribution network under the Last Mile Connectivity initiative. |
Water, Environment, Energy and Natural Resources |
Completed
|
N/A |
Chilchila |
Feedback |
| Kipsigori- Baraka Primary Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,795,031.60 |
Kapsaos |
Feedback |
| Construction of Kichawir - Tata; Kapchomishan -Kaminit; Kapchomishan - Leberer Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,649,608.47 |
Chepseon |
Feedback |
| off E222-Kaptoroi-Kiptenden rd;Muiwek-Tuiyobei rd |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,034,020.00 |
Kapsoit |
Feedback |
| Construction of Soliat Boys- Soliat AGC-Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,389,868.00 |
Soliat |
Feedback |
| Proposed Construction of 600mm culverts at Quintete – Site and Service Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
594,650.00 |
Kapkugerwet |
Feedback |
| Ainamoi/Shinners |
Improve access, quality of learning and care in ecde centers |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
3,360,000.00 |
Chemosot |
Feedback |
| Proposed construction and completion of Out-patient unit at Koisagaat Dispensary. |
To strengthen healthcare service delivery at the dispensary level. |
Health Services |
Completed
|
1,293,900.00 |
Chilchila |
Feedback |
| Lower Kipkecheiyet Water Project |
To expand water supply coverage by connecting unserved households, schools, and institutions to the existing water distribution network under the Last Mile Connectivity initiative. |
Water, Environment, Energy and Natural Resources |
Completed
|
3,920,264.00 |
Soliat |
Feedback |
| Tabet-Koigaron-Mureret Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,300,000.00 |
Kapsaos |
Feedback |
| Construction of Chepsir- Arap Kitai - Binyiny road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,988,767.30 |
Chepseon |
Feedback |
| Kara Tegerei - Gabel rd; Tilrap Malit - Kirongisyet rd; John Bett - Kirongisyet rd; Kaptimothy - Chelule rd; Chemoibei pry - Koitabai rd; Arap Kenei - Kiptendon Rd; Kiptendon - Lemeiywet rd |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,742,792.00 |
Kapsoit |
Feedback |
| Soliat primary-kamugesh-primary school Road 2.7km Kapnogiro-karapkeino Road 0.8km, salgaa-kaaplachelemei-kongereen dip Road 2.3 km ,kongeren river -kabingoi Road 0.8km |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,496,880.51 |
Soliat |
Feedback |
| Proposed Construction of 600mm culverts at Kipchimchim-Kipsakwa – Kipchimchim Sec -Baraka – Kapcherongos -Kimeswon Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
765,693.00 |
Kipchimchim |
Feedback |
| Tegat Junior |
Improve access, quality of learning and care in ecde centers |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
6,496,000.00 |
Cheplanget |
Feedback |
| Proposed Completion and extension of Laboratory at Fort-Tenan Sub County Hospital |
To expand laboratory space for better diagnostic capacity. |
Health Services |
Completed
|
3,986,676.00 |
Chilchila |
Feedback |
| Lower Kiplogoi Water Project |
To provide safe, reliable, and sustainable water supply to the target community through construction of a gravity main, installation of a storage tank, and establishment of communal water points. |
Water, Environment, Energy and Natural Resources |
Completed
|
N/A |
Soliat |
Feedback |
| B1-Sachangwan-Chepkurbet Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,234,180.00 |
Kapsoit |
Feedback |
| Construction of Kapseger- sailo Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
5,800,000.00 |
Chepseon |
Feedback |
| Water tank - Sachangwan - Ngecherok AGC - Off B1 - Sachangwan - Chepkubet pry sch; Off B1 - Full Gospel Church - Samutet central; Off B1 - Kongosiet - Siitotwet; Sitotwet - Jordan rd; Off B1 - Chepsoo rd |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
207,600.00 |
Kapsoit |
Feedback |
| Gravelling For Kapsimba-Chesiche Church Road; Chesiche-Chesiche Ecd Road; Chesiche Ecd-Kaptala Road; Chesiche-Kabokyek Ecd-Kaptala Road;Chesiche-Kabokyek Cattle Dip Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,214,963.00 |
Soliat |
Feedback |
| Proposed Construction of Twin 900mm to Koibarak- Lamaiyat Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
545,171.00 |
Chepseon |
Feedback |
| Chebakal |
Improve access, quality of learning and care in ecde centers |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
2,016,000.00 |
Litein |
Feedback |
| Proposed Completion of Surgical ward at Fort-Tenan Sub County Hospital |
To enhance surgical service capacity at the sub-county level. |
Health Services |
Completed
|
3,794,057.00 |
Chilchila |
Feedback |
| Otui Borehole Water Project |
To provide a safe, reliable, and sustainable source of water for domestic, institutional, and community use through borehole drilling and development. |
Water, Environment, Energy and Natural Resources |
Completed
|
N/A |
Kapsaos |
Feedback |
| Cherandas-Kapsaiah Round |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
981,893.00 |
Kapsoit |
Feedback |
| Construction of Off B1-Sabunit Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,933,500.00 |
Chepseon |
Feedback |
| Water tank - Sachangwan - Ngecherok AGC - Off B1 - Sachangwan - Chepkubet pry sch; Off B1 - Full Gospel Church - Samutet central; Off B1 - Kongosiet - Siitotwet; Sitotwet - Jordan rd; Off B1 - Chepsoo rd |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
4,890,916.00 |
Kapsoit |
Feedback |
| Construction of Chepsengeny-Kwandap Mosong road;Kwandap Mosong-Kaplelach Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
4,153,380.00 |
Soin |
Feedback |
| Proposed Construction of Chesire Box Culvert |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
725,300.00 |
Chilchila |
Feedback |
| Kiptenden |
Improve access, quality of learning and care in ecde centers |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
2,240,000.00 |
Litein |
Feedback |
| Proposed construction of four doors pit latrine with urinal at Songonyet Dispensary |
To improve sanitation standards for patients and staff. |
Health Services |
Completed
|
3,396,524.00 |
Chilchila |
Feedback |
| Rehabilitation of Lelaitich Boiyon Water Project |
To restore and expand access to safe and reliable water supply through repair of the pump motor and extension of last mile connectivity to underserved households and institutions. |
Water, Environment, Energy and Natural Resources |
Completed
|
1,225,000.00 |
Waldai |
Feedback |
| Kapsoit Disp-Sitotwet Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,276,650.00 |
Kapsoit |
Feedback |
| Kipchawir-Leberer Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,400,000.00 |
Chepseon |
Feedback |
| Kichinjet - Kaboswa rd; Karap Tergei - Chepsoo rd; Kamundu rd; Samutet pry - Chemobei rd; Samutet - Kappeter rd; Karap Teregei rd; Tiles - Karap Barjwot rd; Toro - Kameshak rd; Sitotwet - Kirongishet rd; Koitabai rd; Karap Tererei - Gable rd |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,320,760.00 |
Kapsoit |
Feedback |
| Proposed Construction of Twin 900mm Cross Culverts To Kapjonah - Bagao Road (5Km); Ainamoi bridge – Maseriat AGC Road (2km) |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,494,177.52 |
Ainamoi |
Feedback |
| Proposed Consrtuction of Concrete Box Culvert at Kamtego Box River |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
752,782.00 |
Kamasian |
Feedback |
| Nyambolosa |
Improve access, quality of learning and care in ecde centers |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
2,240,000.00 |
Litein |
Feedback |
| Proposed Construction of Four door toilet at Sereng Dispensary |
To improve hygiene and sanitation within the health facility. |
Health Services |
Completed
|
560,000.00 |
Chilchila |
Feedback |
| Sombicho Water Project |
To expand water supply coverage by connecting unserved households, schools, and institutions to the existing water distribution network under the Last Mile Connectivity initiative. |
Water, Environment, Energy and Natural Resources |
Completed
|
1,225,000.00 |
Soliat |
Feedback |
| C35-Kiboibey Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,842,288.80 |
Kapsoit |
Feedback |
| Kolonget-kipchawir Road, Monori-Sailo Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,800,000.00 |
Chepseon |
Feedback |
| Sailo-Chepcholiet Road; Chesumei-Tugunon Road; Sebere-Chesumei Road; Kapsegut- Nyambuko Road; Cherendet-Kiptenden Road. |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
5,048,400.00 |
Chepseon |
Feedback |
| Propsoed Construction of Kokwet Box Culvert |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,252,491.52 |
Chilchila |
Feedback |
| Proposed construction of Cross Pipe Culverts at Sebetet - Kap Kones Quarry Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
787,234.00 |
Cheplanget |
Feedback |
| Kisutuk/tepkutwet |
Improve access, quality of learning and care in ecde centers |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
1,120,000.00 |
Cheboin |
Feedback |
| Proposed installation of an electrical panel at Fort Tenan subcounty Hospital and 3 dispensaries. |
To improve electrical distribution and safety in hospital facilities. |
Health Services |
Completed
|
2,160,000.00 |
Chilchila |
Feedback |
| Sullivan/Annex Spring Protection |
To expand water supply coverage by connecting unserved households, schools, and institutions to the existing water distribution network under the Last Mile Connectivity initiative. |
Water, Environment, Energy and Natural Resources |
Completed
|
1,225,000.00 |
Kapkugerwet |
Feedback |
| Kaboswa Centre-Kaboswa Tbc |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
696,843.00 |
Kapsoit |
Feedback |
| Tilito-chesumot Road, Chebwagan-kaptenet Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,971,577.84 |
Chepseon |
Feedback |
| Mandera-Kipketes Road; Chepcholiet-Tugunon Road; Leberer-Mile Tano; Kamachungwa-Factory Road; Momoniat-Chepchabai Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
4,236,820.00 |
Chepseon |
Feedback |
| Proposed Construction & Rehabilitation of Nyageito Foot Bridge (42.75M ) at Kipsonoi River |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
549,894.00 |
Cheplanget |
Feedback |
| Kimolwet |
Improve access, quality of learning and care in ecde centers |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
1,120,000.00 |
Cheboin |
Feedback |
| Construction of Tingatella Dispensary |
To expand access to healthcare through establishment of a new dispensary. |
Health Services |
Completed
|
627,908.00 |
Kamasian |
Feedback |
| Tulwapmoi Water Project |
To improve water conveyance and expand access to safe and reliable water for the community through the construction of a 2.5KM, 4" gravity main. |
Water, Environment, Energy and Natural Resources |
Completed
|
138,859,917.00 |
Chilchila |
Feedback |
| Telanet Watar Tank-Ngecherok-Kabaruso Tbc Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,258,724.85 |
Kapsoit |
Feedback |
| Construction of Off B1-Chepsir Deliverance church Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,722,878.00 |
Chepseon |
Feedback |
| Kiptenden - Kamarus Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,320,760.00 |
Chepseon |
Feedback |
| Proposed Construction of Twin 900mm of 14m to Cheptigit Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,249,535.00 |
Litein |
Feedback |
| Kapsogut |
Improve access, quality of learning and care in ecde centers |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
2,800,000.00 |
Cheboin |
Feedback |
| Completion of Lelu Dispensary |
To finalize pending works for full functionality. |
Health Services |
Completed
|
615,000.00 |
Kamasian |
Feedback |
| Chesire Water Project |
To provide sustainable, safe, and reliable water supply to the community through spring protection, construction of storage and regulation structures, and establishment of a distribution system |
Water, Environment, Energy and Natural Resources |
Completed
|
97,700,768.00 |
Soliat |
Feedback |
| Ngecherok Agc-TBC Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,201,313.15 |
Kapsoit |
Feedback |
| Lambel Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,937,040.00 |
Kedowa/Kimugul |
Feedback |
| Kaptenet - Chebwareng - Kipchorian Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,433,480.00 |
Chepseon |
Feedback |
| Proposed Construction of 2*900mm Cross Culverts and two lines of 600mm at Chepkonye River |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
860,627.25 |
Kisiara |
Feedback |
| Kamachumo |
Improve access, quality of learning and care in ecde centers |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
7,840,000.00 |
Kapkatet |
Feedback |
| Proposed Construction of toilets at Tingatella Dispensary |
To enhance sanitation within the facility. |
Health Services |
Completed
|
4,095,000.00 |
Kamasian |
Feedback |
| Off C35- Kabaruso TBC Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,989,884.57 |
Kapsoit |
Feedback |
| Construction of Kapchongoti Farm - Tuiyobei Bridge Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,648,747.00 |
Kedowa/Kimugul |
Feedback |
| Kaptenet - Fredrick Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,761,840.00 |
Chepseon |
Feedback |
| Proposed Construction of Three Lines of 900mm Cross Culverts at Ngeny-Cheboriot River |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
850,490.00 |
Tebesonik |
Feedback |
| Chematich |
Improve access, quality of learning and care in ecde centers |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
994,750.00 |
Kapkatet |
Feedback |
| Proposed Construction of toilets at Lelu Dispensary |
To improve sanitation and hygiene standards. |
Health Services |
Completed
|
3,345,079.00 |
Kamasian |
Feedback |
| Kapsoit Sec- Off C35 Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,430,580.00 |
Kapsoit |
Feedback |
| Construction of Delivarance -Ngatumek Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,850,742.40 |
Kedowa/Kimugul |
Feedback |
| Kapsokwe - De;iverance - Kipyoptop Road; Kaptenet - Fredrick - Scheme Road; Kapeli - Tilito - Kaisugu Road; Kapfredrick - Ketienya - Chebochok Road; Kapketungor - Maseti Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
4,758,660.00 |
Chepseon |
Feedback |
| Proposed Construction of 24m of 900mm Cross Culvert to Simbi- Emitiot Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
850,850.00 |
Soin |
Feedback |
| Kaptebengwet |
Improve access, quality of learning and care in ecde centers |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
504,560.00 |
Kapkatet |
Feedback |
| Proposed Completion of OPD at Lelu Dispensary |
To improve outpatient service delivery through OPD completion. |
Health Services |
Completed
|
4,191,360.00 |
Kamasian |
Feedback |
| Masaita Borehole Water |
To provide a safe, reliable, and sustainable source of water for domestic, institutional, and community use through borehole drilling and development. |
Water, Environment, Energy and Natural Resources |
Completed
|
949,680.40 |
Tendeno/Sorget |
Feedback |
| Cheribo Sign Post- Kapjob Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,250,000.00 |
Kapsoit |
Feedback |
| Culverts Installation to Ewat-Kap Maxwell Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,900,080.80 |
Kedowa/Kimugul |
Feedback |
| Off B1 Wima Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,924,540.00 |
Chepseon |
Feedback |
| Routine Maintenance of Elite primary school-Chebangang road |
Potholes patched, ,surface grading completed. |
Public Works, Roads and Transport |
Completed
|
1,429,178.00 |
Londiani |
Feedback |
| Proposed Construction andRehabilitation of Samutet Dispensary
-Kaptungu Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,132,630.00 |
Kapsoit |
Feedback |
| Kaptebengwet |
Improve access, quality of learning and care in ecde centers |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
2,669,700.00 |
Kapkatet |
Feedback |
| Proposed completion of OPD at Tingatella Dispensary |
To operationalize the dispensary through OPD completion. |
Health Services |
Completed
|
1,680,000.00 |
Kamasian |
Feedback |
| Chesino Water Supply |
To expand water supply coverage by connecting unserved households, schools, and institutions to the existing water distribution network under the Last Mile Connectivity initiative. |
Water, Environment, Energy and Natural Resources |
Completed
|
1,297,650.00 |
Soin |
Feedback |
| E22-Torsogek Pry |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,980,000.00 |
Kapsoit |
Feedback |
| Ndarugu-Kedowa Centre;Kedowa Centre access roads |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,403,239.72 |
Kedowa/Kimugul |
Feedback |
| Tenbwet - Complex Road; Kiprengwe - Miti mbali Road; Kipsigori - Kiprengwe corner Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
742,000.00 |
Chepseon |
Feedback |
| Routine Maintenance of Barotion sawmill-Lelsotet road |
Potholes patched, ,surface grading completed. |
Public Works, Roads and Transport |
Completed
|
975,030.00 |
Londiani |
Feedback |
| Proposed Construction and Rehabilitation of Mosore Dip-Mosore Quarry Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,181,512.50 |
Kisiara |
Feedback |
| Roronya |
Improve access, quality of learning and care in ecde centers |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
1,353,625.00 |
Kapkatet |
Feedback |
| Proposed completion of staff House at Kasheen Dispensary |
To improve staff accommodation and service availability. |
Health Services |
Completed
|
4,859,466.00 |
Kamasian |
Feedback |
| Rehabilitation of Ngeny Koiborot School Borehole |
To restore and enhance the functionality of an existing borehole in order to provide reliable and safe water supply for the community. |
Water, Environment, Energy and Natural Resources |
Completed
|
964,555.00 |
Soin |
Feedback |
| Kapsoit Police-Dumpsite |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,190,728.00 |
Kapsoit |
Feedback |
| Construction of Kapmaxwel-Ewat Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,955,739.20 |
Kedowa/Kimugul |
Feedback |
| Siwot - Motanya; Cheboror;Kondamet/ Mutanya - Kapkawa Road ; C woRoad - Ka[somting - Kiptenden Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,520,940.00 |
Chepseon |
Feedback |
| Routine Maintenance of Slaughter house-Towet bridge-Marindany forest road |
Potholes patched, ,surface grading completed. |
Public Works, Roads and Transport |
Completed
|
1,120,200.00 |
Tendeno/Sorget |
Feedback |
| Proposed Construction and Rehabilitation of Chemabei Pry- Samutet Dispensary Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,300,000.00 |
Kapsoit |
Feedback |
| Ketigoi/charera |
Improve access, quality of learning and care in ecde centers |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
2,003,400.00 |
Kisiara |
Feedback |
| Proposed Fencing and gate to Tingatella Dispensary |
To enhance compound security and access control. |
Health Services |
Completed
|
5,043,060.00 |
Kamasian |
Feedback |
| Kapsoroget-Kapkutei Lastmile Connectivity Water Project |
To expand water supply coverage by connecting unserved households, schools, and institutions to the existing water distribution network under the Last Mile Connectivity initiative. |
Water, Environment, Energy and Natural Resources |
Completed
|
850,540.00 |
Cheptororiet/Seretut |
Feedback |
| Kenegut-Lemeiywet |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,788,080.00 |
Kapsoit |
Feedback |
| Tuiyobei-Kedowa river-Kimaut Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,345,078.63 |
Kedowa/Kimugul |
Feedback |
| Siwot Motanya |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,434,480.00 |
Chepseon |
Feedback |
| Routine Maintenance of Murau centre-Bakery road |
Potholes patched, ,surface grading completed. |
Public Works, Roads and Transport |
Completed
|
1,034,595.00 |
Kamasian |
Feedback |
| Proposed Maintenance and Rehabilitation of Kedowa-Darugo Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,197,549.00 |
Kedowa/Kimugul |
Feedback |
| Ngainet |
Improve access, quality of learning and care in ecde centers |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
4,495,250.00 |
Kisiara |
Feedback |
| construction of Tuiyobei Dispensary |
To increase healthcare access for the local community. |
Health Services |
Completed
|
3,290,008.24 |
Kipkelion |
Feedback |
| Chesilot Water Project |
To improve water storage and expand distribution capacity for the community through rehabilitation of an existing 25m ground level masonry tank and construction of new distribution pipelines. |
Water, Environment, Energy and Natural Resources |
Completed
|
946,699.20 |
Kapsoit |
Feedback |
| Kiboiybei-Kimasian |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,298,951.60 |
Kapsoit |
Feedback |
| AGC Karanja-Simotwet-Kiptenden Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,423,090.00 |
Kedowa/Kimugul |
Feedback |
| B1-Kedowa-Ewat road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,371,330.00 |
Kedowa/Kimugul |
Feedback |
| Construction of Off 222- Munai Road 2.4Km, Off 222- Dairy- Kipsotet-Chumo Road 1.7Km, Chepnyonyo-Toror Factory-Boita PAG Church- E222 Road 2.9Km, Off E222- Sepet Pry School Road 0.5km, E222-Kimeswon Road 1.9km |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
668,285.00 |
Kipchimchim |
Feedback |
| Proposed Maintenance of Kap Frank - Sachangwan Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,299,200.00 |
Kaplelartet |
Feedback |
| Kolonget |
Improve access, quality of learning and care in ecde centers |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
5,395,400.00 |
Kisiara |
Feedback |
| Construction of Surgical Kipkelion Surgical wards |
To improve surgical capacity and patient care in Kipkelion. |
Health Services |
Completed
|
980,000.00 |
Kipkelion |
Feedback |
| Upper Sombicho Water Project |
To improve water storage and expand distribution capacity for the community through rehabilitation of an existing 25m ground level masonry tank and construction of new distribution pipelines. |
Water, Environment, Energy and Natural Resources |
Completed
|
1,297,140.00 |
Soliat |
Feedback |
| Telanet-Kipkutuny Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,994,272.00 |
Kapsoit |
Feedback |
| Kamwingi two- Shabaa Road,kamwingi center keringet pry, forest Road, Kap pilot -kapkiron Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,676,607.60 |
Londiani |
Feedback |
| Kedowa River farm-Kimaut-Barngoror Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
4,313,920.00 |
Kedowa/Kimugul |
Feedback |
| Construction of Kipchimchim- Kipsotet-Kimeswon Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,507,786.00 |
Kipchimchim |
Feedback |
| Proposed Construction and Rehabilitation of Kibulgong-Tiriitab Eito- Kap Emmanuel Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,272,201.00 |
Tebesonik |
Feedback |
| Chelelaibei |
Improve access, quality of learning and care in ecde centers |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
4,636,000.00 |
Chemosot |
Feedback |
| Completion of staff house at Kapkwen Dispensary |
To improve health worker welfare through adequate housing. |
Health Services |
Completed
|
1,041,000.00 |
Kipkelion |
Feedback |
| Chesire Water Project Solarization |
To provide sustainable and reliable water supply to the community through the supply and installation of a pump, adoption of solar energy, and protection of water infrastructure. |
Water, Environment, Energy and Natural Resources |
Completed
|
1,132,630.00 |
Soliat |
Feedback |
| Kapsoit-Kaboswa Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
4,000,000.00 |
Kapsoit |
Feedback |
| Kamwingi two- Shabaa Road,kamwingi center keringet pry, forest Road, Kap pilot -kapkiron Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,803,131.00 |
Londiani |
Feedback |
| Ewat - Forest Road; Ndarugu - Kapchebotibiot - Timbilet Road; Kiprengwe - Miti moja - Kapmabwai Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
4,313,920.00 |
Kedowa/Kimugul |
Feedback |
| Construction Of Kapsaino-Chebitet Road, Kapshifta-Chebitet Road, Kapchamgei-Koibarak Road, Chilichila-Koibarak Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,277,574.20 |
Chepseon |
Feedback |
| Proposed Construction and Rehabilitation of Off E252-Kipkering-Arap Moso - Kipsinende Institute - Murgut Junction Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,185,869.00 |
Chilchila |
Feedback |
| Cheborema |
Improve access, quality of learning and care in ecde centers |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
3,483,800.00 |
Chemosot |
Feedback |
| Construction of Kimologit Dispensary |
To provide primary healthcare access to underserved areas. |
Health Services |
Completed
|
1,465,692.00 |
Kipkelion |
Feedback |
| Masarian -Samiyutik Water Project Water Project |
To expand water supply coverage by connecting unserved households, schools, and institutions to the existing water distribution network under the Last Mile Connectivity initiative. |
Water, Environment, Energy and Natural Resources |
Completed
|
1,335,252.80 |
Kapsuser |
Feedback |
| Cheribo Sign Post -Ack Church Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
498,820.00 |
Kapsoit |
Feedback |
| Kaphilemon Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,510,347.00 |
Londiani |
Feedback |
| Kipyemit Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,524,060.00 |
Kedowa/Kimugul |
Feedback |
| Construction Of Chemaluk-Cheptembe Road 1.2km,Chesunet-Kapsigowo Road 1.7km,Chebaron-Kapsorok Day Sec Road 1.9km |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,626,668.00 |
Soliat |
Feedback |
| Proposed Construction and Rehabilitation of Kimasian Technical Institute Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,198,877.00 |
Kedowa/Kimugul |
Feedback |
| Chesingoro |
Improve access, quality of learning and care in ecde centers |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
1,001,700.00 |
Chemosot |
Feedback |
| Construction of Toilets at Kalyet Dispensary |
To improve sanitation for patients and staff. |
Health Services |
Completed
|
1,503,401.00 |
Kipkelion |
Feedback |
| Chesiche Water Project |
To enhance sustainable access to safe and reliable water for the Kaborok community through construction and rehabilitation of key water infrastructure. |
Water, Environment, Energy and Natural Resources |
Completed
|
1,132,202.92 |
Soliat |
Feedback |
| Cherire-Sda Church |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,589,051.52 |
Kapsoit |
Feedback |
| Construction of Kamaina-Sachangwan-Lemotit-Tarmasang Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,403,636.40 |
Londiani |
Feedback |
| Off B1 - Tulwap Road; Road Unit - Kolonget Road; Nyakinywa Roads |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
5,702,561.00 |
Kedowa/Kimugul |
Feedback |
| Construction Of Kamasega Sda-Kasegut-Kiptugumo Pry Sch Rd 4km,Kiptugumo Dispensary-Tamarson Rd 2.5km |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,397,000.00 |
Soliat |
Feedback |
| Proposed Construction and Rehabilitation of Kaborus-Kesengit- Tiriita Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,212,068.34 |
Cheboin |
Feedback |
| Siritiet |
Improve access, quality of learning and care in ecde centers |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
2,003,400.00 |
Tebesonik |
Feedback |
| Proposed Completion of OPD at Kimologit Dispensary |
To enhance patient flow and service delivery through OPD completion. |
Health Services |
Completed
|
3,994,220.00 |
Kipkelion |
Feedback |
| Chepsoo - Kapsasur water project |
To provide safe, reliable, and sustainable water for domestic and livestock use through protection of springs, construction of conveyance and storage infrastructure, and establishment of distribution outlets |
Water, Environment, Energy and Natural Resources |
Completed
|
1,333,490.00 |
Kapsoit |
Feedback |
| Cheplel Tbc-Kipmwogoi |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
786,072.00 |
Kapsoit |
Feedback |
| Construction of Kapfinch-Sotik-Tachasis-Kaplimo-Chumba Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,780,440.00 |
Londiani |
Feedback |
| Kaap Nashon - Kipkoiyo pry (3km); Off C35 - Wispers - Kiptenden Road (2.5km) |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,099,500.00 |
Kedowa/Kimugul |
Feedback |
| Rehabilitation and Construction Drainage Strutures and Tarmacking of 936 Town |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,700,240.00 |
Kedowa/Kimugul |
Feedback |
| Proposed Construction and Rehabilitation of Off B1-Nunda River-
Kipteran ECDE- Ndonyomare Pry-Off B1 Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
933,628.50 |
Soin |
Feedback |
| Litiik |
Improve access, quality of learning and care in ecde centers |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
4,114,970.00 |
Tebesonik |
Feedback |
| Proposed Construction and completion of two doors pit latrine at Kalyet Dispensary |
To improve sanitation and hygiene for facility users. |
Health Services |
Completed
|
1,364,160.50 |
Kipkelion |
Feedback |
| Cherire Solarization Water Project |
To enhance sustainable and reliable access to water by installing a solar-powered submersible pump, necessary accessories, and securing the water infrastructure through fencing. |
Water, Environment, Energy and Natural Resources |
Completed
|
920,000.00 |
Sigowet |
Feedback |
| Kapbese-Church God,I, |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
668,884.00 |
Kapsoit |
Feedback |
| Construction of Nyairobi - Saramek centre- Shabaa Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,414,374.00 |
Londiani |
Feedback |
| Lembel Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
830,400.00 |
Londiani |
Feedback |
| Rehabilitation and Construction of Drainage Structures at Brooke Centre |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,524,060.00 |
Kapkugerwet |
Feedback |
| Proposed Construction and Rehabilitation of Kamasian-Tulwet - Nyasakia Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
938,440.00 |
Kamasian |
Feedback |
| Kenene |
Improve access, quality of learning and care in ecde centers |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
2,731,500.00 |
Tebesonik |
Feedback |
| Kevoko water project |
To improve access to safe and sustainable drinking water for the community by protecting natural springs and establishing reliable water points. |
Water, Environment, Energy and Natural Resources |
Completed
|
5,948,016.00 |
Kapkugerwet |
Feedback |
| Itanda Extension Pipeline |
To expand water supply coverage by connecting unserved households, schools, and institutions to the existing water distribution network under the Last Mile Connectivity initiative. |
Water, Environment, Energy and Natural Resources |
Completed
|
1,050,960.00 |
Waldai |
Feedback |
| Cheplel Tbc-Cheplel Pry Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
798,892.00 |
Kapsoit |
Feedback |
| Construction of Kondamet - Chelalang Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,446,341.00 |
Londiani |
Feedback |
| Jagoror center- Kerembe road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
5,162,200.00 |
Londiani |
Feedback |
| Construction Of Ainamoi Centre- Town Roads |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
7,475,676.00 |
Ainamoi |
Feedback |
| Proposed Construction and Rehabilitation of Arap Yegon Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
913,122.42 |
Londiani |
Feedback |
| Kamugenik/tiriitabmoita |
Improve access, quality of learning and care in ecde centers |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
1,113,000.00 |
Tebesonik |
Feedback |
| Chelogon Spring Protection Water Project |
To improve access to safe and sustainable drinking water for the community by protecting natural springs and establishing reliable water points. |
Water, Environment, Energy and Natural Resources |
Completed
|
1,561,824.00 |
Kapkugerwet |
Feedback |
| Cheptarit Water Project |
To restore and improve the efficiency, reliability, and sustainability of the water supply system through rehabilitation of critical infrastructure, desilting of the dam, and protection of facilities. |
Water, Environment, Energy and Natural Resources |
Completed
|
1,246,758.00 |
Sigowet |
Feedback |
| Kapmrefu-Samutet Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
595,480.00 |
Kapsoit |
Feedback |
| Construction of Hill- tea - Wambare Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,403,551.68 |
Tendeno/Sorget |
Feedback |
| Jagoror center-Cypress Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
6,727,576.00 |
Londiani |
Feedback |
| Construction of Kap Sigilai- Ainamoi River- Kapcheluguma Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,516,740.00 |
Ainamoi |
Feedback |
| Proposed Construction and Rehabilitation of Tektek-Julima- Chepsait Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
986,349.00 |
Kunyak |
Feedback |
| Kaminjeiwa |
Improve access, quality of learning and care in ecde centers |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
1,020,600.00 |
Tebesonik |
Feedback |
| Ainamoi Water project |
To enhance access to clean and sustainable water supply by constructing and installing water infrastructure such as pipelines, water tanks, spring protection systems, and associated fittings, ensuring reliable water delivery to the target community |
Water, Environment, Energy and Natural Resources |
Completed
|
4,371,460.00 |
Ainamoi |
Feedback |
| Kapcheluch water Project |
To expand water supply coverage by connecting unserved households, schools, and institutions to the existing water distribution network under the Last Mile Connectivity initiative. |
Water, Environment, Energy and Natural Resources |
Completed
|
1,197,103.00 |
Kabianga |
Feedback |
| Arap Mojoh-Kapjog |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
739,906.00 |
Kapsoit |
Feedback |
| Construction of Eastleigh-Independent- Forest Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,982,880.00 |
Tendeno/Sorget |
Feedback |
| Off C35 - AIC 936 Academy-Lolongbei Pry Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,272,000.00 |
Londiani |
Feedback |
| Routine Maintenance of Bundalangi- Bechulelach Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,520,400.00 |
Ainamoi |
Feedback |
| Proposed Construction and Rehabilitation of Chemaluk-Gladys Canteen Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,070,688.00 |
Soin |
Feedback |
| Ochi pry |
Improve access, quality of learning and care in ecde centers |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
1,112,400.00 |
Tebesonik |
Feedback |
| Kimigik water Project |
To enhance access to clean and sustainable water supply by constructing pipelines ensuring reliable water delivery to the target community |
Water, Environment, Energy and Natural Resources |
Completed
|
4,095,960.00 |
Ainamoi |
Feedback |
| Reresik Water Project |
To improve water conveyance and expand access to safe and reliable water supply through the construction of a transmission pipeline from Chemaluk spring to Reresik. |
Water, Environment, Energy and Natural Resources |
Completed
|
1,590,592.00 |
Ainamoi |
Feedback |
| Arap Siele-Kapbulit Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
804,877.60 |
Kapsoit |
Feedback |
| Construction of Subukia-Mugumoini Road,Mugumoini-Kamuogo Road,Kamwingi-Miti Tatu Road,Subukia-wambare Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,395,805.00 |
Tendeno/Sorget |
Feedback |
| off C35 -Engineer Rotich-Nukiat-Link 35 Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,639,820.00 |
Londiani |
Feedback |
| Construction of 28m of 600mm and twin 900mm Cross Culvert at Chepkemel Cetre- Arap Cheruiyot- Sumeek Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
7,602,908.00 |
Kaplelartet |
Feedback |
| Proposed Maintenance of Off Chesingoro -Menet TBC - Kapsenetwet Primary School Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
938,440.00 |
Chemosot |
Feedback |
| Lalwat ecde |
Improve access, quality of learning and care in ecde centers |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
1,020,600.00 |
Kisiara |
Feedback |
| Kaplutiet Borehole Project |
To provide a safe, reliable, and sustainable source of water for domestic, institutional, and community use through borehole drilling and development. |
Water, Environment, Energy and Natural Resources |
Completed
|
1,396,002.00 |
Kabianga |
Feedback |
| E22-Kiptegan Pry Muiywek Tbc-Koisomoi Pry Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
743,100.00 |
Kapsoit |
Feedback |
| Mugumoini-Independent Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,496,861.00 |
Tendeno/Sorget |
Feedback |
| Kabarak ECDE - Sachangwan Road 2.8km; Off D 254 -Gishorio Road 1.5km; Kapsenda - Lolonbbei Road 1.3km; Kapchepkorio - Quarry Road0.4km; Kapsenda Dispensary - Chebaraa Road 1.7km; Satek - Langat Road 1.4km |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
5,541,324.00 |
Londiani |
Feedback |
| Construction of Centre Juu Quarry- AGC- Kap Stephano- Kaptebe- Ngeno- Borchole Road 4.5Km, Bartera Pry Sch-Centre Juu Road 2Km |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
4,961,208.00 |
Kamasian |
Feedback |
| Proposed Construction and Rehabilitation of Chebigen Sec- Samaria Nursery School Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
938,440.00 |
Kapsaos |
Feedback |
| Ngesumin |
Ensure Hygiene and Sanitation, Promote Health and Disease Prevention |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
560,000.00 |
Litein |
Feedback |
| Sumeiyon Water Project |
To enhance access to clean and sustainable water supply by constructing pipelines ensuring reliable water delivery to the target community |
Water, Environment, Energy and Natural Resources |
Completed
|
4,551,535.76 |
Kapkugerwet |
Feedback |
| Chepkoinik Kirukto Water Project |
To provide sustainable and reliable water supply to Chepkoinik Primary School and the surrounding community through solarisation, construction of a distribution pipeline, and protection of water infrastructure. |
Water, Environment, Energy and Natural Resources |
Completed
|
1,495,550.00 |
Kapsoit |
Feedback |
| Itibet-Chepkuk-Cheplel-Cherire,C35-Cheplel Pry,C35-Kipmwogoi,C35-Itibet |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,083,300.80 |
Kapsoit |
Feedback |
| Subukia-Kaburi-Mugumoini Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,462,262.36 |
Tendeno/Sorget |
Feedback |
| Barotion pry - Lelsotet Road; Barotion pry - Arap Chief Road; Kaptien - Sorget Road; Miti mingi - Kwa DC - Kaptich Road; |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
5,913,048.00 |
Londiani |
Feedback |
| Construction Of Kapetero Bridge-Annah Tinga-Kapchebos Road 2.5Km, Brenda Shop-Off B1-Sombicho-OFF B1 Road 1.7Km |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,958,857.28 |
Soliat |
Feedback |
| Proposed Construction and Rehabilitation of Kaminjeiwa Pry School-Boroiwek TBC-Asururiet Bridge Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
999,387.00 |
Cheplanget |
Feedback |
| Rwandet |
Ensure Hygiene and Sanitation, Promote Health and Disease Prevention |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
3,217,100.00 |
Kisiara |
Feedback |
| Magiroi Spring Protection Project |
To improve access to safe and sustainable drinking water for the community by protecting natural springs and establishing reliable water points. |
Water, Environment, Energy and Natural Resources |
Completed
|
4,042,594.08 |
Kapkugerwet |
Feedback |
| Rehabilitation of Kericho Town Dumpsite |
To improve solid waste management and enhance environmental health by relocating existing garbage heaps to create additional dumping space. |
Water, Environment, Energy and Natural Resources |
Completed
|
886,379.00 |
Kipchebor |
Feedback |
| Ketitui Sign-Ketitui Sec-Kapchesitgei, |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
697,113.00 |
Kapsoit |
Feedback |
| Kipteris-Korosiot-Tindiret Forest Road; Siret Centre- Siret Factory-Boror Bridge Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,337,339.70 |
Chilchila |
Feedback |
| Sirako - Jerusalem Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,163,400.00 |
Londiani |
Feedback |
| Construction of Chemaluk- Cheptembe Road 1.2Km, Chesunet- Kapsigowo Road 1.7Km, Chebaran- Kapsorok Day School Road 1.9Km |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
4,310,320.58 |
Soliat |
Feedback |
| Victors Academy – Sumeiyon – Boito Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,496,331.27 |
Kapkugerwet |
Feedback |
| Kapnyagoba/tetile |
Ensure Hygiene and Sanitation, Promote Health and Disease Prevention |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
3,254,200.00 |
Cheboin |
Feedback |
| Kiptegan/Kipkaganit water project |
To provide safe and potable water to the community by constructing effective water treatment works. |
Water, Environment, Energy and Natural Resources |
Completed
|
1,021,960.00 |
Kapsaos |
Feedback |
| Rehabilitation of Londiani Dumpsite |
To improve solid waste management and enhance environmental health by relocating existing garbage heaps to create additional dumping space. |
Water, Environment, Energy and Natural Resources |
Completed
|
N/A |
Londiani |
Feedback |
| Off E22-Sugutek Pry Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
760,018.00 |
Kapsoit |
Feedback |
| Forternan Town Road; Koisagat-Mategee Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,348,409.00 |
Chilchila |
Feedback |
| Chinese - Kapsegut Road; Lalanggbei Road; Kapjunior - Kiplangat Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
5,814,156.00 |
Londiani |
Feedback |
| Proposed Construction and Rehabilitation of Sachangwan- Ainapptibik-
Kaplegeny- Kapsegut Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,493,940.00 |
Soliat |
Feedback |
| Ochi |
Ensure Hygiene and Sanitation, Promote Health and Disease Prevention |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
3,323,100.00 |
Tebesonik |
Feedback |
| Lelaigoin, Itoibei and Chemasimba Springs Protection Water Project |
To improve access to safe and sustainable drinking water for the community by protecting natural springs and establishing reliable water points. |
Water, Environment, Energy and Natural Resources |
Completed
|
3,978,600.00 |
Kapsaos |
Feedback |
| Kericho Town Dumpsite weighbridge offices |
To strengthen solid waste management operations in Kericho Town by establishing weighbridge container offices at the dumpsite for improved monitoring, control, and staff welfare. |
Water, Environment, Energy and Natural Resources |
Completed
|
N/A |
Kipchebor |
Feedback |
| Kaboswa- Kiboibei Slaughter House Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,198,600.00 |
Kapsoit |
Feedback |
| Sereng-Chebululu-Boror Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,391,310.00 |
Chilchila |
Feedback |
| Chinese - Kapsegut Road; Lalanggbei Road; Kapjunior - Kiplangat Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
5,589,548.00 |
Londiani |
Feedback |
| Construction Of Soliat Dispensary-Mogonjet Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,874,254.92 |
Soliat |
Feedback |
| Proposed Construction of cross pipe culverts to Kwa Shabaa access roads in 939 |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,702,100.00 |
Tendeno/Sorget |
Feedback |
| Ainamoi/shinners |
Ensure Hygiene and Sanitation, Promote Health and Disease Prevention |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
4,264,445.00 |
Chemosot |
Feedback |
| Otui/Buchenge/Manyoror Water Supply Rehabilitation Project |
To improve water supply reliability and coverage through the rehabilitation of existing pipeworks and construction of extension pipelines. |
Water, Environment, Energy and Natural Resources |
Completed
|
1,842,486.00 |
Kapsaos |
Feedback |
| Mjini/Kisima Water Project |
To secure, rehabilitate, and enhance access to clean and safe water for the community through spring protection, rehabilitation works, construction of public water points, and fencing. |
Water, Environment, Energy and Natural Resources |
Completed
|
1,494,920.00 |
Kipchebor |
Feedback |
| Kapkitany-Koisagat-Noah Too Road, |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
831,950.00 |
Kapsoit |
Feedback |
| Cherara Centre-Kamiwa-Coffee Factory Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,686,859.18 |
Chilchila |
Feedback |
| Tegat - Lelsotet Road; Dr Ngeno-Roadunit |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,520,400.00 |
Londiani |
Feedback |
| Construction Of Kapkisai- Simbi Road 2.5Km, Kapkisai Society- Simbi River Road 1.0Km, Simbi- Chemengeng iver- Emitiot Road 0.5km, Kapkigoro Junction- Kap Pastor Road 1.4km, Chepsegeny Academy- Senetwet- Nyaberi Road 2.5km |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,575,038.00 |
Soin |
Feedback |
| Proposed Construction of cross pipe culverts to Cheres- Kap Mathayo road in 939 |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,492,113.00 |
Tendeno/Sorget |
Feedback |
| Tegat junior |
Ensure Hygiene and Sanitation, Promote Health and Disease Prevention |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
1,788,371.00 |
Tebesonik |
Feedback |
| Chepngobob Borehole Solarisation |
To improve sustainable access to safe and reliable water in Chepngobob by solarizing the existing borehole system. |
Water, Environment, Energy and Natural Resources |
Completed
|
4,376,651.00 |
Kapsaos |
Feedback |
| Birirbei Water Project Phase II |
To expand access to safe and reliable water supply by constructing a rising main, installing UPVC storage tanks, and providing public water points for community use |
Water, Environment, Energy and Natural Resources |
Completed
|
1,411,987.00 |
Kipchebor |
Feedback |
| Kapnyanya - Kapchesitkei Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,092,502.00 |
Kapsoit |
Feedback |
| Timbilil-Tegat-Kaplogoro Kamotos Road; Tunnel - Chembek - Mogoywet - Kiptenden Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,253,031.11 |
Chilchila |
Feedback |
| Turienga - Barotion boRoader Road; Off Lemotit Road - Njia Mpya - Link C35 Road; Kapcheplanga sec sch - Kapcheplanga pry - Kap Musa - Good luck Academy Road; Kap matthew - Kamaritim Road; Kapkondoo Junction - Kapcentre quarry Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,252,418.00 |
Tendeno/Sorget |
Feedback |
| Construction of Gokul-Kamelilo box culvert |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,500,972.52 |
Ainamoi |
Feedback |
| Proposed Construction of twin 900mm cross pipe culvert to Kwa Noah-Kivuno Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,493,950.00 |
Tendeno/Sorget |
Feedback |
| Chebakal |
Ensure Hygiene and Sanitation, Promote Health and Disease Prevention |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
1,853,243.00 |
Litein |
Feedback |
| Otui/Buchenge Phase 2 |
To improve water supply reliability and coverage through the construction of extension pipelines. |
Water, Environment, Energy and Natural Resources |
Completed
|
13,623,698.88 |
Kapsaos |
Feedback |
| Kimologit–KasongochoWater Project |
To enhance water supply coverage and reliability by supplying and installing HDPE pipes and fittings for extension pipelines to underserved areas. |
Water, Environment, Energy and Natural Resources |
Completed
|
1,500,445.00 |
Kamasian |
Feedback |
| Kapsoit Disp-Cheptingting Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,984,960.00 |
Kapsoit |
Feedback |
| Yalla-Kipteres-Tinderet Road; Mogire Sec- Teldet - Kiptenden Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,180,625.61 |
Chilchila |
Feedback |
| Turienga - Barotion boRoader Road; Off Lemotit Road - Njia Mpya - Link C35 Road; Kapcheplanga sec sch - Kapcheplanga pry - Kap Musa - Good luck Academy Road; Kap matthew - Kamaritim Road; Kapkondoo Junction - Kapcentre quarry Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,815,400.00 |
Tendeno/Sorget |
Feedback |
| Construction of Precast culverts at Kapfinch-Sotik Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,400,367.12 |
Londiani |
Feedback |
| Proposed Construction of twin 900mm cross pipe culvert across Lelechwet river |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,552,467.00 |
Londiani |
Feedback |
| Kiptenden |
Ensure Hygiene and Sanitation, Promote Health and Disease Prevention |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
4,773,882.00 |
Litein |
Feedback |
| Chepkoinik/Kirukto Water project |
To enhance access to safe, reliable, and sustainable water supply through spring protection, improved storage, infrastructure rehabilitation, and expanded distribution. |
Water, Environment, Energy and Natural Resources |
Completed
|
9,773,380.00 |
Kapsoit |
Feedback |
| Kabosenywo Water Project |
To expand water supply coverage by connecting unserved households, schools, and institutions to the existing water distribution network under the Last Mile Connectivity initiative. |
Water, Environment, Energy and Natural Resources |
Completed
|
1,191,350.00 |
Soliat |
Feedback |
| Kapsoit Disp-Simotwet Nursery-Sitotwet- Deliverance Church |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,985,644.00 |
Kapsoit |
Feedback |
| Cheborus-Kaptuiya-Korosyot Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,375,135.00 |
Chilchila |
Feedback |
| Tendeno dip-Kariuki Road;Tumaini sec-Kericho boRoader-Nominated MCA Road;Kienyere Road-Ndoiro Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
5,601,180.00 |
Tendeno/Sorget |
Feedback |
| Construction of Chepkemel- Arap Cheruiyot-Sumeek Road twin 900mm Cross Culvert at Kululut River |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,576,239.36 |
Kaplelartet |
Feedback |
| Proposed Construction of cross pipe culverts to Mumetet-Macheisok road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,498,113.90 |
Kipkelion |
Feedback |
| Kimolwet |
Ensure Hygiene and Sanitation, Promote Health and Disease Prevention |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
3,311,220.00 |
Cheboin |
Feedback |
| Kenegut Water supply |
To restore or enhance water pumping capacity for reliable water delivery through the supply and installation of a new pumpset. |
Water, Environment, Energy and Natural Resources |
Completed
|
13,263,522.36 |
Kapsoit |
Feedback |
| Katet Water Project |
To provide sustainable and reliable water supply through solarisation, installation of a pumpset, and protection of water infrastructure |
Water, Environment, Energy and Natural Resources |
Completed
|
1,207,980.00 |
Londiani |
Feedback |
| Kapsoit Main Road Jnt- Kiptenden- Kiboibei Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,969,322.80 |
Kapsoit |
Feedback |
| Yalla-Kipteres-Tinderet Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,596,586.00 |
Chilchila |
Feedback |
| Centre one-Cheborge Road;CheborgeMarsin Road;Miti tatu-Lovito-Kolonget Road;Kongoni dispensary-Chepkok Road;Singoi-Gwitu pry Road;Ayondi-Atiokigit river Road;Chabaya-Kichagi Road;Chabaya-KiMuremi Munga Road;Leltae-Kosigu-Captain Road;Towet-Kimager Road;Cheriro-wokter-mokiolok Road; E254-kk-Mwano-Muoroto-Siangatia Road;Chege-Wamutu-Wamagi Road;Zakao-kag church Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,578,400.00 |
Tendeno/Sorget |
Feedback |
| Construction of Sombicho Twin 900mm Cross Culverts |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
4,988,069.60 |
Soliat |
Feedback |
| Proposed backfilling of Koweek river box culvert and opening approach roads |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,501,828.80 |
Cheboin |
Feedback |
| Kapsogut |
Ensure Hygiene and Sanitation, Promote Health and Disease Prevention |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
4,786,045.00 |
Cheboin |
Feedback |
| Kipkutuny Springs |
To improve access to safe and sustainable drinking water for the community by protecting natural springs and establishing reliable water points. |
Water, Environment, Energy and Natural Resources |
Completed
|
6,848,869.29 |
Kapsoit |
Feedback |
| Kaplaba Borehole |
To provide a safe, reliable, and sustainable source of water for domestic, institutional, and community use through borehole drilling and development. |
Water, Environment, Energy and Natural Resources |
Completed
|
1,449,676.00 |
Kipkelion |
Feedback |
| Kapsoit-Telanet Road Grading And Gravel Spreading |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
7,805,790.00 |
Kapsoit |
Feedback |
| Chepkendi -11 - Kapkures - Serenge Road; Kositany - Sombo Road;Koisagat - Kamiwa Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,745,730.45 |
Chilchila |
Feedback |
| Kapsabet-Bagdad Road;Muikamba-David Mtaro Road;Emmanuel-PCA Road-Kaburi Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,602,720.00 |
Tendeno/Sorget |
Feedback |
| Construction of Kipaiwa Twin 900mm Cross Culverts |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,880,149.00 |
Soliat |
Feedback |
| Proposed construction of twin 900mm pipe culvert to Kondamet- Jordan road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,499,699.00 |
Kapsoit |
Feedback |
| Kamachumo |
Ensure Hygiene and Sanitation, Promote Health and Disease Prevention |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
2,583,000.00 |
Kapkatet |
Feedback |
| Ogirgir/Kinyose water projects |
To restore and expand access to safe, reliable, and sustainable water supply for communities served by the Kinyose and Ogirgir water projects. |
Water, Environment, Energy and Natural Resources |
Completed
|
4,474,120.00 |
Kapsoit |
Feedback |
| Tingoro Borehole Water Project |
To provide a safe, reliable, and sustainable source of water for domestic, institutional, and community use through borehole drilling and development. |
Water, Environment, Energy and Natural Resources |
Completed
|
1,204,250.00 |
Kipkelion |
Feedback |
| Kenegut C-Chepkuk- Kiptegan-Kisaibei Pry-Kenegut Centre- Chepkuk Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
980,292.80 |
Kapsoit |
Feedback |
| Kaplelit- Kamotos Road and Kamiwa- Kamotos Rod |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,253,031.11 |
Chilchila |
Feedback |
| Tendeno-SubukiaRoad;Subukia-Wambare Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
4,807,140.00 |
Tendeno/Sorget |
Feedback |
| Routine Maintenance of Off D314-Mutanya road |
Potholes patched, ,surface grading completed. |
Public Works, Roads and Transport |
Completed
|
3,609,015.20 |
Chepseon |
Feedback |
| Proposed Construction of cross pipe culverts to Kedowa Kimugul and its environs in 937 |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,504,470.00 |
Kedowa/Kimugul |
Feedback |
| Chematich |
Ensure Hygiene and Sanitation, Promote Health and Disease Prevention |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
2,786,700.00 |
Kapkatet |
Feedback |
| Koisamoi water project |
To improve access to safe and adequate water supply through the development of a spring source, construction of a storage tank, and installation of a distribution pipeline. |
Water, Environment, Energy and Natural Resources |
Completed
|
6,736,120.00 |
Kapsoit |
Feedback |
| Simotwo Borehole Water Project |
To provide a safe, reliable, and sustainable source of water for domestic, institutional, and community use through borehole drilling and development. |
Water, Environment, Energy and Natural Resources |
Completed
|
1,335,728.00 |
Kipkelion |
Feedback |
| Kenegut Centre- Kipmwagoi Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
770,727.20 |
Kapsoit |
Feedback |
| Kamiwa Factory-Cherara Kamaget;Kenegut Mkt--Kisebei Pry Sch. Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,596,000.00 |
Chilchila |
Feedback |
| Miti - tatu - Benditai Road; Chebusit main road - JXN road; Chemororen - Kamau Nubery Road; Rajab - CHEMWOKTER ROAD; Chebaibai - Kapkimoi nRoad; Kimoi - Kamaua; Rajab - Busara Road; Chebaibai - Ximboiyo Road; Cheborgei - Seronei Road; Seronei - Benditai BoaRoader Road; Mikingo - Bridge Road; Maritim - Kimoi Road; Sach 4 - Barno Road; Bitok - Yegen Selim -KAcheyat Road; KAptembwo - Forest Road; Maranget - Chemwokter Road; Chebubto - Cheriro Road ; Chebaibai - Louito Road and Simboiyon Sach 4 Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
7,999,960.00 |
Tendeno/Sorget |
Feedback |
| Routine Maintenance of Koitamat Pry Sch- Quarry Laliat -Dip Road 1.5Km; Sachangwan- Koitamat-Chepngetuny Road 2Km |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
4,461,729.90 |
Ainamoi |
Feedback |
| Proposed Construction of Concrete Box Culvert across Daraja mbili road in 940 |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,480,682.00 |
Kunyak |
Feedback |
| Roronya |
Ensure Hygiene and Sanitation, Promote Health and Disease Prevention |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
3,425,028.00 |
Kapkatet |
Feedback |
| Ogirgir/Koisamoi |
To restore and expand access to safe, reliable, and sustainable water supply for communities served by the Kinyose and Ogirgir water projects. |
Water, Environment, Energy and Natural Resources |
Completed
|
3,665,948.00 |
Kapsoit |
Feedback |
| Kipkoyo Water Project |
To expand water supply coverage by connecting unserved households, schools, and institutions to the existing water distribution network under the Last Mile Connectivity initiative. |
Water, Environment, Energy and Natural Resources |
Completed
|
1,499,170.00 |
Kedowa/Kimugul |
Feedback |
| Kenegut-Kisabei,Ketitui Sach Somok Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
646,816.00 |
Kapsoit |
Feedback |
| Road Opening Opening Of Kokwet-Toroton-Tombiret-Kipsasur Road. (15km) |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,412,942.14 |
Chilchila |
Feedback |
| Kahuho Road; Tumaini Road; Kaigemi Ak foRoad Road; Wangare- MCA Road; Mukamba - mulkaroubo Road; Mahinga - Borchek Road; Subukia - Independent Road; Mburu - Dave Road; Independent - Isili - Tendeno pry Road; Nginga - Kamwingi Road; Independent church - Nginga Jxn Road; Micheal JXN- Mwangi Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,175,040.00 |
Tendeno/Sorget |
Feedback |
| Construction of Off E222- Ainamoi AIC- Chepngetuny Road 1.7km; Off E222-Chepngetuny-Koitamat Road 2.2Km |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,697,732.00 |
Ainamoi |
Feedback |
| Proposed Construction and Rehabilitation of 600mm culverts to Ngororga Treatment Works - Chepngobob Pry-Maso centre road in 949 |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
936,550.00 |
Kapsaos |
Feedback |
| Ketigoi/tulwet |
Ensure Hygiene and Sanitation, Promote Health and Disease Prevention |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
1,537,000.00 |
Kisiara |
Feedback |
| Melit 2/Kimungen and Ainapbon springs |
To improve access to safe and sustainable drinking water for the community by protecting natural springs and establishing reliable water points. |
Water, Environment, Energy and Natural Resources |
Completed
|
1,501,883.55 |
Kipchebor |
Feedback |
| Sugutek Borehole Water Project |
To provide a safe, reliable, and sustainable source of water for domestic, institutional, and community use through borehole drilling and development. |
Water, Environment, Energy and Natural Resources |
Completed
|
1,497,473.00 |
Kipkelion |
Feedback |
| Kiptegan- Kisabei- Kenegut Tbc Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,852,636.00 |
Kapsoit |
Feedback |
| Tunnel-Chepkosa Nyanza Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
4,144,958.40 |
Chilchila |
Feedback |
| Construction of Kamwingi II - Kiangundo Road;Kamwingi pry - KIMARI - Singati Road; Centre 1 - Majani Road; Taarifa corner Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,575,028.00 |
Chilchila |
Feedback |
| Constructionof Off Main Road- Metro Pry Sch- Metro Box Culvert-Metro AIC Church Road 2.7Km; Chepsetyion Main Road- Kipchorian Bridge- Bishop Okoth Secondary School Road 2.5Km |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
4,516,993.60 |
Ainamoi |
Feedback |
| Proposed Construction and Rehabilitation of 600mm culverts to Cereal-Mjini-Kwa Reuben-Cherote-Kipkeles- Nyagacho road in 947 |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
600,000.00 |
Kipchebor |
Feedback |
| Ngainet |
Ensure Hygiene and Sanitation, Promote Health and Disease Prevention |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
700,000.00 |
Kisiara |
Feedback |
| Ainabon Water Project |
To enhance access to clean and reliable water supply for the targeted community through the use of appropriate, sustainable, and low-maintenance technologies. |
Water, Environment, Energy and Natural Resources |
Completed
|
2,403,495.00 |
Kipchebor |
Feedback |
| Kesabo Water Project |
To expand water supply coverage by connecting unserved households, schools, and institutions to the existing water distribution network under the Last Mile Connectivity initiative. |
Water, Environment, Energy and Natural Resources |
Completed
|
1,101,658.00 |
Kedowa/Kimugul |
Feedback |
| Chesilot Sign-Sugutek Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,791,022.60 |
Kapsoit |
Feedback |
| Kasheen - Borowet - Morau Pry Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,984,082.64 |
Kamasian |
Feedback |
| Kaigai Road; UPC raod; Majani sawmil Awii; Amos Saiz Road; Independent church - Dam Road; Catholic main -Cherer diversion Road; Macam Milka - Koigo Road; Cheres Road; Chebangang Road; Josh dam Road; Chane rs; Upendo Road; Akimani Road; Zakayo Road; Mama Mike Road; Mrs Langat - Forest Road; Botpla Road; Mama wangari cam Daniel Road; Speaker Kipronon Road; Kwa Daniel Road; Daniel Forest Road; Centaa Roads; Kipkelion works; Barsiele Road; Mau Road; Power Road; owet Guito Road; Ngingo - highway Road; Peters - gwitu Road; Bungowma - Roisili Road; Assembly Church Bridge - Bridge cheres Road; Bridge Road; Assembly Church - bridge Road; Cheres - Bridge Road; Mama chelimo Al shabaab Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,473,400.00 |
Chilchila |
Feedback |
| Routine Maintenance of Off E222- Koitamat Pry School Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,634,000.00 |
Ainamoi |
Feedback |
| Proposed Construction of twin 900mm across Maburo river in 956 |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
987,000.00 |
Kapkatet |
Feedback |
| Kolonget |
Ensure Hygiene and Sanitation, Promote Health and Disease Prevention |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
3,593,180.00 |
Kisiara |
Feedback |
| Kisima water project |
To improve access to safe and sustainable drinking water for the community by protecting natural springs and establishing reliable water points. |
Water, Environment, Energy and Natural Resources |
Completed
|
5,099,733.96 |
Kipchebor |
Feedback |
| Simotwet Borehole Solarization |
To enhance access to sustainable and safe water supply through borehole equipping, solarisation, installation of storage tanks, and construction of a distribution pipeline |
Water, Environment, Energy and Natural Resources |
Completed
|
1,350,082.00 |
Kunyak |
Feedback |
| Ogirgir Jxn-Kisabei Bridge Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,294,999.68 |
Kapsoit |
Feedback |
| Kasheen-Kapluso-Chemonge Road;Lelu-Central-Nyairobi Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,900,420.00 |
Kamasian |
Feedback |
| Kwa Chief-Jagoror Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,363,196.00 |
Chilchila |
Feedback |
| Construction Of Tendwet-Kapsilangwa-Ainapsososiot Road 4Km, Kimuitiony-Kapriwet Road 1.8Km |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,587,396.24 |
Kapsaos |
Feedback |
| Kapsuser Market |
To improve sanitation facilities at Kapsuser Market |
Trade, Industrialization, Cooperative Development, Tourism and Wildlife |
Completed
|
940,000.00 |
Kapsuser |
Feedback |
| Chelelaibei |
Ensure Hygiene and Sanitation, Promote Health and Disease Prevention |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
2,060,640.00 |
Chemosot |
Feedback |
| Dionysoet Water Catchment Rehabilitation |
To restore and protect the Dionysoet water catchment area to ensure sustainable water supply, enhance biodiversity, and prevent land degradation. |
Water, Environment, Energy and Natural Resources |
Completed
|
1,908,944.49 |
Kipchebor |
Feedback |
| Chemutian Water Project Phase II |
To provide sustainable and reliable access to safe water through installation of a submersible pumpset, solar power system, construction of a masonry storage tank, and supporting pipework |
Water, Environment, Energy and Natural Resources |
Completed
|
1,772,596.00 |
Soliat |
Feedback |
| Kiptenden Tbc-Kapsoit Centre |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,080,000.00 |
Kapsoit |
Feedback |
| Kapkures-Nyasakia Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
4,739,902.68 |
Kamasian |
Feedback |
| Kokwet-Toroton-Kipsasur Road;Bomore-Kap Chapati Road;Kokwet Centre Road;Momugut-Kapinguron;Chemunyala-Store Road;Sachangwan-Kapchorua Road;Burutu-Kapkesee Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
5,847,512.00 |
Chilchila |
Feedback |
| Construction Of Manyoror Dip- Kamungei Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
4,972,406.00 |
Kapsaos |
Feedback |
| Brooke Market |
To enhance hygiene and sanitation at Brooke Market |
Trade, Industrialization, Cooperative Development, Tourism and Wildlife |
Completed
|
881,200.00 |
Kapsaos |
Feedback |
| Cheborema |
Ensure Hygiene and Sanitation, Promote Health and Disease Prevention |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
7,001,400.00 |
Chemosot |
Feedback |
| Rehabilitation of recreational park (Moi garden) |
To enhance the safety, functionality, and aesthetic appeal of the garden area by constructing a secure perimeter wall, installing access control through steel gates, and providing durable seating for visitors |
Water, Environment, Energy and Natural Resources |
Completed
|
2,009,120.00 |
Kipchebor |
Feedback |
| Rehabilitation of Kabokyek Secondary School Borehole |
To restore and improve the performance of an existing borehole by conducting flushing works and rehabilitating the submersible pump for reliable and sustainable water supply |
Water, Environment, Energy and Natural Resources |
Completed
|
1,419,388.00 |
Soliat |
Feedback |
| Off E22- Kaboswa-Kaptoimen Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,689,518.00 |
Kapsoit |
Feedback |
| Kasheen-Borowet Road 6km) |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
6,155,122.40 |
Kamasian |
Feedback |
| Off Chilchila Sch.-Kapedo Road-Chepkendi Dispensary-Railway Chemunyala Factory-Nyanza Road;Chepkendi-Kapkures Road;Cherara-Kamaget-Murgut Road;Kaplelit-Kishara-Kamatos Road;Kaplelit-Tegat-Timbil Road;Yala-Teldet Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
5,942,132.00 |
Chilchila |
Feedback |
| Construction Of Tabet- Koigaron- Mureret Road 3.7Km |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,535,559.36 |
Kapsaos |
Feedback |
| Sondu Market |
To provide adequate sanitation for traders and customers |
Trade, Industrialization, Cooperative Development, Tourism and Wildlife |
Completed
|
890,950.00 |
Kaplelartet |
Feedback |
| Chesingoro |
Ensure Hygiene and Sanitation, Promote Health and Disease Prevention |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
1,370,580.00 |
Chemosot |
Feedback |
| Rehabilitation of recreational park (Moi garden) |
To improve accessibility and recreational opportunities within the facility by constructing a parking yard for visitors and installing diverse, child-friendly playground equipment to promote social interaction, physical activity, and community engagement |
Water, Environment, Energy and Natural Resources |
Completed
|
2,023,341.60 |
Kipchebor |
Feedback |
| Chepkurbet – Kewasco Lastmile Connectivity Water Project |
To expand water supply coverage by connecting unserved households, schools, and institutions to the existing water distribution network under the Last Mile Connectivity initiative. |
Water, Environment, Energy and Natural Resources |
Completed
|
1,178,864.00 |
Kapsoit |
Feedback |
| Off B1-Grassland-Telanet,Ngecherok Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,572,601.06 |
Kapsoit |
Feedback |
| Kasheen-Borowet Road 6km;Leldet-Kipsegi Road 4km;Kwa Mutai-Tingatela 6km Kasheen Quarry |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,728,298.00 |
Kamasian |
Feedback |
| Ndubusat-Kaburenik Forest Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,102,860.00 |
Chilchila |
Feedback |
| Construction of Tabet – Koigaron – Mureretv Road 2.2km |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
4,945,000.00 |
Kapsaos |
Feedback |
| Kapkelek Market |
To enhance market security and boundary control |
Trade, Industrialization, Cooperative Development, Tourism and Wildlife |
Completed
|
890,000.00 |
Cheptororiet/Seretut |
Feedback |
| Geterwetecdetoilet |
Ensure Hygiene and Sanitation, Promote Health and Disease Prevention |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
4,752,420.00 |
Chemosot |
Feedback |
| Solid waste management infrastructure |
To enhance the operational efficiency and capacity of infrastructure development and maintenance works by acquiring a multi-purpose wheel loader for earthmoving, loading, and material handling tasks |
Water, Environment, Energy and Natural Resources |
Completed
|
3,139,632.80 |
Kipchebor |
Feedback |
| Cherotuk Chebululu Water Project |
To expand water supply coverage by connecting unserved households, schools, and institutions to the existing water distribution network under the Last Mile Connectivity initiative. |
Water, Environment, Energy and Natural Resources |
Completed
|
1,101,658.00 |
Kipkelion |
Feedback |
| B1-Sachangwan-Chepkutbei Pry Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
653,000.00 |
Kapsoit |
Feedback |
| Mtaragon-Kawangware Road;Chebirirmoi-Kimologit Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,934,395.20 |
Kamasian |
Feedback |
| Murgut Pry Sch.- Nyanza Boundary Road (1.3km); Off E 250 - Karap Murel Road (0.6km); Koisagat - Kapchebere - Morombit Road (0.8km) |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,670,580.00 |
Chilchila |
Feedback |
| Constuction Of Baraka-Kamungei 1.6km, Off C23-Lamaiyat Primary- Torochgaa Box Culvert 2.5 Km Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,799,080.00 |
Kapsoit |
Feedback |
| Fortenan Museum |
To improve sanitation standards for visitors and staff |
Trade, Industrialization, Cooperative Development, Tourism and Wildlife |
Completed
|
739,094.00 |
Chilchila |
Feedback |
| Construction of a toilet at Ririat ECDE Centre |
Ensure Hygiene and Sanitation, Promote Health and Disease Prevention |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
969,900.00 |
Cheboin |
Feedback |
| Solid waste management infrastructure |
To improve solid waste management, cleanliness, and public hygiene by strategically placing durable waste bins in high-traffic and public areas to reduce littering and encourage responsible waste disposal |
Water, Environment, Energy and Natural Resources |
Completed
|
2,168,620.00 |
Kipchebor |
Feedback |
| Chepkoiyo Water Project |
To strengthen water supply infrastructure and improve access to safe and reliable water through construction of a gravity main and installation of storage tanks on raised platforms. |
Water, Environment, Energy and Natural Resources |
Completed
|
1,511,890.00 |
Ainamoi |
Feedback |
| Ngecherok-Fgck-Sosit Pry Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,045,550.00 |
Kapsoit |
Feedback |
| Railway - Kipchorian; River Losirwo - Kipchorian Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,556,047.00 |
Kipkelion |
Feedback |
| Morombit - Morombinyik |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,082,780.00 |
Chilchila |
Feedback |
| Construction Of NCPB-Jua Kali Road 1.2Km,Mjini Highlands Road 3.5,Kenya Highlands 2.6Km,Kipochebor Primary Access Roads 1.5Km,Kimungen-Kamasian AGC Road 1Km |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,283,699.20 |
Kipchebor |
Feedback |
| Gikomba Market |
To enhance hygiene and sanitation through modern toilet facilities |
Trade, Industrialization, Cooperative Development, Tourism and Wildlife |
Completed
|
158,020.00 |
Kapkugerwet |
Feedback |
| Construction of ECDE classroom at Tuiyobei ECDE Centre |
Improve access, quality of learning and care in ecde centers |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
1,344,080.00 |
Cheboin |
Feedback |
| Solid waste management infrastructure |
Improve Waste Collection Efficiency,Support Clean and Sustainable Urban Environments |
Water, Environment, Energy and Natural Resources |
Completed
|
1,586,518.08 |
Kipchebor |
Feedback |
| Enginit Borehole Water Project |
To provide sustainable and reliable access to clean water for domestic and livestock use through solarisation, installation of a pumpset and storage tank, construction of communal water points and cattle trough, and securing of water infrastructure. |
Water, Environment, Energy and Natural Resources |
Completed
|
1,420,628.00 |
Londiani |
Feedback |
| Soundcity-Keltabeliot River |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,946,750.00 |
Kapsoit |
Feedback |
| Railway - Kipchorian Roads; Siret Pry Road; Chemager -Siret Quarry Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,698,992.00 |
Kipkelion |
Feedback |
| Tendwet - Yalla - Kipteres Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,147,363.00 |
Chilchila |
Feedback |
| Construction Of Market-Cereal-Cementry Road 1.7Km,Melit-Milimani Road 0.2Km,Melit-Zion Assembly Church Road 0.2Km,Melit-Kenya Highlands 0.4Km, Police Station Satellite Road 0.5Km,Nya=Gacho Stage-Tegek Road 0.5 Km |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
4,769,530.00 |
Kipchebor |
Feedback |
| Kipsitet Market |
To promote hygiene and sanitation for traders and customers |
Trade, Industrialization, Cooperative Development, Tourism and Wildlife |
Completed
|
1,421,000.00 |
Soin |
Feedback |
| Construction of a twin Workshop at Chemosot VTC Phase I |
Expand Practical Training Capacity. Support Youth Empowerment and Employability |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
1,647,240.00 |
Chemosot |
Feedback |
| Kipsotet Water Project |
To enhance access to safe, reliable, and sustainable water supply through spring protection, improved storage, infrastructure rehabilitation, and expanded distribution. |
Water, Environment, Energy and Natural Resources |
Completed
|
1,134,108.80 |
Kipchimchim |
Feedback |
| Lelaitich IDP Water Project |
To expand water supply coverage by connecting unserved households, schools, and institutions to the existing water distribution network under the Last Mile Connectivity initiative. |
Water, Environment, Energy and Natural Resources |
Completed
|
1,258,900.00 |
Soin |
Feedback |
| Sound City-Grassland Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
627,000.00 |
Kapsoit |
Feedback |
| Segetet Junction-Kaplabotwo Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,196,586.40 |
Kipkelion |
Feedback |
| Teldet Centre - Kortende - Forest Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,426,690.00 |
Chilchila |
Feedback |
| Construction of Mjini Access Road 1.7Km; Kwa Taa- Mombasa Ndogo Road 0.5Km; Light and Life Church Road 0.3Km; Barabara Mpya-Nursery School Road 0.7Km; Riverside-Kitu Road 0.9Km; Melit-Mliminai Road 0.3Km; Kipcheobr Pry-Kamasian AGC Road 1Km |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
4,371,524.96 |
Kipchebor |
Feedback |
| Kapsaos Market |
To improve sanitation facilities through sustainable solutions |
Trade, Industrialization, Cooperative Development, Tourism and Wildlife |
Completed
|
585,590.00 |
Kapsaos |
Feedback |
| Construction of a pit latrine at Nganaset ECDE Centre |
Ensure Hygiene and Sanitation, Promote Health and Disease Prevention |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
4,107,220.00 |
Kapkatet |
Feedback |
| Kaptoroi Water Project |
To enhance access to safe, reliable, and sustainable water supply through spring protection, improved storage, infrastructure rehabilitation, and expanded distribution. |
Water, Environment, Energy and Natural Resources |
Completed
|
1,167,840.00 |
Kipchimchim |
Feedback |
| Rehabilitation of Chepkurbet Water Supply |
To expand water supply coverage by connecting unserved households, schools, and institutions to the existing water distribution network under the Last Mile Connectivity initiative. |
Water, Environment, Energy and Natural Resources |
Completed
|
1,297,940.00 |
Kapsoit |
Feedback |
| Sitotwet-Samutet Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
692,264.80 |
Kapsoit |
Feedback |
| Cheboit-Tingoro Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,849,252.00 |
Kipkelion |
Feedback |
| Chepkechei - Kaplekwa - Kipteris FGIK Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
4,872,280.00 |
Chilchila |
Feedback |
| Construction Of Sinonin-Itondo AGC 2Km |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,849,885.00 |
Kabianga |
Feedback |
| Tuiyo Market |
To promote environmental health and sanitation |
Trade, Industrialization, Cooperative Development, Tourism and Wildlife |
Completed
|
407,500.00 |
Kunyak |
Feedback |
| Construction of a 3 door pit latrine at Lalwat ECDE Centre |
Ensure Hygiene and Sanitation, Promote Health and Disease Prevention |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
1,810,500.00 |
Kisiara |
Feedback |
| Kipchimchim/Lower Kinyose/Kipsotet Water Projects |
To improve water access and distribution efficiency by installing a reliable pipeline network for the targeted service area.systems, and associated fittings, ensuring reliable water delivery to the target community |
Water, Environment, Energy and Natural Resources |
Completed
|
1,486,226.80 |
Kipchimchim |
Feedback |
| Tree seedlings/ fencing |
To support sustainable tree nursery development and environmental conservation by supplying, delivering, and installing UPVC storage tanks for reliable water access. |
Water, Environment, Energy and Natural Resources |
Completed
|
1,528,100.00 |
Kipkelion |
Feedback |
| Soet- Itibet Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,945,620.00 |
Kapsoit |
Feedback |
| Siret Centre-Siret Factory- Boror Bridge Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,738,050.00 |
Kipkelion |
Feedback |
| Chepkitar Centre - Toroton Boundary - Yalla Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,251,040.00 |
Chilchila |
Feedback |
| Construction Of Dispensary Sanga- Kap Senetor Road 2.6km, Kapmawei Dispensary- Kiptome Road 1.5Km |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,854,254.28 |
Kabianga |
Feedback |
| Roret Market |
To improve hygiene standards for traders and users |
Trade, Industrialization, Cooperative Development, Tourism and Wildlife |
Completed
|
1,339,075.00 |
Kisiara |
Feedback |
| Construction of a 3 door pit latrine with urinal at Cheptagum ECDE Centre |
Ensure Hygiene and Sanitation, Promote Health and Disease Prevention |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
3,999,900.00 |
Tebesonik |
Feedback |
| Kiboet Borehole water project |
To provide a reliable and efficient submersible pump system capable of meeting the site’s water supply or dewatering needs. |
Water, Environment, Energy and Natural Resources |
Completed
|
1,407,544.00 |
Cheptororiet/Seretut |
Feedback |
| Solarization of Chebilawa water supply |
To provide sustainable and reliable water supply through solarisation, installation of a pump, and construction of a control house for secure and efficient system operation |
Water, Environment, Energy and Natural Resources |
Completed
|
1,772,596.00 |
Chemosot |
Feedback |
| Masaita Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
925,343.60 |
Londiani |
Feedback |
| Siret-Tuiyobei Road,Off C35-Chemagel-Quarry Road,Kaborok-Kipchorian Road, Kaborok Tuiyobei |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,889,822.80 |
Kipkelion |
Feedback |
| Toroton - Tulwapmoi Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,282,200.00 |
Chilchila |
Feedback |
| Construction Of Kap Peter- Masarian Pry- Masombok- Kap Joshua Road 2.5Km |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
4,965,900.00 |
Kapsuser |
Feedback |
| Chesigot FCs |
To support coffee storage and quality management |
Trade, Industrialization, Cooperative Development, Tourism and Wildlife |
Completed
|
1,010,130.00 |
Kunyak |
Feedback |
| Kabusienduk |
Ensure Hygiene and Sanitation, Promote Health and Disease Prevention |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
3,348,608.00 |
Tebesonik |
Feedback |
| Cheptororiet Borehole Water Project |
To procure and deliver high-quality drilling materials that meet the technical and operational requirements of the project. |
Water, Environment, Energy and Natural Resources |
Completed
|
4,095,960.00 |
Cheptororiet/Seretut |
Feedback |
| Last mile Connectivity in Ainamoi ward |
To expand water supply coverage by connecting unserved households, schools, and institutions to the existing water distribution network under the Last Mile Connectivity initiative. |
Water, Environment, Energy and Natural Resources |
Completed
|
1,504,550.00 |
Ainamoi |
Feedback |
| Baration Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
821,551.44 |
Londiani |
Feedback |
| Sugutek-Kalyet Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,445,996.00 |
Kipkelion |
Feedback |
| Chilchila Quarry(Tinderet Forest Road) |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
5,007,926.00 |
Kamasian |
Feedback |
| Construction Of Jericho-Master Seed- Kapzablon-Pentagon-Chemosi-Sesga Road 1.8 Km |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
4,165,000.00 |
Kapsuser |
Feedback |
| Kosiachtany FCs |
To reduce milk spoilage and improve quality |
Trade, Industrialization, Cooperative Development, Tourism and Wildlife |
Completed
|
398,500.00 |
Sigowet |
Feedback |
| Kenene |
Ensure Hygiene and Sanitation, Promote Health and Disease Prevention |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
4,739,032.00 |
Tebesonik |
Feedback |
| Cheptororiet borehole water project |
To equip an existing borehole with all necessary components to enable a sustainable and efficient water supply system. |
Water, Environment, Energy and Natural Resources |
Completed
|
3,013,332.00 |
Cheptororiet/Seretut |
Feedback |
| Rehabilitation of Kipngetuny Water Project |
To expand water supply coverage by connecting unserved households, schools, and institutions to the existing water distribution network under the Last Mile Connectivity initiative. |
Water, Environment, Energy and Natural Resources |
Completed
|
1,386,498.00 |
Kapsuser |
Feedback |
| Sereng-Chemosogon Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,525,543.80 |
Chilchila |
Feedback |
| Railway - Kipchorian River; Lesirwo - Kipchorian Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,875,885.00 |
Kipkelion |
Feedback |
| Tendwet - Malinja - Magire Dispensary Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
5,942,712.00 |
Kamasian |
Feedback |
| Construction Of Sesgaa-Kapsoiyo Primary School-Kipkoiyan Corner Road 5Km |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,513,640.00 |
Kapsuser |
Feedback |
| Kipagenge FCs |
To enhance milk distribution efficiency |
Trade, Industrialization, Cooperative Development, Tourism and Wildlife |
Completed
|
1,049,670.00 |
Litein |
Feedback |
| Construction of an ECDE classroom at Chepkong'ony ECDE Centre |
Improve access, quality of learning and care in ecde centers |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
4,231,788.00 |
Chemosot |
Feedback |
| Seretut 1 |
To provide communities with improved access to clean and safe water through the extension of the water distribution network. |
Water, Environment, Energy and Natural Resources |
Completed
|
3,000,000.00 |
Cheptororiet/Seretut |
Feedback |
| Sosiot Water Project Lastmile Connectivity |
To expand and improve the existing water supply system through the extension of the distribution pipeline and rehabilitation of existing storage infrastructure, ensuring increased water access and reliability for the target population |
Water, Environment, Energy and Natural Resources |
Completed
|
1,850,028.00 |
Waldai |
Feedback |
| Morombit-Maji Moto Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,362,594.00 |
Chilchila |
Feedback |
| Kapkwen-Chesonoi-Kabirong Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,712,048.00 |
Kunyak |
Feedback |
| Misoi-Chumba Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
4,191,360.00 |
Kamasian |
Feedback |
| Construction Of Kaptebeswet-Kigorwet AGC-Mosombok Stream 1.9Km, Kiboito TBC-Kapchogeka-Kiboei AGC- Sachoran Road 5.5Km, Bot Musa Road 0.1Km |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
4,219,000.00 |
Kapsuser |
Feedback |
| Support to Cooperatives |
To digitize cooperative operations and record management |
Trade, Industrialization, Cooperative Development, Tourism and Wildlife |
Completed
|
289,120.00 |
Soliat |
Feedback |
| Construction of Pit latrine at Bargiro ECDE Centre |
Improve access, quality of learning and care in ecde centers |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
8,172,396.00 |
Chemosot |
Feedback |
| Seretut Borehole Water Project |
To provide all required drilling materials that meet industry standards and project specifications for water borehole drilling or geotechnical investigations. |
Water, Environment, Energy and Natural Resources |
Completed
|
7,168,974.00 |
Cheptororiet/Seretut |
Feedback |
| Kiptuigo-koiyet rd |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,643,870.80 |
Cheboin |
Feedback |
| Tunnel Centre-Chepkosa Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
4,988,144.00 |
Chilchila |
Feedback |
| Koteteni-Chepsil,Girimori-Urafiki Factory |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,973,507.00 |
Kunyak |
Feedback |
| Kipsongol-Kap Luso-Chemongen Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,952,704.00 |
Kamasian |
Feedback |
| Construction Of Off Chebungungon Road-Kesagetiet TBC Road 1.8Km, Kapelexanda-Chemosn-Kapstephano-Kapturmesendo-Brazil Road 4Km/3.7km, Kap Mathayo-Chepngetuny Road 1.4Km |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,680,313.00 |
Cheptororiet/Seretut |
Feedback |
| Support to Cooperatives |
To improve milk handling and hygiene |
Trade, Industrialization, Cooperative Development, Tourism and Wildlife |
Completed
|
879,630.00 |
Kapsoit |
Feedback |
| Construction of pit latrine at Kabartegan ECDE Centre |
Improve access, quality of learning and care in ecde centers |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
1,865,596.00 |
Chemosot |
Feedback |
| Seretut Primary and Chemogoriet AIC Water Tanks |
To enhance access to safe, reliable, and sustainable water supply through improved storage, infrastructure rehabilitation, and expanded distribution. |
Water, Environment, Energy and Natural Resources |
Completed
|
1,842,486.00 |
Cheptororiet/Seretut |
Feedback |
| Spencon- KapChebo School Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,387,548.00 |
Cheboin |
Feedback |
| Mendera Dispensary- Kiptenden-Kipchorian Footh Bridge Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,232,400.00 |
Chilchila |
Feedback |
| Girimori-Chesonoi Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
7,495,838.80 |
Kunyak |
Feedback |
| Kasheen-Morao Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
5,459,964.00 |
Kamasian |
Feedback |
| Construction Of Chemoson - Kapturmesedet- Kap Stephano- Brazil Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,688,508.80 |
Cheptororiet/Seretut |
Feedback |
| Fortenan Museum |
To enhance comfort for visitors and promote tourism |
Trade, Industrialization, Cooperative Development, Tourism and Wildlife |
Completed
|
2,596,808.96 |
Chilchila |
Feedback |
| Construction of a pit latrine at Kapkusum ECDE Centre |
Ensure Hygiene and Sanitation, Promote Health and Disease Prevention |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
6,905,292.00 |
Chemosot |
Feedback |
| Cheptororiet Borehole Water Project (Extension) |
To enhance access to safe, reliable, and sustainable water supply through improved storage, infrastructure rehabilitation, and expanded distribution. |
Water, Environment, Energy and Natural Resources |
Completed
|
2,088,000.00 |
Cheptororiet/Seretut |
Feedback |
| Ngororga-cheptigit sachangwan rd |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,483,941.35 |
Cheboin |
Feedback |
| Kamiwa-Kamotos Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,300,008.00 |
Chilchila |
Feedback |
| Girimori-Urafiki Factory;Kotetni-Chepsil Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,411,314.00 |
Kunyak |
Feedback |
| Kimeto-Kaplaba Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,704,032.00 |
Kamasian |
Feedback |
| Construction Of Greenfield -Sambeek Clinic- Kapcheren- Ainapkoi Road 3Km; Kipsolu Agc- Kibaraa Road 1.6Km; Chepkoton Bridge- Milimani TBC- Maina Road 2Km |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
4,163,155.55 |
Cheptororiet/Seretut |
Feedback |
| Sosiot Market |
To improve sanitation and hygiene |
Trade, Industrialization, Cooperative Development, Tourism and Wildlife |
Completed
|
3,996,353.70 |
Waldai |
Feedback |
| Construction of a toilet at Nyambolosa ECDE Centre |
Ensure Hygiene and Sanitation, Promote Health and Disease Prevention |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
3,229,712.00 |
Litein |
Feedback |
| Tea Farm |
To provide communities with improved access to clean and safe water through the extension of the water distribution network. |
Water, Environment, Energy and Natural Resources |
Completed
|
4,141,200.00 |
Kabianga |
Feedback |
| chakoror-chematui rd |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,279,516.00 |
Cheboin |
Feedback |
| Koisegem- Nyanza Boundary Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,645,049.00 |
Chilchila |
Feedback |
| Kenegut-Tumoek-Kapkurin Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,969,654.01 |
Kunyak |
Feedback |
| Kasheen-Borowet-Murau Pry Sch. Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
6,553,241.00 |
Kamasian |
Feedback |
| Construction Of Kesagetiet Tbc-Kiptserten; Kap Mathayo – Chepngetuny Pri-Arap Koech Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,150,478.80 |
Cheptororiet/Seretut |
Feedback |
| Tebesonik Market |
To promote market hygiene and sanitation |
Trade, Industrialization, Cooperative Development, Tourism and Wildlife |
Completed
|
4,855,760.00 |
Tebesonik |
Feedback |
| Construction of a classroom at Kapsogeruk ECDE centre |
Improve access, quality of learning and care in ecde centers |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
2,724,750.00 |
Litein |
Feedback |
| Kapcheluch Borehole Water Project |
To procure and deliver high-quality drilling materials that meet the technical and operational requirements of the project. |
Water, Environment, Energy and Natural Resources |
Completed
|
4,617,960.00 |
Kabianga |
Feedback |
| Off C23-chemosot- Chebulu TBC-Chereres - kaminjeiwet Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
9,963,559.04 |
Cheboin |
Feedback |
| Kimugul Dispensary- Kapcheplanget Railways Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,158,216.00 |
Chilchila |
Feedback |
| Nyanza-Girimori-Kapwen Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,952,210.00 |
Kunyak |
Feedback |
| Muharate-Nyairobi-Jagoror Road;Jagoror-Some Road;Jagoror-Kap Sharack Road;Makutano-Nyairobi Sec Road-Kiplaba-Kimologitbridge Road-Kap Sugurup-Greenland Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,134,000.00 |
Kamasian |
Feedback |
| Construction Of Sosiot-Chepkoin 3.6Km, Cheimen- Barabu TBC Road 1.4Km |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,687,577.25 |
Waldai |
Feedback |
| Litein Market |
To expand and modernize market facilities |
Trade, Industrialization, Cooperative Development, Tourism and Wildlife |
Completed
|
3,651,596.00 |
Litein |
Feedback |
| Construction of a pit latrine at Kibolgong Ecde Centre |
Ensure Hygiene and Sanitation, Promote Health and Disease Prevention |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
3,229,712.00 |
Tebesonik |
Feedback |
| Kapcheluch borehole water Project |
Construct a modern and hygienic ablution block to improve sanitation and convenience for users. |
Water, Environment, Energy and Natural Resources |
Completed
|
2,976,560.00 |
Kabianga |
Feedback |
| Chemosit - chebarema - kabitungu rd |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
19,780,000.00 |
Chemosot |
Feedback |
| Three Ways- Kap Micheal Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,490,313.48 |
Chilchila |
Feedback |
| Kenegut-Kapkurin Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,253,487.00 |
Kunyak |
Feedback |
| Lelu Centre-Corner Junction Road 3.7KM;Kamtego-Monastry Road 1.2km;Of D312 -Lelu Dispensary Road 15km |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,116,050.00 |
Kipkelion |
Feedback |
| Construction Of Cheptenye Sign Post-Nukiat Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,499,503.00 |
Waldai |
Feedback |
| Chepngisiriet |
Improve access, quality of learning and care in ecde centers |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
5,220,424.00 |
Waldai |
Feedback |
| Koisegem ECDE |
Improve access, quality of learning and care in ecde centers |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
3,064,048.00 |
Chilchila |
Feedback |
| Kapcheluch borehole water Project |
Reliable Water Supply System, Safe and Accessible Water Distribution,Equipping of Borehole,Installation of Water Storage Tank on Painted Steel Tower |
Water, Environment, Energy and Natural Resources |
Completed
|
2,883,760.00 |
Kabianga |
Feedback |
| Awrorwet TBC- Bargiro Primary- Kiptyemat River Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
420,000.00 |
Chemosot |
Feedback |
| Yala- Chepkitar Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
882,783.20 |
Chilchila |
Feedback |
| Asenewet - Judo - Kipsitet Highway; Rai Cement - Kaplelach Pry Road; Rai Cement - Kaplelach - Kisumu Concrete; Cheptagum- Chebirech Road; Kapsombich-Kaptalamwa |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,850,742.40 |
Soin |
Feedback |
| Kapsugurup - Greenland - Kichagi Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,450,064.00 |
Kipkelion |
Feedback |
| Construction Of Off Cheribo-Chemoroch Road 3Km |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,704,086.04 |
Waldai |
Feedback |
| Mereonik |
Improve access, quality of learning and care in ecde centers |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
2,043,959.00 |
Kapsuser |
Feedback |
| Toroton Polytechnic (1 Workshop) |
To provide accessible, practical, and industry-relevant technical education and vocational training. |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
544,460.00 |
Chilchila |
Feedback |
| Kapcheluch |
To provide communities with improved access to clean and safe water through the extension of the water distribution network. |
Water, Environment, Energy and Natural Resources |
Completed
|
1,046,871.00 |
Kabianga |
Feedback |
| Chebotawa- Getarwet- Samuget Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
6,192,474.40 |
Chemosot |
Feedback |
| Makire- Or Tenden- Teldet Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
587,604.00 |
Chilchila |
Feedback |
| Rai Cement-Kaplelach Pry-KSM Concrete ;Cheptagum-Chebirir Road,Kipkombich-Kiptalamwama Road,Kapchebwai-Kapnyoge Road,Kejiriet Dip-Cheptililik Pry;Asenetwet-Judo-Kipsitet-Dip Bridge Road,Cheptililik Pry-Kipsitetet Ngerermwo Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,900,080.80 |
Soin |
Feedback |
| Siret Centre-Siret Quarry; Chemager Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
6,553,241.00 |
Kipkelion |
Feedback |
| Construction of Chesingei – Cheptalus Road 0.4km; Atebwo TBC – Koweek River Road 0.7km; Kwa Aurelius – Tuiyobei Kapstanley Road 1.5km |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,959,472.00 |
Cheboin |
Feedback |
| Samiytuk |
Improve access, quality of learning and care in ecde centers |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
1,703,504.60 |
Kapsuser |
Feedback |
| Workshop Kipsimbol Polytechnic |
To provide accessible, practical, and industry-relevant technical education and vocational training. |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
2,572,995.00 |
Kipkelion |
Feedback |
| Kibingei |
To enhance access to clean and reliable water supply for the targeted community through the use of appropriate, sustainable, and low-maintenance technologies. |
Water, Environment, Energy and Natural Resources |
Completed
|
2,270,140.00 |
Kabianga |
Feedback |
| Rutheren kiletien rd |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,820,000.00 |
Chepseon |
Feedback |
| Yala- Kipteres- Kap Meshack Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,399,700.00 |
Chilchila |
Feedback |
| Bokwo - Kapchebwai Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,986,676.00 |
Soin |
Feedback |
| AGC-Machilil Road; Tuiyobei- Arap Ngeno-Tilolwet Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,134,000.00 |
Kipkelion |
Feedback |
| Construction of Cllr Jane- Dip – Kimwogit Kongasis Road 1km; Cheptinet – Kapchebo Road 1.9km; Kaptangul – Kapcheluget Road 5.5km |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,701,897.00 |
Cheboin |
Feedback |
| Kapsisiywo |
Improve access, quality of learning and care in ecde centers |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
2,321,351.00 |
Kabianga |
Feedback |
| Construction of an ECDE classroom and pit latrine at Magire ECDE Centre |
Improve access, quality of learning and care in ecde centers |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
2,654,708.00 |
Chilchila |
Feedback |
| Rising main overhaul |
To provide communities with improved access to clean and safe water through the extension of the water distribution network. |
Water, Environment, Energy and Natural Resources |
Completed
|
2,392,780.20 |
Kabianga |
Feedback |
| Off-B1 - Chepsir - kipkeremwo rd |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
729,988.00 |
Chepseon |
Feedback |
| Kaplelit- Cherara Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,413,692.00 |
Chilchila |
Feedback |
| Cheptilili-Chebotot-Ngeremwo Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,810,349.20 |
Soin |
Feedback |
| Faith Church-Arap Moi Road;Chepkei-Chepkolon Road;Chepkiber-Kaplekwa-Kapkiyao Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
6,069,688.00 |
Kipkelion |
Feedback |
| Construction of Kapdaut – Kiptewit Dispensary Road 1.5km; Chebaibai – Tetile Road1.5km; Kapkitende – Birirbei Road 0.5km |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,999,158.00 |
Cheboin |
Feedback |
| Kapchebet |
Improve access, quality of learning and care in ecde centers |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
2,196,614.00 |
Kabianga |
Feedback |
| Construction of Toilet at Murao/ Kapluso ECDE Centre |
Ensure Hygiene and Sanitation, Promote Health and Disease Prevention |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
2,015,955.00 |
Kamasian |
Feedback |
| Ainaptuga springs |
To improve access to safe and sustainable drinking water for the community by protecting natural springs and establishing reliable water points. |
Water, Environment, Energy and Natural Resources |
Completed
|
3,219,541.26 |
Kapsuser |
Feedback |
| kapkatunga - kaplamboi |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,818,781.00 |
Chepseon |
Feedback |
| Junction Nyairobi- Karap Siongok Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
751,680.00 |
Chilchila |
Feedback |
| Kipkombich-Kaptalamwa Road;Cheptagum-Chebirech Road;Chepterwo-Chebirech Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,400,000.00 |
Soin |
Feedback |
| Quarry -Fuko Coffee Society Road; Quarry - KitobenRoad |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,242,810.00 |
Kipkelion |
Feedback |
| Construction of Chematui – Bosco – Korongoi Girls Road 2.3km |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,359,288.00 |
Cheboin |
Feedback |
| Mobego centre |
Improve access, quality of learning and care in ecde centers |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
2,175,120.00 |
Kabianga |
Feedback |
| Construction of an ECDE classroom and at Chebitet ECDE Centre |
Improve access, quality of learning and care in ecde centers |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
2,189,313.00 |
Kamasian |
Feedback |
| Cheptingit Project |
To enhance access to safe, reliable, and sustainable water supply through spring protection, improved storage, infrastructure rehabilitation, and expanded distribution. |
Water, Environment, Energy and Natural Resources |
Completed
|
3,717,180.75 |
Kapsuser |
Feedback |
| Kaplelit - kamiwa - Kapkese rd |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,281,220.00 |
Chilchila |
Feedback |
| Chepkechei- Songonyet Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
458,500.00 |
Chilchila |
Feedback |
| Kaplengeny - Sachangwan - Kiplogoi Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,045,772.16 |
Soliat |
Feedback |
| AGC - Kipchorian - Machilil Road; Tuiyobei - Arap Ngeno - Tilolwet Road; Barsiele Centre - Chorwet Pry - Sugutek Road; Trailor - Kapsoheria Road; Cereal - Magunia Road; Sachwangan - Belsoi Road; Katepia - Mama Major Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,618,532.00 |
Kipkelion |
Feedback |
| Construction of Kipwastuiyo-Asururiet Bridge Road 1.2Km, Lelach Junction-Lelach Girls Road 0.7Km, Joyland Academy-Chesanga Pry Shool Road 0.3Km, Asururiet Bridge- Masubeti Pry School Road 1.2Km, Kipwastuiyo Mkt- Kenene Quarry Road 2Km (Grading Only) |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
6,222,555.00 |
Cheplanget |
Feedback |
| Kesegetiet ecde centre |
Improve access, quality of learning and care in ecde centers |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
853,300.00 |
Cheptororiet/Seretut |
Feedback |
| Construction of twin workshop at Kiptere VTC Phase I |
To provide accessible, practical, and industry-relevant technical education and vocational training. |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
4,457,140.00 |
Kaplelartet |
Feedback |
| Cheptingit Water Project (Masonry Tank) |
Provide and install a Horizontal or Vertical Centrifugal Pump capable of meeting the required flow rate and head |
Water, Environment, Energy and Natural Resources |
Completed
|
6,265,337.25 |
Kapsuser |
Feedback |
| Kabianga girls - maranata |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
899,928.00 |
Kabianga |
Feedback |
| Ndubusat- Kaptuiya- Chepkechei- Kipteris Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,240,000.00 |
Chilchila |
Feedback |
| Kapsegut Quarry For Gravelling Kapsimba - Chesiche Road; Chesiche - Kabokyek Road; Chesiche - Tuiyobei Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,432,128.00 |
Soliat |
Feedback |
| Kobiro-Macheisok Road 5km;Miti Moja-Blue Hills Dip Road 3km; Kimologit-Blus Hilss Road 5km |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,217,234.00 |
Kipkelion |
Feedback |
| Construction of Mosore Dip- Kap Daktari Road 1.6Km; Sachangwan- Roret ICT Road 2Km; Tendwet- Arap Leitich Road 1.5Km |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,517,289.28 |
Kisiara |
Feedback |
| Kiboet ecde centre |
Improve access, quality of learning and care in ecde centers |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
3,945,879.20 |
Cheptororiet/Seretut |
Feedback |
| Siritiet |
Ensure Hygiene and Sanitation, Promote Health and Disease Prevention |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
2,391,476.00 |
Tebesonik |
Feedback |
| Sosiot Water Supply |
Ensure a reliable water intake system and efficient filtration to enhance water quality and supply reliability, Install an Elevated Backwash TankIntegrate Essential Accessories and FittingsTesting and Commissioning |
Water, Environment, Energy and Natural Resources |
Completed
|
4,752,200.00 |
Waldai |
Feedback |
| Kabianga bridge -Chepnyogaa Jnc - Mobego rd |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,500,000.00 |
Kabianga |
Feedback |
| Toroton-Malinja- Yalla- Tulwab Moi Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
4,499,124.00 |
Chilchila |
Feedback |
| Chesiche-Kabokyek Cattle Dip, Tuiyobei Pry-Kapsimba Road,Kaprero-Chesiche Pry Road,Kaptala-Chesiche Academy Road, Kap Elisha-Tenduet- Tuiyobei Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,492,554.16 |
Soliat |
Feedback |
| Agc - Kipchorian - Machilil |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,614,693.00 |
Kipkelion |
Feedback |
| Construction of Mosore Dip- Kap Daktari Road 1.6Km; Sachangwan- Roret ICT Road 2Km; Tendwet- Arap Leitich Road 1.5Km |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,705,025.00 |
Kisiara |
Feedback |
| Kiletien |
Ensure Hygiene and Sanitation, Promote Health and Disease Prevention |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
5,303,172.00 |
Kabianga |
Feedback |
| Construction of a toilet at Tiriitab Eito ECDE Centre |
Ensure Hygiene and Sanitation, Promote Health and Disease Prevention |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
2,168,937.00 |
Tebesonik |
Feedback |
| Cheribo springs |
To improve access to safe and sustainable drinking water for the community by protecting natural springs and establishing reliable water points. |
Water, Environment, Energy and Natural Resources |
Completed
|
4,420,005.00 |
Waldai |
Feedback |
| Kaptembwo - Leldet - polythcnic - kipsegi rd |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
836,875.00 |
Kamasian |
Feedback |
| Koiset- Kutung Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
4,051,518.00 |
Kamasian |
Feedback |
| Soko Huru Kapsogut Road, Shauri-Kinoyo Road, Posta-Chemutian Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,870,815.50 |
Soliat |
Feedback |
| Tuiyobei - Arap Ngeno - Tilolwet Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,134,000.00 |
Kipkelion |
Feedback |
| Routine Maintenance of Kabianga University- Chematich- Kaptirbet Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,020,573.84 |
Kapkatet |
Feedback |
| Kapkonga/kiptenden |
Ensure Hygiene and Sanitation, Promote Health and Disease Prevention |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
3,500,000.00 |
Waldai |
Feedback |
| Kaminjeiwa |
Ensure Hygiene and Sanitation, Promote Health and Disease Prevention |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
4,099,400.00 |
Tebesonik |
Feedback |
| Chepkoin |
To improve access to safe and sustainable drinking water for the community by protecting natural springs and establishing reliable water points. |
Water, Environment, Energy and Natural Resources |
Completed
|
1,435,397.92 |
Waldai |
Feedback |
| kerio valley - Nyairobi zongonyet rd |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,791,761.00 |
Kamasian |
Feedback |
| Morau Centre- Morau Sec School- Karap Ng'eny Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
802,005.44 |
Kamasian |
Feedback |
| Tuiyobei Bridge-Soliat-JoRoadan Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
N/A |
Soliat |
Feedback |
| Barsiele Centre – Kipchorian – Machilil Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,493,844.00 |
Kunyak |
Feedback |
| Construction of Kap Johna-Cheribo Road 2Km; 954Mission-Arap Lele Road 1Km; Nyambolosa-Kipkurgat Road 0.6Km; Kipkuna- Chebwagan TBC Road 2Km; Lebekwet-Kolonget Road 0.7Km; Kap Bembe-Munywet Road 0.2Km |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,387,763.68 |
Litein |
Feedback |
| Chepkutbei |
Ensure Hygiene and Sanitation, Promote Health and Disease Prevention |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
3,335,863.04 |
Cheptororiet/Seretut |
Feedback |
| Construction of a pit latrine at Kusumek ECDE Centre |
Ensure Hygiene and Sanitation, Promote Health and Disease Prevention |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
3,896,440.00 |
Chemosot |
Feedback |
| Kiptaldal |
To improve access to safe and sustainable drinking water for the community by protecting natural springs and establishing reliable water points. |
Water, Environment, Energy and Natural Resources |
Completed
|
4,963,970.00 |
Waldai |
Feedback |
| Kaptirbet-Kaptich-Kabianga University Campus rd |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
357,375.20 |
Kapkatet |
Feedback |
| Kosongocho- Chepkunyuk Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
925,035.04 |
Kamasian |
Feedback |
| Chesiche Pri-Kamugut Road;Soko Ndizi-Kapchebungei Road,Kapchangarie- Kaplengei Road,Sombicho-Kipkecheiyet Road,Sombicho-Samutet Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,900,037.16 |
Soliat |
Feedback |
| Off Main Road - Chemagel Road; Siret Centre Coffee Factory Road; Kimologit Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,763,520.00 |
Kunyak |
Feedback |
| Construction of Kaptibin- Kap Chief- Tabet Road 1.5Km, Barotion- Kiptongit- Kapkarin Road 3.2Km, Chebwagan AIC_ Kipkuna Road 1.5Km |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,941,176.68 |
Litein |
Feedback |
| Chepkoson/ ngainet |
Ensure Hygiene and Sanitation, Promote Health and Disease Prevention |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
3,800,000.00 |
Waldai |
Feedback |
| Construction of a pit latrine at Kamenjo ECDE Centre |
Ensure Hygiene and Sanitation, Promote Health and Disease Prevention |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
3,598,436.00 |
Tebesonik |
Feedback |
| Musumen |
To improve access to safe and sustainable drinking water for the community by protecting natural springs and establishing reliable water points. |
Water, Environment, Energy and Natural Resources |
Completed
|
3,222,037.87 |
Waldai |
Feedback |
| ainapkarik bridge-mabwaita TBC road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
740,875.00 |
Kapkatet |
Feedback |
| Off D312-Nyasakia-Kapkures Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,547,711.20 |
Kamasian |
Feedback |
| Kabokyek-Chesiche-Tuiyobei-Motero-Kiptenten Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,352,380.00 |
Soliat |
Feedback |
| Kiptenden Kapkurin Road; Kapkurin-Kamiron Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
6,561,740.00 |
Kunyak |
Feedback |
| Kaptebengwet-Inat Road 1.9km,Chemobei-Kapjohnstone-Nyamanga Road 2km,Nairobi-Kaptebengwo Road 0.4km |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,523,634.48 |
Tebesonik |
Feedback |
| Chepngisiriet |
Ensure Hygiene and Sanitation, Promote Health and Disease Prevention |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
1,223,300.00 |
Waldai |
Feedback |
| Construction of a 3 door pit latrine at Kaptirbet ECDE Centre |
Ensure Hygiene and Sanitation, Promote Health and Disease Prevention |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
4,097,537.60 |
Kapkatet |
Feedback |
| sosiot water supply project |
To provide communities with improved access to clean and safe water through the extension of the water distribution network. |
Water, Environment, Energy and Natural Resources |
Completed
|
1,904,140.00 |
Waldai |
Feedback |
| Keongo-st jpsephs catholic –prison |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,750,048.00 |
Kapkugerwet |
Feedback |
| Kipkelion- Kap Laban |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,530,388.00 |
Kipkelion |
Feedback |
| Kaitui Center-Birirbei-Chemutian Dip Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
937,535.20 |
Soliat |
Feedback |
| Nyanza- Girimori - Kapkwen Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
6,071,160.00 |
Kunyak |
Feedback |
| Kaptebengwo- Innat Road 1.7Km, And Chemobei- Kap Johnstone-Nyammaganga Road 1.8Km, Nairobi- Kaptebengwet Road 0.4Km |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,697,524.28 |
Tebesonik |
Feedback |
| Turguito |
Ensure Hygiene and Sanitation, Promote Health and Disease Prevention |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
1,282,800.00 |
Waldai |
Feedback |
| Construction of a classroom at Kimugul ECDE Centre |
Ensure Hygiene and Sanitation, Promote Health and Disease Prevention |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
4,495,710.85 |
Kapkatet |
Feedback |
| Itanda masonry Tank |
To enhance access to safe, reliable, and sustainable water supply through improved storage, infrastructure rehabilitation, and expanded distribution. |
Water, Environment, Energy and Natural Resources |
Completed
|
1,419,341.20 |
Waldai |
Feedback |
| Main Junction-Kaboloin Dispensary culverts |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,895,000.00 |
Kapsaos |
Feedback |
| Manyanni- Kitobe Nursery Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,157,216.00 |
Kipkelion |
Feedback |
| Arap Ngeny-Brendashop Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,089,611.20 |
Soliat |
Feedback |
| Kapkwen - Chesonoi - Kabirong - Kapkurin - Kiptenden Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,086,463.00 |
Kunyak |
Feedback |
| Proposed Routine Maintenance of Ngoina Agc- Kipsamoi Cattle Dip Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,727,312.56 |
Tebesonik |
Feedback |
| Mereonik |
Ensure Hygiene and Sanitation, Promote Health and Disease Prevention |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
997,600.00 |
Kapsuser |
Feedback |
| Construction of a classroom at Chebagal ECDE centre |
Improve access, quality of learning and care in ecde centers |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
4,491,520.00 |
Litein |
Feedback |
| Ainamoi Water Project Lot 1 |
To enhance access to clean and sustainable water supply by constructing pipelines ensuring reliable water delivery to the target community |
Water, Environment, Energy and Natural Resources |
Completed
|
1,796,770.40 |
Ainamoi |
Feedback |
| Lemeiywet - Kenegut rd |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
404,989.00 |
Kapsoit |
Feedback |
| Kimologit- Kware Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
498,200.00 |
Kipkelion |
Feedback |
| Shauri Yako-Kaitui Mkt Road,Kaitui Bridge-Coffee Factory Road,Sombicho Highway-Brenda Shop Road,Ngeny Road,Sombicho Pry-Samutet Road,Sombicho Pry - Kipkecheiyet Road,Kapchangarie-Kaplengei Road,Chesiche- Kapsimba Road,Chesiche -AGC Road,Chesiche-Kabokyek Road,Chesiche -Tuiyobei Road., |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,500,000.00 |
Soliat |
Feedback |
| Minihaha - Sirgoi Pry Sch Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,438,585.00 |
Kunyak |
Feedback |
| Proposed Routine Maintenance Cheptagum-Kibirech Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,620,249.57 |
Tebesonik |
Feedback |
| Samiytuk |
Ensure Hygiene and Sanitation, Promote Health and Disease Prevention |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
3,642,600.00 |
Kapsuser |
Feedback |
| Construction of a classroom at Nyambolosa ECDE centre |
Improve access, quality of learning and care in ecde centers |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
3,499,752.48 |
Litein |
Feedback |
| Ainamoi Water Project Lot 2 |
To enhance access to clean and sustainable water supply by constructing pipelines ensuring reliable water delivery to the target community |
Water, Environment, Energy and Natural Resources |
Completed
|
1,686,292.00 |
Ainamoi |
Feedback |
| Masarian AGC - Borborwet TBC RD |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
7,907,735.08 |
Kapsuser |
Feedback |
| Chumba- Chupait Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,273,580.00 |
Kipkelion |
Feedback |
| Keteswa-Mwebe-Chepngoror Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,299,969.86 |
Sigowet |
Feedback |
| Dip - Kolonget - Ngebebo Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
6,210,708.00 |
Kunyak |
Feedback |
| Kap Joseph Maritm- Kap57-Kap George Mutai- Kipkeles Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,700,246.80 |
Tebesonik |
Feedback |
| Sanga |
Ensure Hygiene and Sanitation, Promote Health and Disease Prevention |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
3,305,600.00 |
Kabianga |
Feedback |
| Construction of pit latrine at Kelunet ECDE Centre |
Ensure Hygiene and Sanitation, Promote Health and Disease Prevention |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
3,097,880.00 |
Tebesonik |
Feedback |
| Kaborus water project |
To enhance access to clean and sustainable water supply by constructing pipelines, water tanks & associated fittings ensuring reliable water delivery to the target community |
Water, Environment, Energy and Natural Resources |
Completed
|
3,445,258.00 |
Ainamoi |
Feedback |
| Kapnandet -kapnandet- kakiptui dispensary TG49 rd |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
612,248.00 |
Kapsuser |
Feedback |
| Chumba- Sachangwan Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
687,085.00 |
Kipkelion |
Feedback |
| Kipranye-Kabasweti-Mindililwet Road;Cheptuiyet Centre-Chemanget Road;Cheptuiyet Girls-Kululut River Road ;Kapeli Pry-Sigowet KMTC ROAD;Lutheran Church -Sigowet-Cheptembe Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,002,379.24 |
Sigowet |
Feedback |
| Kotetni - Chemunyala - Cherara Road 4.5km; Chepsii - Kapsale Pry - Chemunyala Road 3.2km; Chelalo - Kilengel Road 3.1km; Timbilil - Ngola Road 2km; Kabirong - Kapkwen Road 3.5km |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,630,143.00 |
Kunyak |
Feedback |
| Construction Of Kamiwa-Kamotos Road 4.1Km |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,145,560.40 |
Chilchila |
Feedback |
| Kapchebet |
Ensure Hygiene and Sanitation, Promote Health and Disease Prevention |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
3,755,738.00 |
Kabianga |
Feedback |
| Kiboito |
Improve access, quality of learning and care in ecde centers |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
4,676,770.00 |
Kapsuser |
Feedback |
| Kimigik Water project |
To enhance access to clean and sustainable water supply by constructing pipelines ensuring reliable water delivery to the target community |
Water, Environment, Energy and Natural Resources |
Completed
|
1,529,919.82 |
Ainamoi |
Feedback |
| Lelsotet - tegat rd |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,136,858.00 |
Kedowa/Kimugul |
Feedback |
| Sachangwan- Kanaan Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
611,024.00 |
Kipkelion |
Feedback |
| Cherote - Kigomba Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
4,859,466.20 |
Sigowet |
Feedback |
| Kipsitet-Mbasa Road; Kipsitet bridge-Kaplabotwo Road; Ngeremwo-Kipsitet dip Road; Nunda-Kipteran Road; Kipteran-Nyaberi Road-Laitigo pry-Maemba Road; Laitigo pry- kapsermi Road; Kapsimingoi-Ndanyomare Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
6,467,128.00 |
Soin |
Feedback |
| Construction Of Chemosogon- Kipsegi- Kimologit Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,495,922.16 |
Chilchila |
Feedback |
| Chemoson |
Ensure Hygiene and Sanitation, Promote Health and Disease Prevention |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
1,986,036.00 |
Cheptororiet/Seretut |
Feedback |
| Chesiche |
Improve access, quality of learning and care in ecde centers |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
1,553,000.00 |
Kaplelartet |
Feedback |
| Senetwet/Ketipyese water project. |
To strengthen water supply infrastructure by providing durable pipes and fittings for construction, rehabilitation, and extension of distribution networks. |
Water, Environment, Energy and Natural Resources |
Completed
|
1,110,013.28 |
Ainamoi |
Feedback |
| Kabasenwo-Senetwet(Kamusar) Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
527,100.00 |
Soin |
Feedback |
| Chepkemel Shopping Centre - Arap Cheruiyot- Chepkwer- Sumeek Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,781,416.00 |
Kaplelartet |
Feedback |
| Kabore-Cheptililik Road; Cheptililik-Kapkatit Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
5,882,330.00 |
Soin |
Feedback |
| Construction Of Chemosogon- Kipsegi- Kimologit Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,205,365.36 |
Chilchila |
Feedback |
| Construction of a four-door toilet |
Ensure Hygiene and Sanitation, Promote Health and Disease Prevention |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
2,346,120.00 |
Cheptororiet/Seretut |
Feedback |
| Tabet/sosur |
Improve access, quality of learning and care in ecde centers |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
119,000,000.00 |
Kaplelartet |
Feedback |
| Seretut Borehole Water Project(Equipping) |
To equip an existing borehole with all necessary components to enable a sustainable and efficient water supply system. |
Water, Environment, Energy and Natural Resources |
Completed
|
1,343,653.60 |
Waldai |
Feedback |
| Kimungen- kwa oriango- kipkeles- kwa sambu- kap eli road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
820,875.00 |
Kipchebor |
Feedback |
| Kapingok-Kapchepkaigat - Kurabei- Chesunet Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
518,552.00 |
Soliat |
Feedback |
| Cherote-Obot Recho-Kap Kapkamano-Cherote Sondu Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
936,463.12 |
Kaplelartet |
Feedback |
| Ngeremwo-Chebotot Road; Maemba Road; Mbasa Road; Asenwet Road; Cheptagum Road; Laitigo primary Road; Koitaburot Road; Kapkatit Road; Cheptililik Road; Cheptororwo Road; - kipteran-Chepsengeny Sch; ndonyomare Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
5,145,134.00 |
Soin |
Feedback |
| Construction Of Burutu Junction- Kapkese Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,613,823.82 |
Chilchila |
Feedback |
| Korosiot |
Ensure Hygiene and Sanitation, Promote Health and Disease Prevention |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
2,180,619.04 |
Cheptororiet/Seretut |
Feedback |
| Kaplelartet |
Improve access, quality of learning and care in ecde centers |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
1,594,500.00 |
Kaplelartet |
Feedback |
| Sosiot Pipeline Extension |
To enhance access to clean and sustainable water supply by constructing pipelines ensuring reliable water delivery to the target community |
Water, Environment, Energy and Natural Resources |
Completed
|
2,025,295.04 |
Waldai |
Feedback |
| Kapkwen Tbc- Ainamoi Quarry |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,800,000.00 |
Kipchimchim |
Feedback |
| Kipkecheiyet-Baregeiwet Bridge-Baregeiwet Pry Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
521,083.50 |
Soliat |
Feedback |
| Gravelling of Simbi Box Culvert and Simbi Pry Sch Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,403,551.86 |
Soin |
Feedback |
| Tobentai-Kipyoren-Kapkormom Road;Moetik-Tobentai;Kap Macharia-Kipyoren Road,Kap Gravel-Chemaluk Road;Kaplelach-Kwondop Morsong-kaplelach Bridge -Chepsengeny Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
N/A |
Soin |
Feedback |
| Construction Of Barsiele Centre-CDA Road 3.9Km, Off C35-Sugutet Primary-Kalyet Road 0.9Km |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,486,994.72 |
Kipkelion |
Feedback |
| Kiboetedce toilet |
Ensure Hygiene and Sanitation, Promote Health and Disease Prevention |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
1,341,934.40 |
Cheptororiet/Seretut |
Feedback |
| Kamolok |
Improve access, quality of learning and care in ecde centers |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
820,000.00 |
Kaplelartet |
Feedback |
| Sosiot Pipeline Maintenance and Rehabilitation |
To enhance access to clean and sustainable water supply by constructing pipelines ensuring reliable water delivery to the target community |
Water, Environment, Energy and Natural Resources |
Completed
|
1,221,255.00 |
Waldai |
Feedback |
| Kapkwen - Keldabeliot Rd |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
745,218.00 |
Kipchimchim |
Feedback |
| Kapkawa Shops -Kapkawa Bridge-Chemutian Dip Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
348,280.00 |
Soliat |
Feedback |
| Construction of Off Kabore- Kipsitet Pry School Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,500,000.00 |
Soin |
Feedback |
| Ngeremwo-Chebotot Road (6km) and Kwa Michael -Laitigo (4km) |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,989,046.20 |
Soin |
Feedback |
| Construction of Kapchepkeber-Faith Church Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,884,334.24 |
Kipkelion |
Feedback |
| Gesagetiet ECDE |
Improve access, quality of learning and care in ecde centers |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
1,357,238.28 |
Cheptororiet/Seretut |
Feedback |
| Ihanja/kabasweti |
Improve access, quality of learning and care in ecde centers |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
1,598,865.00 |
Sigowet |
Feedback |
| Sosiot Pipeline Extension |
To enhance access to clean and sustainable water supply by constructing pipelines ensuring reliable water delivery to the target community |
Water, Environment, Energy and Natural Resources |
Completed
|
1,059,671.60 |
Waldai |
Feedback |
| Sukutek - Kalyet Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
964,837.50 |
Kipkelion |
Feedback |
| Kaitui Centre-Birirbei-Chemutian Dip Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
701,834.00 |
Soliat |
Feedback |
| Construction of Kapkormom Pry- Kapkormom Junction Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,915,864.16 |
Soin |
Feedback |
| Kapkormom Pry - Kapkormom Dispensary Road - Kejiryet - Kaplaboitwa- Sideways - Kapchoge - Laitigo-Ngeremwo Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,588,980.00 |
Soin |
Feedback |
| Construction of Ngendalel Centre-Kipsimbol ECDE Centre-Kamachungwa Bridge Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,024,934.00 |
Kipkelion |
Feedback |
| Chebirirbei Polytechnic |
To provide accessible, practical, and industry-relevant technical education and vocational training. |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
2,261,536.00 |
Kabianga |
Feedback |
| Kibirirgut |
Improve access, quality of learning and care in ecde centers |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
19,670,000.00 |
Sigowet |
Feedback |
| Sosiot Pump repair |
To provide a reliable and efficient Horizontal Multistage Centrifugal Pump capable of meeting the site’s water supply or dewatering needs. |
Water, Environment, Energy and Natural Resources |
Completed
|
1,155,637.24 |
Waldai |
Feedback |
| Kaproret-Rwandit AIC Church rd |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
756,875.00 |
Kisiara |
Feedback |
| Kaitui Pentacostal-Sauri Yako Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,677,180.00 |
Soliat |
Feedback |
| Routine Maintenance of Kiptenten-Kapkurin Road |
Potholes patched, ,surface grading completed. |
Public Works, Roads and Transport |
Completed
|
1,260,746.00 |
Kunyak |
Feedback |
| Kongeren river- Birirbei-Kapchelemei Road; Arap Chebochok-Arap Chepkoit; Kongeren pry Road; Kap Ingok-Birirbei Road; Chepkoson Road; Chepkoson-Kapsigilai Road; Kapchesilim-Kabokyek cattle dip road; Arap Seronik-sesgaa Road-Sesgaa-Kapsegut Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
4,043,160.00 |
Soliat |
Feedback |
| Construction of Off C35-Kap Zephania Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
4,364,937.32 |
Kipkelion |
Feedback |
| Community Empowerment |
Enable communities to identify their needs, mobilize resources, and implement solutions independently |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
2,904,460.00 |
Chaik |
Feedback |
| Kipsamoi |
Improve access, quality of learning and care in ecde centers |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
5,250,000.00 |
Sigowet |
Feedback |
| Litein Water Supply |
To provide communities with improved access to clean and safe water through the extension of the water distribution network. |
Water, Environment, Energy and Natural Resources |
Completed
|
1,155,513.12 |
Soliat |
Feedback |
| Chamamanik - kelelwa culvert installation |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,802,524.00 |
Kisiara |
Feedback |
| Kaitui Dispensary-Kapkawa Bridge Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
470,960.00 |
Soliat |
Feedback |
| Itibet - Bagao- Deliverance Church Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
10,338,300.00 |
Ainamoi |
Feedback |
| Soliat corner-Kiptugumo pry Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
N/A |
Soliat |
Feedback |
| Construction of Kimologit Quary- Kimologit Coffee Factory Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,182,900.80 |
Kipkelion |
Feedback |
| Construction of a 3 door pit latrine at Kaplemeiywet |
Ensure Hygiene and Sanitation, Promote Health and Disease Prevention |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
645,500.00 |
Kapsuser |
Feedback |
| Kipranye |
Improve access, quality of learning and care in ecde centers |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
9,499,848.00 |
Sigowet |
Feedback |
| Chepkosa Spring rehabilitation |
To improve access to safe and sustainable drinking water for the community by protecting natural springs and establishing reliable water points. |
Water, Environment, Energy and Natural Resources |
Completed
|
947,789.20 |
Soliat |
Feedback |
| Sireret B Kotetni-Kapkoros-Mlango Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
6,204,439.00 |
Kunyak |
Feedback |
| Chemutian Dip-Kibaiywo Factory-Kaitui Bridge Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
370,410.00 |
Soliat |
Feedback |
| Kiburet- Factory- Yasomok Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,205,220.00 |
Ainamoi |
Feedback |
| Kaplaba-kiptare-Kapcheptoo Road-kapkenyele Road;Kurabei-koyabeyon Road;Kurabei-Chesunut-Kapsigowo Road;Kapsigowo-Malanylem Road;Chesunut-Kapcherinyit Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
6,572,000.00 |
Soliat |
Feedback |
| Construction of Lesirwo- Chewen Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,609,099.84 |
Kipkelion |
Feedback |
| Renovation of ECDE classroom at Susumwet ECDE Centre |
Improve access, quality of learning and care in ecde centers |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
736,020.00 |
Kapsuser |
Feedback |
| Kibioren ecde centre |
Improve access, quality of learning and care in ecde centers |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
4,967,300.00 |
Sigowet |
Feedback |
| Ngororga Borehole Water Project |
To procure and deliver high-quality drilling materials that meet the technical and operational requirements of the project. |
Water, Environment, Energy and Natural Resources |
Completed
|
920,250.21 |
Soliat |
Feedback |
| Isacco-Lalagin Rd |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,081,000.00 |
Litein |
Feedback |
| Taprason-Kiptugumo Pry-Ainaitik Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,563,500.00 |
Soliat |
Feedback |
| Kap Zakayo- Ainamoi Polythecnic Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,307,200.00 |
Ainamoi |
Feedback |
| Tabrason-Kiptugumo Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
6,459,424.00 |
Soliat |
Feedback |
| Construction of Chamngei-Tingoro Road 1.4Km, Siret- Bakao Nursery Road 0.7Km, Siret-Kamachungwa- Chemengon-Kipchorian Bridge Road 1.7Km, Ngendalel-Kamcahungi-Kapkimolwo Road 1.2Km, Cheptole-Kamusa Road 1km, Segete-Kitoben- Karap Bore Road 2Km, Quarry-Kitoben Road 1.5Km, Kitoben Nursery-Segetet Road 1Km |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
4,479,558.08 |
Kipkelion |
Feedback |
| Construction of a pit latrine at Chekutung ECDE Centre |
Ensure Hygiene and Sanitation, Promote Health and Disease Prevention |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
890,010.00 |
Kapsuser |
Feedback |
| Mindililwet |
Ensure Hygiene and Sanitation, Promote Health and Disease Prevention |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
8,999,940.00 |
Sigowet |
Feedback |
| Tiroto, Lelach and Birirbei springs |
To improve access to safe and sustainable drinking water for the community by protecting natural springs and establishing reliable water points. |
Water, Environment, Energy and Natural Resources |
Completed
|
1,200,101.20 |
Soliat |
Feedback |
| Kapkitony banda-kapsimet river rd |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,858,915.00 |
Litein |
Feedback |
| Ainapitik-Sachangwan-Kiplogoi Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,449,950.00 |
Soliat |
Feedback |
| Nyinyitiet- Chemorir Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
560,000.00 |
Ainamoi |
Feedback |
| Kaboykek cattle dip - Kimugul Road; Kimugul koi Barak Road; kapsiongori - Arap ngeny Road; jolydab academy - kaprero Road; Arap Chepsengeny - Chemaluk Road; Chemaluk - Cheptembe Road; Kap injelio - Kap George Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,443,664.00 |
Soliat |
Feedback |
| Construction Of Kijawir-Kolonget-Arap Cheres -Tata Road 1.6Km |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,826,637.19 |
Chepseon |
Feedback |
| Construction of a pit latrine at Masarian ECDE Centre |
Ensure Hygiene and Sanitation, Promote Health and Disease Prevention |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
750,000.00 |
Kapsuser |
Feedback |
| Kipkok |
Ensure Hygiene and Sanitation, Promote Health and Disease Prevention |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
850,210.00 |
Kaplelartet |
Feedback |
| Ainap Kirgit Water Project |
to enhance water storage capacity, improve distribution efficiency, and increase community access to clean water, |
Water, Environment, Energy and Natural Resources |
Completed
|
1,225,699.62 |
Soliat |
Feedback |
| Lalagin junction-Lalagin sec. rd |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,600,800.00 |
Litein |
Feedback |
| Kapasweti- Kipranye- Mindililwet Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
733,840.00 |
Sigowet |
Feedback |
| Kiburet- Nyinyitiet Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
420,000.00 |
Ainamoi |
Feedback |
| Seska- Arap Seronik -Arap Chepsegeny- Chemaluk Rad; Jolydab- Kap Rero Road; Chemaluk Church of Christ- Kapsegut Pry- Cheptembe Road; Kapkingok- Birirbei- Chepkoson Road; Koibarak-Kimgul Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
5,471,400.00 |
Soliat |
Feedback |
| Construction Of Kapchief-Kamarus Annex Road 2.1Km,Mile 4-Kondamet Road 2.8Km,Chetite-Sachangwan Road 0.7Km,Full Gospel-Rita Road0.25Km,FFPK Church-Kap Brook Road 0.5 Km,Kap Ezekiel-Kamkamba Road 0.4Km,Mile 4 AIC Church Road 0.35Km,Cherukechuu-Kapsingen Road 0.5Km |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,588,160.72 |
Chepseon |
Feedback |
| Construction of pit latrine at Cheronget ECDE Centre |
Ensure Hygiene and Sanitation, Promote Health and Disease Prevention |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
697,009.20 |
Waldai |
Feedback |
| Seronik |
Ensure Hygiene and Sanitation, Promote Health and Disease Prevention |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
1,526,010.00 |
Kaplelartet |
Feedback |
| Proposed Kipkobob Water Project |
Secure and Efficient Water Intake and Storage,Optimize Water Distribution,Modernize and Protect Infrastructure |
Water, Environment, Energy and Natural Resources |
Completed
|
1,376,978.00 |
Chemosot |
Feedback |
| Ngesumin girls - kipsamoi river ngeny pry junction- pry sch |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,000,000.12 |
Litein |
Feedback |
| Itibet - Bagao- Deliverance Church Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,505,055.00 |
Ainamoi |
Feedback |
| Duka Moja- Kiparao Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
5,409,180.00 |
Kapkugerwet |
Feedback |
| Kurabei - Mogonjet ; Kurabei/Arap Ngeno - Chepkoson; Soliat Dispensary/boys -Chepkoson Road; Soliat Boys Sec School -Soliat AGC road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
7,529,400.00 |
Soliat |
Feedback |
| Construction Of Kapchemusian Road 2.7Km, Chepsain Road 2.1Km, Chepcholliet Road 2Km, Chepsir Road 0.1km |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,552,923.36 |
Chepseon |
Feedback |
| Construction of a pit latrine at Kabirer ECDE Centre |
Ensure Hygiene and Sanitation, Promote Health and Disease Prevention |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
3,588,808.00 |
Waldai |
Feedback |
| Chemogoch |
Ensure Hygiene and Sanitation, Promote Health and Disease Prevention |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
4,982,000.00 |
Kaplelartet |
Feedback |
| Chelelachbei Springs |
To improve access to safe and sustainable drinking water for the community by protecting natural springs and establishing reliable water points. |
Water, Environment, Energy and Natural Resources |
Completed
|
2,014,862.00 |
Chemosot |
Feedback |
| Offd314-Mashariki |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
7,481,327.00 |
Londiani |
Feedback |
| Kiburet- Factory- Yasomok Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,492,799.00 |
Ainamoi |
Feedback |
| Sumeiyon- Chelogoi Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,038,000.00 |
Kapkugerwet |
Feedback |
| AGC Chesunet - Kapchesengeny Road; Motero pry - Kapkitandyus Road; Kapcherunyit - Kurabei Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,724,052.00 |
Soliat |
Feedback |
| Construction Of Mile Nne- Momoniat Road 1.5Km; Sigowet- Cheboror Road 5.5Km |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,148,468.48 |
Chepseon |
Feedback |
| Construction of a pit latrine at Kaborok ECDE Centre |
Ensure Hygiene and Sanitation, Promote Health and Disease Prevention |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
456,067.92 |
Waldai |
Feedback |
| Kapsorok |
Ensure Hygiene and Sanitation, Promote Health and Disease Prevention |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
1,484,335.00 |
Kaplelartet |
Feedback |
| Chepkutut ndisiot Springs |
To improve access to safe and sustainable drinking water for the community by protecting natural springs and establishing reliable water points. |
Water, Environment, Energy and Natural Resources |
Completed
|
1,330,400.00 |
Chemosot |
Feedback |
| Elite Primary -E254 Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
8,288,487.55 |
Londiani |
Feedback |
| Duka Moja- Saptet- Kwa Micheal Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,178,060.00 |
Kapkugerwet |
Feedback |
| Kapriwet- Arap Nyige |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,747,300.00 |
Kapsaos |
Feedback |
| Kapingok-Kapchepkaigat -Kurabei road; Arap Chebochok-Arap chepkoit road: Kapchelemei-Kongeren river-Salgaa road: Soliat Boys Sec School-Turguito bridge road: Kongeren pry – Mirmiro: Kapshongiroi - Arap Ngeny: Kaboykek cattle dip - Kapchesilim - Kapsigilai Road : Kaptelo – Chelogong Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,352,400.00 |
Soliat |
Feedback |
| Construction of Off Main Road- Chepsir-Melile River Bridge Road 3.2Km |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,010,128.00 |
Chepseon |
Feedback |
| Construction of ECDE classroom at Koitalel ECDE Centre |
Improve access, quality of learning and care in ecde centers |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
743,600.00 |
Waldai |
Feedback |
| Kechiriet |
Ensure Hygiene and Sanitation, Promote Health and Disease Prevention |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
670,000.00 |
Sigowet |
Feedback |
| Kabitungu/ Kapkalia Springs |
To improve access to safe and sustainable drinking water for the community by protecting natural springs and establishing reliable water points. |
Water, Environment, Energy and Natural Resources |
Completed
|
1,058,455.92 |
Chemosot |
Feedback |
| Michingilwet-Chesagat |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,435,000.00 |
Cheptororiet/Seretut |
Feedback |
| Kericho Toyota- Lavington Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,850,000.00 |
Kapkugerwet |
Feedback |
| Manyoror Sign Post- Manyoror Sec- Off Kapsaos Ainamoi Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,316,250.00 |
Kapsaos |
Feedback |
| Seska- Arap Seronik -Arap Chepsegeny- Chemaluk Rad; Jolydab- Kap Rero Road; Chemaluk Church of Christ- Kapsegut Pry- Cheptembe Road; Kapkingok- Birirbei- Chepkoson Road; Koibarak-Kimgul Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,211,800.00 |
Soliat |
Feedback |
| Construction Of Sally Bii- Julius Road 1.2Km, Kap Tirop- Kap Eldoret Road 0.3Km, Chebewor-Muratit Road 0.35Km, World Wide Road 0.4Km, Transomi- Stano-Chebewor Pry Road 0.8Km, Kapcheres-Kiplekwa- Kona Shop Road 0.7Km, Ndiwa Roads 2.5Km |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,589,520.01 |
Kedowa/Kimugul |
Feedback |
| Mindililwet |
Improve access, quality of learning and care in ecde centers |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
3,485,336.00 |
Sigowet |
Feedback |
| Ngeremi/tabaita |
Ensure Hygiene and Sanitation, Promote Health and Disease Prevention |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
648,664.00 |
Sigowet |
Feedback |
| Kaptangut Springs |
To improve access to safe and sustainable drinking water for the community by protecting natural springs and establishing reliable water points. |
Water, Environment, Energy and Natural Resources |
Completed
|
1,832,829.98 |
Chemosot |
Feedback |
| Kibaraa- Kapsimotwet- Bae |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
12,208,403.76 |
Cheptororiet/Seretut |
Feedback |
| Off Binyiny -Kaboloin Signpost ROAD, Chebigen- Manyoror Dispensary Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,952,415.00 |
Kapsaos |
Feedback |
| Torochgaa- Koigaron- Tegunot Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,393,784.00 |
Kapsaos |
Feedback |
| Kapnyakitari Centre - Kiptugumo Dispensary Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
5,893,600.00 |
Soliat |
Feedback |
| Chemogoch |
Improve access, quality of learning and care in ecde centers |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
2,702,800.00 |
Kaplelartet |
Feedback |
| Chepterwo/kipsitet |
Ensure Hygiene and Sanitation, Promote Health and Disease Prevention |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
649,000.00 |
Sigowet |
Feedback |
| Mosombet Springs |
To improve access to safe and sustainable drinking water for the community by protecting natural springs and establishing reliable water points. |
Water, Environment, Energy and Natural Resources |
Completed
|
1,138,598.00 |
Chemosot |
Feedback |
| Sisionik Tumoiyot Rd |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
7,776,976.40 |
Sigowet |
Feedback |
| Sachangwan- Kamungei Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,059,000.00 |
Kapsaos |
Feedback |
| Kosisit Primary- Kap Abinwas- Arap Rugut |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,300,452.00 |
Kapsoit |
Feedback |
| Kaplengeny - Kiptugumo Road; Tabrasin - Kiptugumo dispensary Road; Kapneesoi - Highway - Moretik - Arap Tuei Road; Soliat Boys - Kongeren river- Kapchelemei Road; Kongeren pry - Mirmiro Road; Siriat – Kapsisirwo Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,384,000.00 |
Soliat |
Feedback |
| Kapsorok |
Improve access, quality of learning and care in ecde centers |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
1,926,600.00 |
Kaplelartet |
Feedback |
| Cheramor |
Ensure Hygiene and Sanitation, Promote Health and Disease Prevention |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
664,000.00 |
Kaplelartet |
Feedback |
| Arokyet Borehole Water Project |
To procure and deliver high-quality drilling materials that meet the technical and operational requirements of the project. |
Water, Environment, Energy and Natural Resources |
Completed
|
1,571,834.80 |
Cheplanget |
Feedback |
| kamaget - tamboiyot –kapchanga |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,435,000.00 |
Sigowet |
Feedback |
| Samutet Pry.Sch Junction-Cattle Dip- JoRoadan Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,900,000.00 |
Kapsoit |
Feedback |
| Off B1- Chepsoo Pry School Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,890,404.00 |
Kapsoit |
Feedback |
| Shauri Yako - Kapkenyelo - Kipcheiyet Road; Kapkara - Karap Cheruiyot Road; Kapchesengeny - Chepyegon - Kapchepchilat Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
4,969,156.00 |
Soliat |
Feedback |
| Construction of Cherote-Kapkamano Road 2.3Km, Kap Pastor-Kapkatet TBC Road 2.3Km |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,212,472.64 |
Kaplelartet |
Feedback |
| Kaplelach |
Improve access, quality of learning and care in ecde centers |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
2,806,680.00 |
Sigowet |
Feedback |
| Chesiche |
Ensure Hygiene and Sanitation, Promote Health and Disease Prevention |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
710,170.00 |
Kaplelartet |
Feedback |
| Londiani Water Supply Project |
To enhance reliable access to safe water for the community through the supply and installation of a pumpset and development of a distribution pipeline |
Water, Environment, Energy and Natural Resources |
Stalled
|
N/A |
Londiani |
Feedback |
| Barrit-Kaplelechon |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Stalled
|
102,407,437.60 |
Kedowa/Kimugul |
Feedback |
| Sigowet Water Supply |
To restore and enhance the functionality, reliability, and sustainability of the Sigowet Water Supply system in order to improve access to safe and adequate water for households, institutions, and businesses within Sigowet area |
Water, Environment, Energy and Natural Resources |
|
880,000.00 |
Sigowet |
Feedback |