LIST OF ALL FINANCIAL YEAR PROJECTS

- All Projects-

Project Objective Department Status Budget(Kshs) Ward
Ap Line- Jogoo- Market Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport N/A Kapkugerwet Feedback
Leberer-Kamachungwa-coffee factory road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport 3,941,891.12 Chepseon Feedback
Construction of 938- 938 Girls Road; Chepsir- Kipkeremwo Road; Monori- Sailo Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport 2,490,816.96 Chepseon Feedback
Tulwapmoi Water Project Phase 1 To initiate the phased development of the Tulwapmoi Water Project with the aim of expanding access to safe, reliable, and sustainable water for the Tulwapmoi community through Phase 1 infrastructure works Water, Environment, Energy and Natural Resources 2,500,000.00 Chilchila Feedback
Construction of Culverts at 946 To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport 4,493,817.26 Kapkugerwet Feedback
Kipsitet Water Supply Project To enhance access to safe, affordable, and sustainable water for the Kipsitet community through solarisation of the pumping system and extension of distribution pipelines Water, Environment, Energy and Natural Resources 1,500,000.00 Soin Feedback
Kapkondor/Cheusi/Setek/United Water Project To strengthen water storage capacity and ensure reliable supply for Kapkondor, Cheusi, Setek, and United communities through the supply and installation of eight UPVC storage tanks. Water, Environment, Energy and Natural Resources 1,500,000.00 Londiani Feedback
Mogoriot Water Project To expand access to safe and reliable water for the Mogoriot community through the construction of a water distribution pipeline. Water, Environment, Energy and Natural Resources 10,000,000.00 Soliat Feedback
Baregeiywet Dispensary Road (Twin 900mm Culvert 14M); Chepkembe B (7m, 900mm); Ainaptibik Culvert (7m, 900mm) Menjo River (7m 900mm) Arap Oriango (14m, 900mm) To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport 2,098,500.00 Soliat Feedback
Kapcheplanga Borehole Water Project To enhance sustainable access to safe and reliable water for the community through test pumping, solarisation of the water system, installation of a UPVC storage tank, and fencing for source protection. Water, Environment, Energy and Natural Resources 2,851,694.00 Londiani Feedback
Routine Maintenance of Kaplelartet chiefs' office-Tabaita center road Potholes patched, ,surface grading completed. Public Works, Roads and Transport 2,996,699.92 Kaplelartet Feedback
Kiptere/Simbamoo Water Project To improve sustainable access to safe and reliable water for the community through spring protection, bulk storage, and efficient conveyance via a gravity main pipeline Water, Environment, Energy and Natural Resources 234,970,538.00 Sigowet Feedback
Motokyimet and Kabarus Water Project To enhance access to clean and sustainable water supply by constructing pipelines ensuring reliable water delivery to the target community Water, Environment, Energy and Natural Resources 2,565,000.00 Ainamoi Feedback
Routine Maintenance of Kamasega SDA- Kapsegut- Kiptugumo Pry School Road 4Km, Kitugumo Dispensary- Tamarson Road 2.5Km To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport 3,397,816.32 Soliat Feedback
Construction of Kap Kutu- Kapsenda Quarry Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport 2,140,221.34 Londiani Feedback
Construction Of Independence-Subukia Road 5.2Km, Kinyere Independence Road 2.1Km, Tumaini Secondary School-Nominated MCA Road 1.4Km To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport 4,493,817.26 Tendeno/Sorget Feedback
Proposed Construction of 600mm 28m of culverts at 938 complex-Keta Academy Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport On-Going 1,039,934.20 Chepseon Feedback
Proposed Construction of Kaptebengwet- Cheptangulgei River Box Culvert To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport On-Going 1,409,706.24 Kapkatet Feedback
Proposed construction of storm water drainage facilities (Phase 2 – World Bank Funded) To reduce and manage flooding in the project area by channeling storm water through an effective and well-designed drainage system. Lands, Housing and Physical Planning On-Going 1,487,440.80 Kapkugerwet Feedback
Kabartegan-Ainapkoroitik Water Project To provide sustainable, safe, and reliable water supply to the Kabartegan–Ainapkoroitik community through equipping and solarisation of the spring source, construction of a masonry storage tank, rising main and distribution pipelines, and associated infrastructure Water, Environment, Energy and Natural Resources On-Going 1,292,385.00 Chemosot Feedback
Enginit Borehole Water Project To increase access to safe and reliable water supply for the Enginit community through borehole drilling, development, and associated infrastructure Water, Environment, Energy and Natural Resources On-Going 1,424,526.40 Londiani Feedback
Construction of Off B1-Kaitui bridge-kiptugumo pry sch Road; Kamasenga-Soliat Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport On-Going 3,695,760.00 Soliat Feedback
Jagoror Borehole Water Project To provide a safe, reliable, and sustainable source of water for domestic, institutional, and community use through borehole drilling and development. Water, Environment, Energy and Natural Resources On-Going N/A Londiani Feedback
Segetet-Siranga Road (7m, 900MM); Chebirir-Sachangwan Road (7m, 600MM); Kaula-Kapsoton Road (14m, 600MM) To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport On-Going 616,804.48 Kipkelion Feedback
Supply, Delivery, And Installation Of Kivuno-Korori Road;Mugumoini-Centre Road;Subukia-Centre Road;Centre One -Gwitu Farm Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport On-Going 2,007,746.56 Tendeno/Sorget Feedback
Proposed Culverts Installation To Bosuben Junction-Tanguret Road,Kipteran-Kapsinendet Church Of Christ Road,Kap Petero-Kapsimbiri Dip Road,Kapsimbor-Kap Mosonik Shops,Arokyet Tinga-Kap Cape Town Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport On-Going 1,900,928.54 Cheplanget Feedback
Supply,delivery and installation of culverts at Chebinyiny-Kenene rd,Mobet-tabut rd,mobet-keregut road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport On-Going 1,847,972.80 Cheplanget Feedback
Routine Maintenance of Silva junction-Siongi-Kampala road Potholes patched, ,surface grading completed. Public Works, Roads and Transport On-Going 3,640,590.40 Tebesonik Feedback
Kaminjeiwa Borehole Water Project to supply, deliver, install, test, and commission a submersible pump set to enhance water extraction and distribution from the designated water source Water, Environment, Energy and Natural Resources Completed 3,179,333.44 Cheplanget Feedback
Nyaberi Junction- Kap Nyakitari Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 820,875.00 Soin Feedback
Kaptegere- Chepsoo Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,300,000.00 Kapsoit Feedback
Cherire - Kisabei Pry- Kiptegan Nursery Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,880,704.00 Kapsoit Feedback
Extension Kenya 1 - Cattle dip - Quarry Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 5,182,888.00 Soliat Feedback
Construction of Iraa Pry-School of Excellency- Masare Market Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,295,500.03 Kaplelartet Feedback
Chepterwo/kipsitet Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 3,143,600.00 Sigowet Feedback
Tabet/sosur Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 1,473,900.00 Kaplelartet Feedback
Mulkelwet Dispensary To enhance the safety, security, and operational environment of Mulkelwet Dispensary by constructing a perimeter fence that protects health infrastructure, staff, and medical supplies, while providing a conducive atmosphere for service delivery Health Services Completed 1,665,945.60 Ainamoi Feedback
Litein Water Supply To enhance access to clean and sustainable water supply by constructing and installing water infrastructure such as pipelines, water tanks, spring protection systems, and associated fittings, ensuring reliable water delivery to the target community Water, Environment, Energy and Natural Resources Completed 1,348,680.00 Cheplanget Feedback
Tuiyobei pry - Sukutek Primary School Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,884,952.68 Soliat Feedback
Mortgage - Kericho Primary Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,482,248.00 Kipchebor Feedback
Kap Eli - Off B1 - Koiyet - Chesanga -Hass Petrol Station- Emanuels Agc Chucrh- Kiboko- Off B1 Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 5,411,600.00 Kipchebor Feedback
Kapchemirmir TBC - Cherire TBC - Kapsewe Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,696,476.00 Sigowet Feedback
Construction of Kapsomboch- Chepkosa Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,084,742.72 Kaplelartet Feedback
Kondamet Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 3,670,704.00 Sigowet Feedback
Kaplelartet Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 4,899,080.00 Kaplelartet Feedback
Mulkelwet Dispensary To improve access to quality primary healthcare services for the residents of Mulkelwet and surrounding areas through the establishment of a fully functional dispensary equipped to offer preventive, promotive, and curative health services Health Services Completed 2,137,500.00 Ainamoi Feedback
Kaminjeiywa Borehole –Tegat To enhance access to clean and sustainable water supply by constructing and installing water infrastructure such as pipelines, water tanks, spring protection systems, and associated fittings, ensuring reliable water delivery to the target community Water, Environment, Energy and Natural Resources Completed 2,119,039.00 Cheplanget Feedback
Soko huru kapsegut pry kubinkok rd To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 7,927,648.80 Soliat Feedback
Satelite - Matobo Primary-Nyagacho - Nursery Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,552,629.00 Kipchebor Feedback
Satelite - Matobo Primary-Nyagacho - Nursery Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 911,900.00 Kipchebor Feedback
Kapchanga - Taiwet - Centre Juu Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,520,910.00 Sigowet Feedback
Proposed Routine Maintenance of Tamboiyot TBC - Kiptenden TBC - Kebeneti Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,398,378.61 Sigowet Feedback
Chemildagei Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 2,591,668.00 Kaplelartet Feedback
Kamolok Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 675,905.00 Kaplelartet Feedback
Kimeswon Dispensary. To improve facility functionality, sanitation, and utility access through installation of shelves, sanitation facilities, water harvesting, and electricity connection. Health Services Completed 2,006,970.00 Kipchimchim Feedback
Kaminjeiywa- Mobwo Borehole Water Project To enhance access to clean and sustainable water supply by constructing and installing water infrastructure such as pipelines, water tanks, spring protection systems, and associated fittings, ensuring reliable water delivery to the target community Water, Environment, Energy and Natural Resources Completed 1,796,770.40 Cheplanget Feedback
Ngeny-green leaf academy To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 7,155,866.00 Tebesonik Feedback
Baraka Kipsotet-Kimeswon Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,432,423.00 Kipchimchim Feedback
Baraka Kipsotet-Kimeswon Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 566,575.00 Kipchimchim Feedback
Kapchemirmir TBC - Cherire TBC - Kapsewe Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 822,094.32 Sigowet Feedback
Construction of Kaplaiba-Chesunet-Kapsigowo Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,938,716.12 Soliat Feedback
Cheramor Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 2,991,474.00 Kaplelartet Feedback
Kibirirgut Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 673,000.00 Sigowet Feedback
Seretut dispensary To provide adequate and safe staff housing to improve staff retention and service delivery at Seretut Dispensary. Health Services Completed 872,238.80 Cheptororiet/Seretut Feedback
Kipsonoi/Cheplanget Water Project To enhance water supply reliability, storage efficiency, and infrastructure security through the construction and electrification of a control panel house, rehabilitation of a 100 m3 water tank, installation of a rising main, and fencing of critical installations Water, Environment, Energy and Natural Resources Completed 1,589,077.04 Cheplanget Feedback
Kapkisiara junction- chesamisiet road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,912,518.00 Tebesonik Feedback
Taiwet - Kipsutet Primary School Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,149,630.00 Kipchimchim Feedback
Taiwet - Kipsutet Primary School Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 140,000.00 Kipchimchim Feedback
Kakibei-KMC - Kuche - Kiptenden - Rwandit - Kapchanga Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,616,416.00 Sigowet Feedback
Construction of Soliat Dispensary-Mongojet Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 4,532,475.88 Soliat Feedback
Kaplamboi Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 900,651.84 Chepseon Feedback
Kondamet. Ecde toilet Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 668,830.00 Sigowet Feedback
Seretut Dispensary To improve sanitation and waste management at the facility. Health Services Completed 1,461,298.40 Cheptororiet/Seretut Feedback
Kapkatet springs and Litein water supply to enhance water storage capacity, improve distribution efficiency, and increase community access to clean water, Water, Environment, Energy and Natural Resources Completed 1,408,258.56 Kapkatet Feedback
Cherote cheptagum pry kapelex kobologong To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,128,175.00 Tebesonik Feedback
Routine Maintenance of Arap Mangei- Nyaga Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,410,391.00 Cheboin Feedback
Kap Joseah- Kipsakwa Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,021,000.00 Kipchimchim Feedback
Sigowet - Kaplieli - Sisionik (3Km); Cherote - Kigomba Road (4.1km) To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,080,000.00 Sigowet Feedback
Construction of Kapsorok Market- Chepyegon Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,647,239.52 Soliat Feedback
Barotion Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 1,516,265.00 Londiani Feedback
Kileges ECDE Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 680,725.00 Sigowet Feedback
Merto Dispensary To enhance sanitation and hygiene standards at Metro Dispensary by providing adequate and gender-sensitive sanitation facilities for patients, staff, and visitors, thereby promoting a healthy and safe healthcare environment Health Services Completed 1,747,859.00 Ainamoi Feedback
Litein water supply To enhance access to clean and sustainable water supply by constructing and installing water infrastructure such as pipelines, water tanks, spring protection systems, and associated fittings, ensuring reliable water delivery to the target community Water, Environment, Energy and Natural Resources Completed 1,853,100.00 Kapkatet Feedback
Nigeria - Kabusienduk rd To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 4,221,640.00 Tebesonik Feedback
Routine Maintenance of Cheptendeniet- Cheboin Centre Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,945,687.00 Cheboin Feedback
Kapango- Simotwet Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 632,000.00 Kipchimchim Feedback
Sigowet - Kaplieli - Sisionik (3Km); Cherote - Kigomba Road (4.1km) To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,337,300.00 Sigowet Feedback
Construction of Prime Steel Junctions-Boroiywek Road; Munara Canteen-ATC Road; Chebirir centre-Chebirir River Bridge Road; Kileges main Road-Prime steel gate Road; prime steel gate - Karap Towett Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,698,397.84 Soin Feedback
Kongasis Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 1,146,950.00 Tendeno/Sorget Feedback
Chebirir ECDE Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 2,634,905.00 Sigowet Feedback
Ainamoi Sub County Hospital To strengthen the county’s health response capacity by upgrading and modifying existing hospital infrastructure to provide a safe, well-equipped, and functional COVID-19 recovery ward for effective management of post-COVID and infectious disease patients. Health Services Completed 2,410,468.40 Ainamoi Feedback
Kapkatet (Segerwer) Hospital Water Project To enhance access to clean and sustainable water supply by constructing and installing water kiosk, 200m3 water tanks, and associated fittings, ensuring reliable water delivery to the target community Water, Environment, Energy and Natural Resources Completed 1,273,146.40 Kapkatet Feedback
Kamwingi II Kimageri rd To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 5,623,072.74 Tendeno/Sorget Feedback
Routine Maintenance of Koborus- Kesengit- Kipagenge-Chepkulgong- Arap Barchile Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,415,325.00 Cheboin Feedback
Routine Maintenance of Kapsegut- Jerusalem Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,645,020.00 Cheboin Feedback
Orgong - Kaplieli - Kalelbusienduk - Kapchanga Road; Tamboiyot - Kitenden - Kebeneti Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,030,540.00 Sigowet Feedback
Kipsirichet Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 1,119,186.56 Londiani Feedback
Kaplelach ECDE Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 2,306,192.00 Sigowet Feedback
Ainamoi Sub County Hospital To improve the functionality, safety, and aesthetic condition of Ainamoi Sub-County Hospital by undertaking exterior renovation and modification works that support the conversion of the facility into a fully operational COVID-19 recovery ward. Health Services Completed 1,795,383.62 Ainamoi Feedback
Segerwer extension pipeline To enhance access to clean and sustainable water supply by constructing and installing water infrastructure such as pipelines, water tanks, , and associated fittings, ensuring reliable water delivery to the target community Water, Environment, Energy and Natural Resources Completed 1,189,694.00 Kapkatet Feedback
Chepkoin - Chemororoch road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 820,875.00 Waldai Feedback
Routine Maintenance of Moburu- Chemunye- Ririat Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,250,761.00 Cheboin Feedback
Routine Maintenance of Ngororga 08 tbc- cheptigit- Sahangwan Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,671,200.00 Cheboin Feedback
Orgong - Kaplieli - Kalelbusienduk - Kapchanga Road; Tamboiyot - Kitenden - Kebeneti Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,918,972.00 Sigowet Feedback
Construction Of Quarry- Cheboror River- Kiprengwe Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 554,767.68 Kedowa/Kimugul Feedback
Londiani farmers Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 1,306,345.60 Londiani Feedback
Nyaberi ECDE Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 794,600.00 Sigowet Feedback
Mulkelwet Dispensary To enhance access to quality outpatient healthcare services by completing the construction of the OPD block at Mulkelwet Dispensary, thereby improving service delivery capacity and patient flow within the facility. Health Services Completed 15,600,000.00 Ainamoi Feedback
Chebirirbei water project To improve access to safe and sustainable drinking water for the community by protecting natural springs and establishing reliable water points. Water, Environment, Energy and Natural Resources Completed 1,133,426.72 Kisiara Feedback
Highway- Maraba- Cattle Dip Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,370,374.00 Waldai Feedback
Maintenance of Kabarus junction-Chabasta River-Ngeny River Spencon- Kapchebo Pry School Road To enhance the safety, accessibility, and all-weather usability of rural roads Public Works, Roads and Transport Completed 1,879,201.00 Cheboin Feedback
Routine Maintenance of Maburo- Malinja- Bakoiyot Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 560,000.00 Cheboin Feedback
Sinendet Cherire TBC Road; Kapchemirmir Road; Centre juu - Taiywet - Kapchanga Road; Kiptere market Roads. To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 5,528,300.00 Sigowet Feedback
Kabarak Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 2,301,016.60 Londiani Feedback
Ndonyomare ECDE Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 779,800.00 Sigowet Feedback
Ainamoi Sub County Hospital To improve water supply reliability and efficiency at Ainamoi Sub-County Hospital by upgrading the existing submersible pump and undertaking associated works to ensure uninterrupted water access for hospital operations and patient care. Health Services Completed 1,535,527.00 Ainamoi Feedback
Koituk Borehole Water Project To procure and deliver high-quality drilling materials that meet the technical and operational requirements of the project. Water, Environment, Energy and Natural Resources Completed 2,291,348.00 Kisiara Feedback
Ainamoi centre -Ainamoi pry- Itibet rd To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,174,524.40 Ainamoi Feedback
Routine Maintenance of Kabarus junction-Chabasta River-Ngeny River Road To improve the condition, safety, and accessibility of an existing road Public Works, Roads and Transport Completed 1,530,306.00 Cheboin Feedback
Routine Maintenance of Off C23- ChemosIt- Chebarema- Kabitungu TBC Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 8,607,424.00 Chemosot Feedback
Sisionik - Chemegong - Kapndege Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 6,434,200.00 Sigowet Feedback
Construction of Kaptirbet River (Semi Box Culvert (21m, 900MM) To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,993,154.40 Kapkatet Feedback
Chepcholiet Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 708,992.00 Chepseon Feedback
Kebimbir ECDE Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 1,560,600.00 Sigowet Feedback
Ainamoi Social Hall To expand access to primary healthcare services for the Ainamoi community by converting the existing social hall into a functional dispensary with essential service rooms and providing adequate sanitation facilities for both staff and patients. Health Services Completed 3,356,170.00 Ainamoi Feedback
Koituk Primary School Borehole To equip an existing borehole with all necessary components to enable a sustainable and efficient water supply system. Water, Environment, Energy and Natural Resources Completed 1,603,824.68 Kisiara Feedback
Potholes pavement repairs of Town roads To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 5,380,356.08 Kipchebor Feedback
Routine Maintenance of Kapchelogoi- Soet Pry- Kipsereti River- Ps Cheruiyot- Maria Joy- Kap Than You Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,957,183.00 Chemosot Feedback
Routine Maintenance of Off C23- Chemosot Centre- Arap Irongi- Chebulu Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,920,000.00 Chemosot Feedback
Kaplelartet-Tililbei Road;Chepkemel-Sumeek Road; Sumeek-Tililbei Road. To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,958,163.00 Kaplelartet Feedback
Proposed Construction and Rehabilitation of Off E22- Kabarus Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,122,741.00 Ainamoi Feedback
Cheboror Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 2,028,240.00 Chepseon Feedback
KapkisaiECDE Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 596,200.00 Sigowet Feedback
Ainamoi Sub County Hospital To enhance power reliability and safeguard hospital electrical infrastructure by constructing a secure generator house to protect the standby generator and ensure uninterrupted power supply for critical health services Health Services Completed 3,199,950.00 Ainamoi Feedback
Roret Pineapple Processing Plant To enhance access to clean and sustainable water supply by constructing and installing water infrastructure such as pipelines, water tanks, , and associated fittings, ensuring reliable water delivery to the target community Water, Environment, Energy and Natural Resources Completed 1,316,850.56 Kisiara Feedback
Sachangwan kapkiam pry kapsigori rd To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 501,600.00 Kipchimchim Feedback
Routine Maintenance of Ngoina Road- Pastor Weldon Chumo- Kipkerieny Pry- Chebarema Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,549,915.00 Chemosot Feedback
Routine Maintenance of Off C23- Kaminjeiwet- Chebulu Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,279,000.00 Chemosot Feedback
Mutwot - Kokwasoi - Emdit Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 6,645,260.00 Kaplelartet Feedback
Proposed Construction and Rehabilitation of Bundalangi- Bechulelach Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,302,700.00 Ainamoi Feedback
Chepchabai Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 1,693,085.89 Chepseon Feedback
Kapkigoro ECDE Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 1,426,070.00 Sigowet Feedback
Laliat Dispensary To improve staff welfare and enhance service delivery at Laliat Dispensary by completing the staff house to provide suitable accommodation for health workers and constructing a two-door pit latrine to promote sanitation and hygiene within the facility Health Services Completed 4,142,072.00 Ainamoi Feedback
Koituk Primary School Borehole Water Project To enhance access to clean and sustainable water supply by constructing and installing water infrastructure such as pipelines, water tanks, , and associated fittings, ensuring reliable water delivery to the target community Water, Environment, Energy and Natural Resources Completed 1,479,754.14 Kisiara Feedback
Simotwet -Nyakacho-Kwa Sambu-Matobo Agc Church -Chesanga Rd To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 498,400.00 Kapsaos Feedback
Routine Maintenance Off C23 - Cheborus - Kapcario - Salvation ECDC Main -Kipsisin TBC - Kapsenetwet - Sugutek TBC- Chelilis CD Getarwet To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,379,948.76 Chemosot Feedback
Routine Maintenance of Nairobi Ndogo- Kimauto Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 910,000.00 Cheplanget Feedback
Chepkemel Centre - Arap Cheruiyot - Sumeek Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 6,633,960.00 Kaplelartet Feedback
Proposed Construction and Rehabilitation of Ainapsosiot- Binyiny Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 177,040.00 Kapsaos Feedback
Irerma Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 1,711,238.96 Kedowa/Kimugul Feedback
Kamogon ECDE Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 695,000.00 Sigowet Feedback
Chepkoiyo Dispensary -Phase1 To improve maternal and child health services by initiating the construction of a maternity block at Chepkoiyo Dispensary, thereby expanding the facility’s capacity to provide safe delivery, antenatal, and postnatal care services Health Services Completed 4,196,010.00 Ainamoi Feedback
Tulwet Borehole water Project To equip an existing borehole with all necessary components to enable a sustainable and efficient water supply system. Water, Environment, Energy and Natural Resources Completed 1,153,282.90 Kisiara Feedback
Baraka - Chepyose-Kimeswon Rd To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,982,600.00 Kapkugerwet Feedback
Routine Maintenance of Kitaiit-Kimonjuk Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,915,308.48 Cheplanget Feedback
Routine Maintenance of Tabaita- Kap Johna Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,598,400.00 Cheplanget Feedback
Kaplelartet - Arap Cheruiyot - Sumeek Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 6,553,340.00 Kaplelartet Feedback
Proposed Construction and Rehabilitation of Muiywek- Kipsamoi Pry- Kiptegan Pry School Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,504,206.00 Kapsoit Feedback
Tiriita Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 1,041,448.00 Kedowa/Kimugul Feedback
Kapsomboch ECDE Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 1,577,948.00 Sigowet Feedback
Ainamoi sub county hospital To ensure reliable and adequate water supply throughout Ainamoi Sub-County Hospital by installing an efficient water reticulation system that supports clinical operations, sanitation, and patient care. Health Services Completed 3,198,004.00 Ainamoi Feedback
Chebwagan-Kalacha Dispensary Water Project To enhance access to clean and sustainable water supply by constructing and installing water infrastructure such as pipelines, water tanks, and associated fittings, ensuring reliable water delivery to the target community Water, Environment, Energy and Natural Resources Completed 1,501,622.78 Kisiara Feedback
Kapkatet Hospital - Link cheplanget -Off mainroad Sosit To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,979,443.80 Kapkatet Feedback
Routine Maintenance of Kaldit TBC- Tegat UPEC/Arokyet- Tinga Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,957,183.01 Cheplanget Feedback
Routine Maintenance of Twoliot- Church Of Christ- Tangit- Sebetet- Ainapkarik Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,800,000.00 Cheplanget Feedback
Mutwot - Kokwasoi - Emdit Road; Chepkemel Center - Karap Cheruiyot Road; Kapmorok - Chepkemel TBC - Centre Road; Chepchelalemit - Sime Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,014,000.00 Kaplelartet Feedback
Proposed Construction and Rehabilitation of Kenegut Market- Cheplel Pry- Cherire Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,231,298.00 Kapsoit Feedback
Chepkongony Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 1,052,087.52 Kedowa/Kimugul Feedback
Kapwos ECDE Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 4,982,420.00 Sigowet Feedback
Municipal Health Centre To improve sanitation and hygiene standards at the Municipal Health Centre by constructing a modern ablution block that adequately serves patients, visitors, and healthcare staff, thereby promoting a clean and healthy healthcare environment. Health Services Completed 3,193,480.00 Kapkugerwet Feedback
Litein Water Supply To enhance access to safe, reliable, and sustainable water supply through improved storage, infrastructure rehabilitation, and expanded distribution. Water, Environment, Energy and Natural Resources Completed 1,561,202.00 Kisiara Feedback
Kiptere Market Roads To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,967,154.40 Kaplelartet Feedback
Routine Maintenanve of Kenene Dispensary- Tiritap Moita- Chebinyiny Junction Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,349,500.00 Cheplanget Feedback
Routine Maintenance of Nuru- Meturi Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 865,000.00 Kapkatet Feedback
Mutwot - Kapkawa- Kiplekwa pry School Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,498,000.00 Kaplelartet Feedback
Proposed Construction and Rehabilitation of Kipchimchim Sec School- Kipsakwa Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,502,113.00 Kipchimchim Feedback
Tumaini Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 1,368,233.92 Tendeno/Sorget Feedback
Emdiit ECDE Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 682,578.00 Sigowet Feedback
Binyiny Dispensary. To enhance the functionality, safety, and service delivery environment of Binyiny Dispensary through renovation works aimed at upgrading existing infrastructure and improving working and patient conditions Health Services Completed 4,986,757.00 Kapsaos Feedback
Sachangwan Cheribo Line Extension To enhance access to clean and sustainable water supply by constructing and installing water infrastructure such as pipelines, water tanks, spring protection systems, and associated fittings, ensuring reliable water delivery to the target community Water, Environment, Energy and Natural Resources Completed 1,956,125.31 Kisiara Feedback
Kipwastuyo - Kenene Kaminjeiwa rd To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 960,016.00 Sigowet Feedback
Routine Maintenance of Bossman Road- Kap Josea Sang - Marisin -Kap Josea gate Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,852,103.00 Kapkatet Feedback
Routine Maintenance of Chebitet- Kap Tebengwet Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 6,183,180.00 Kapkatet Feedback
Kaplelartet - Kapsomboch Primary School Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,753,400.00 Kaplelartet Feedback
Proposed Construction and Rehabilitation of Kimungen Bridge- Kamasian AGC Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,495,043.00 Kipchebor Feedback
Mugumoine Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 525,303.68 Tendeno/Sorget Feedback
Chebirech ECDE Ensure Reliable Water Supply, Promote Hygiene and Health Education, Youth Affairs, Sports, Culture and Social Services Completed 697,780.60 Sigowet Feedback
Kapsaos Dispensary To enhance the security and safety of Kapsaos Dispensary by constructing a perimeter fence to protect health infrastructure, medical supplies, staff, and patients, while creating a conducive environment for healthcare service delivery Health Services Completed 4,076,124.00 Kapsaos Feedback
Chemitan Water Project To establish a sustainable and efficient water supply system that secures natural water sources, enhances storage capacity, and improves community access through effective distribution. Water, Environment, Energy and Natural Resources Completed 1,427,681.60 Kisiara Feedback
Musaria -kapkatet TBC road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,995,882.60 Sigowet Feedback
Routine Maintenance of Chemoiben- Egisiek- kapcheluch Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,650,440.00 Kapkatet Feedback
Routine Maintenance of Chebitet Sign Post- Sachangwan Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,650,000.00 Kapkatet Feedback
Kona Sita - Sumeek Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,975,000.00 Kaplelartet Feedback
Proposed Construction and Rehabilitation of Kwa Zablon- Kipchebor Pry School Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,188,246.00 Kipchebor Feedback
Morao bakery/kapluso Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 1,028,651.12 Kamasian Feedback
Nyalilbuch ECDE Ensure Reliable Water Supply, Promote Hygiene and Health Education, Youth Affairs, Sports, Culture and Social Services Completed 1,400,000.00 Sigowet Feedback
Kipsolu Dispensary To enhance sanitation and hygiene for patients and staff at Kipsolu Dispensary. Health Services Completed 2,829,814.00 Cheptororiet/Seretut Feedback
Chemitan Solarisation To establish a sustainable and efficient water supply system that secures natural water sources, and improves community access through effective distribution. Water, Environment, Energy and Natural Resources Completed 1,259,540.76 Kisiara Feedback
OffB1/A1 - chepkolon - greenhighlands rd To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 970,000.00 Kipchebor Feedback
Routine Maintenance of 954DC Junction- Soy Palza- 954East- MP Hom- Upper Hill Acadeny- Off C23- Morit Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,474,119.00 Kapkatet Feedback
Routine Maintenance of Sachangwan- Mabasi TBC- Ketingoi Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 5,987,000.00 Kisiara Feedback
Rehabilitation and Construction of Lelagoi- Yanja- Karap Maina Road 4.5Km To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 8,578,680.00 Sigowet Feedback
Proposed Construction and Rehabilitation of Annex Prison- Kwa Silvan Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,252,030.00 Kapkugerwet Feedback
Kawangware Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 862,877.60 Kamasian Feedback
Ngendalel ECDE Ensure Reliable Water Supply, Promote Hygiene and Health Education, Youth Affairs, Sports, Culture and Social Services Completed 875,000.00 Sigowet Feedback
Kipsolu Dispensary. To complete and operationalize the dispensary by providing basic utilities and fittings. Health Services Completed 1,862,960.00 Cheptororiet/Seretut Feedback
Cheptenybei Spring Protection To improve access to safe and sustainable drinking water for the community by protecting natural springs and establishing reliable water points. Water, Environment, Energy and Natural Resources Completed 1,379,003.36 Kisiara Feedback
site and service roads To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,549,680.80 Kapkugerwet Feedback
Routine Maintenance of Ngesumiin Girls- Nyambolosa Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,747,264.00 Litein Feedback
Routine Maintenance of Keregut- Sikongo Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 4,964,800.00 Kisiara Feedback
Rehabilitation of Drainage Structures and access roads in Kapkatet Market To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,614,856.00 Kapkatet Feedback
Proposed Construction and Rehabilitation of Mangweni Academy- Satelight Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,427,190.00 Kapkugerwet Feedback
Laliat Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 1,833,426.40 Kamasian Feedback
Kaptalamwa ECDE Ensure Reliable Water Supply, Promote Hygiene and Health Education, Youth Affairs, Sports, Culture and Social Services Completed 1,560,880.00 Sigowet Feedback
Seretut Dispensary. To improve living conditions for health personnel at Seretut Dispensary. Health Services Completed 1,335,392.00 Cheptororiet/Seretut Feedback
Kapkisiara Borehole Water Project To restore or enhance water pumping capacity for reliable water delivery through the supply and installation of a new pumpset. Water, Environment, Energy and Natural Resources Completed 1,231,889.00 Tebesonik Feedback
Town drainage culverts To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,732,360.00 Litein Feedback
Routine Maintenance of Chemitan- Chebwagan- 954Motuary Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,629,374.00 Litein Feedback
Routine Maintenance of Machorwa- Chomisian- Charera To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,730,000.00 Kisiara Feedback
Rehabilitation and Construction of Kapias- Timbilil-Kamotos Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 7,457,528.00 Kunyak Feedback
Proposed Construction and Rehabilitation of Kasheen Centre- Borowet- Kosongosho Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,500,445.00 Kamasian Feedback
Chepkongony Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 2,379,570.64 Kedowa/Kimugul Feedback
Samisbei ECDE Ensure Reliable Water Supply, Promote Hygiene and Health Education, Youth Affairs, Sports, Culture and Social Services Completed 2,007,170.00 Sigowet Feedback
Chepkosilen Dispensary To improve sanitary disposal of medical waste and enhance hygiene within the facility. Health Services Completed 2,938,860.00 Cheptororiet/Seretut Feedback
Kapkisiara Water Project To enhance access to safe, reliable, and sustainable water supply through improved storage, infrastructure rehabilitation, and expanded distribution. Water, Environment, Energy and Natural Resources Completed 1,102,400.20 Tebesonik Feedback
Off C35-Chinese site - Barotion rd To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,269,300.00 Londiani Feedback
Routine Maintenance of Siritiet Junction- Siritiet Pry- Chepkoit- Ainapek Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,416,375.00 Tebesonik Feedback
Routine Maintenance of Kelelwa- Kimugul Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 4,672,480.00 Kisiara Feedback
Routine Maintenance of Kap Ezekiel Centre- Kipkwes Pry School-Kipchorian River- Kipchorian Bridge Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,113,000.00 Ainamoi Feedback
Proposed Construction and Rehabilitation of Kipkelion Sub County Office- KapLaban Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,408,704.00 Kipkelion Feedback
Chepchabai Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 1,380,098.60 Chepseon Feedback
Kapkongoni ECDE Ensure Reliable Water Supply, Promote Hygiene and Health Education, Youth Affairs, Sports, Culture and Social Services Completed 596,060.00 Sigowet Feedback
Kaplutiet Dispensary To increase access to primary healthcare services in Kaplutiet area. Health Services Completed 2,800,565.00 Kabianga Feedback
Kapkisiara Water Project To enhance access to clean and sustainable water supply by constructing pipelines, water tanks, and associated fittings, ensuring reliable water delivery to the target community Water, Environment, Energy and Natural Resources Completed 1,346,017.60 Tebesonik Feedback
Dampsite cereal ring rd cemetry juakali rd To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,941,362.52 Kipchebor Feedback
Routine Maintenance of Kalya Junction-Chepnyogaa Centre Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,875,237.00 Kabianga Feedback
Routine Maintenance of Reresik Pry- Kiprichait- Roret Boys- Chebululu- Tulwet- Ngainet Bridge Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 4,608,880.00 Kisiara Feedback
Routine Maintenance of Yasomok-Kamelilo Coffee Factory-Kiburet Pry School Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,324,708.00 Ainamoi Feedback
Proposed Construction and Rehabilitation of Kamunyu- Songonyet- Chepkitar Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,193,725.00 Chilchila Feedback
Kapkondoo Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 544,214.00 Londiani Feedback
Kejiriet ECDE To provide a space where nutritious meals can be prepared and served, supporting the healthy growth and development of young children in the Early Childhood Development Education (ECDE) program. Education, Youth Affairs, Sports, Culture and Social Services Completed 1,550,000.00 Sigowet Feedback
Nyabangi Dispensary To provide accommodation for healthcare workers at Nyabangi Dispensary. Health Services Completed 2,907,958.00 Kabianga Feedback
Kibugat Borehole Water Project To procure and deliver high-quality drilling materials that meet the technical and operational requirements of the project. Water, Environment, Energy and Natural Resources Completed 2,200,056.00 Tebesonik Feedback
Construction of Quarry- Turguito Bridge Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,973,790.00 Waldai Feedback
Routine Maintenance of Kaplutiet- Kiptuigo- Ainabisarak Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,969,624.00 Kabianga Feedback
Routine Maintenance of America- Sinendet Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,151,160.00 Litein Feedback
Ainamoi centre-berea AIC Church-Pakao-Delivarance-Kap Jona To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,281,920.00 Ainamoi Feedback
Proposed Construction and Rehabilitation of Kaplelit- Kamotos- Kamiwa Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,156,845.00 Chilchila Feedback
Construction of a pit latrine at Koiyat ECDE Centre Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 1,364,276.00 Kaplelartet Feedback
Asenwet ECDE To provide a space where nutritious meals can be prepared and served, supporting the healthy growth and development of young children in the Early Childhood Development Education (ECDE) program. Education, Youth Affairs, Sports, Culture and Social Services Completed 1,579,850.00 Kaplelartet Feedback
Kaplutiet Dispensary To improve sanitation facilities for patients and visitors. Health Services Completed 2,520,993.00 Kabianga Feedback
Kibugat borehole Water Project To equip a borehole, extend power supply, and develop key water infrastructure that supports reliable water extraction, storage, and distribution for the community. Water, Environment, Energy and Natural Resources Completed 1,662,032.22 Tebesonik Feedback
Construction of Kabartegan AIC- Kap Patrick Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,777,453.00 Chemosot Feedback
Routine Maintenance of Off Chepnyogaa-Mobengo-Kapchebet Signpost Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,052,000.00 Kabianga Feedback
Routine Maintenance of Bushmouth- Samuget- Kap Brown - TTC Valley Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,646,520.00 Litein Feedback
Grading Of Kipchimchim Sec-Kabotris Road, Kabotris-Kondamet Road,Kapcheptoror-Sirimdo Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,455,700.00 Kipchimchim Feedback
Proposed Construction and Rehabilitation of Kimugul- 951 Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 962,278.00 Kedowa/Kimugul Feedback
Construction of a pit latrine at Simbamoi ECDE Centre Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 1,419,579.00 Kaplelartet Feedback
Simbi ECDE To provide a space where nutritious meals can be prepared and served, supporting the healthy growth and development of young children in the Early Childhood Development Education (ECDE) program. Education, Youth Affairs, Sports, Culture and Social Services Completed 658,048.00 Kaplelartet Feedback
Kaplutiet Dispensary To enhance service delivery and usability of the dispensary premises. Health Services Completed 4,471,800.00 Kabianga Feedback
Kiptome Borehole Water Project To procure and deliver high-quality drilling materials that meet the technical and operational requirements of the project. Water, Environment, Energy and Natural Resources Completed 1,139,510.92 Tebesonik Feedback
Construction of Chebitet- Kaptumbo Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,108,851.62 Kisiara Feedback
Routine Maintenance of Chepkutung Banda - Maseti – Kaplangacha Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,605,577.00 Kapsuser Feedback
Routine Maintenance of Kapkarin- Chesoen TBC Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,503,600.00 Litein Feedback
Construction of Kiptabo TBC-Chepkosilen sec-Ainap Isirek-Bondeni road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 5,329,016.00 Cheptororiet/Seretut Feedback
Proposed Construction and Rehabilitation of Itoik- Kaptich Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,772,596.00 Londiani Feedback
Construction of a classroom at Chemamul ECDE Centre Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 1,273,239.20 Kipkelion Feedback
Tabaita ECDE To provide a space where nutritious meals can be prepared and served, supporting the healthy growth and development of young children in the Early Childhood Development Education (ECDE) program. Education, Youth Affairs, Sports, Culture and Social Services Completed 923,130.00 Kaplelartet Feedback
Kiptome Dispensary To expand capacity and improve patient comfort and service delivery. Health Services Completed 3,957,953.00 Kabianga Feedback
Kaptaragon Borehole Water Project To procure and deliver high-quality drilling materials that meet the technical and operational requirements of the project. Water, Environment, Energy and Natural Resources Completed 1,613,832.88 Chepseon Feedback
Construction of Kaptumo – chankelek Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 524,041.60 Kisiara Feedback
Routine Maintenance of Chepkutung Hills - Kipngetuny - BAE - Arap Cheruiyot Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,366,405.00 Kapsuser Feedback
Routine Maintenance of Ainapset AIC- Kapbomwo- Rungut Pry- Chepsembe- Tendwet TBC Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,704,050.00 Litein Feedback
Construction of Chomisian- Ngariet Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,629,200.00 Kisiara Feedback
Proposed Construction and Rehabilitation of United Soi- Rosekebei-Arap Chuma Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,680,000.00 Londiani Feedback
Construction of a pit latrine at Kapsamoi ECDE Centre Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 1,058,455.92 Sigowet Feedback
Kamolok ECDE To provide a space where nutritious meals can be prepared and served, supporting the healthy growth and development of young children in the Early Childhood Development Education (ECDE) program. Education, Youth Affairs, Sports, Culture and Social Services Completed 652,725.00 Kaplelartet Feedback
Nyabangi Dispensary To improve functionality and sanitation of the facility. Health Services Completed 4,034,306.00 Kabianga Feedback
Chepseon Polytechnic Borehole To procure and deliver high-quality drilling materials that meet the technical and operational requirements of the project. Water, Environment, Energy and Natural Resources Completed 1,624,649.60 Chepseon Feedback
Construction of Sikongo- Kondamet Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 599,176.40 Kisiara Feedback
Routine Maintenance of Kapchelibon - Kipngetuny – Kapkonyinyis Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,613,030.00 Kapsuser Feedback
Routine Maintenance of Chepkitach- Kipsagetet Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,279,860.00 Tebesonik Feedback
Construction Of Chepkitar Centre- Toroton Boundary- Yalla Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,516,740.00 Chilchila Feedback
Proposed Construction and Rehabilitation of Kamwingi Centre- Chiefs Office - Kwa Duncan- Dip- Maritim Forest Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,097,569.00 Tendeno/Sorget Feedback
Construction of a classroom and pit latrine at Kimugul ECDE Centre Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 2,341,434.40 Sigowet Feedback
Mindililwet ECDE Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 652,002.00 Sigowet Feedback
Kamawoi Dispensary To improve maternity services and ensure sustainable water supply. Health Services Completed 2,005,408.00 Kabianga Feedback
Kaplelachbei water project Increase Water Storage Capacity, Enhance Water Intake Efficiency, Improve Water Distribution Water, Environment, Energy and Natural Resources Completed 1,494,486.00 Chepseon Feedback
Kiptenden TBC- Kiptenden Pry sch road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 676,512.00 Litein Feedback
Routine Maintenance of Kesagetiet TBC-Kipchombul TBC - Seretut TBC Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,114,105.00 Cheptororiet/Seretut Feedback
Routine Maintenance of Kibaranji- Karapngerer Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,434,628.00 Tebesonik Feedback
Grading of Chilchila- Murgut Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,484,640.00 Chilchila Feedback
Proposed Construction and Rehabilitation of Kwa Kagathe- Cheres Road and Its Environs To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,450,200.00 Tendeno/Sorget Feedback
Construction of a pit latrine at Chebirir ECDE Centre Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 1,543,663.04 Soin Feedback
Kakiboch ECDE Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 620,000.00 Sigowet Feedback
Kakiptui Dispensary To upgrade and improve the physical condition of Kakiptui Dispensary for better service delivery. Health Services Completed 2,230,800.00 Kapsuser Feedback
Chilchilla Pan Rehabilitation Increase Water Storage Capacity, Enhance Water Intake Efficiency, Improve Water Distribution Water, Environment, Energy and Natural Resources Completed 1,386,788.17 Chepseon Feedback
Chebwagan- Lebekwet- Kolonget Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,896,846.00 Litein Feedback
Routine Maintenance of Cheptororiet Pri-Kaldit Tbc Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,823,287.00 Cheptororiet/Seretut Feedback
Routine Maintenance of Kibolgong-Tiritab Eito Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,326,050.00 Tebesonik Feedback
Kisumu Ndogo-TBC-Melit r, Kapsamba-Kamasian Road, Kimungen Road,Dispensary-KamasianRoad, maso Market-Maso sch Road; Maso Shopping -Maso Church Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 4,656,736.00 Kamasian Feedback
Proposed Construction and Rehabilitation of AGC Chepkemel- Chepkemel Pry- Ormarichok- Tililbei TBC ML 50B- Kapkendu Centre Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed N/A Kaplelartet Feedback
Chepkolon ECDE Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 791,045.35 Kipchebor Feedback
Kechiriet ECDE Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 1,484,950.00 Sigowet Feedback
Kapsuser Dispensary To provide a functional kitchen facility for staff and patients at Kapsuser Dispensary. Health Services Completed 2,870,745.00 Kapsuser Feedback
Chepsain Water Project Increase Water Storage Capacity, Enhance Water Intake Efficiency, ,Enhance Security and Reduce Contamination Water, Environment, Energy and Natural Resources Completed 1,893,521.36 Chepseon Feedback
Construction of Leldet-Kapluso Road-Kapkures-Nyasikia Road; Kamutego-Kapkures Road; Tngatela Road-Kamasian- tingatela farm Road; Borborwet Road; saoset church ; kebeneti- changei Road; lelu-bartera Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 314,824.00 Kamasian Feedback
Routine Maintenance of Kapsoroget AGC - Cheboseron Tbc-Milimani Junction Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,593,500.00 Cheptororiet/Seretut Feedback
Routine Maintenance of Silva Junction- Siongi- Kampala Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,697,305.00 Tebesonik Feedback
Kiprengwe Pry School- Miti Moja Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 4,189,694.00 Kedowa/Kimugul Feedback
Proposed Construction and Rehabilitation of Kapkongoni Pry- Nyaberi Primary School -Kapkisai Pry School Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,495,043.00 Soin Feedback
Koisagat Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 3,447,308.88 Kapsoit Feedback
Kondamet ECDE Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 680,740.00 Sigowet Feedback
Kapsuser Dispensary To enhance diagnostic capacity and improve patient care. Health Services Completed 2,219,544.00 Kapsuser Feedback
Chepseon Water projects (Tugunon Water project) To enhance access to clean and sustainable water supply by constructing pipelines, , and associated fittings, ensuring reliable water delivery to the target community Water, Environment, Energy and Natural Resources Completed 1,138,236.54 Chepseon Feedback
Construction of Simboyon- Kandege Forest Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,009,800.00 Tendeno/Sorget Feedback
Routine Maintenance of Kapsuser Slaughter-Masiat Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,490,900.00 Cheptororiet/Seretut Feedback
Routine Maintenance of Chebirirbei Centre- Chepnagai Pry School Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 5,603,520.00 Kabianga Feedback
Masaita - Itoik - 936 farmers Road 5.4km To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 6,078,550.00 Londiani Feedback
Proposed Construction and Rehabilitation of Kapsigowo- Koibaino ECDE Centre- Koibaino FPPK- Chebaran Dip Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,289,060.00 Soliat Feedback
Kimeswon Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 1,194,478.80 Kipchimchim Feedback
Kabore ECDE Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 1,579,999.00 Sigowet Feedback
Kapsuser Dispensary To ensure reliable and sustainable water supply to the facility. Health Services Completed 2,208,060.00 Kapsuser Feedback
Londiani water supply To enhance access to clean and sustainable water supply by constructing pipelines, , and associated fittings, ensuring reliable water delivery to the target community Water, Environment, Energy and Natural Resources Completed 1,375,551.20 Kedowa/Kimugul Feedback
Construction of Ngariet bridge-Kalyongwet Booster To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,431,045.50 Kaplelartet Feedback
Routine Maintenance of Kesagetiet TBC-Kipchombul TBC - Seretut TBC Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,067,582.00 Cheptororiet/Seretut Feedback
Routine Maintenance of Kapsisiywa Pry- Kipseger TBC- Sinonin Pry Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 5,359,540.00 Kabianga Feedback
Routine Maintenance of Itibet - Bagao- Deliverance Church Road Potholes patched, ,surface grading completed. Public Works, Roads and Transport Completed 4,524,760.96 Ainamoi Feedback
Proposed Construction and Rehabilitation of Baregeiywet FPPK- Motonyi Believers Church- Corner C Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,252,030.00 Soliat Feedback
St Patrick Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 522,208.00 Kapkugerwet Feedback
Kapasenwo ECDE Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 1,576,470.00 Kaplelartet Feedback
Sachoran Dispensary To improve access to diagnostic and testing services at Sachoran. Health Services Completed 3,985,528.00 Kapsuser Feedback
Rehabilitation of Tulwapsigis Pan Increase Water Storage Capacity, Enhance Water Intake Efficiency, Improve Water Distribution Water, Environment, Energy and Natural Resources Completed 1,725,152.00 Kedowa/Kimugul Feedback
Construction of Cheptarit-Ngariet Bridge road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 352,500.00 Kaplelartet Feedback
Routine Maintenance of Kabiwot - Chelalang Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,776,796.00 Waldai Feedback
Routine Maintenance of Mobego B TBC- Nyabangi Sec. School- Kolonget Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,951,040.00 Kabianga Feedback
Routine Maintenance of Kabias junction-Kapkoros primary-Sugut road Potholes patched, ,surface grading completed. Public Works, Roads and Transport Completed 1,101,658.00 Kunyak Feedback
Proposed Construction and Rehabilitation of Kebeneti- Mwebe SDA- Cheplosgei Dispensary- Tamboiyot Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,299,306.00 Sigowet Feedback
Ainapkoror Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 1,236,267.68 Kapsaos Feedback
Kabokyek ECDE Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 590,170.00 Kaplelartet Feedback
Machorwa Dispensary To establish access to quality healthcare services in Machorwa area. Health Services Completed 2,955,637.00 Waldai Feedback
Kapkeri Water Project To enhance access to clean and sustainable water supply by constructing pipelines, , and associated fittings, ensuring reliable water delivery to the target community Water, Environment, Energy and Natural Resources Completed 1,129,751.40 Kedowa/Kimugul Feedback
Construction of Kalyongwet- kiptere Market Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 486,900.00 Kaplelartet Feedback
Routine Maintenance of Off Cheribo- Chebaibai Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,045,559.00 Waldai Feedback
Routine Maintenance of Kaplutiet- Kiptuigo- Ainabisarak Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,503,600.00 Kabianga Feedback
Routine Maintenance of Sireret-Kotetnik-Kabias Junction road Potholes patched, ,surface grading completed. Public Works, Roads and Transport Completed N/A Kunyak Feedback
Proposed Construction and Rehabilitation of Chemongen - Sosiot Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,219,970.00 Cheboin Feedback
Kiprotgorik Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 1,029,216.96 Kapsoit Feedback
Seronik ECD Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 773,762.00 Kaplelartet Feedback
Keben Dispensary To improve patient and staff sanitation facilities. Health Services Completed 3,866,000.00 Waldai Feedback
Katet Borehole Water project To provide sustainable and reliable water access through the drilling and equipping of a borehole, supported by power infrastructure and secure water storage Water, Environment, Energy and Natural Resources Completed 1,453,619.20 Londiani Feedback
Kalyongwet-Kimorogo road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 961,900.00 Kaplelartet Feedback
Routine Maintenance of Off Sondu Road - Mark Peter Pry. School Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,499,812.00 Waldai Feedback
Routine Maintenance of Bot Musa- Cheboin- Kimolwet- SBI- Kugerwet Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 7,882,712.00 Kapsuser Feedback
Construction Of Orgony-Kapleili-Kapelebusienduk-Kapchanga Road 2.5Km,Kapchanga TBC-Kapkeiyo TBC-Rwandet TBC-Kapkibbei Road 3.2Km,Kipranye-Chemindilil-Kipirigut Road 2.5Km,Tamboiyot TBC-Kiptenden TBC-Kebeneti Road 4Km To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 332,800.00 Sigowet Feedback
Proposed Construction and Rehabilitation of KapJoel - Kapcheboi - TBC - Panda Mpya TBC Access Culvert Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,219,970.00 Cheboin Feedback
Jordan/chemobei Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 1,162,784.00 Kapsoit Feedback
Kipkok ECDE Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 1,562,510.00 Kaplelartet Feedback
Machorwa Dispensary To provide adequate sanitation facilities for patients and visitors. Health Services Completed 3,508,443.00 Waldai Feedback
Kiptangit Water project Phase 1 To restore efficient water transmission from the source (e.g., borehole, treatment plant) to the storage facility or distribution network, minimizing losses and ensuring reliable water supply. Water, Environment, Energy and Natural Resources Completed 1,009,391.08 Londiani Feedback
Construction of Kapchebinyal- Chpekorot TBC- Taiywet Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 341,700.00 Sigowet Feedback
Rouitne Maintenance of 938- Leberer-Kamachungwa Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,397,635.00 Chepseon Feedback
Routine Maintenance of Cheptororiet- Arap Tanui Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 5,167,040.00 Kapsuser Feedback
Construction of Monget- Kapsinendet Road; Quarry- Cheramus Road; Chemutian- Baregeiywet SDA- Quarry Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,770,000.00 Soliat Feedback
Proposed Construction and Rehabilitation of Chebarema Pry - Kiptiliolit - Kibatit - Off C23 Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 912,050.00 Chemosot Feedback
Kapcheptendeniet/mulgelwet Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 2,065,315.97 Ainamoi Feedback
Furnishing classrooms (county wide) Create a comfortable, safe, and conducive space for students to focus and engage Education, Youth Affairs, Sports, Culture and Social Services Completed 1,581,945.00 Kaplelartet Feedback
Kaborok Dispensary To restore and improve infrastructure for effective healthcare delivery. Health Services Completed 1,802,501.00 Waldai Feedback
Kiptangit Water Project Phase II to enhance water supply reliability and accessibility through the completion of the Rising Main Rehabilitation, Pipeline Extension, Establishment of Communal Water Points, and Installation of Water Meters Water, Environment, Energy and Natural Resources Completed 1,141,788.00 Londiani Feedback
Construction of Lutheran Church- Sachsomok Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,500,000.00 Sigowet Feedback
Routine Maintenance of Kamarus – Annex Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,495,763.00 Chepseon Feedback
Routine Maintenance of Kamungwana- Bae-kaplemeywet- Kapnandet Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 4,037,140.00 Kapsuser Feedback
Routine Maintenance of Salgaa-Kongeren river-Kaplaiba road Potholes patched, ,surface grading completed. Public Works, Roads and Transport Completed 1,206,407.28 Soliat Feedback
Proposed Construction and Rehabilitation of Sebetet - Sugutek Dip - AinapKarit Road and Off Sebetet/Sugute k dip road - Kasyongei - Cheplanget Market Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,034,595.00 Cheplanget Feedback
Kaitamat Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 1,411,082.00 Ainamoi Feedback
Curriculum Designs Ensure learning activities and content are tailored to the developmental stages of 3–6-year-old children. Create consistency in teaching and learning across different schools and regions Education, Youth Affairs, Sports, Culture and Social Services Completed 1,584,725.00 Kaplelartet Feedback
Sosiot Health Centre To expand inpatient capacity and improve maternal healthcare services. Health Services Completed 4,278,445.00 Waldai Feedback
Masaita Borehole Water Projects To procure and deliver high-quality drilling materials that meet the technical and operational requirements of the project. Water, Environment, Energy and Natural Resources Completed 871,160.00 Londiani Feedback
Construction of Kamasega- Solait Junction Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,080,625.10 Soliat Feedback
Routine Maintenance of Kosovo – Sailo Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,952,891.00 Chepseon Feedback
Routine Maintenance of Changoi Road- Boito- Kapburkei- Mlimani Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,251,970.00 Cheptororiet/Seretut Feedback
Construction of AIC Chemorir - Kitoben pry - Koitabmat - Chebilat cattle dip Road 6.5km; Chebitet - Somo Coffee factory - Barsayain Lower - Kipseng rivers and its environs 2.9km; AIC church - Tolilit - Koisirat 1.4km; Kamelilo pry sch - Tolilit - Rongai Road 2.6km; Chepkoiyo quarrr - Bechunlelach 1km; Budalangi - Bechunlelach 1.3km To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,182,120.00 Ainamoi Feedback
Proposed Construction and Rehabilitation of Kaprongori - Kaprote - Reresik Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,173,839.00 Kisiara Feedback
Dicece Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 1,025,370.40 Kapkugerwet Feedback
Recruitment of ECDE teachers Ensure learners are taught by qualified, skilled, and passionate educators Education, Youth Affairs, Sports, Culture and Social Services Completed 3,298,327.00 Kaplelartet Feedback
Kaborok Dispensary To improve maternal health services and provide safe delivery environment. Health Services Completed 1,990,189.00 Waldai Feedback
Barotion Water Project To provide communities with improved access to clean and safe water through the extension of the water distribution network. Water, Environment, Energy and Natural Resources Completed 1,559,712.80 Londiani Feedback
Construction of Kelunet-Kapkimoro Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 500,010.45 Tebesonik Feedback
Routine Maintenance of Kap Zakayo-Simotwet Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,805,412.00 Chepseon Feedback
Routine Maintenance of Cheswerta AGC- Chepkutbei Bridge Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,149,890.00 Cheptororiet/Seretut Feedback
Construction of Kaprongori- -Kaproret Road; Tulwet-Ngianet Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 4,925,328.00 Kisiara Feedback
Proposed Construction and Rehabilitation of Kap 57- Kipkeles Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,237,455.00 Tebesonik Feedback
Queentete Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 935,748.80 Kapkugerwet Feedback
Training of ECDE teachers. on the New Basic Education Curriculum To ensure every ECDE center has skilled personnel capable of implementing the new curriculum. Education, Youth Affairs, Sports, Culture and Social Services Completed 1,571,905.00 Kaplelartet Feedback
Sosiot Health Centre To ensure continuous and adequate water supply to the facility. Health Services Completed 4,188,702.00 Waldai Feedback
Kamwingi II Water Project To ensure reliable water extraction and supply through the Supply and Installation of a Borehole Pump. Water, Environment, Energy and Natural Resources Completed 2,621,429.48 Tendeno/Sorget Feedback
Construction of Taiywet- Kakiboch- Kapchanga ROad To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,398,762.88 Sigowet Feedback
Routine Maintenance of Off B1 -ngatumek pry, and Kapchumo Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,152,100.00 Kedowa/Kimugul Feedback
Routine Maintenance of Kipsolu pry- Soweto TBC- Michingilwet- Cherigat Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,551,740.00 Cheptororiet/Seretut Feedback
Routine Maintenance of Darajet-Barekeiwet dinspensary-Arap Maina-Mungenik road Potholes patched, ,surface grading completed. Public Works, Roads and Transport Completed 6,423,960.00 Soliat Feedback
Proposed Construction and Rehabilitation of Kipkesombe River - Kimugul centre - Ochi - Sakasatiet Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,151,490.00 Kapkatet Feedback
Township Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 995,686.00 Kapkugerwet Feedback
Bursary for needy Learners Ensure that children from low-income or vulnerable backgrounds can attend and stay in school. Alleviate financial burdens that cause learners to drop out due to inability to pay fees or buy learning materials. Education, Youth Affairs, Sports, Culture and Social Services Completed 1,587,630.00 Kaplelartet Feedback
Sosiot Health Centre To modernize and improve functionality of key service areas. Health Services Completed 2,548,520.00 Waldai Feedback
Benditai Water Project. To increase water collection, storage capacity, and distribution efficiency through the Expansion of Intake Works, Construction of a 100m Masonry Storage Tank, and Extension of the Distribution Pipeline. Water, Environment, Energy and Natural Resources Completed 2,613,029.92 Tendeno/Sorget Feedback
Construction of Kap Solomon- Chemegong Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,663,174.40 Sigowet Feedback
Routine Maintenance of Off Kedowa Pry. - Testai - Kabisoi Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,924,548.00 Kedowa/Kimugul Feedback
Routine Maintenance of Kosachmwai- Chemoset Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 4,098,550.00 Cheptororiet/Seretut Feedback
Routine Maintenance of Off D312-938 Girls Road Potholes patched, ,surface grading completed. Public Works, Roads and Transport Completed 1,288,392.00 Chepseon Feedback
Proposed Construction and Rehabilitation of Sosit dispensary - Kolongei Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,177,040.00 Kapkatet Feedback
Kipsotet Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 1,664,072.20 Kipchimchim Feedback
Capital Grants Transfer Ensure that children from low-income or vulnerable backgrounds can attend and stay in school. Alleviate financial burdens that cause learners to drop out due to inability to pay fees or buy learning materials. Education, Youth Affairs, Sports, Culture and Social Services Completed 692,653.00 Kaplelartet Feedback
Kaptoboiti Dispensary To ensure the completion and operational readiness of Kaptoboiti Dispensary for improved access to healthcare. Health Services Completed 2,049,285.00 Waldai Feedback
Kivuno Borehole Water Project To procure and deliver high-quality drilling materials that meet the technical and operational requirements of the project. Water, Environment, Energy and Natural Resources Completed 2,114,104.64 Tendeno/Sorget Feedback
Construction of Kiptugumo- Kamasega Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,604,192.00 Soliat Feedback
Routine Maintenance of Cherote-Lelsotet Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,835,556.00 Kedowa/Kimugul Feedback
Routine Maintenance of Cheptenye Sign post- Off Sosiot- Keben Pry Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 7,801,748.00 Waldai Feedback
Excavation of Kalmelilo coffee farm-reresik Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,051,453.00 Ainamoi Feedback
Proposed Construction and Maintenance of Kamanamsin Centre - Cheptigit River - Cheptigit Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,120,200.00 Litein Feedback
Ngenybare Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 976,262.00 Kipchimchim Feedback
Supply of ECDE Branded Chairs Enhance Learning Environment. Improve Classroom Organization and Efficiency: Education, Youth Affairs, Sports, Culture and Social Services Completed 2,262,045.00 Kaplelartet Feedback
Kaptoboiti Dispensary To promote hygiene and proper waste management at Kaplelach Dispensary. Health Services Completed 2,806,985.00 Waldai Feedback
Jagoror Water Project To secure and optimize water collection, storage, and distribution through the Spring Protection, Construction of a Distribution Pipeline, and Installation of a Masonry Water Tank. Water, Environment, Energy and Natural Resources Completed 1,618,340.32 Tendeno/Sorget Feedback
Construction of Soliat Boys Junction- Kabokyek Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 6,357,659.95 Soliat Feedback
Routine Maintenance of Off B1-Kapchumo Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,639,906.00 Kedowa/Kimugul Feedback
Routine Maintenance of Mark Peter- Off Kabianga- Chemumbe- Kaborok Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 11,192,013.00 Waldai Feedback
Construction of Koitabmat-Bondeni-Kiburet rd To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,144,000.00 Ainamoi Feedback
Proposed Construction and Rehabilitation of Kapsoit Police Station- Kiboito Pry Sch.- Arap Koima - Kiptulwa Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,140,430.00 Kapsuser Feedback
Kimeswon Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 1,242,384.36 Kipchimchim Feedback
Supply and Delivery of Learning Materials Ensure learning activities and content are tailored to the developmental stages of 3–6-year-old children. Create consistency in teaching and learning across different schools and regions Education, Youth Affairs, Sports, Culture and Social Services Completed 667,440.00 Kaplelartet Feedback
Keben Dispensary To enhance service delivery and improve water harvesting and storage capacity. Health Services Completed 4,860,209.00 Waldai Feedback
Kiploikyi water project- solar to enhance water supply reliability and accessibility through the completion of the intake weir, Pipeline Extension, Water, Environment, Energy and Natural Resources Completed 2,069,115.20 Tendeno/Sorget Feedback
Nyitnyitwet -Kapkwen- Koita Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,499,999.90 Ainamoi Feedback
Routine Maintenance of Arap Chepyoset-Job-Southrift Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,573,967.00 Londiani Feedback
Routine Maintenance of Off Cheribo- Ngariet Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 350,000.00 Waldai Feedback
Construction Of Chepsetyion Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,451,995.00 Kapkugerwet Feedback
Proposed Construction and Rehabilitation of Seretut Centre- Chemurwon TBC- Chelule Shop Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,173,450.00 Cheptororiet/Seretut Feedback
Kipchebor Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 541,743.00 Kipchebor Feedback
Supply and delivery of Persons Living With Disability Assistive Devices Provide assistive devices (e.g., wheelchairs, crutches, hearing aids, white canes) to help PWDs move freely and live independently Education, Youth Affairs, Sports, Culture and Social Services Completed 677,750.00 Kaplelartet Feedback
Cheronget dispensary and Kibuastuiyo To improve maternal healthcare services and upgrade staff welfare facilities. Health Services Completed 1,535,410.00 Waldai Feedback
Fort Tenan Health Centre Water Project To enhance water storage, purification, and distribution through the Construction of 3 No. 25 m Ground Level Masonry Tanks, a Composite Filtration Unit, and a Gravity Pipeline. Water, Environment, Energy and Natural Resources Completed 2,898,190.40 Chilchila Feedback
Kaptongilo -Merto Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,795,071.00 Ainamoi Feedback
A Routine Maintenance of Arap Kogo-Lolongbei Road and Jagoror Quarry Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,338,591.00 Londiani Feedback
Routine Maintenance of Off D314- Mutanya Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 6,794,100.00 Chepseon Feedback
Construction Of Karap Kitur-Sumeiyon-Victor Academy-Orison Annex Road 4.8Km,Arap Kitur-Ainapbelek-Chelogoi Road 0.6Km To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,755,115.00 Kapkugerwet Feedback
Proposed Construction and Rehabilitation of Milit Nganiet- Chepnangai - Changware Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,225,853.00 Kabianga Feedback
Kimultiony ecde centre Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 1,529,320.06 Kapsaos Feedback
Construction of a Cultural Hall Phase I Preserve and Promote Local Culture. Support Arts, Music, and Traditional Practices Education, Youth Affairs, Sports, Culture and Social Services Completed 1,479,410.00 Kaplelartet Feedback
Kiplalmat and Keben Dispensary To enhance security and hygiene at health facilities. Health Services Completed 2,851,889.00 Waldai Feedback
Ndubusat Water Project To restore and expand water supply infrastructure through the Rehabilitation of the Gravity Main, Construction of a 50 m (50,000 liters) Storage Tank at Nyairobi, and Extension of the Distribution Line. Water, Environment, Energy and Natural Resources Completed 2,800,472.00 Chilchila Feedback
Laliat- Barsayan- Koitamat- Primary Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,834,636.00 Ainamoi Feedback
Routine Maintenance of United Soy-Kiplangat Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,033,584.00 Londiani Feedback
Routine Maintenance of 938 - Central Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,420,780.00 Chepseon Feedback
Construction Bondeni- Kerego Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,144,017.00 Kapkugerwet Feedback
Proposed Construction of Kaplutitet Pry Sch- Terer Academy Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,120,000.00 Kabianga Feedback
Kipkaganit Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 970,000.00 Ainamoi Feedback
Renovation of IK Dodi Office Create a safer, more comfortable, and functional office space for staff. Education, Youth Affairs, Sports, Culture and Social Services Completed 1,110,750.00 Kaplelartet Feedback
Kiplalmat Dispensary To improve sanitation and water supply at the facility. Health Services Completed 2,103,010.00 Waldai Feedback
Teldet Water Project To restore and enhance water transmission, storage, and distribution through the Rehabilitation of the Gravity Main, Construction of a 50 m Storage Tank, and Extension of the Distribution Line. Water, Environment, Energy and Natural Resources Completed 1,102,324.70 Chilchila Feedback
Annex Prison -Sumeiyon Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 6,081,960.00 Kapkugerwet Feedback
Routine Maintenance of Cheres-Orwasa Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,930,816.00 Londiani Feedback
Routine Maintenance of Kipyobob Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 4,214,000.00 Chepseon Feedback
Construction Of Arap Chepkoshom- Laibon Bridge- St. Joseph Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,791,139.00 Kapkugerwet Feedback
Proposed Construction and Rehabilitation of Kamondoi - Chemumbe Pri - Cherargei Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,120,200.00 Waldai Feedback
Tabaita Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 1,149,794.64 Ainamoi Feedback
Interior Design of the new office block for the Governor To design office interiors that promote productivity, smooth workflow, and ease of navigation for both staff and visitors. Lands, Housing and Physical Planning Completed 911,916.60 Kipchebor Feedback
Cheribo Dispensary To provide accessible primary healthcare services to the local community. Health Services Completed 2,047,168.00 Cheboin Feedback
Cherara-Kaplelit-Kapkese water project To Construct Gravity Main and enhance water transmission, Water, Environment, Energy and Natural Resources Completed 1,698,000.69 Chilchila Feedback
Mangweni- Kipsirichet- Chemugusu Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,962,013.00 Kapkugerwet Feedback
Routine Maintenance of OffD314 - Benjamin Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed N/A Tendeno/Sorget Feedback
Routine Maintenance of Chesinende Catholic- Koibarak Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,596,712.00 Chepseon Feedback
Chepsetyon Assorted Roads To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,929,080.00 Kapkugerwet Feedback
Proposed Construction and Rehabilitation of Off Sosiot - Ngariet Tbc - Ngariet Pri Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,150,128.00 Waldai Feedback
Baraka kipsigory Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 2,025,290.00 Kapsaos Feedback
Preparation of Land Use Development plans for Majengo Talai To guide orderly physical development through rational allocation of land for various uses Lands, Housing and Physical Planning Completed 1,501,394.00 Kapkugerwet Feedback
Malinja Dispensary To finalize facility works for operationalization. Health Services Completed 2,499,850.00 Cheboin Feedback
Kipsinende Water Project to enhance water storage capacity and supply reliability through the Construction of a 100 M3 (100,000 liters) Ground Level Masonry Water Tank. Water, Environment, Energy and Natural Resources Completed 972,010.40 Chilchila Feedback
Off E222-Chelogoi-Sumeyon Chepchwir Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,501,900.00 Kapkugerwet Feedback
Routine Maintenance of Off E254-Kamuingi-Kichagi-Gwitu Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,540,493.00 Tendeno/Sorget Feedback
Routine Maintenance of D314- 938 Girls Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed N/A Chepseon Feedback
Construction of Kisabei-Kenegut-Lemeiywet Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,790,690.00 Kapsoit Feedback
Proposed Construction and Rehabilitation of 938 Police Station- Crisco Church Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,169,698.00 Chepseon Feedback
Koisagat Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 1,375,551.20 Kapsoit Feedback
Preparation of Land Use Development plans for Swahili Village To guide orderly physical development through rational allocation of land for various uses Lands, Housing and Physical Planning Completed 995,582.00 Kipchebor Feedback
Cheribo Dispensary To improve sanitation facilities for patients and staff. Health Services Completed 1,199,045.00 Cheboin Feedback
Ndubusat Water Project Phase 2 to enhance water storage capacity and supply reliability through the Construction of a 2no. 50M3 Ground Level Masonry Water Tank. Water, Environment, Energy and Natural Resources Completed 1,307,210.00 Chilchila Feedback
Off E222 - Chepstyon Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,705,722.00 Kapkugerwet Feedback
Routine Maintenance of Cheborge Junction-Center One Forest Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,141,488.00 Tendeno/Sorget Feedback
Routine Maintenance of Off B1- Ewat Kap Maxwel - Catholic- Kiplekwa Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,438,000.00 Kedowa/Kimugul Feedback
Construction Of Karap Tegerei-Gabriel Road ,Tilitrap Malit-Kirongisyet Road,Kap Timothy-Chelule Road,Rugut-Chemoibei Road, Chemoibei Primary-Koitabai Road,Arap Kenei-Kiptetoon-Lemeiywet-Tunga Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,500,004.00 Kapsoit Feedback
Kamelilo- Yasomok Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,802,524.00 Ainamoi Feedback
St Patrick Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 833,041.70 Kapkugerwet Feedback
Acquisition of land To obtain legal ownership or rights to land for the development of public infrastructure, institutions, utilities, or investment purposes. Lands, Housing and Physical Planning Completed 1,900,520.00 Chaik Feedback
Kaborus Dispensary To expand outpatient services and improve patient flow. Health Services Completed 4,942,296.00 Cheboin Feedback
Leldet borehole Water Project To ensure reliable water extraction and supply through the Supply and Installation of a Borehole Pump. Water, Environment, Energy and Natural Resources Completed 1,561,202.00 Kamasian Feedback
Baraka Primary -Kamungen Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,152,450.00 Kapsaos Feedback
Routine Maintenance of Kapilot -Sorget Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,929,766.00 Tendeno/Sorget Feedback
Routine Maintenance of Off C35- Ndiwa Cattle Dip Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 5,194,000.00 Kedowa/Kimugul Feedback
Costruction Of Samutet-Engineer Bett Road 3.5km To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,189,997.00 Kapsoit Feedback
Ainamoi Pry- Chemila- Kapsigilai-Kap Zakayo Junction Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,494,130.00 Ainamoi Feedback
Ainapkoror Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 1,857,461.60 Kapsaos Feedback
Proposed construction of non-motorized transport facilities To provide for parking and paths for safe movement by pedestrians within town Lands, Housing and Physical Planning Completed 3,000,000.00 Kapkugerwet Feedback
Cheribo Dispensary To enhance service delivery at the outpatient department. Health Services Completed 4,711,112.00 Cheboin Feedback
Kipsegi Borehole Water Project To procure and deliver high-quality drilling materials that meet the technical and operational requirements of the project. Water, Environment, Energy and Natural Resources Completed 3,715,070.00 Kamasian Feedback
Highway - Kaboloin Sec- Kaboloin Pri Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,599,770.00 Kapsaos Feedback
Routine Maintenance of Kokwet-Kapsinendet-Cherara To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,413,483.00 Chilchila Feedback
Routine Maintenance of Slaughter House- Towet Bridge- Maridany Forest Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,422,100.00 Tendeno/Sorget Feedback
Construction Of Off C35-Kisabei Pry - Kenegut- Lemeiywet Road 3.5Km, Off C35- Cherire Road 1Km To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,197,834.00 Kapsoit Feedback
Kap Thomas- Tabet Pry- Samoei Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,170,000.00 Kapsaos Feedback
Jordan/chemobei Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 3,923,642.00 Kapsoit Feedback
Beautification of Uhuru gardens and construction of fire station Enhance Aesthetic Appeal, Improve Usability and Comfort Lands, Housing and Physical Planning Completed 4,739,902.68 Kapkugerwet Feedback
Cheboin Dispensary To improve maternal health services and sanitation systems. Health Services Completed 4,934,854.00 Cheboin Feedback
Lelu Water Project To enhance access to clean and sustainable water supply by constructing pipelines ensuring reliable water delivery to the target community Water, Environment, Energy and Natural Resources Completed 560,000.00 Kamasian Feedback
Kipsigori - Sachangwan Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,495,160.00 Kapsaos Feedback
Routine Maintenance of Sachangwan-Kipgeigei-Kapchorwa To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,859,120.00 Chilchila Feedback
Routine Maintenance of Kapkondoo Centre- Silibwet Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 717,950.00 Londiani Feedback
Constrution Of Ogirgir Sign Post-Ogirgir Tbc-Kisabei Road 2.9km,Off E222-Ketitui Pry-Ketitui Sec Sch Road 0.6km Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,694,477.00 Kapsoit Feedback
Chesumot- Kamukek- Kapkiam Seconadry Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,082,020.00 Kapsaos Feedback
Kaitamat Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 1,236,491.56 Ainamoi Feedback
Refurbishment of the Deputy Governors' office Enhance Aesthetic Appeal, Improve Usability and Comfort Lands, Housing and Physical Planning Completed 1,350,054.12 Kipchebor Feedback
Kiptewit Dispensary To enhance sanitation and water access. Health Services Completed 3,075,000.00 Cheboin Feedback
Borowet Water Project To enhance water distribution efficiency and expand access through the Supply, Delivery, Excavation, and Laying of a Distribution Pipeline. Water, Environment, Energy and Natural Resources Completed 2,599,900.00 Kamasian Feedback
Buchenge-Chebigen Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,235,181.00 Kapsaos Feedback
Routine Maintenance of Off-C35-Ngomwo Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,016,622.88 Kamasian Feedback
Routine Maintenance of Kapcheplanga Centre- Martina Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,114,000.00 Londiani Feedback
Construction of Kenegut centre 1.4km-Kamorongo Road 2km, Kapmosit-Tembwab kenegut Road 2km, Karap Marindany-Cheptagum ROad 3km, Kamosit-Karap keino Road 2km To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,798,813.00 Kapsoit Feedback
Kipsamungut- Telanet Pry- Grassland Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,175,024.00 Kapsoit Feedback
Dicece Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 2,890,931.12 Kapkugerwet Feedback
Proposed Construction perimeter wall To provide physical protection for the premises by preventing unauthorized access and reducing theft, vandalism, or encroachment. Lands, Housing and Physical Planning Completed 3,341,340.00 Kipchebor Feedback
Cheborge HC To improve medical waste management at the facility. Health Services Completed 1,831,176.00 Cheboin Feedback
Centa Juu Borehole Water Project To establish a sustainable and secure water supply system through the Supply and Delivery of Drilling Materials, Installation and Solarization of a Submersible Pump, Construction of a 50 m Masonry Tank, Rising Pipeline, Distribution Pipeline, and Fencing of the Borehole and Tank Area. Water, Environment, Energy and Natural Resources Completed 1,001,700.00 Kamasian Feedback
Kenegut Sign Post Pri. Sch. Lemeiwet Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,798,672.00 Kapsoit Feedback
Routine Maintenance of Kapkures-Kamtego Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,648,573.68 Kamasian Feedback
Routine Maintenance of Elite Primary School- Chebangang Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,288,730.00 Londiani Feedback
Construction of Kaboswa- Kiptenden- Cheptagum ROad To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,725,073.00 Kapsoit Feedback
Kenegut Quarry- Lemeiywet- Kenegut Market Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,116,001.00 Kapsoit Feedback
Queentete Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 3,650,169.68 Kapkugerwet Feedback
Proposed construction of storm water drainage facilities (Phase 1 – World Bank Funded) To reduce and manage flooding in the project area by channeling storm water through an effective and well-designed drainage system. Lands, Housing and Physical Planning Completed 3,564,424.32 Kapkugerwet Feedback
Ngoina Road Dispensary To enhance access to health services in the area. Health Services Completed 1,700,033.00 Chemosot Feedback
Kipsegi Borehole Water Project To establish a sustainable and secure water supply system through the Installation of a Solar System, Equipping of Borehole, Construction of a Control House, Rising Main, Elevated Storage Tank, Distribution Pipeline, Communal Water Points, and Fencing of the Solar Structure Area. Water, Environment, Energy and Natural Resources Completed 2,904,400.00 Kamasian Feedback
Kipsamumgut Telanet Pri. Kipkutuny Cheribo Sign Post ACK Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,000,513.00 Kapsoit Feedback
Routine Maintenance of 390-Simotwet-Kipsirichet-Kerembe -KapedWard Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,470,527.36 Kipkelion Feedback
Routine Maintenance of Sachangwan- Kap Tilia Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 7,883,590.00 Londiani Feedback
Construction Of Off B1- FGCK Samutet- Market Road 0.7km, Off B1- JoRoadan Junction Road 1Km, Salgaa-Muguiywet-Oriango Road 1.6Km, Kiget Shop- Sunrise Academy- Sugutek Pry- River Road 2.5Km To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,004,881.00 Kapsoit Feedback
Arap Tegere – Kwa biwot – Korosek Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 883,966.00 Kapsoit Feedback
Township Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 1,613,831.44 Kapkugerwet Feedback
Acquisition of land for expansion of water treatment works Increase Water Treatment Capacity, Secure Adequate Space for Infrastructure Expansion Lands, Housing and Physical Planning Completed 1,641,160.00 Kapkugerwet Feedback
Chemosot Dispensary To improve infrastructure and service environment. Health Services Completed 983,332.00 Chemosot Feedback
Kipkelion Water Supply To enhance access to clean and sustainable water supply by constructing pipelines, , and associated fittings, ensuring reliable water delivery to the target community Water, Environment, Energy and Natural Resources Completed 3,285,585.00 Kipkelion Feedback
Muiywek Tbc -Koisamoi Primary School To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,790,441.00 Kapsoit Feedback
Routine Maintenance of Eng. Fred - Soi Mingin Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,649,630.16 Kipkelion Feedback
Routine Maintenance of Barotion- Sawmill- Lelsotet Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,724,750.00 Londiani Feedback
Construction of Kenegut Centre- Lemeiywet Road 1.5Km; Kenegut AIC-Cherire Road 1Km To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,066,000.00 Kapsoit Feedback
Kenegut Centre- Lemeiywet Pry School - Worlwide Church Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,183,200.00 Kapsoit Feedback
Kimeswon Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 1,198,187.20 Kipchimchim Feedback
Consultancy services for the preparation of Local Physical and Land Use Development plans To come up with plan to guide development and acquisition of ownership documents Lands, Housing and Physical Planning Completed 801,360.00 Kapkugerwet Feedback
Kapriret Dispensary To improve functionality and staff welfare. Health Services Completed 2,983,694.00 Chemosot Feedback
Kipkelion Pipeline Extension To enhance water distribution infrastructure by ensuring the supply and delivery of pipes and fittings for the following water projects:Kapkia Water Project,Jambo Kenya Siret Water Project,Maji Mazuri Water Project,Soil Conservation Line,Cherotuk Line,Kalyet Borehole Water Project Water, Environment, Energy and Natural Resources Completed 4,883,150.00 Kipkelion Feedback
Kapkwen - Keldabeliot Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,808,858.00 Kipchimchim Feedback
Routine Maintenance of Kabias Junction-Kapkoros Pry.-Sugut Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,048,890.22 Kunyak Feedback
Routine Maintenance of Burutu- Kamiwa- Kapkese Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,210,500.00 Chilchila Feedback
Construction of Telanet girls - Kaboswa TBC rd To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,879,200.00 Kapsoit Feedback
Sebetet- Kamatwere - Itibet Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,200,000.00 Kipchimchim Feedback
Kipchebor Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 1,849,426.98 Kipchebor Feedback
Consultancy services for the preparation of Local Physical and Land Use Development plans To guide orderly physical development through rational allocation of land for various uses Lands, Housing and Physical Planning Completed 4,233,372.00 Kapsuser Feedback
Kabitungu Dispensary To improve outpatient facilities and water storage. Health Services Completed 2,105,887.00 Chemosot Feedback
Lelechwet Water Peroject To enhance access to clean and sustainable water supply by constructing pipelines, , and associated fittings, ensuring reliable water delivery to the target community Water, Environment, Energy and Natural Resources Completed 5,513,900.00 Kipkelion Feedback
Boito -Kapcheptoror -Kapnyoyo -Kipsirgong Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,799,972.00 Kipchimchim Feedback
Routine Maintenance of Sireret-Kotetnik-Kabias Junction Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,767,147.28 Kunyak Feedback
Routine Maintenance of Factory Junction- Kamiwa- Kapkese Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 5,642,380.00 Chilchila Feedback
Construction of Ogirgir sign post-Ogirgir tbc-kisabei Road 2.9km,Off E222-Ketitui pry-Ketitui sec sch Road 0.6km Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,174,000.00 Kapsoit Feedback
Boito- Kapcheptoror Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,294,304.00 Kipchimchim Feedback
sositecde toilet Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 1,071,747.20 Kapsoit Feedback
Consultancy services for the preparation of Local Physical and Land Use Development plans To guide orderly physical development through rational allocation of land for various uses Lands, Housing and Physical Planning Completed 2,234,452.00 Cheboin Feedback
Chemosot Health Centre To enhance medical waste management. Health Services Completed 3,991,424.00 Chemosot Feedback
Maji Mazuri Pan Protect and sustain the water source (spring),Expand and improve water distribution to the community,Promote public health and environmental hygiene Water, Environment, Energy and Natural Resources Completed 2,731,400.00 Kipkelion Feedback
Kamatweri -Itibet Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,970,747.00 Kipchimchim Feedback
Kapchebwai-Koiyabei- Sideways Shop- Koitaburot Pry School Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,257,885.22 Soin Feedback
Routine Maintenance of Tunnel- Chumbeek Dispensary Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,783,630.00 Chilchila Feedback
Construction of NCPB- Mjini Road; Cereal BoaRoad- Owour Church- Nyagacho- Mjini Road, Slip Footh path-Church- River Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 4,837,715.00 Kipchebor Feedback
Off B1- Green Square Mall - Kericho Golf Club- Kericho Pry- Mortgage Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,289,591.00 Kipchebor Feedback
Koita ECDE Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 1,969,090.72 Kipchebor Feedback
Consultancy services for the preparation of Local Physical and Land Use Development plans To guide orderly physical development through rational allocation of land for various uses Lands, Housing and Physical Planning Completed 5,455,764.00 Kisiara Feedback
Kaldit Dispensary To improve sanitation and facility security. Health Services Completed 4,933,016.00 Cheplanget Feedback
Ngendalel Borehole Water Project To enhance water extraction and distribution efficiency through the Supply, Delivery, Installation, and Commissioning of a Multi-Stage Centrifugal Borehole Pump and Pipework. Water, Environment, Energy and Natural Resources Completed 4,598,010.00 Kipkelion Feedback
Chepsetyon - AGC Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 4,795,380.00 Kipchimchim Feedback
Ngomwet- Kap Mursoi Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,226,637.72 Soin Feedback
Routine Maintenance of Mutai- Lelei Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,314,020.00 Kamasian Feedback
Construction Of Jua Kali Rd,Mjini Hilands Rd,Kenya Highlands Roads,Kipchebor Pry Access Roads,Kimungen-Kamasian Agc Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,152,100.00 Kipchebor Feedback
Satelite- Matobo Pry School - Barabara Mpya- Taa Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,499,938.00 Kipchebor Feedback
Kiletien Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 3,036,162.20 Kabianga Feedback
Proposed Construction of modern market and installation of high mast flood lights To construct a modern, organized, and accessible market facility that meets current safety, hygiene, and commercial standards. Lands, Housing and Physical Planning Completed 4,397,676.00 Kipchebor Feedback
Kipwastuiyo Dispensary To improve outpatient service delivery. Health Services Completed 2,692,080.00 Cheplanget Feedback
Siret Pipeline to improve water conveyance efficiency and reliability through the design, and construction of a Rising Main for enhanced water supply to storage tanks or distribution points. Water, Environment, Energy and Natural Resources Completed 2,237,290.00 Kipkelion Feedback
Kapketienya Ochi, Kimugen Kwa Orinago – Kamasian Pry Kooma Chief Office Mombasa Ndogo Satelight Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 4,873,433.00 Kipchebor Feedback
Kenya One - Kabokyek Dip Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,200,000.00 Soliat Feedback
Routine Maintenance of Nyairobi- Songonyet Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,627,540.00 Kamasian Feedback
Construction of NCPB Cereals- Nyagacho Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,650,000.00 Kipchebor Feedback
Kwa Reuben- Cherote- Kimugen Dispensay- Kamasian Pry School Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,249,000.00 Kipchebor Feedback
Masaita Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 1,503,401.20 Londiani Feedback
Kaldit Dispensary To improve health service space and usability. Health Services Completed 4,893,605.00 Cheplanget Feedback
Kalyet Water Project To enhance access to clean and sustainable water supply by constructing pipelines, , and associated fittings, ensuring reliable water delivery to the target community Water, Environment, Energy and Natural Resources Completed 3,800,856.00 Kipkelion Feedback
Kenya Power- Ochi Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,439,560.00 Kipchebor Feedback
Soliat Corner - Kaplengeny - Kiptugumo Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,992,503.00 Soliat Feedback
Routine Maintenance of Murau Centre- Bakery Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,101,700.00 Kamasian Feedback
Munai-Kipsot-Toror factory-Kimeswan Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,924,548.00 Kipchimchim Feedback
Chemugusu Junction- Chemugusu Pry-Kondamet- Satelight Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,249,535.00 Kapkugerwet Feedback
Jambo Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 1,098,788.00 Tendeno/Sorget Feedback
Proposed repair and redecoration works at Mama Ngina Estate Phase II Enhance Aesthetic Appeal, Improve Usability and Comfort Lands, Housing and Physical Planning Completed 987,000.00 Kapkugerwet Feedback
Tiritab Moita Dispensary To enhance sanitation services for facility users. Health Services Completed 3,499,200.00 Cheplanget Feedback
Masibun Water Project To establish a sustainable and secure water supply system through the Installation of a Solar System, Equipping of Borehole, Construction of a Control House, Rising Main, Elevated Storage Tank, Distribution Pipeline, Communal Water Points, and Fencing of the Solar Structure Area. Water, Environment, Energy and Natural Resources Completed 3,988,767.30 Kipkelion Feedback
Maili Tatu- Ochi- Kap Ouma- Eagle Schools Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,950,426.00 Kipchebor Feedback
Konasita - Cheboptaa - Kona Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,075,880.00 Sigowet Feedback
Routine Maintenance of Off C35- Segetet- Murau Brige Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,180,000.00 Kipkelion Feedback
Construction Of Kabianga Tea Factory-Chepkutbei TBC 1.5Km, Tuiyobei Bridge-Kapchebet Agcroad 0.6Km,Kondamet AGC-Turkana Road 0.8Km,Arap Siele Mobego Primary 1Km To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 982,608.00 Kabianga Feedback
Londiani farmers Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 1,465,692.48 Londiani Feedback
Proposed roof renovation at the Governor's office block Extend Roof Lifespan Lands, Housing and Physical Planning Completed 987,000.00 Kipchebor Feedback
Kipwastuiyo Dispensary To improve maternal healthcare infrastructure. Health Services Completed 4,245,136.00 Cheplanget Feedback
Simchorwet Water Project To enhance access to clean and sustainable water supply by constructing pipelines, , and associated fittings, ensuring reliable water delivery to the target community Water, Environment, Energy and Natural Resources Completed 7,251,100.00 Kipkelion Feedback
Site And Service Roads To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,988,827.00 Kipchebor Feedback
Kaitui - Kipkecheiyet Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,710,905.16 Soliat Feedback
Routine Maintenance of Kamore- Kap Sephania Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,268,400.00 Kipkelion Feedback
Construction Of Kaptumbo-Kipkeurit Road 1.6Km, Kibingei Girls-Ngainet Road 1.2Km,Kabianga-Market Road 0.6Km,Kaplong-Kamaso Primary School Road 1.4Km To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,455,079.68 Kabianga Feedback
Sumeiyon- Chelogoi Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 540,908.00 Kapkugerwet Feedback
Kabarak Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 3,676,037.48 Londiani Feedback
Proposed refurbishment of County Court Modernize Court Facilities, Enhance Functionality and Efficiency Lands, Housing and Physical Planning Completed 1,308,945.00 Kipchebor Feedback
Kapkatet Hospital To provide sustainable water supply for hospital operations. Health Services Completed 2,861,567.00 Kapkatet Feedback
Chesonoi Water Project to enhance access to safe and reliable water for the target community through the construction, rehabilitation, and installation of critical water supply infrastructure,to improve water conveyance and storage by constructing a gravity main pipeline and a 100mł ground-level masonry storage tank Water, Environment, Energy and Natural Resources Completed 2,277,400.00 Kunyak Feedback
Routine Maintenance of Chakoror-Kamososet Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,625,184.00 Cheboin Feedback
Site Clearance, Desilting of Existing Culverts To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 4,798,658.32 Sigowet Feedback
Routine Maintenance of Kap Onyango-Kapkwen Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,423,800.00 Kunyak Feedback
Nyabangi Centre-Chesebet Road 1.9k ;itembe-stashine AGC-Link Kiptere Road 0.9km,Karap Cheriro-Kap D.O Road 1.3km;Sinonin-Itondo Bridge Road 2.5km To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,839,344.80 Kabianga Feedback
Chelogoi - Chepsetyon Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 540,094.00 Kapkugerwet Feedback
Chepcholiet Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 3,922,478.60 Chepseon Feedback
Proposed repairs and redecoration to County houses at Belgut estate Restore Structural .Integrity Lands, Housing and Physical Planning Completed 3,284,036.69 Kapkugerwet Feedback
Chemoiben Dispensary. To provide staff accommodation and sanitation facilities. Health Services Completed 4,718,991.00 Kapkatet Feedback
Tendwet water Project to enhance access to safe and reliable water for the target community through the construction, rehabilitation, and installation of critical water supply infrastructure,to improve water conveyance and storage by constructing a gravity main pipeline and a 101mł ground-level masonry storage tank Water, Environment, Energy and Natural Resources Completed 4,536,000.00 Kunyak Feedback
Routine Maintenance of Cheborgei Boys-Kimolwet- Kimugul Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 4,300,011.00 Cheboin Feedback
Kapchemirmir TBC-Kimalal Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,680,560.48 Sigowet Feedback
Routine Maintenance of Sachangwan- Mariwa Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,211,800.00 Kunyak Feedback
Kiptule TBC-Kolonget tbc-kaphentry Road 2km, off momul factory-itindo AGC Chemamul SDA ROAD 2.8KM To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 5,208,281.68 Kabianga Feedback
Kalyet- Sachangwan- Kaula Center Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 522,475.00 Kipkelion Feedback
Cheboror Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 2,871,238.20 Chepseon Feedback
Installation of cabro works at the County Government head quarters Enhance Accessibility and Mobility Lands, Housing and Physical Planning Completed 3,209,073.59 Kipchebor Feedback
Roret and Kapkatet Hospital To enhance water supply to hospital facilities. Health Services Completed 3,570,600.00 Kapkatet Feedback
Timbilil Water Project To enhance access to safe and reliable water supply for the community by upgrading the existing water infrastructure, including the replacement of the gravity main, construction of a new distribution pipeline, and installation of water storage facilities, with a specific focus on improving service delivery to key institutions such as the local dispensary Water, Environment, Energy and Natural Resources Completed 1,441,600.00 Kunyak Feedback
Routine Maintenance of Sachangwan -Cheboror Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,575,512.00 Cheboin Feedback
Kapsomboch-Kapkilel Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,242,411.12 Kaplelartet Feedback
Routine Maintenance of Chesino- Kapkormom- Koiyabei Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,420,720.00 Soin Feedback
Construction of Mereonik- Kigorwet- Chief’s Office- Cheboin Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,972,551.04 Kapsuser Feedback
Lesirwo Junction- Lesirwo Round Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 649,300.00 Kipkelion Feedback
Irerma Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 5,600,000.00 Kedowa/Kimugul Feedback
Renovation works at the LHPP head quarters Enhance Working Environment Lands, Housing and Physical Planning Completed 3,196,994.65 Kipchebor Feedback
Kapsaos Dispensary To enhance the functionality and efficiency of healthcare service delivery at Kapsaos Dispensary by renovating the Outpatient Department (OPD) and installing proper shelving in the pharmacy room for improved drug storage and management Health Services Completed 2,842,893.20 Kapsaos Feedback
Timbilil Phase II To strengthen the community's water supply infrastructure through the construction of supportive tank platforms and valve chambers, and the installation of plastic water storage tanks and distribution pipework, ensuring reliable water access for domestic and institutional use Water, Environment, Energy and Natural Resources Completed 3,010,400.00 Kunyak Feedback
Routine Maintenance of Kap Reuben- Chepswerta- Changoi Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,950,960.00 Chemosot Feedback
Tililbei cattle dip-Toror Academy-Kap Aron Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,561,543.28 Kaplelartet Feedback
Routine Maintenance of Kipsitet Cattle Dip- Asenwet-Kap Musar Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,749,000.00 Soin Feedback
Construction of Seretut- Kamathayo- Chepngetuny- Pry- Arap Koech- Arap Mitei- Kap Oriango Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,692,341.47 Cheptororiet/Seretut Feedback
Kipkelion Girls Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 547,955.60 Kipkelion Feedback
Tiriita Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 4,480,000.00 Kedowa/Kimugul Feedback
Preparation of development plans (Sosiot Local Physical and Land Use Development Plan Guide Orderly Land Use and Development, Promote Sustainable Urban and Rural Growth Lands, Housing and Physical Planning Completed 7,535,900.00 Waldai Feedback
Binyiny Dispensary To improve healthcare service delivery and security at Binyiny Dispensary by completing OPD works, fitting pharmacy shelves, constructing sanitation facilities, and fencing the compound. Health Services Completed 1,892,785.92 Kapsaos Feedback
Chepngosos Borehole Water Project To procure and deliver high-quality drilling materials that meet the technical and operational requirements of the project. Water, Environment, Energy and Natural Resources Completed 902,195.00 Kunyak Feedback
Routine Maintenance of Patrick- Simon- Sachangwan- Menet TBC Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 4,980,765.25 Chemosot Feedback
RC431-MI27B Cheptagum Pry Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,051,453.96 Kaplelartet Feedback
Routine Maintenance of Chemaluk- Gladys Canteen- Bokwo Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,352,400.00 Soin Feedback
Construction of Kuresiet-Happy church-kibaraa rd 1.5km,michilingwet TBC-chepngerer-mandela Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 5,202,516.48 Cheptororiet/Seretut Feedback
Murao High- Mutai Lelei Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 545,013.68 Kamasian Feedback
Ngatumek Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 3,360,000.00 Kedowa/Kimugul Feedback
Preparation of development plan (Chelimo Local Physical and Land Use Development Plan) Guide Orderly Land Use and Development, Promote Sustainable Urban and Rural Growth Lands, Housing and Physical Planning Completed 608,000.00 Kapkugerwet Feedback
Maso Dispensary To enhance water availability for clinical use and sanitation through installation of a rainwater harvesting system. Health Services Completed 1,544,366.00 Kapsaos Feedback
Kichawir Water Project To improve access to safe, sustainable, and reliable water supply for the community through the protection and development of a spring source, construction of essential water infrastructure, and installation of adequate storage and distribution systems Water, Environment, Energy and Natural Resources Completed 1,533,200.00 Kunyak Feedback
Routine Maintenance of Ngoino Road TBC-Ngaram Primary-Kapkosum-Chebarema Tbc Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 4,851,173.36 Chemosot Feedback
Construction of Chemorin-Kapkwen Box Culvert To mitigate flooding risks, improve local infrastructure resilience Public Works, Roads and Transport Completed 1,795,228.68 Ainamoi Feedback
Routine Maintenance of Soliat Corner – Kaplengeny – Kiptugumo Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,363,060.00 Soliat Feedback
Construction Of Teldet-Menet Road 2.3Km, Milimani-Machorwa Road 2.1Km, To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 876,889.00 Waldai Feedback
Off E252 - Kipkering- Arap Moso- Kipsinende Institute- Murgut Junction Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 649,500.00 Chilchila Feedback
Tumaini Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 2,240,000.00 Tendeno/Sorget Feedback
Proposed construction of LHPP offices Establish a Functional Office Facility for LHPP Operations, Enhance Service Delivery and Efficiency Lands, Housing and Physical Planning Completed 500,000.00 Kedowa/Kimugul Feedback
Kapsaos Disp To ensure consistent water supply for healthcare operations by installing a rainwater harvesting system. Health Services Completed 1,832,918.24 Kapsaos Feedback
Manyatta Water Project To expand and improve the existing water supply system through the extension of the distribution pipeline and rehabilitation of existing storage infrastructure, ensuring increased water access and reliability for the target population Water, Environment, Energy and Natural Resources Completed 6,013,800.00 Kunyak Feedback
Routine Maintenance of Off C23 Cheluget Road-Museset TBC-Kusumek Market-Chepngeny Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 4,972,398.00 Chemosot Feedback
Construction of Kaptongilo Cheplil-Metro Road Box Culvert To mitigate flooding risks, improve local infrastructure resilience Public Works, Roads and Transport Completed 1,082,913.36 Ainamoi Feedback
Routine Maintenance of R47- Chebaran Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,949,360.00 Soliat Feedback
Construction of Sosiot Centre Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,348,662.40 Waldai Feedback
Korosiot Centre- Tindiret Pry School Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 506,247.20 Chilchila Feedback
Mugumoine Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 2,240,000.00 Tendeno/Sorget Feedback
Manyoror Dispensary To improve sanitation and ensure reliable water supply at Manyoror Dispensary through construction of sanitation and water facilities. Health Services Completed 1,512,176.00 Kapsaos Feedback
Chepkemel primary water project To expand and improve the existing water supply system through the extension of the distribution pipeline and rehabilitation of existing storage infrastructure, ensuring increased water access and reliability for the target population Water, Environment, Energy and Natural Resources Completed 2,713,500.00 Kaplelartet Feedback
Routine Maintenance of Cheplanget Market-Tembwo TBC-Kipkonyanit Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 4,383,000.00 Cheplanget Feedback
Construction of Kiptegan-Kapsaos Market Box Culvert To mitigate flooding risks, improve local infrastructure resilience Public Works, Roads and Transport Completed 1,500,488.61 Kapsaos Feedback
Routine Maintenance of Cheramor Centre- Kipkerer Bridge- Arap Bore Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 735,000.00 Soliat Feedback
Construction of Kipkoskei-Kapkolumbei Road, 0.5km, cheboin tbc-Kaprap joshua r 1.5km,arap koskei-Faith Church-Kapnyangai river-bot elijah corner tatu-Link Highway Road 2.7km To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,193,841.00 Cheboin Feedback
Barit- Kabao Upper / Lower Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed N/A Kedowa/Kimugul Feedback
Kamuogo Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 2,240,000.00 Tendeno/Sorget Feedback
Kapkatet Sub- County Hospital To improve hospital utility systems. Health Services Completed 1,664,072.20 Kapkatet Feedback
Kameme water project To develop and protect a sustainable water source for both human and livestock use by implementing spring/intake development, constructing essential water collection and delivery infrastructure, and promoting environmental conservation through fencing and tree planting Water, Environment, Energy and Natural Resources Completed 3,635,450.00 Kaplelartet Feedback
Routine Maintenance of Mosubeti TBC-Tiritab Moita Sec Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 4,199,616.00 Cheplanget Feedback
Construction of Sebetet-Sirimdo Box Culvert To mitigate flooding risks, improve local infrastructure resilience Public Works, Roads and Transport Completed 3,478,384.87 Kipchimchim Feedback
Routine Maintenance of Tarajet- Baregeiwet Dispeensary- Karap Maina- Mungenik Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 667,800.00 Soliat Feedback
Construction of Kenene Quarry- Kenene TBC Road 0.9km; Cheplanget Market Roads 0.3Km; Twoliot TBC- Kapsogeruk Bridge Road 1Km, Kaldit TBC- Matureti Road 1Km; Cheplanget Market- Kapsiongei Road 1.4Km To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 937,092.08 Cheplanget Feedback
Quarry- Chebewor Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 536,850.00 Kedowa/Kimugul Feedback
Kapkondoo ECDE Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 1,680,000.00 Londiani Feedback
Kapkatet Hospital NBU To improve the functionality and privacy of the NBU unit. Health Services Completed 1,187,104.10 Kapkatet Feedback
Kwa Benjamin water project To develop and protect a sustainable water source for both human and livestock use by implementing spring/intake development, constructing essential water collection and delivery infrastructure, and promoting environmental conservation through fencing and tree planting Water, Environment, Energy and Natural Resources Completed 4,309,500.00 Kaplelartet Feedback
Routine Maintenance of Kolongei – Kimugul Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 4,959,991.00 Kapkatet Feedback
Construction of Torsogek Box Culvert To mitigate flooding risks, improve local infrastructure resilience Public Works, Roads and Transport Completed 1,749,578.06 Kapsoit Feedback
Routine Maintenance of Salgaa- Kongeren River- Kap Laiba Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,360,800.00 Soliat Feedback
Construction of Arap Kesoro-Tamboiyot Box Culvert Road 0.6Km,; Kap Petero-Kap Simbirir Dip Road 0.6Km, Kapsimbirir-Kap Mosonik Shop Road 1.1Km, Arokyet Tinga- Kap Cape Town Road 1.1Km To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,448,076.80 Cheplanget Feedback
Batat- Cheplobot- Cheboror Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 474,856.12 Chepseon Feedback
Chepkongony ECDE Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 2,240,000.00 Kedowa/Kimugul Feedback
kapkatet sub-county Hospital To enhance oxygen supply for critical units. Health Services Completed 1,150,213.31 Kapkatet Feedback
Tabaita water project To develop and protect a sustainable water source for both human and livestock use by implementing spring/intake development, constructing essential water collection and delivery infrastructure, and promoting environmental conservation through fencing and tree planting Water, Environment, Energy and Natural Resources Completed 4,199,852.00 Kaplelartet Feedback
Routine Maintenance of Sosit – Kaptirbet Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,813,614.00 Kapkatet Feedback
Construction Of Jordan Box Culvert To mitigate flooding risks, improve local infrastructure resilience Public Works, Roads and Transport Completed 1,551,079.44 Kapsoit Feedback
Routine Maintenance of Kakibei- Kapchemirmir- Mutata- Chepkochun Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 6,216,900.00 Sigowet Feedback
Construction of Mombwo Pry- Sugutek TBC Road 0.8Km; Arap Kesembe- Caterpillar Road 2km; Bosuben Junction- Tanguret Road 1.3Km; Kipteran-Kapsinendet Church of Chridst Road 1.3Km To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,670,678.40 Cheplanget Feedback
Kap Nondin- South Africa Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 536,732.00 Chepseon Feedback
Tulwap Kiplekwa ECDE Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 2,912,000.00 Kedowa/Kimugul Feedback
kapkatet sub-county Hospital To improve safety and aesthetics. Health Services Completed 1,074,606.60 Kapkatet Feedback
Upper Kautet Spring Protection To develop and protect a sustainable water source for both human and livestock use by implementing spring/intake development, constructing essential water collection and delivery infrastructure, and promoting environmental conservation through fencing and tree planting Water, Environment, Energy and Natural Resources Completed 2,276,680.00 Kaplelartet Feedback
Routine Maintenance of Tengecha Kapkatet Hospital – Daraja Sita Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,741,741.00 Kapkatet Feedback
Construction of Kapsogut Box Culvert To mitigate flooding risks, improve local infrastructure resilience Public Works, Roads and Transport Completed 1,266,466.50 Cheboin Feedback
Routine Maintenance of Sisionik- Tumoyot Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 4,600,412.00 Sigowet Feedback
Construction of Off Chesingoro TBC-Kapsumet TBC-Chililis-Morit bridge Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,287,129.12 Chemosot Feedback
Keringet Dispensary- Forest Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 540,093.68 Londiani Feedback
Ngatumek ECDE Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 1,680,000.00 Kedowa/Kimugul Feedback
Kapkatet Hospital To increase hospital water storage capacity. Health Services Completed 1,584,928.90 Kapkatet Feedback
Sigowet Water Project To enhance the reliability, safety, and sustainability of the community water supply system by upgrading key infrastructure components, protecting the water source, and ensuring efficient water distribution to end-users Water, Environment, Energy and Natural Resources Completed 3,498,000.00 Kaplelartet Feedback
Routine Maintenance of Kaproret –Charera Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,908,120.00 Kisiara Feedback
Construction of Chemosot-Ainaptibik box culvert To mitigate flooding risks, improve local infrastructure resilience Public Works, Roads and Transport Completed 1,360,872.00 Chemosot Feedback
Routine Maintenance of ML 10- Chebetet- Kalyongwet TBC Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,503,850.00 Kaplelartet Feedback
Construction Of Kaprongori-Kaprote Roads2.3Km,Tulwet-Ngainet Road 1.7Km To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,975,268.96 Kisiara Feedback
Miti Tatu- Kolongei Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 511,840.00 Tendeno/Sorget Feedback
Sailo ECDE Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 1,120,000.00 Chepseon Feedback
Sosit Dispensary. To expand outpatient services. Health Services Completed 1,242,384.36 Kapkatet Feedback
Chepoptaa water project To develop and protect a sustainable water source for both human and livestock use by implementing spring/intake development, constructing essential water collection and delivery infrastructure, and promoting environmental conservation through fencing and tree planting Water, Environment, Energy and Natural Resources Completed 6,191,460.00 Kaplelartet Feedback
Routine Maintenance of Kapsimit-Changkelek-Kondamet –Keregut Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 4,972,266.00 Kisiara Feedback
Construction of Chesingoro-Lalagin (Chepkochun) Box Culvert To mitigate flooding risks, improve local infrastructure resilience Public Works, Roads and Transport Completed 1,569,599.00 Chemosot Feedback
Routine Maintenance of Mutwot - Emdit Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,190,012.00 Kaplelartet Feedback
Construction of Chemeteget- Molyolok-Kimulwo Deliverance- Off C23 Roads; OFC Church- Shallai- Chelilis Primary School Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,897,196.32 Chemosot Feedback
Kimoson Dispensary- Sumeek Pry- Sumeek TBC Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 535,750.00 Kaplelartet Feedback
Chepchabai ECDE Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 2,240,000.00 Chepseon Feedback
Roret Hospital power supply To enhance electrical reliability. Health Services Completed 1,482,484.64 Kisiara Feedback
Kamaget water project To develop and protect a sustainable water source for both human and livestock use by implementing spring/intake development, constructing essential water collection and delivery infrastructure, and promoting environmental conservation through fencing and tree planting Water, Environment, Energy and Natural Resources Completed 3,964,450.00 Kaplelartet Feedback
Routine Maintenance of Sachangwan - Kapemit Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,335,569.00 Kisiara Feedback
Construction of Tamboyot box Culvert To mitigate flooding risks, improve local infrastructure resilience Public Works, Roads and Transport Completed 1,541,517.00 Cheplanget Feedback
Routine Maintenance of Kaplelartet Chief’s Office- Tabaita Centre Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,166,000.00 Kaplelartet Feedback
Construction Of Kaprongori-Kaprote Roads2.3Km,Tulwet-Ngainet Road 1.7Km To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,730,644.64 Kisiara Feedback
Kaplelartet SDA Church- Emdit Pry School Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 25,725.00 Kaplelartet Feedback
Jambo ECDE Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 896,000.00 Tendeno/Sorget Feedback
Mosore Dispensary To operationalize the facility. Health Services Completed 1,523,834.00 Kisiara Feedback
Ketigoi Water project To improve access to clean and reliable water for the target population by extending the water distribution network and rehabilitating existing water storage infrastructure Water, Environment, Energy and Natural Resources Completed 5,169,820.00 Kaplelartet Feedback
Routine Maintenance of AIC Chepwagan-Kipkuna Chepwagan Tbc Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,354,323.00 Litein Feedback
Construction of Koitabai-Mabwaita Pipe Culverts To mitigate flooding risks, improve local infrastructure resilience Public Works, Roads and Transport Completed 1,364,160.48 Kapkatet Feedback
Construction of Kerego Box Culvert at Kwa Silvan- Kids home - Kerego To improve road safety and accessibility Public Works, Roads and Transport Completed 2,082,900.00 Kapkugerwet Feedback
Construction of Keregut-Taach Centre Road 1km,Tinga-Tulwap Kipsigis Road 0.3km,Misoi-Chebirribei-Aroron Road 0,85km,Mongoita-Chemamanik Road 0.4km,Sunset Junction-Chepkoiyo Road 1km, Kelelwa-Chepkoiyo Road 0.7km,Kasebet-Chepkembe Road 1km To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,496,709.00 Kisiara Feedback
Seronik TBC-Seronik Pry- Chepkitwal TBC- Musaria Pry School Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 536,850.00 Kaplelartet Feedback
Construction of a Classroom at Leberer ECDE Centre Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 2,240,000.00 Chepseon Feedback
Tulwet Dispensary To improve diagnostic capacity. Health Services Completed 1,746,226.88 Kisiara Feedback
Sasuriet Water Project To enhance access to clean and sustainable water supply by constructing spring protection pipelines, water tanks & associated fittings ensuring reliable water delivery to the target community Water, Environment, Energy and Natural Resources Completed 6,549,900.00 Ainamoi Feedback
Routine Maintenance of Ketisyek -Church of Christ Kibaliach Bridge Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 4,816,144.00 Litein Feedback
Construction of Kipkosil River Pipe Culvert To mitigate flooding risks, improve local infrastructure resilience Public Works, Roads and Transport Completed 1,755,115.38 Kapkatet Feedback
Construction of Ainapkosobin 3X900mm cross culvert To improve road safety and accessibility Public Works, Roads and Transport Completed 1,441,600.00 Kapkugerwet Feedback
Shiners-Temuge r 0.4km, Kaptirbet-koros-ngesumin Road 2.5km, Kapkatet mortuary-Cementry Road 0.4km, Kapkatet Factory-Nganaset Road 0.6km, cherandas-sewerer Road 0.3km, kapkatet-AIC Holy Harvest church Road 0.5km,Kap mp-cherus tbc Road 0.6km, Off main Road-arap chepkwony Road 0.6km,off main Road-dcs residence Road 0.2, off main road kiko Road 0.2km matunda Road 0.2km, 954east-kipkosil pry sch Road 0.5km,mabwaita Aic -Catholic church Road 1km To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,495,316.64 Kapkatet Feedback
Kipsitet Primary- Karap Tele- Muhuroni Junction Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 463,478.00 Soin Feedback
Construction of an Administration Block and Library at 938 VTC Strengthen Institutional Management and Operations Education, Youth Affairs, Sports, Culture and Social Services Completed 2,912,000.00 Chepseon Feedback
Mabasi Dispensary To operationalize the facility. Health Services Completed 1,485,672.32 Kisiara Feedback
KMTC Sigowet Extension Line To facilitate the installation of new water pipelines through systematic excavation, laying of pipes, jointing, and backfilling, ensuring proper alignment, depth, and protection of the water supply infrastructure Water, Environment, Energy and Natural Resources Completed 2,272,993.00 Kaplelartet Feedback
Routine Maintenance of Kiptenden -AIC Maronget Kiptenden Pry Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 4,221,240.00 Litein Feedback
Construction of Arap Komuilong Ketengeret Box Culvert To mitigate flooding risks, improve local infrastructure resilience Public Works, Roads and Transport Completed 2,059,237.00 Litein Feedback
Construction of Twin 900mm cross culvert at Wema - Chemugusu Road To improve road safety and accessibility Public Works, Roads and Transport Completed 2,179,800.00 Kapkugerwet Feedback
Koiwa-Pefa church Road, chebagal tbc,ainapset river agc Road, Tendwet-Kaphilimon Road;Pefa Church-Cheptigit -Arap Maina Road, Kapkaren-Soet Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 5,845,379.00 Litein Feedback
Kamusar- Kipkombich- Kaptalamwa Pry School Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 558,728.90 Soin Feedback
Construction of pit latrine at Chesinende ECDE Centre Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 672,000.00 Chepseon Feedback
Kaproret Dispensary. To operationalize the dispensary. Health Services Completed 1,268,049.36 Kisiara Feedback
Lebekwet Water project To develop and protect a sustainable water source for both human and livestock use by implementing spring/intake development, constructing essential water collection and delivery infrastructure, and promoting environmental conservation through fencing and tree planting Water, Environment, Energy and Natural Resources Completed 2,715,720.00 Kaplelartet Feedback
Routine Maintenance of Moroncho Chebagal Junction Moroncho Tbc Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 19,780,000.00 Litein Feedback
Construction of Rift Valley Culverts To enhance transportation infrastructure and improve drainage systems Public Works, Roads and Transport Completed 1,614,225.18 Litein Feedback
Construction of Torsogek Box Culvert To improve road safety and accessibility Public Works, Roads and Transport Completed 3,794,800.00 Kapsoit Feedback
Construction Of Kamiwa- Kamotos 4.1Km, To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 4,285,617.68 Chilchila Feedback
Cheptuiyet ML 018-Kap John- Nduma Junction- Lelagoi Pry- Lelagoi Junction Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 580,000.00 Sigowet Feedback
Construction of pit latrine at Kapchemusian ECDE Centre Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 1,120,000.00 Chepseon Feedback
Roret hospital To improve staff and patient catering services. Health Services Completed 1,241,680.24 Kisiara Feedback
Kipsitet borehole water project To enhance sustainable access to safe and reliable water for domestic use through the development and equipping of borehole-based water infrastructure and distribution systems Water, Environment, Energy and Natural Resources Completed 1,574,046.00 Soin Feedback
Routine Maintenance of Tombitret Bridge- Cheboror Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,336,800.00 Tebesonik Feedback
Construction of Tuiyobei- Nigeria Box Culvert To mitigate flooding risks, improve local infrastructure resilience Public Works, Roads and Transport Completed 1,200,291.10 Tebesonik Feedback
Construction of Jordan Box Culvert To improve road safety and accessibility Public Works, Roads and Transport Completed 1,816,604.00 Kapsoit Feedback
Construction Of Kapwanja- Chebisom Road 2.5Km To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,026,752.00 Chilchila Feedback
Kuche-Rwandit Dip- Kapkeburu Pry School Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 797,100.00 Sigowet Feedback
Construction of pit latrine at Kaptaragon ECDE Centre Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 448,000.00 Chepseon Feedback
Roret sub-county hospital To expand surgical service capacity. Health Services Completed 1,225,699.62 Kisiara Feedback
Lelaitich IDP Camp Water Project To procure and deliver high-quality drilling materials that meet the technical and operational requirements of the project. Water, Environment, Energy and Natural Resources Completed 1,930,399.00 Soin Feedback
Routine Maintenance of Kiptome dispensary -itondo pry -off chebirirbei To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,299,250.00 Kabianga Feedback
Construction of Kapchebet Pipe Culvert To improve road safety and accessibility Public Works, Roads and Transport Completed 1,338,758.00 Kabianga Feedback
Construction of Mjini Box Culvert To improve road safety and accessibility Public Works, Roads and Transport Completed 2,609,944.00 Kipchebor Feedback
Construction Of Baseline Songonyet Kimandui Road , Rarinwet Sereng Road, Chegen Road Laboso Pry Siwot Factory Siwit Dispensary Road , Maarifa Pry Siwot Catle Dip Road, Museum Koiserem Pry Road, Leketetiot Road, Kapkures Road Laboso Academ Siwat Factory Siwot Dispesary Siwot Seconday Siwot Farm Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,853,706.72 Chilchila Feedback
ML 018- Kululut River- Coffee Factory- Cattle Dip Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 598,995.00 Sigowet Feedback
Construction of pit latrine at Lamaiyat ECDE Centre Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 2,240,000.00 Chepseon Feedback
Kaproret Dispensary To improve outpatient service delivery by completing the OPD, enhancing drainage, and expanding the pharmacy room Health Services Completed 1,087,616.00 Kisiara Feedback
Kipsitet Dip water project To improve access to reliable and sustainable water supply for livestock by developing and rehabilitating key water infrastructure, thereby enhancing animal health, agricultural productivity, and livelihoods of the local community Water, Environment, Energy and Natural Resources Completed 5,263,732.00 Soin Feedback
Routine Maintenance of Conner C -Kabianga Bridge Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,299,298.00 Kabianga Feedback
Construction of Matarmat Pipe Culvert To improve road safety and accessibility Public Works, Roads and Transport Completed 1,038,108.44 Kabianga Feedback
Construction of Gokul- Kamelilo Box Culvert To improve road safety and accessibility Public Works, Roads and Transport Completed 4,264,692.00 Ainamoi Feedback
Construction Of Kokwet Secondary School-Kapnguron-Kipsumei Road 2Km,Burutu Dip-Mugut Factory Road 1.6Km,Yala-Magire Secondary School-Teldet Road 2.8Km, To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 4,479,771.52 Chilchila Feedback
Kongeren SDA- Kimugul SDA- Kimugul Junction Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 491,364.00 Soliat Feedback
Construction of a pit latrine at Kimasian ECDE Centre Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed N/A Kedowa/Kimugul Feedback
Mosore Dispensary To enhance sanitation and waste management infrastructure for improved public health standards. Health Services Completed 2,859,120.00 Kisiara Feedback
Koitaburot Borehole water project To improve access to safe water for both domestic and livestock use through the development of essential water storage and distribution infrastructure Water, Environment, Energy and Natural Resources Completed 4,252,782.00 Soin Feedback
Routine Maintenance of Mp/CS Road-Kabianga Tea Factory Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,157,183.00 Kabianga Feedback
Construction of Nyabangi Road Culverts To enhance road connectivity and improve drainage infrastructure Public Works, Roads and Transport Completed 3,144,017.14 Kabianga Feedback
Installation of 10 lines of 600mm along Arap Cheruiyot- Maberiat AGC Church Road, Budalangi-Totlilet- Mureret Road To improve road safety and accessibility Public Works, Roads and Transport Completed 1,015,000.00 Ainamoi Feedback
Construction of Tendwet-Malinja-Magire dispesary Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,946,746.88 Chilchila Feedback
Motero- Mongojet Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 558,041.20 Soliat Feedback
Construction of 2 Classrooms at Londiani Vocational Training Centre Education, Youth Affairs, Sports, Culture and Social Services Completed 672,000.00 Londiani Feedback
Mabasi Dispensary To improve sanitation and hygiene for patients and staff. Health Services Completed 2,016,623.00 Kisiara Feedback
Kebimbir water Project To expand and improve the existing water supply system through the extension of the distribution pipeline and rehabilitation of existing storage infrastructure, ensuring increased water access and reliability for the target population Water, Environment, Energy and Natural Resources Completed 6,162,600.00 Soin Feedback
Routine Maintenance of Borborwet Tbc-Kapjokega-Kiboe Junction-Sachoran AGC Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,230,000.00 Kapsuser Feedback
Construction of Mereonik-Kapnandet mini bridge To improve Drainage Infrastructure Public Works, Roads and Transport Completed 1,238,554.82 Kapsuser Feedback
Construction of Koigaron Twin 900mm cross culvert To improve road safety and accessibility Public Works, Roads and Transport Completed 1,251,860.00 Kapsaos Feedback
Gravelling of Tendwet-Malinja-Magire dispesary rd To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,190,255.20 Chilchila Feedback
Chepkulgong Pry School - Barchilei - Chepkoiyet - Siriat Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 800,750.00 Cheboin Feedback
Construction of ECDE classroom at Kapkwen ECDE Centre Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 3,136,000.00 Londiani Feedback
Litein Dispensary To rehabilitate and upgrade existing health infrastructure for better service delivery Health Services Completed N/A Litein Feedback
Laitigo School water Project To expand and improve the existing water supply system through the extension of the distribution pipeline and rehabilitation of existing storage infrastructure, ensuring increased water access and reliability for the target population Water, Environment, Energy and Natural Resources Completed 5,558,080.00 Soin Feedback
Routine Maintenance of Kapnandet-Kaplemeiywet-Bae River Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,125,200.00 Kapsuser Feedback
Construction of Kapmatayo box culvert To improve road safety and accessibility Public Works, Roads and Transport Completed 1,757,756.88 Cheptororiet/Seretut Feedback
Construction of Buchenge Deck for Bridge To improve road safety and accessibility Public Works, Roads and Transport Completed 4,696,800.00 Kapsaos Feedback
Factory-Chepkosa Road,Chepkosa-Legetiot Road,Legetiot-Chembek Road,Chumbek-Kiptenden Road,Sereng-Chepkendi Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,005,386.00 Chilchila Feedback
Lelach- Kapsogut TBC Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 682,900.00 Cheboin Feedback
Construction of a classroom at Kapsinendet ECDE centre Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 560,000.00 Londiani Feedback
Kalaacha Dispensary To operationalize the dispensary and enhance access to primary healthcare services Health Services Completed 2,682,394.00 Litein Feedback
Kapkatit water project To improve the safety, reliability, and accessibility of water supply by protecting the natural spring source, constructing a robust distribution pipeline, and establishing user-friendly water points for community access. Water, Environment, Energy and Natural Resources Completed 1,860,032.00 Soin Feedback
Routine Maintenance of Kimolwet -SBI juction - Surian Canteen Arap Seroney Arap Tonui – Kigorwet Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,920,074.00 Kapsuser Feedback
Construction of Kapstehano Pipe Culvert To improve road safety and accessibility Public Works, Roads and Transport Completed 1,791,139.49 Cheptororiet/Seretut Feedback
Construction of Kisabei Box Culvert To improve road safety and accessibility Public Works, Roads and Transport Completed 1,124,500.00 Kapsoit Feedback
Construction Of Seguton Santos Round-AIC Church Road 2.6Km,Pinus Tamarsang 1.5Km To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,154,624.64 Kipkelion Feedback
Off C23 - Kabartegan - Chemamul TBC - Kimotyo Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 530,861.56 Chemosot Feedback
Construction of ECDE classroom at Jambo ECDE Centre Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 1,680,000.00 Tendeno/Sorget Feedback
Rungut Dispensary To expand healthcare access through the establishment of a new dispensary. Health Services Completed 2,162,737.00 Litein Feedback
Kebimbir Water Project 2 To expand and improve the existing water supply system through the extension of the distribution pipeline and rehabilitation of existing storage infrastructure, ensuring increased water access and reliability for the target population Water, Environment, Energy and Natural Resources Completed 4,844,568.00 Soin Feedback
Routine Maintenance of Kapkelek -chepseron -kipngetuny road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,299,298.00 Cheptororiet/Seretut Feedback
Construction of Kapkelek Cross Culvertd To improve Drainage Infrastructure Public Works, Roads and Transport Completed 1,929,080.00 Cheptororiet/Seretut Feedback
Construction of Sugutek Box Culvert To improve road safety and accessibility Public Works, Roads and Transport Completed 391,680.00 Kapsoit Feedback
Construction of Off C35-Chebululu Road,Mocheisok-Mumetet Road,Chemamul-kobiro Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,419,604.56 Kipkelion Feedback
Chepkonye TBC Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 530,758.00 Chemosot Feedback
Construction of a classroom at Kamuogo ECDE Centre Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 1,120,000.00 Tendeno/Sorget Feedback
Litein Health Centre To improve patient care and water access through OPD renovation and installation of a water tank base. Health Services Completed 2,570,898.00 Litein Feedback
Koitabrot,Kaptalamwa,Kechiriet,Kamalabu & Kaptalamwa Water Project To expand and improve the existing water supply system through the extension of the distribution pipeline and rehabilitation of existing storage infrastructure, ensuring increased water access and reliability for the target population Water, Environment, Energy and Natural Resources Completed 7,631,668.00 Soin Feedback
Routine Maintenance of Cherigat-Chepkutbei-Cheswerta Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,912,169.60 Cheptororiet/Seretut Feedback
Construction of Chepkutbei Pipe Culverts To improve road safety and accessibility Public Works, Roads and Transport Completed 1,737,186.72 Cheptororiet/Seretut Feedback
Construction of Kapsinei Mini Bridge To improve road safety and accessibility Public Works, Roads and Transport Completed 2,120,000.00 Kapsoit Feedback
Construction of Liloch Pry sch-Koisaet pry sch Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,673,199.12 Kamasian Feedback
Cheplanget High School - Singorwet TBC - Off D226- Cheplanget Pry Sign Post Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 672,382.40 Cheplanget Feedback
Completion and Renovation of ECDE classrooms at Chebaibai and Kamaua ECDE Centres Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 1,120,000.00 Tendeno/Sorget Feedback
Kaboeito Dispensary To enhance healthcare access by establishing a new dispensary. Health Services Completed 1,845,950.00 Tebesonik Feedback
Koyabei Water Project To expand and improve the existing water supply system through the extension of the distribution pipeline and rehabilitation of existing storage infrastructure, ensuring increased water access and reliability for the target population Water, Environment, Energy and Natural Resources Completed 2,472,000.00 Soin Feedback
Routine Maintenance of Seretut Pri. Sch.-Arap Kitur-Kesagetiet Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,777,598.00 Cheptororiet/Seretut Feedback
Construction of Kapkonga box culvert To improve road safety and accessibility Public Works, Roads and Transport Completed 1,189,997.66 Waldai Feedback
Construction of Kapsakwa Box Culvert To improve road safety and accessibility Public Works, Roads and Transport Completed 4,028,000.00 Kipchimchim Feedback
Construction Of Bartera-Murero Road,Irengeti-Changee Road,Kawangware-Mtaragon Road,Kaptepengwa-Tinga Farm Road,Kaptepengwo-Bartera-Murera Road,Singoi Road,Kaptego-Borowet Road,Kuakali Road,Kaplaba Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,475,605.00 Kamasian Feedback
Tendwet TBC - Kimaech Baptist Church - Cheptembe Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 534,850.00 Cheplanget Feedback
Construction of a 3 door pit latrine at Sorget ECDE Centre Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 1,680,000.00 Tendeno/Sorget Feedback
Kaboeito Dispensary To improve staff welfare and sanitation within the health facility Health Services Completed 3,506,065.00 Tebesonik Feedback
Bargeiwet Water Project phase 1 To enhance water supply capacity, quality, and sustainability by restoring dam storage volume, improving water intake infrastructure, constructing a gravity-fed pipeline system, and protecting the dam area from environmental degradation and encroachment Water, Environment, Energy and Natural Resources Completed 2,624,586.00 Soliat Feedback
Routine Maintenance of Chepkoin - Chemororoch Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,886,067.00 Waldai Feedback
Construction of Kapcheluch Foot Bridge To improve Drainage Infrastructure Public Works, Roads and Transport Completed 1,790,690.34 Chaik Feedback
Construction of Kimugen Box Culvert To improve road safety and accessibility Public Works, Roads and Transport Completed 6,360,000.00 Kipchebor Feedback
Construction Of Centre Juu-Kiringeti-Makanisa Road 4Km, Bartera-Centre Juu Road 1.5Km, Kapkures-Sirgoi Road 3Km To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,434,386.40 Kamasian Feedback
Charera - Kapsirwoi TBC - Rwandit TBC - Kaproret Centre - Tapnyole Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 719,020.00 Kisiara Feedback
Kokwet Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 1,680,000.00 Chilchila Feedback
Kericho Forest Dispensary To restore and improve existing infrastructure for quality service delivery Health Services Completed 1,988,890.00 Chepseon Feedback
Bargeiwet Water Project- Phase 2 To expand and improve the existing water supply system through the extension of the distribution pipeline and rehabilitation of existing storage infrastructure, ensuring increased water access and reliability for the target population Water, Environment, Energy and Natural Resources Completed 2,546,532.00 Soliat Feedback
Routine Maintenance of Kapchereren Shop Off sosiot highway -Kapsoit Police Station Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 999,712.90 Waldai Feedback
Construction of Kimaut-Karap Bangoror Culvert To improve road safety and accessibility Public Works, Roads and Transport Completed 3,500,004.20 Londiani Feedback
Construction of 600mm cross culvert to Kaborus - Chabasta road 2km To improve road safety and accessibility Public Works, Roads and Transport Completed 4,006,800.00 Cheboin Feedback
Construction of Centre Juu - Kerengeti - Makanisa Road 4.0km , Bartera- Centre Juu Road 1.5km and Kapkures - Sirgoi Road 3.0km To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,873,901.00 Kamasian Feedback
Mosore dip - Mosore Quarry Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 510,139.00 Kisiara Feedback
Kabirong/Kiptenden Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 1,120,000.00 Kunyak Feedback
Kamachungwa Dispensary To finalize construction for operational readiness of the dispensary. Health Services Completed 2,014,036.00 Chepseon Feedback
Kabokyek borehole water project To enhance sustainable access to safe and adequate water through the construction and installation of essential water infrastructure including storage, pumping, and distribution systems Water, Environment, Energy and Natural Resources Completed 2,651,808.00 Soliat Feedback
Routine Maintenance of Off Cheribo-Kiptaldal AGC-Ainapkoi Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,380,000.00 Waldai Feedback
Construction of Lelsotet-Saw mill Pipe Culverts To improve road safety and accessibility Public Works, Roads and Transport Completed 1,688,640.00 Londiani Feedback
Construction of 600mm cross culvert to Koitamat - Cheptenteniet road 3km To improve road safety and accessibility Public Works, Roads and Transport Completed 4,900,000.00 Cheboin Feedback
Chemosogon - Kipsegi - Kimologit rd To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,187,800.64 Kamasian Feedback
Kwa Chief- Siritiet- Kap Chumbo- Siongi Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 599,981.00 Tebesonik Feedback
Chesoen Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 1,120,000.00 Kipkelion Feedback
Kiletien Dispensary To operationalize the facility by completing outstanding construction works. Health Services Completed 2,680,560.00 Chepseon Feedback
Kapsorok Water Project To rehabilitate and expand existing water supply infrastructure to ensure safe, adequate, and accessible water for both domestic and livestock use in the target community Water, Environment, Energy and Natural Resources Completed 2,649,180.00 Soliat Feedback
Routine Maintenance of Sosiot Posta - Chemororoch Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,950,000.68 Waldai Feedback
Construction of Kap Jackson-Anderea Pipe Culverts To improve road safety and accessibility Public Works, Roads and Transport Completed 1,430,494.50 Londiani Feedback
Construction of Machorwa- Kapcheluch Box Culvert To improve road safety and accessibility Public Works, Roads and Transport Completed 4,256,960.00 Kisiara Feedback
Construction Of Njoro-Kapkoros Road 1.5km, Kapserem-Timbek Road 1.5Km, Tumoek-Kapkurin Road 2Km, Tumoek-Kabarak Road 3Km, To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,998,381.92 Kunyak Feedback
Off D226 - Nyamanga - Chesamisiet - Kapsila Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 502,552.00 Tebesonik Feedback
Centre Juu Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 1,120,000.00 Kamasian Feedback
Kiletien Dispensary To improve patient flow and service efficiency through OPD completion Health Services Completed 3,242,411.00 Chepseon Feedback
Chesiche Water Project To improve sustainable access to clean water through spring protection, gravity-based conveyance, solar-powered pumping, and secure storage infrastructure Water, Environment, Energy and Natural Resources Completed 3,027,560.00 Soliat Feedback
Routine Maintenance of Tulwap Kibiywet-Tapsargoi/Off Sosiot Highway To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,102,500.00 Waldai Feedback
Construction of Kapkondoo-Binam pipe culvert To improve road safety and accessibility Public Works, Roads and Transport Completed 1,989,836.00 Londiani Feedback
Construction of Senetwet Box Culvert To improve road safety and accessibility Public Works, Roads and Transport Completed 8,492,300.00 Cheplanget Feedback
Construction of Kap DO - Njoro Kolonge Road 1.9km; Kapkwen - Kiptenden Road 8.5km; DO's - Kimoro Road 1km; Sireret - Mlango Road 8.6km; Kapis - Kamaragaa Road 1km - Kunyak Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,021,708.32 Kunyak Feedback
Tiriita - Kapchemoiben - Chestit - Kapchemoiben Stream Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 529,284.80 Tebesonik Feedback
Ndubusat Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 2,240,000.00 Chilchila Feedback
Chepcholiet Dispensary phase 2 To complete the remaining construction works for full utilization of the dispensary Health Services Completed 1,271,443.00 Chepseon Feedback
Kabokyek Pipeline Extension water Project To enhance water access and optimize existing infrastructure through pipeline extension, construction of new water points, and strategic relocation of water storage tanks Water, Environment, Energy and Natural Resources Completed 6,557,540.00 Soliat Feedback
Rouitne Maintenance of Momoniat-Center-Kondamet Primary Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 940,655.60 Chepseon Feedback
Construction of drainage Structures at Barotion Road To improve road safety and accessibility Public Works, Roads and Transport Completed 1,945,686.56 Londiani Feedback
Construction of Kisiara -Kap nyongo Box Culvert To improve road safety and accessibility Public Works, Roads and Transport Completed 2,300,900.00 Chemosot Feedback
Construction of Cattle Dip- Ngepepo Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,110,802.16 Kunyak Feedback
Kap Rop Canteen- Kap David Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed N/A Tebesonik Feedback
Samolel Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 1,120,000.00 Chilchila Feedback
Proposed Construction of toilets and Final Paint Works at Kiletien Dispensary To improve sanitation and aesthetics through toilet construction and painting. Health Services Completed 1,296,274.00 Chepseon Feedback
Kapkenyoloi-Kikechiyet Water Project To expand and improve the existing water supply system through the extension of the distribution pipeline and rehabilitation of existing storage infrastructure, ensuring increased water access and reliability for the target population Water, Environment, Energy and Natural Resources Completed 6,013,795.00 Soliat Feedback
Routine Maintenance of Offd12-Sigowet-Cheboror Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 898,565.00 Chepseon Feedback
Construction of Jagoror Bridge and Maintenance of the abutments To improve road safety and accessibility Public Works, Roads and Transport Completed 1,551,765.17 Londiani Feedback
Construction of Kaptebengwet - Cheptangulgei Box Culvert To improve road safety and accessibility Public Works, Roads and Transport Completed 4,347,060.00 Kapkatet Feedback
Construction of Kapkilumben-Chagaranda road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,202,523.28 Kunyak Feedback
Off C23 -Nganaset - Tengecha Boys School - Kapkatet Morgue Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed N/A Kapkatet Feedback
Korosiot Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 1,120,000.00 Chilchila Feedback
Proposed Completion of OPD at Kamachungwa Dispensary To improve service delivery through completion of the outpatient unit Health Services Completed 2,003,440.00 Chepseon Feedback
Regerego-Mogoriot Water Project To expand and improve the existing water supply system through the extension of the distribution pipeline and rehabilitation of existing storage infrastructure, ensuring increased water access and reliability for the target population Water, Environment, Energy and Natural Resources Completed 5,818,356.00 Soliat Feedback
Rouitne Maintenance of Chepkongoni Kiptenten Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,693,020.00 Kedowa/Kimugul Feedback
Construction of Lelsotet- Sawmill Pipe Culverts To improve road safety and accessibility Public Works, Roads and Transport Completed 1,144,000.00 Londiani Feedback
Construction of Chematich-Kaptirbet Twin 900mm Cross Culverts To improve road safety and accessibility Public Works, Roads and Transport Completed 560,000.00 Kapkatet Feedback
Construction of Kapkurin- Kabirong- Chesonoi-Kapkwen Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,501,005.28 Kunyak Feedback
Sosit Centre- Sertwet Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 579,849.00 Kapkatet Feedback
Tuiyobei Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 1,120,000.00 Kipkelion Feedback
Proposed completion of OPD, construction of two door pit latrine and installation of 10, 000L water tank at Chepcholiet Dispensary To enhance service delivery and sanitation by completing OPD, pit latrine, and water storage system. Health Services Completed 3,904,800.00 Chepseon Feedback
Rehabilitation of Kabokyek Borehole Water Project To restore the functionality and efficiency of the existing borehole system to ensure continuous access to clean and safe water Water, Environment, Energy and Natural Resources Completed 4,844,568.00 Soliat Feedback
Rouitne Maintenance of Kahorora Ring Roads To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,979,589.00 Kedowa/Kimugul Feedback
Construction of Murazoi Box Culvert To improve road safety and accessibility Public Works, Roads and Transport Completed 1,792,349.04 Chepseon Feedback
Construction of Kabusienduk Twin 900mm Cross Culverts To improve road safety and accessibility Public Works, Roads and Transport Completed 4,197,600.00 Tebesonik Feedback
Constuction Of Kigora-Mosonik Road 3.5Km, To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 4,650,801.92 Chepseon Feedback
Valley - Valley Teachers College - Kipawui - Joyland Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 828,924.00 Litein Feedback
Barsiele Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 1,120,000.00 Kipkelion Feedback
Proposed completion of maternity room at Momoniot Dispensary To improve maternal healthcare by completing and equipping the maternity room Health Services Completed 2,700,200.00 Chepseon Feedback
Sombicho Water Project To expand and improve the existing water supply system through the extension of the distribution pipeline and rehabilitation of existing storage infrastructure, ensuring increased water access and reliability for the target population Water, Environment, Energy and Natural Resources Completed 1,198,521.00 Soliat Feedback
Rouitne Maintenance of C35-Jagoror Pri School Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 827,312.00 Londiani Feedback
Construction of Arap Soi Box Culvert To improve road safety and accessibility Public Works, Roads and Transport Completed 1,450,000.00 Kedowa/Kimugul Feedback
Construction of Chesebet Pipe Culverts To improve road safety and accessibility Public Works, Roads and Transport Completed 3,308,360.00 Kabianga Feedback
Chepsir-Kipkeremwo Road 5.7km, Monori- Sailo Road 2km To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,350,000.00 Chepseon Feedback
Off D226- Centre 1 - Centre 2- Lalagin Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 846,580.00 Litein Feedback
Tachasis Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 1,120,000.00 Kipkelion Feedback
Proposed completion of OPD, extension of a verandah and waiting bay, supply and installation of 5000 liters water tank at 938Dispensary To enhance patient comfort and water supply by extending waiting bay and installing water tank Health Services Completed 138,400.00 Chepseon Feedback
Chebilawa Spring Protection To enhance safe and sustainable access to clean spring water by protecting the water source and improving physical access through the construction of stairways Water, Environment, Energy and Natural Resources Completed 1,860,032.00 Soliat Feedback
Rouitne Maintenance of Nairobi Center -Langalanga -Tamarsat Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,799,130.00 Londiani Feedback
Construction of Chebwareng Box Culvert To improve road safety and accessibility Public Works, Roads and Transport Completed 1,037,760.81 Chepseon Feedback
Construction of Nyabangi Road Culverts To improve road safety and accessibility Public Works, Roads and Transport Completed 3,216,040.00 Kabianga Feedback
Construction Of Kipkeremwo- Ngasura Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 4,040,978.32 Chepseon Feedback
Tabet - Kipsomoi River Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 899,278.00 Litein Feedback
Maronget/lemeywet Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 2,240,000.00 Kipkelion Feedback
Sitotwet Dispensary To increase access to primary healthcare services for Sitotwet community by establishing a new dispensary. Health Services Completed 2,773,550.00 Kapsoit Feedback
Kererut Spring Protection To develop and protect a sustainable water source for both human and livestock use by implementing spring/intake development, constructing essential water collection and delivery infrastructure, and promoting environmental conservation through fencing and tree planting Water, Environment, Energy and Natural Resources Completed 2,065,620.00 Soliat Feedback
Rouitne Maintenance of Off d314-Masaita Hill-Kaptich Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,450,700.00 Tendeno/Sorget Feedback
Construction of Kamuogo-Independent Box Culvert To improve road safety and accessibility Public Works, Roads and Transport Completed 1,392,307.98 Tendeno/Sorget Feedback
Construction of twin 900mm cross Culvert at Arap Kitur - Arap Serem Road To improve road safety and accessibility Public Works, Roads and Transport Completed 6,701,830.00 Kapsuser Feedback
Construction of Momoniat Centre- Cheboror Pry- Kap Cherotich- Karap Malel- Sigowet Road 5Km To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 4,555,520.45 Chepseon Feedback
Sachoran- Kapnandet- Kaplemeiywet AGC- Off Tegat Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 850,000.00 Kapsuser Feedback
Kapias Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 1,120,000.00 Kunyak Feedback
Torsogeek Dispensary To enhance service delivery by completing the outpatient block for improved patient flow and healthcare access. Health Services Completed 5,992,860.00 Kapsoit Feedback
Kiplogoi Water Project To expand and improve the existing water supply system through the extension of the distribution pipeline and rehabilitation of existing storage infrastructure, ensuring increased water access and reliability for the target population Water, Environment, Energy and Natural Resources Completed 2,034,020.00 Soliat Feedback
Rouitne Maintenance of Kamwingi - Sanchangwan -D314 Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,182,636.00 Tendeno/Sorget Feedback
Construction of Morombit Box Culvert To improve road safety and accessibility Public Works, Roads and Transport Completed 1,451,994.99 Chilchila Feedback
Construction of Twin 900mm cross Culvert at Cheboin river To improve road safety and accessibility Public Works, Roads and Transport Completed 3,503,150.00 Kapsuser Feedback
Construction of AGC-Kobeiyot Road 0.5Km; Momoniat Pry Schl- Cllr Road 0.2Km, Kap Hezron Road 0.6Km To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,876,196.80 Chepseon Feedback
Masarian AGC- Borborwet TBC- Kiboe TBC Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 534,240.00 Kapsuser Feedback
Chepngosos/sirgoi Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 4,480,000.00 Kunyak Feedback
Torsogeek Dispensary To improve sanitation facilities and enhance drug management through construction of toilets and pharmacy shelving. Health Services Completed 3,900,800.00 Kapsoit Feedback
Kongeren Spring Protection To develop and protect a sustainable water source for both human and livestock use by implementing spring/intake development, constructing essential water collection and delivery infrastructure, and promoting environmental conservation through fencing and tree planting Water, Environment, Energy and Natural Resources Completed 2,224,800.00 Soliat Feedback
Rouitne Maintenance of Subukia Independent Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,388,813.00 Tendeno/Sorget Feedback
Construction of Mogire Box Culvert To improve road safety and accessibility Public Works, Roads and Transport Completed 1,700,602.00 Chilchila Feedback
Construction of Twin 900mm cross Culvert at Arap Samityuk - Kap Christopher Road To improve road safety and accessibility Public Works, Roads and Transport Completed 2,226,000.00 Kapsuser Feedback
Construction of Kapmachungwa-Mutanya road;Off Kamachungwa-Leberer cattle dip road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,098,633.00 Chepseon Feedback
Susumwet AGC- Starehe Girls Sch.- Kapmungwan Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 520,594.00 Kapsuser Feedback
Lesonet/sirgoi Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 2,240,000.00 Kunyak Feedback
Kericho County Referral hospital To improve storage organization, security, and client comfort at the County Drug Store. Health Services Completed 3,499,700.00 Kipchebor Feedback
Chepkeikei Water Project To enhance access to safe, reliable, and sustainable water supply for households and institutions within Chepkeikei community through the equipping and solarisation of spring protection, construction of sump, installation of UPVC tanks, rising main and distribution pipelines Water, Environment, Energy and Natural Resources Completed 4,437,140.00 Soliat Feedback
Routine Maintenance of Sereng -Chemosogol Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,441,587.00 Chilchila Feedback
Construction of Murgut Bridge and 3km approach Road To improve road safety and accessibility Public Works, Roads and Transport Completed 1,592,276.72 Chilchila Feedback
Construction of Chepkutbei Pipe Culverts To improve road safety and accessibility Public Works, Roads and Transport Completed 2,249,000.00 Cheptororiet/Seretut Feedback
Kosachmwai Centre- Kuresiet- Chemoset Bridge Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 491,944.00 Cheptororiet/Seretut Feedback
Koisegem Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 4,480,000.00 Chilchila Feedback
Kericho County Referral hospital To enhance security and safety of public health and blood bank premises. Health Services Completed 1,503,600.00 Kipchebor Feedback
Kimigik water Project (Pipeline Extension) To enhance access to clean and sustainable water supply by constructing pipelines, water tanks & associated fittings ensuring reliable water delivery to the target community Water, Environment, Energy and Natural Resources Completed 4,298,670.00 Ainamoi Feedback
Routine Maintenance of Off C35-Museum Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,151,286.00 Chilchila Feedback
Construction of Kawangware Box Culvert To improve road safety and accessibility Public Works, Roads and Transport Completed 1,569,543.43 Kamasian Feedback
Construction of Kipkeremwo twin 900mm Cross Culverts To improve road safety and accessibility Public Works, Roads and Transport Completed 5,992,400.00 Chepseon Feedback
Kesukyo - Chesagat TBC - Michingilwet Canaan AGC Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 817,600.00 Cheptororiet/Seretut Feedback
Tulwapmoi Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 1,680,000.00 Chilchila Feedback
Kericho County Referral hospital To provide adequate and safe electrical connections for the new Comprehensive Care Centre (CCC) block. Health Services Completed 3,699,635.00 Kipchebor Feedback
Routine Maintenance of Sombo-Lelu-Sambu Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,658,755.00 Chilchila Feedback
Construction of Kapkwen Matarmat Box culvert To improve road safety and accessibility Public Works, Roads and Transport Completed 1,851,583.44 Kipkelion Feedback
Construction of twin 900mm cross culvert at 938 dip Road To improve road safety and accessibility Public Works, Roads and Transport Completed 3,428,720.00 Chepseon Feedback
Construction of Chebitet- Kiletien Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,845,441.00 Chepseon Feedback
Cheboseroi- Arap Kamoing- Kwenet TBC- Off-Cheptenye Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 773,683.00 Waldai Feedback
Chepkendi Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 2,240,000.00 Chilchila Feedback
Kericho County Referral hospital To enhance functionality and usability of the CCC block through interior finishing works. Health Services Completed 2,023,540.00 Kipchebor Feedback
Routine Maintenance of Kipchorian Primary -Martha Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,314,220.00 Kipkelion Feedback
Construction of Matarmat Box culvert To improve road safety and accessibility Public Works, Roads and Transport Completed 1,910,372.33 Kipkelion Feedback
Construction of Silibonik-Kiplekwa Box Culvert To improve road safety and accessibility Public Works, Roads and Transport Completed 10,526,200.00 Kedowa/Kimugul Feedback
Construction of Kipkeremwo - Ngasura Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,562,309.50 Chepseon Feedback
Chemumbe- Off Kabianga- Makitem- Cheptarit Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 661,780.00 Waldai Feedback
Milimani Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 2,240,000.00 Chilchila Feedback
Kericho County Referral hospital To enhance functionality and usability of the CCC block through interior finishing works. Health Services Completed 1,060,000.00 Kipchebor Feedback
Ainabon water project in Kipchebor ward To expand access to safe, reliable, and sustainable water supply for the Ainabon community in Kipchebor Ward through the supply and installation of a hydrum pump, construction of a 23.4m? steel elevated water tower, and laying of a 2 km distribution pipeline Water, Environment, Energy and Natural Resources Completed 1,488,973.00 Kipchebor Feedback
Routine Maintenance of Kipkelion Town Maguni -Police Station -Chongoti Bridge Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,895,080.00 Kipkelion Feedback
Construction of Kapkoros-Njoro Box Culvert in 940 To improve road safety and accessibility Public Works, Roads and Transport Completed 1,225,500.00 Kunyak Feedback
Construction of Off B1 - Lembel Culverts To improve road safety and accessibility Public Works, Roads and Transport Completed 7,120,904.00 Kedowa/Kimugul Feedback
Construction Of Deliverance-Ngatumek Road 3.4Km, Mathias- Kipyemit Road 1.2Km To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,816,435.73 Kedowa/Kimugul Feedback
Tabsargoi- Tulwap Kipiywet- Lelaitich AGC Church Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 793,150.00 Waldai Feedback
Imbaragai Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 1,120,000.00 Kunyak Feedback
Chesanga Dispensary To improve stormwater management and environmental hygiene through proper drainage installation. Health Services Completed 2,421,720.00 Kipchebor Feedback
Kapkatet Water Spring Protection To improve access to safe and sustainable drinking water for the community by protecting natural springs and establishing reliable water points. Water, Environment, Energy and Natural Resources Completed 1,650,044.00 Kapkatet Feedback
Routine Maintenance of Tamarsat-Tingoro Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,043,953.89 Kipkelion Feedback
Construction of Kapkurin Cross Culverts To improve road safety and accessibility Public Works, Roads and Transport Completed 3,292,320.00 Kunyak Feedback
Construction of Cross Culverts to Chebitet- Kipyemit Road To improve road safety and accessibility Public Works, Roads and Transport Completed 1,590,000.00 Kedowa/Kimugul Feedback
Construction of Kimugul-Kimoson Primary School Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 4,253,729.28 Kedowa/Kimugul Feedback
Nyinyitiet - Kapkwen Pry School Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 773,762.00 Ainamoi Feedback
Talai farm Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 5,600,000.00 Kunyak Feedback
Kimungen Dispensary To improve the physical environment and accessibility of Kimungen Dispensary through landscaping works. Health Services Completed 1,775,200.00 Kipchebor Feedback
Kibaraa Water Project To provide sustainable, reliable, and affordable access to safe water for the Kibaraa community through solarisation, pump set installation, pipework, and UPVC tank installation Water, Environment, Energy and Natural Resources Completed 1,372,402.00 Waldai Feedback
Routine Maintenance of Lelu- Bartera Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,395,492.80 Kamasian Feedback
Construction of Kapkesiro Box Culvert To improve road safety and accessibility Public Works, Roads and Transport Completed 2,004,881.00 Sigowet Feedback
Construction of precast culvertsat Nairobi - Saramek Road To improve road safety and accessibility Public Works, Roads and Transport Completed 3,969,330.00 Londiani Feedback
Construction of Free pentacost church-Kiprengwe-Kapchelule road; Cattle dip-Miti Moja road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,798,778.40 Kedowa/Kimugul Feedback
Off Highway - Kabuloin Secondary School Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 551,980.00 Kapsaos Feedback
Lelechwet Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 2,240,000.00 Kipkelion Feedback
Kericho County Referral hospital To finalize construction and operationalize the comprehensive care clinic and administration block. Health Services Completed 1,113,000.00 Kipchebor Feedback
Kaitui Water Project To improve access to safe, reliable, and sustainable water supply for the Kaitui community in 964 through the construction of a water distribution pipeline Water, Environment, Energy and Natural Resources Completed 1,782,177.00 Soliat Feedback
Routine Maintenance of Murau - Centre - Tinga Farm Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,495,170.00 Kamasian Feedback
Construction of Kipranye Box Culvert To improve road safety and accessibility Public Works, Roads and Transport Completed 2,283,573.21 Sigowet Feedback
Construction of precast culvert to Chelalang - Kondamet Road To improve road safety and accessibility Public Works, Roads and Transport Completed 3,731,680.00 Londiani Feedback
Construction of Off B1-Barkechechek River Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,524,012.64 Kedowa/Kimugul Feedback
Chemosot - Simoton TBC - Chemosot Dip - Simoton Pry Sch Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 772,612.00 Chemosot Feedback
Chebirir Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 1,120,000.00 Kipkelion Feedback
Kimungen Dispensary To improve sanitation standards by providing adequate toilet facilities for patients. Health Services Completed 1,272,000.00 Kipchebor Feedback
Mabasi Water Project To enhance access to safe, reliable, and sustainable water for the Mabasi community in Bureti’s Kisiara Ward through equipping and solarisation of the intake, installation of submersible motor, construction of rising main and distribution pipelines, and installation of UPVC storage tanks Water, Environment, Energy and Natural Resources Completed 1,476,427.00 Kisiara Feedback
Routine Maintenance of Kiptenten-Kapkurin Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,388,813.00 Kunyak Feedback
Construction of Muteta Box Culvert To improve road safety and accessibility Public Works, Roads and Transport Completed 2,564,526.08 Sigowet Feedback
Construction of precast culverts to Kafinch - Sotik Road To improve road safety and accessibility Public Works, Roads and Transport Completed 2,204,800.00 Londiani Feedback
Construction Of Kwa Chumo Rd,Kipsigori-Agc Church Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,069,131.16 Kedowa/Kimugul Feedback
Chesanga - Jonland Academy - Chesanga Church of Christ Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 766,876.00 Cheplanget Feedback
Borowet Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 2,240,000.00 Kamasian Feedback
Chesanga Dispensary To enhance security and protect health infrastructure by constructing a perimeter wall Health Services Completed 2,003,400.00 Kipchebor Feedback
Mtaragon Water Project To increase access to safe, reliable, and sustainable water for the Mtaragon community in Kamasian Ward through construction of a masonry storage tank, installation of UPVC tank, distribution pipelines, communal water points, and fencing of the spring source. Water, Environment, Energy and Natural Resources Completed 1,381,574.00 Kamasian Feedback
Routine Maintenance of Mariwa – Singoiwek Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,492,180.20 Kunyak Feedback
Construction of Chebotot-Ngeremwo Box Culvert To improve road safety and accessibility Public Works, Roads and Transport Completed 4,837,715.40 Soin Feedback
Construction of Lelsotet Bridge To improve road safety and accessibility Public Works, Roads and Transport Completed 1,632,400.00 Londiani Feedback
Construction Of Kapkondoo-Kapisoi Road 3.8Km, To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,299,034.62 Londiani Feedback
Sachangwan - Kap Emit - Monoru - Kondamet Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 537,280.00 Kisiara Feedback
Centre juu Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 1,120,000.00 Kamasian Feedback
Kericho County Referral hospital To strengthen infection prevention and control by converting an existing ward into a dedicated isolation unit. Health Services Completed 5,319,600.00 Kipchebor Feedback
Londiani Water Supply Intake and Gravity Mains Project To improve water supply reliability and coverage for the Londiani community through supply, delivery, and excavation of gravity main, construction of a weir, and fencing of intake works. Water, Environment, Energy and Natural Resources Completed 1,392,197.00 Kedowa/Kimugul Feedback
Routine Maintenance of Tektek- Talai Farm Road - Kapkwen Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 880,440.00 Kunyak Feedback
Construction of Kapkisai Box Culvert To improve road safety and accessibility Public Works, Roads and Transport Completed 1,630,209.12 Soin Feedback
Construction of Koisagat - Chilchila Boundary Box Culvert To improve road safety and accessibility Public Works, Roads and Transport Completed 3,460,060.00 Chilchila Feedback
Construction Of Kapkwen Pry School- Arap Kurgat Road 1.2Km, AIC Cheres- Kap Asariah Road 0.4km, Cheres Centre- Forest Road, Arap Choge- Ninja Road, SDA Cheres-Kap Zachariah Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 4,677,463.36 Londiani Feedback
Kelunet - Kimoro - Wochi Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 551,980.00 Tebesonik Feedback
Laliat Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 1,120,000.00 Kamasian Feedback
County Referral Hospital To improve testing and sample handling capacity through construction of a designated COVID-19 sample collection area. Health Services Completed 2,353,600.00 Kipchebor Feedback
Sosur Borehole Water Project To increase access to safe, reliable, and sustainable water supply for the Sosur community in Kaplelartet Ward through drilling and development of a borehole. Water, Environment, Energy and Natural Resources Completed 623,565.00 Kaplelartet Feedback
Bokwo- Kapchebwai Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 753,338.00 Soin Feedback
Construction Of Kamaget Box Culvert To improve road safety and accessibility Public Works, Roads and Transport Completed 1,352,869.92 Soliat Feedback
Construction of Segetet - Kitobe Twin twin 900mm cross Culvert To improve road safety and accessibility Public Works, Roads and Transport Completed 3,325,250.00 Kipkelion Feedback
Construction of Kipsirichet-Boma-Jagoror Quarry Road 1.5km,Kapketin-Kigen-Academy Road 1.2km, Baba Noa -DC Road 1.1km To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,849,905.21 Londiani Feedback
Cheptarit AGC - Ngariet bridge - Kalyongwet Pry School Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 798,150.00 Kaplelartet Feedback
Ndubusat Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 1,120,000.00 Chilchila Feedback
Proposed water tank base and water collection at Kiletien Dispensary To provide a reliable water harvesting and supply system. Health Services Completed 1,918,600.00 Chepseon Feedback
Chemutian Water Project To provide safe, reliable, and sustainable water supply for the Chemutian community in 964 through construction of a 50m? ground-level masonry storage tank, protection of two springs, and development of gravity mains and distribution pipelines. Water, Environment, Energy and Natural Resources Completed 686,210.00 Soliat Feedback
Kapkisai - Kapkigoro Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 376,450.00 Soin Feedback
Construction Of Chepkoson Box Culvert To improve road safety and accessibility Public Works, Roads and Transport Completed 1,879,200.00 Soliat Feedback
Construction of Mogire Box Culvert To improve road safety and accessibility Public Works, Roads and Transport Completed 7,624,000.00 Chilchila Feedback
Construction of Kapsenda quarry - Kipsotet Road 1.3km; Kapkondoo SB - Chebirir Road 2.0km and Kimout - Chepkoiyo Road 1.4km To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,075,343.20 Londiani Feedback
Sachangwan - Kipkeiyo TBC - KapChanga TBC Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 793,672.00 Sigowet Feedback
Samolel Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 2,240,000.00 Chilchila Feedback
Facelift to Londiani Hospital To modernize the hospital environment and improve patient experience. Health Services Completed 2,224,800.00 Kedowa/Kimugul Feedback
Purchase of Land for Litein Municapal Water & Sewarage Treatment Plant To secure adequate land for the establishment of a modern water and sewerage treatment plant in Litein Municipality, aimed at improving access to safe water, sanitation, and hygiene services for residents, institutions, and businesses. Water, Environment, Energy and Natural Resources Completed 1,341,139.00 Kisiara Feedback
Kipsitet - Kabore Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 325,000.00 Soin Feedback
Construction of Chepyegon- Arap Tegere Bridge To improve road safety and accessibility Public Works, Roads and Transport Completed 2,129,520.00 Soliat Feedback
Construction of Soi Mingin - Blue Hills Cattle Dip Twin 900mm Cross Culvert To improve road safety and accessibility Public Works, Roads and Transport Completed 4,791,300.00 Kipkelion Feedback
Grading, gravelling and compaction of Lower Cheres Road, Kapkwen pry school - Arap Kurgat rd,AIC Cheres - Kap Asariah Road, Cheres Centre - Forestry Road; Arap Choge - Ninja Road; SDA Cheres -Kapzachariah Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,762,126.85 Londiani Feedback
Kipsitet Pry School - Kipsitet Dip - Kap Jeremiah Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 793,672.00 Soin Feedback
Korosiot Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 1,120,000.00 Chilchila Feedback
Extension of laboratory blocks at Kapkatet and Londiani County Hospitals To strengthen diagnostic capacity by expanding laboratory facilities. Health Services Completed 2,764,850.00 Kedowa/Kimugul Feedback
Chepkosilen Secondary Borehole Water Project To improve access to safe, reliable, and sustainable water supply for Chepkosilen Secondary School and the surrounding community through borehole drilling and development. Water, Environment, Energy and Natural Resources Completed 1,104,543.00 Cheptororiet/Seretut Feedback
Kipsitet Pry- Kipsitet Dip Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 962,120.25 Soin Feedback
Construction Of Cheptembe Tililbei Box Culvert To improve road safety and accessibility Public Works, Roads and Transport Completed 3,174,000.00 Kaplelartet Feedback
Construction of Minihaha Box Culvert To improve road safety and accessibility Public Works, Roads and Transport Completed 743,900.00 Kunyak Feedback
Construction of Barno-Kimout pry sch-Kimout centre rd 3km,Sudan Kapraplimo rd 0.3km, Kiplangat-Chepkoiyo-Kapkiondo rd 1.3km, Kapsenda Dispesary-Kerich -Kutu rd 1.7km,Marindany-Lalangbek pry sch rd 1.6km Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,615,691.00 Londiani Feedback
Nyaberi bridge- Kap Pastor Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 841,561.00 Soin Feedback
Cherara Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 2,240,000.00 Chilchila Feedback
Proposed construction of laboratory at Londiani Hospital To enhance diagnostic and testing services through new lab construction. Health Services Completed 3,954,800.00 Kedowa/Kimugul Feedback
Kipsolu Pipeline Water Project To expand and improve the existing water supply system through the extension of the distribution pipeline and rehabilitation of existing storage infrastructure, ensuring increased water access and reliability for the target population Water, Environment, Energy and Natural Resources Completed 1,019,845.00 Cheptororiet/Seretut Feedback
Koitaburot - Kejiryet Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 4,000,000.00 Soin Feedback
Kapzakayo-Ainamoi Poly Road 2.2km, Ainamioi Sec- Chemorir Road 1.9km ,Nyinyitwet-Kiburet Rd 1.9 Km,Merto-Kichorian Rd 4 Km To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,483,205.00 Ainamoi Feedback
Construction of Nunda Box Culvert To improve road safety and accessibility Public Works, Roads and Transport Completed 2,158,400.00 Soin Feedback
Construction Of Independet- Kamwogo Road 4.5Km To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,889,408.00 Tendeno/Sorget Feedback
Salgaa - Arap Chebochok - Arap Bilo Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 510,515.00 Soliat Feedback
Tuiyobei Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 1,120,000.00 Kipkelion Feedback
Proposed construction of medical store at Londiani Hospital To improve medical storage and logistics efficiency. Health Services Completed 2,003,400.00 Kedowa/Kimugul Feedback
Maso-Kewasco Lastmile Connectivity Water Project To expand and improve the existing water supply system through the extension of the distribution pipeline and rehabilitation of existing storage infrastructure, ensuring increased water access and reliability for the target population Water, Environment, Energy and Natural Resources Completed 1,080,000.00 Kapkugerwet Feedback
Soko Huru Kapsegut Pry Kubinkok Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,172,101.00 Soliat Feedback
Chepkoyo Quarry- Sambula-Lelechwet Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,254,922.26 Ainamoi Feedback
Construction of Kapaiwo twin 900mm Culvert To improve road safety and accessibility Public Works, Roads and Transport Completed 2,595,000.00 Soliat Feedback
Grading Of Kaigai Road, Upc Road: 1km, Majani Sawmill- Awii Road: 1.2km,Amos- Saiz Road: 2.7km Independent Church- Dam Road: 1.2km, Ajaja Road:1.1km, Catholic- Main- Cherer Diversion Road: Madam Milka- Koigo Road: Cheres Road: Chebangang Road: Josh- Dam Road: 1.3km, Chane Road: 2km,Upendo Road:1.5km, Wakimani Road:1.1km Zakayo Road:1.2km, Mama Mike Road:1.2km, Mrs Langat- Forest Road: 1.3km, Botpla Road: 1.2km, Mama Wangari- Dam - Daniel Road: 2km, Speaker Kiprono Road:1.8km,Kwa Daniel Road:1.2km,Daniel - Forest Road:2km,Centaa Road: 3km,Kipkelion Works:2.1km, Barsiele Road:1.8km, Mau Road- Rowerr Road:00.8km,Towett-Guito Road:1.2km, Ngingo- Highway Road:1.8km,Peters- Gwitu Road:1.8km Bungoma Road- Isilii Road: Assembly Church Bridge- Cheres Road: Bridge Road: Assembly Church Bridge- Cheres -Bridge Road: Mama Chelimo- Al Shabaab Road: 0.8km To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,373,212.26 Tendeno/Sorget Feedback
Kamasega SDA - Kamasega Central ECDE Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 853,890.00 Soliat Feedback
Barsiele Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 2,240,000.00 Kipkelion Feedback
Construction of laboratory at Kedowa Health Center To improve laboratory capacity for patient testing and diagnostics. Health Services Completed 8,070,480.00 Kedowa/Kimugul Feedback
Kendabei Water Project Extension To expand and improve the existing water supply system through the extension of the distribution pipeline and rehabilitation of existing storage infrastructure, ensuring increased water access and reliability for the target population Water, Environment, Energy and Natural Resources Completed 500,000.00 Kabianga Feedback
Kapkara –Kap Cheruiyot Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 10,300,000.00 Soliat Feedback
Ainamoi Centre- Itibet Rd To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,223,988.38 Ainamoi Feedback
Construction of Kongeren twin 900mm Culvert To improve road safety and accessibility Public Works, Roads and Transport Completed 6,164,640.00 Soliat Feedback
Construction Of Sorget Chief's Office-Sorget Pry Sch Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,699,633.01 Tendeno/Sorget Feedback
Kaptembwa - Lelechonik Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 626,632.00 Kedowa/Kimugul Feedback
Maronget/lemeiywet Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 1,120,000.00 Kipkelion Feedback
Construction of Testai Dispensary To expand primary healthcare coverage through new dispensary construction. Health Services Completed 2,843,800.00 Kedowa/Kimugul Feedback
Posta-Kaitui-Root Eleven-Chemutian Dip Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,298,676.00 Soliat Feedback
Budalangi - Kap CID -Bechulelach Road 2km, To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,794,746.48 Ainamoi Feedback
Construction of Sombicho Twin 900mm Culverts Box Culvert To improve road safety and accessibility Public Works, Roads and Transport Completed 5,117,200.00 Soliat Feedback
Construction Of Kakibe Primary-Chepkalo Coffee Factory-Catholic Church-Simotwet Primary-Tirita Bricks YaRoad Road 2Km To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,549,505.34 Sigowet Feedback
Kipteris Girls - Kipsinende Technical Institute Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 503,760.00 Chilchila Feedback
Kapias Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 2,240,000.00 Kunyak Feedback
Proposed Completion of OPD/shelving of pharmacy and Construction of Four Door Toilets at Testai Dispensary To improve patient access and sanitation facilities within the dispensary. Health Services Completed 553,600.00 Kedowa/Kimugul Feedback
Matobo Kewasco Water Supply Project Last Mile Connectivity To expand and improve the existing water supply system through the extension of the distribution pipeline and rehabilitation of existing storage infrastructure, ensuring increased water access and reliability for the target population Water, Environment, Energy and Natural Resources Completed 2,500,000.00 Kipchebor Feedback
Soliat - Mogonjet Bridge Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,739,860.00 Soliat Feedback
Sambula-Lelechwet-Mureret Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,339,908.12 Ainamoi Feedback
Construction of Orgony Box Culvert To improve road safety and accessibility Public Works, Roads and Transport Completed 8,391,800.00 Sigowet Feedback
Construction Of Tabrasoi-Kiplogoi Pry-Saachangwan Road 3.6km,Sugutek-Tuiyobei Pry Sch Road 4km To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,810,000.00 Soliat Feedback
Toroton - Kokwet Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 681,168.00 Chilchila Feedback
Chepngosos/ koru farm Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 2,240,000.00 Kunyak Feedback
Proposed completion of medical drug store at Londiani Sub County Hospital To strengthen drug management and supply chain efficiency. Health Services Completed 1,176,400.00 Kedowa/Kimugul Feedback
Kapkara –Kap Cheruiyot Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,339,903.00 Soliat Feedback
Openning Of Laliat Lower-Chesilyot-Lelboinet Rd 5km, Merto Chesilyot 2km, Grading Gravelling Compaction Of 0.3km Ainamoi Centre Rds., To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 982,608.00 Ainamoi Feedback
Construction of Sime Box Culvert To improve road safety and accessibility Public Works, Roads and Transport Completed 1,608,900.00 Kaplelartet Feedback
Construction of Siriat- Kamungesha Road; Moinget- Kapsinendet Road; Quarry- Cheramus Road; Chemutian- Baregeiywet SDA- Quarry Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 4,598,309.60 Soliat Feedback
Nyairobi - Jagoror Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 894,543.00 Kamasian Feedback
Leldet ECDE Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 5,600,000.00 Kamasian Feedback
Construction of OPD at Setek Hills Dispensary To improve healthcare access through the construction of a new OPD block. Health Services Completed 2,646,300.00 Londiani Feedback
Tegat Sachangwan,Choruet Water Project To expand and improve the existing water supply system through the extension of the distribution pipeline and rehabilitation of existing storage infrastructure, ensuring increased water access and reliability for the target population Water, Environment, Energy and Natural Resources Completed 800,000.00 Kapsuser Feedback
Chebulu -Taita Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,244,079.81 Kaplelartet Feedback
Kamelilo Cofee Factory-Gokul Quarry Rd To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,120,790.00 Ainamoi Feedback
Construction of School of Excellence Box Culvert To improve road safety and accessibility Public Works, Roads and Transport Completed 2,650,000.00 Kaplelartet Feedback
Sachangwan Corner- Mariwa Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 532,850.00 Kunyak Feedback
Borowet ECDE Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 3,360,000.00 Kamasian Feedback
construction of united Dispensary To expand access to healthcare services by constructing a new dispensary. Health Services Completed 1,425,700.00 Londiani Feedback
Borborwet Water Project To expand and improve the existing water supply system through the extension of the distribution pipeline and rehabilitation of existing storage infrastructure, ensuring increased water access and reliability for the target population Water, Environment, Energy and Natural Resources Completed 1,200,000.00 Kapsuser Feedback
Cheptagum-Cheptembe- Panda Tililbei Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,297,114.18 Kaplelartet Feedback
Merto Darajet-Kap Fredrick Road 3km, Kabarus-Kipchorian Road 2.5km, Completion Of Budalangi -Kap CID- Bechulelach 2km To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,605,056.16 Ainamoi Feedback
Budalangi-Bechulelach-Kipchorian rd; Kaptongilo-Cheplit rd To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,158,400.00 Ainamoi Feedback
Construction of Kabingok-Kongereen pry-Mirmiro Road 1.7km,Kapshiongiroi-Kaap Chepsengeny r 2.2.km;Seskaa-Ainap Itiik-Kapmathayo Road 1.4km Kapraptuei-Kamageso Road 1.5km To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,613,813.89 Soliat Feedback
Cherote- Samutet Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 720,328.00 Kunyak Feedback
Milimani ECDE Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 5,040,000.00 Chilchila Feedback
Proposed Completion of OPD /Shelving of pharmacy and Construction of Four Door Toilets for Patients at United Dispensary To enhance outpatient services, pharmaceutical storage, and patient sanitation facilities. Health Services Completed 2,120,000.00 Londiani Feedback
Cheptagum Borehole Water Project To provide a safe, reliable, and sustainable source of water for domestic, institutional, and community use through borehole drilling and development. Water, Environment, Energy and Natural Resources Completed 1,200,000.00 Kaplelartet Feedback
Koiyat-Iraa Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,690,900.00 Kaplelartet Feedback
Kapzakayo - Ainamoi Poly Rd; Ainamoi Sec – Chemor Road; Nyinyitwet - Kiburet; Metro - Kipchorian Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,834,702.00 Ainamoi Feedback
Kiburet-Factory- Yasomok Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,988,720.00 Ainamoi Feedback
Construction of Soliat boys sec-chepkoson river rd, karobetKamasenga Quarry rd; Korabei-Chesunet-Kapsigowo rd;Cheramor-siriat rd;sesagaa-kapchelemei-Kongereen To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 4,008,437.76 Soliat Feedback
Kabianga High Sch. Gate- Kaplong TBC ML20 Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 497,704.00 Kabianga Feedback
Chepkendi ECDE Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 7,280,000.00 Chilchila Feedback
Proposed Completion OPD at Setek Hills Dispensary To improve patient flow and operational capacity through OPD completion. Health Services Completed 2,350,560.00 Londiani Feedback
Kebimbir Borehole Water To provide a safe, reliable, and sustainable source of water for domestic, institutional, and community use through borehole drilling and development. Water, Environment, Energy and Natural Resources Completed 2,500,000.00 Soin Feedback
Ormarichok-Kapsomboch Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 898,953.60 Kaplelartet Feedback
Tabet Quarry(Cheribo Tbc-Kapsinei-Kapchumo Rd,Sound City-Telanet Tbc Road) To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,710,950.76 Kapsoit Feedback
Ketpyse rd;Kamelilo rd To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 224,774,768.60 Ainamoi Feedback
Construction of Kabokyek- Chesiche Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,270,053.84 Soliat Feedback
Off Tegat - Susumwet AGC - Starehe Girls Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 69,872.00 Kapsuser Feedback
Tulwap-Moi ECDE Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 7,840,000.00 Chilchila Feedback
Proposed completion of Laboratory at Londiani Sub County Hospital To strengthen diagnostic capacity by completing the laboratory block. Health Services Completed 1,590,000.00 Londiani Feedback
Nyairobi-Sogonyeti Pipeline To expand and improve the existing water supply system through the extension of the distribution pipeline and rehabilitation of existing storage infrastructure, ensuring increased water access and reliability for the target population Water, Environment, Energy and Natural Resources Completed 1,100,000.00 Kamasian Feedback
Construction of Tamboiyot Box Culvert To mitigate flooding risks, improve local infrastructure resilience Public Works, Roads and Transport Completed 2,658,198.00 Cheplanget Feedback
Karap Teregei - Gabel Rd; Tilrap Malit -Kirongisyet Rd; Kaptimothy - Chelule Rd; Chemoiben Pry; Chemoiben Pry - Koitabai Rd; Arap Kenei - Kiptetoon Rd; Kiptetoon - Lemeiywet - Tunga Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,655,503.96 Kapsoit Feedback
Ainamoi Polytechnic - Kapsengerini rd (2Km); Ainamoi Sub County Hospital (0.5Km); Kapjonah - Bagao rd (5Km); Ainamoi bridge – Maseriat AGC Rd (2km) To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 15,363,827.10 Ainamoi Feedback
Construction of Kapkormom Junction- Chesino Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,769,728.48 Soin Feedback
Off Cheptenye - Keben Secondary School - Teigaa TBC Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 688,194.00 Waldai Feedback
Chebirir ECDE Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 1,120,000.00 Kipkelion Feedback
Proposed construction of two doors at Kimaut Dispensary To improve sanitation for patients and staff. Health Services Completed 2,573,680.00 Londiani Feedback
Kipkelion Health Centre Borehole Distribution Pipeline To expand and improve the existing water supply system through the extension of the distribution pipeline and rehabilitation of existing storage infrastructure, ensuring increased water access and reliability for the target population Water, Environment, Energy and Natural Resources Completed 1,100,000.00 Kipkelion Feedback
Construction of Boreywek Box Culvert To mitigate flooding risks, improve local infrastructure resilience Public Works, Roads and Transport Completed 1,828,032.40 Cheplanget Feedback
Off B1 -Kaboswa-Cheptagum Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,808,646.12 Kapsoit Feedback
Ainamoi Shopping centre- Ainamoi pry- Itibet road; Senetwet - Arap Cheruiyot - Maberiat FGC rd; Kamelilo coffee factory - Kamelilo pry - Arap Ngeny rd; Kamelilo pry - Koisirat rd To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 46,884,040.00 Ainamoi Feedback
Construction Of Ngeremwo-Chobotot-Laitigo Road 6km,Kwa Michael-Laitigo Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,130,604.50 Soin Feedback
Off C25 - Posta - Kaboson TBC Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 839,600.00 Waldai Feedback
Lelechwet ECDE Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 1,120,000.00 Kipkelion Feedback
Proposed completion of OPD, fencing and gate at United Dispensary To enhance service delivery and security through OPD completion and perimeter fencing. Health Services Completed 807,910.00 Londiani Feedback
Sasuriet Water Project Last Mile Connectivity To expand water supply coverage by connecting unserved households, schools, and institutions to the existing water distribution network under the Last Mile Connectivity initiative. Water, Environment, Energy and Natural Resources Completed 1,100,000.00 Ainamoi Feedback
Construction of Chemosot- Ainaptibik Box Culvert To mitigate flooding risks, improve local infrastructure resilience Public Works, Roads and Transport Completed 1,292,187.20 Chemosot Feedback
Kenegut-Itibet-Chepkuk Cheplel Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,403,502.56 Kapsoit Feedback
Lelechwet - Mureret rd; Ainamoi town To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 8,941,017.66 Ainamoi Feedback
Construction Of Ngeremwo-Chobotot-Laitigo Road 6km,Kwa Michael-Laitigo Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,590,290.40 Kapkugerwet Feedback
Proposed Construction and Rehabilitation of Mogo – Itibet – Chepkuk – Cheplel Pry School Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 691,650.00 Kapsoit Feedback
Imbaragai ECDE Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 3,360,000.00 Kunyak Feedback
Proposed construction of 4 door pit latrine at Masaita Dispensary To improve sanitation and hygiene within the health facility. Health Services Completed 2,583,200.00 Tendeno/Sorget Feedback
Chepngobob-Kiptegan Water Project last Mile Connectivity To expand water supply coverage by connecting unserved households, schools, and institutions to the existing water distribution network under the Last Mile Connectivity initiative. Water, Environment, Energy and Natural Resources Completed 1,800,000.00 Kapsaos Feedback
Construction of Chesingoro- Lalagin (Chepkochun) Box Culvert To mitigate flooding risks, improve local infrastructure resilience Public Works, Roads and Transport Completed 2,695,631.30 Chemosot Feedback
Cheribo Tbc -Kapsinei Road 1.3Km, Kipkutung Cheribo Road 1.5Km To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,338,591.28 Kapsoit Feedback
Ainamoi Market - Ainamoi pry - Itibet rd To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 25,984,788.64 Ainamoi Feedback
Proposed Construction of Off B2- Saoset TBC- Chemugusu Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,826,637.19 Kapkugerwet Feedback
Proposed Construction and Rehabilitation of Off B1 – Chepkolon Green Highlands School – Kipkeles Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 720,328.00 Kipchebor Feedback
Kotetni ECDE Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 3,360,000.00 Kunyak Feedback
Proposed construction of Kitchen at Kamwingi Dispensary To improve nutrition and patient meal preparation capacity. Health Services Completed 4,273,920.00 Tendeno/Sorget Feedback
Taiwet Water Project To expand water supply coverage by connecting unserved households, schools, and institutions to the existing water distribution network under the Last Mile Connectivity initiative. Water, Environment, Energy and Natural Resources Completed 1,370,993.00 Kipchimchim Feedback
Construction of Chematich- Kaptirbet Box Culvert To mitigate flooding risks, improve local infrastructure resilience Public Works, Roads and Transport Completed 1,981,260.00 Kapkatet Feedback
Tabet Quarry Excavation(Cheribo Tbc-Kapsinei-Kap Chumo Rd,2.0Km, Telanet-Chepkurbet Road 1.5Km To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,120,308.65 Kapsoit Feedback
Senetwet - Arap Cheruiyot - Maberiat FGK rd To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 242,660.00 Ainamoi Feedback
Proposed Construction and Rehabilitation of Off C23 – Kamungwana – Mogoma TBC Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 782,406.00 Kapsuser Feedback
Talai Farm ECDE Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 6,720,000.00 Kunyak Feedback
Proposed completion of Mugumoini Dispensary To finalize construction and operationalize the dispensary. Health Services Completed 1,001,700.00 Tendeno/Sorget Feedback
Kabarak Borehole Water Project To provide sustainable, safe, and reliable water supply to the target community through borehole equipping, solarisation, installation of storage infrastructure, and source protection Water, Environment, Energy and Natural Resources Completed 5,400,735.00 Londiani Feedback
Construction of Kipkosil River Pipe Culvert To mitigate flooding risks, improve local infrastructure resilience Public Works, Roads and Transport Completed 3,900,906.00 Kapkatet Feedback
Cheribo Tbc-Kap Sinei -Kapchumo Road 2.0Km,Telanet-Chepkurbet Road 1.5Km To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,283,802.58 Kapsoit Feedback
Kakobirit - Karapbii rd; Kapkeregu - Budalangi - Kapcosmas - Sitini rd To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,153,168.00 Ainamoi Feedback
Proposed Construction of Mjini Box Culvert To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 4,007,910.00 Kipchebor Feedback
Proposed Construction and Rehabilitation of Kaula – Quarry Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 769,281.00 Kipkelion Feedback
Kilengel ECDE Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 4,480,000.00 Kunyak Feedback
Renovation of Masaita Dispensary To restore and modernize the dispensary for improved service delivery. Health Services Completed 4,161,555.00 Tendeno/Sorget Feedback
Construction of Arap Komuilom- Ketengeret Box Culvert To mitigate flooding risks, improve local infrastructure resilience Public Works, Roads and Transport Completed 627,590.00 Litein Feedback
Murram Supply At Tabet Quarry(Cheribo Tbc-Kapsinei-Kap Chumo Road) To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,798,813.00 Kapsoit Feedback
Lelechwet - Arap cheboiyon rd; Kaptongilo - Kapchepngok rd To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,058,746.00 Ainamoi Feedback
Construction of Koisagat- Chilchila Boundary Box Culvert To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,439,286.70 Chilchila Feedback
Proposed Construction and Rehabilitation of Ormorijok – Kapsomboch Pry School Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 729,814.00 Kaplelartet Feedback
Tabaita ECDE Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 4,480,000.00 Ainamoi Feedback
Proposed Completion of Staff house at Subukia Dispensary To improve staff accommodation and retention. Health Services Completed 986,860.00 Tendeno/Sorget Feedback
Construction of Koitabai- Mabwaite Pipe Culverts To mitigate flooding risks, improve local infrastructure resilience Public Works, Roads and Transport Completed 991,974.00 Kapkatet Feedback
Cheribo Tbc-Kapsinei- Kapjuma Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,725,073.12 Kapsoit Feedback
Kamelilo factory - Karapngeny rd; Kamelilo pry sch - Kapseremiot river rd; Kapkenat - Kapboniface Kilii rd To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 6,914,380.00 Ainamoi Feedback
Proposed Construction of Chesingoro- Lalagin Box Culvert To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,402,532.80 Chemosot Feedback
Proposed Maintenance of Itibet-Ngeny Bare-Bagao- Deliverance Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 515,650.00 Ainamoi Feedback
Chebigen Polytechnic To provide accessible, practical, and industry-relevant technical education and vocational training. Education, Youth Affairs, Sports, Culture and Social Services Completed 4,480,000.00 Ainamoi Feedback
Renovation /completion of maternity block at Kamwingi Dispensary To enhance maternal and newborn health services. Health Services Completed 5,854,097.00 Tendeno/Sorget Feedback
Construction of Kaboloin -Kapseger foot Bridge To mitigate flooding risks, improve local infrastructure resilience Public Works, Roads and Transport Completed 1,065,344.00 Chepseon Feedback
Offc35-Mbororu-Lemeywet Rd; Kapchetinget-Kamundui-Kachesik Rd; Offc35-Kipsoi-Kapnandet Rd To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,551,375.86 Kapsoit Feedback
Ainamoi Centre rd/Bagao To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,444,376.00 Ainamoi Feedback
Proposed Twin 900mm Cross Culverts to Cherara Bridge, Chebululu- Ng'erng'erwet Road and Kimugul- Ngainet TBC Road At Ngepchebyaat River To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,834,996.18 Kisiara Feedback
Samoei Academy-Kap Martin Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 507,012.00 Kapsaos Feedback
Construction of ECDE Classroom at Barsayan ECDE Centre Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 2,240,000.00 Ainamoi Feedback
Construction of generator house at Fort Ternan Hospital. To provide secure housing for power backup systems. Health Services Completed 4,999,650.00 Chilchila Feedback
Kenegut-Koisagat Water Project To enhance access to safe, reliable, and sustainable water supply for the Kenegut–Koisagat community through construction of a masonry storage tank, rising main, and distribution pipeline Water, Environment, Energy and Natural Resources Completed 1,408,270.00 Kapsoit Feedback
Construction of Kibulkany- Kuresoi Box culvert To mitigate flooding risks, improve local infrastructure resilience Public Works, Roads and Transport Completed 1,179,968.58 Chepseon Feedback
Offc35-Asurur-Cheribopryrd;Offc35-Kipteganpry Sch.Rd;Kiptegan-FGCK Rd;Kaporiango-Karachebochok-Tuiyobei Rd To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,246,269.68 Kapsoit Feedback
Keongo Pry School ground leveling To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,402,200.00 Kapkugerwet Feedback
Proposed Construction of Itibet-Cheptang Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 777,850.00 Kapsoit Feedback
Construction of a 6 door Pit Latrine at Poiywek ECDE Centre Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 7,840,000.00 Ainamoi Feedback
Construction of Kipsinende Dispensary To expand access to healthcare services. Health Services Completed 2,502,800.00 Chilchila Feedback
Koitatui Water Project To expand water supply coverage by connecting unserved households, schools, and institutions to the existing water distribution network under the Last Mile Connectivity initiative. Water, Environment, Energy and Natural Resources Completed 840,980.00 Soin Feedback
Construction of Itoik Box culvert To mitigate flooding risks, improve local infrastructure resilience Public Works, Roads and Transport Completed 2,313,369.00 Londiani Feedback
Masaria TBC-Samituk Rd; Off C35 - Kondamet - Ainamoi Pry Sch Rd; Off C 35 - Itibet - Taturo Rd To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,821,705.20 Kapsoit Feedback
Keongo-Kapsigong Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,950,340.00 Kapkugerwet Feedback
Routine Maintenance Of Kap Josea-Kap Sakawa Road Potholes patched, ,surface grading completed. Public Works, Roads and Transport Completed 4,350,955.84 Kipchimchim Feedback
Proposed Construction and Rehabilitation of Baraka-Kap Maina Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 581,137.00 Kipchimchim Feedback
Construction of a Classroom at Chepkoiyo ECDE Centre Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 5,600,000.00 Ainamoi Feedback
Kericho Referral Hospital To improve patient comfort and service standards by renovating the existing ward. Health Services Completed 6,557,540.00 Kipchebor Feedback
Gwitu Borehole Water Project To provide a safe, reliable, and sustainable source of water for domestic, institutional, and community use through borehole drilling and development. Water, Environment, Energy and Natural Resources Completed 804,550.00 Tendeno/Sorget Feedback
Construction of 936 Farmers Bridge To improve accessibility for farmers, enhance transportation of agricultural produce, and support local economic development Public Works, Roads and Transport Completed 1,609,830.00 Londiani Feedback
Off C35-Kosisit Pry Sch Rd; To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,197,834.00 Kapsoit Feedback
Chemugusu rd; Laibon Town rds; Keongo - Sumeiyon Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 7,309,772.00 Kapkugerwet Feedback
Routine Maintenance of Cheptororiet-Arap Tonui road Potholes patched, ,surface grading completed. Public Works, Roads and Transport Completed 2,937,783.52 Kapsuser Feedback
Proposed Construction of Ngoina Road TBC – Chebarema Primary – Chebarema TBC – Bargiro Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 794,200.00 Chemosot Feedback
Construction of a classroom at Annex Prison ECDE centre Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 4,480,000.00 Kapkugerwet Feedback
Kimugen Dispensary To enhance outpatient service delivery by completing the OPD block. Health Services Completed 716,184.00 Kipchebor Feedback
Ainabon Water Project Phase 11 To provide sustainable, reliable, and safe water supply to the target community through construction of a sump, solarisation of the pumping system, installation of storage tanks, and development of a distribution pipelin Water, Environment, Energy and Natural Resources Completed 1,846,760.00 Kipchebor Feedback
Construction of Ndarungo Bridge To improve accessibility for farmers, enhance transportation of agricultural produce, and support local economic development Public Works, Roads and Transport Completed 2,857,972.69 Kedowa/Kimugul Feedback
Samutet-Kapkorio Rd To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,694,477.00 Kapsoit Feedback
Roads at Kapkurgwet ward To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 4,019,544.00 Kapkugerwet Feedback
Routine Maintenance of Kosachmwai-Chemoset road Potholes patched, ,surface grading completed. Public Works, Roads and Transport Completed 2,090,061.26 Cheptororiet/Seretut Feedback
Tendwet – Moronjo – Chebagal –Sosiot AIC Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 490,650.00 Litein Feedback
Construction of a Classroom at Tabain ECDE Centre Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 3,360,000.00 Kapsaos Feedback
Kimeswon Dispensary To increase access to healthcare by finalizing construction of Kimeswon Dispensary. Health Services Completed 1,549,354.00 Kipchimchim Feedback
Borowet-Kasheen Water Project To expand water supply coverage by connecting unserved households, schools, and institutions to the existing water distribution network under the Last Mile Connectivity initiative. Water, Environment, Energy and Natural Resources Completed 1,515,000.00 Kamasian Feedback
Construction of Kapkwen-Matarmat box culvert To mitigate flooding risks, improve local infrastructure resilience Public Works, Roads and Transport Completed 2,693,970.00 Kipkelion Feedback
Kapsoit Sec-Deliverance-Kapseriord To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,423,090.00 Kapsoit Feedback
Arap Bii - Chemugusu Rd (2km); TG 12TBC - Kapgregory (2km) To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 4,231,788.00 Kapkugerwet Feedback
Routine Maintenance of Chebitet-Kap Tebengwet road Potholes patched, ,surface grading completed. Public Works, Roads and Transport Completed 3,187,540.80 Kapkatet Feedback
Kamaget Dispensary- Tamboiyot Pry- Kapchanga Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 537,063.00 Sigowet Feedback
Construction of an ECDE Toilet at Kosisit ECDE Centre Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 3,360,000.00 Kapsaos Feedback
Kapcheptoror Dispensary. To enhance diagnostic services through the construction of a laboratory facility. Health Services Completed 2,334,682.00 Kipchimchim Feedback
Enhancement of Ngendalel, Kalyet, Masibun and Simchorwet water project To expand water supply coverage by connecting unserved households, schools, and institutions to the existing water distribution network under the Last Mile Connectivity initiative. Water, Environment, Energy and Natural Resources Completed 1,500,000.00 Kipkelion Feedback
Construction of Chemolo Box Culvert To mitigate flooding risks, improve local infrastructure resilience Public Works, Roads and Transport Completed 2,622,180.00 Sigowet Feedback
Kapsoit-Telanet Rd To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,640,000.00 Kapsoit Feedback
Arap Bii - Chemugusu Rd (2km); TG 12TBC - Kapgregory (2km); Keongo FGCK - Kapturungi rd (2km; Masengo - Laibon rd (2km); Kondamet - Agc - Ngororoga rd (2km); Nukiat - Catholic - Keongo rd (2km) To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,272,892.00 Kapkugerwet Feedback
Routine Maintenance of Reresik-Kiprichait-Roret boys-Chebululu-Tulwet-Ngainet bridge Potholes patched, ,surface grading completed. Public Works, Roads and Transport Completed 4,629,140.08 Kisiara Feedback
Proposed Maintenance of Chepsoo- Quarry- Kapkawa Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 710,152.00 Soliat Feedback
Construction of ECDE Classroom at Buchenge ECDE Centre Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 6,720,000.00 Kapsaos Feedback
Construction of Kapkures Dispensary To enhance healthcare access within the community. Health Services Completed 2,764,898.00 Chilchila Feedback
Jagoror - Kapsimotwo Water Project To improve access to safe, reliable, and sustainable water for the community through spring protection, construction of a clear water sump, solarisation, and development of a distribution pipeline. Water, Environment, Energy and Natural Resources Completed 2,987,603.00 Londiani Feedback
Construction of Kapkesiro box culvert To mitigate flooding risks, improve local infrastructure resilience Public Works, Roads and Transport Completed 920,810.00 Sigowet Feedback
Kenegut Mkt-Mongo-Itibetchepku-Cheplel,Kenegut Mkt-Cheplel Pry-Cheplel TB-Muratit,Kiboiybeislap Slaughter-Kimasian-Kaptoroi-Kaboswa-Kapsoit Mkt-Kiptenden TBC;Abrahamacademy Telanet-Kaboswa TBC Rd;Kap Job Mkt- Karap Mursoi ;Offe222-Chesilyotwater Project Intake Sugutekpry Rd;Cherandas-Kap Willion-Kapsaih Rd;Kapsoiyo Healthcentre-Kapsoiyo Sec School ;Kapsoiyo Healthcentre-Kapsoiyo Sec School ;Baraka Pry-Kapmungei Rd To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,955,739.20 Kapsoit Feedback
Keongo - Quentete - Sumeiyon Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 712,320.00 Kapkugerwet Feedback
Routine Maintenance of Kapkarin-Chesoen TBC road Potholes patched, ,surface grading completed. Public Works, Roads and Transport Completed 3,469,031.04 Litein Feedback
Proposed Mintenance of Kimugul- Kabokyek Junction - Chelogong- Chemaluk Church of Christ -Sesgaa Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,237,455.00 Soliat Feedback
Construction of an ECDE classroom and 2 door pit latrine at Koibeiyot ECDE Centre Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 7,840,000.00 Kapsaos Feedback
Construction of Magire Dispensary To expand primary healthcare infrastructure. Health Services Completed 4,655,260.00 Chilchila Feedback
Kapmelilo Coffee Factory- Kameliloc Pry- Gokul Quary Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,599,820.00 Ainamoi Feedback
Kapmosi-Kipmwokoi Itibet Rd,;Telanet Water Tank-Ngecherok Pry-Chekurbet-Kapmaso TBC Rd;Off C35-Kosisit Pry Rd;Chepkurbet Pry-Sachwan Rd;Ngecherok Pry-Keldapbelyot River;Sondu Cityncentre-Keldapbeliotriver ;Sonducity Centre-Grassland Academy;Ngecherok FGCK-Church-Sosit Pry-Karap Mase Rd;Off E222-Kiplukirikitriver-Cheribo Pry;Ogirgir Pry Sign Post- Ogirgir TBC--Cherandas;Kisabei Pry-Cherandas-Kapchesitgei-Kiptegan Nursery School;Off E222-Brilliant Academy;Kapsoitsec School-Kaboswa;Kwa Kiget Shop- Kiptegan Pry-Kiptegan FGCK;Kenegut Mkt-Kisabeipry-Kiptegan Pry To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,345,078.63 Kapsoit Feedback
Chemugusu - Satelite rd; Tea point - Paksonrd; Eland Academy - Majengo - St. Patrick rd; Site and Service- Kericho Academy - Talai rd; Tea Hotel - Kimugu Treatment works rd; Quintete - Talai rd; Off B1 - Duka Moja Junction rd To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,664,200.00 Kapkugerwet Feedback
Routine Maintenance of Ainapset A.I.C-kap Bomwo-Rungut primary-Chemsembe-Tenwet T.B.C road Potholes patched, ,surface grading completed. Public Works, Roads and Transport Completed 1,548,176.83 Litein Feedback
Proposed Maintenance of Kurabei- Kiptenden - Mogonjet Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 507,268.00 Soliat Feedback
Construction of a 3 door pit latrine at Cheplel ECDE Centre Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 2,240,000.00 Kapsoit Feedback
Extension of OPD at Makyolok Dispensary To improve patient handling capacity through OPD expansion. Health Services Completed 3,201,600.00 Chilchila Feedback
Kaptongilo- Kapchebisom- Rongai Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,179,200.00 Ainamoi Feedback
Constaruction of Ainapsosiot-Cheriroet Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,781,416.00 Chepseon Feedback
Kapsilangwa-Ainapsosiot rd;Kapoldoit-Kaprewet rd;Chesumot rd;Binyiny rd ;Mureret rd To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 600,600.00 Kapsaos Feedback
Routine Maintenance of Kibolgong-Tiriitab Eito road Potholes patched, ,surface grading completed. Public Works, Roads and Transport Completed 4,397,908.00 Tebesonik Feedback
Proposed Maintenance of Kurabei- Koibeyon- Kamaseka Quarry Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 764,550.00 Soliat Feedback
Construction of a classroom at Cheplel ECDE Centre Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 1,680,000.00 Kapsoit Feedback
Proposed water works at Makyolok Dispensary To ensure reliable water supply for facility operations. Health Services Completed 2,753,660.00 Chilchila Feedback
Kapkatet Spring Rehabilitation To secure and improve access to clean, safe, and sustainable water for the community through construction of a spring protection system Water, Environment, Energy and Natural Resources Completed 102,000,000.00 Kapkatet Feedback
Tendwet-Kapsilangwa Primary School Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 700,000.00 Kapsaos Feedback
Construction of Binyiny- Sogobet Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,803,131.00 Chepseon Feedback
Kipsigori - Kapsaos Centte rd; Off C35 - Lamaiyat pry - Torochgaa brdige rd; Kapngetuny rd To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 6,017,604.00 Kapsaos Feedback
Routine Maintenance of Kibaranji-Karapngerer road Potholes patched, ,surface grading completed. Public Works, Roads and Transport Completed 4,162,824.00 Tebesonik Feedback
Proposed Construction of Soko Ndizi-Kap Simba-Off B1- Chesiche Pri.Junction Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 497,704.00 Soliat Feedback
Construction of a classroom at Kisabei ECDE Centre Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 2,240,000.00 Kapsoit Feedback
fencing of Makyolok Dispensary To enhance security and compound management. Health Services Completed 4,982,000.00 Chilchila Feedback
Kapkondor/Cheusi/Setek/Itoik Water Project To expand water supply coverage by connecting unserved households, schools, and institutions to the existing water distribution network under the Last Mile Connectivity initiative. Water, Environment, Energy and Natural Resources Completed 1,225,000.00 Londiani Feedback
Kapoldoit-Kaprimet Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,552,760.00 Kapsaos Feedback
Construction of Kamagaa-Sogobet Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,510,347.00 Chepseon Feedback
Tabet-Koigaron-Mureret-Kipsigori-Kamuungei road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,293,900.00 Kapsaos Feedback
Routine Maintenance of Mutwot-Emdit road Potholes patched, ,surface grading completed. Public Works, Roads and Transport Completed 3,996,587.60 Kaplelartet Feedback
Proposed Maintenance and Rehabilitation of Kipkelion Town Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,140,430.00 Kipkelion Feedback
Construction of a classroom at Kinyose ECDE centre Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 1,120,000.00 Kipchimchim Feedback
Proposed Completion of Staff House Makyolok Dispensary To improve housing for medical personnel. Health Services Completed 3,434,400.00 Chilchila Feedback
Kapkongoni Water Project To expand water supply coverage by connecting unserved households, schools, and institutions to the existing water distribution network under the Last Mile Connectivity initiative. Water, Environment, Energy and Natural Resources Completed 51,782,168.00 Soliat Feedback
Ainapsosiot Pry- Ainapsosoit River Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 8,490,160.00 Kapsaos Feedback
Construction Maili Nne - Chepnoet Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,679,607.60 Chepseon Feedback
Kapsoit-Kaboswa- Kimasian-Kiboibei-Slaughter hse road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 4,135,256.00 Kapsoit Feedback
Off Sosiot – Mochongoi Junction – Lelaitich Agc Church – Kiptaldal Pry School – Off Cheribo Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 780,912.00 Waldai Feedback
Construction of a pit latrine at Kerego ECDE Centre Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 2,240,000.00 Kipchimchim Feedback
Proposed Laboratory Construction in Fort Tenan Hospital- Kericho County To expand diagnostic capacity through new lab infrastructure. Health Services Completed 3,800,000.00 Chilchila Feedback
Kapkwen Borehole Water Project To provide a safe, reliable, and sustainable source of water for domestic, institutional, and community use through borehole drilling and development. Water, Environment, Energy and Natural Resources Completed N/A Londiani Feedback
Tendwet-Kapsilangwa Primary School Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 5,418,383.00 Kapsaos Feedback
Construction of Kamarus - Kamarus Annex - Kamarus school for Disability Ltd To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,999,999.00 Chepseon Feedback
mongo- Chepkut rd; Kenegut-Chepkel TBC-Chesire rd; Kenegut MKT-Kisabei Pry-Kiptegan Nursery rd; Kapsoit- Kaboswa-Kimasian-Kiboibei-Slaughter rd; Off b1-Ngecherok AGC-Chepkurbet Pry road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 5,483,160.00 Kapsoit Feedback
Construction Of Kapkawa Bridge-Chemutian Dip Road 2Km, Chemutian-Kapjonathan Road 1.2Km, Kapkawa Bridge-Kapkongoni Road 2Km To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,615,691.00 Soliat Feedback
TeaView2- Kaptongeno TBC- Chepkutbei Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 530,103.00 Cheptororiet/Seretut Feedback
Construction of ECDE classroom at Kipsotet ECDE Centre Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 3,360,000.00 Kipchimchim Feedback
Supply, Delivery, Installation and Testing of Generator Cables at Fort Tenan Sub-County Hospital To enhance hospital power reliability and safety. Health Services Completed 2,810,349.00 Chilchila Feedback
Kapruben Water Project To enhance access to safe and reliable water supply for learners and the community through construction of distribution return lines to Kaplengeywo ECD and Kapriro Primary School. Water, Environment, Energy and Natural Resources Completed 3,906,180.00 Kabianga Feedback
Kipsigori- Baraka Primary Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,501,072.48 Kapsaos Feedback
Construction of Chilchila - Lamaiyat Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,949,930.00 Chepseon Feedback
Off B1-Chemobei rd;Off B1-Chepkurbet AGC;Off B1-Ngecherok AGC rd To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 4,201,828.00 Kapsoit Feedback
Construction of Kaplengeny- Kiptugumo Road:2.6km, Tabrasin-Kiptugumo dispensary Road:2.2km, Kamaneesoi-Highway-Moretiik-Arap Tuei Road: 2.2km, Soliat Boys-Kongeren river-Kapchelemei Road:0.5km, Kongereen pry-Mirmiro Road:1.3km, Siriat-Kaosisrwo Road:1.2km To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,707,324.00 Soliat Feedback
Proposed Construction of 21m of 900mm Cross Culverts and 7m of 600mm to Kamelilo- Koisirat- Tembwet Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 549,177.93 Ainamoi Feedback
Ochi Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 5,600,000.00 Tebesonik Feedback
Proposed Construction and Completion of Out-Patient Unit at Siwot Dispensary To improve outpatient services and access to healthcare. Health Services Completed 1,085,380.00 Chilchila Feedback
Fortenan-Koisagat water supply To expand water supply coverage by connecting unserved households, schools, and institutions to the existing water distribution network under the Last Mile Connectivity initiative. Water, Environment, Energy and Natural Resources Completed N/A Chilchila Feedback
Kipsigori- Baraka Primary Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,795,031.60 Kapsaos Feedback
Construction of Kichawir - Tata; Kapchomishan -Kaminit; Kapchomishan - Leberer Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,649,608.47 Chepseon Feedback
off E222-Kaptoroi-Kiptenden rd;Muiwek-Tuiyobei rd To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,034,020.00 Kapsoit Feedback
Construction of Soliat Boys- Soliat AGC-Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,389,868.00 Soliat Feedback
Proposed Construction of 600mm culverts at Quintete – Site and Service Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 594,650.00 Kapkugerwet Feedback
Ainamoi/Shinners Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 3,360,000.00 Chemosot Feedback
Proposed construction and completion of Out-patient unit at Koisagaat Dispensary. To strengthen healthcare service delivery at the dispensary level. Health Services Completed 1,293,900.00 Chilchila Feedback
Lower Kipkecheiyet Water Project To expand water supply coverage by connecting unserved households, schools, and institutions to the existing water distribution network under the Last Mile Connectivity initiative. Water, Environment, Energy and Natural Resources Completed 3,920,264.00 Soliat Feedback
Tabet-Koigaron-Mureret Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,300,000.00 Kapsaos Feedback
Construction of Chepsir- Arap Kitai - Binyiny road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,988,767.30 Chepseon Feedback
Kara Tegerei - Gabel rd; Tilrap Malit - Kirongisyet rd; John Bett - Kirongisyet rd; Kaptimothy - Chelule rd; Chemoibei pry - Koitabai rd; Arap Kenei - Kiptendon Rd; Kiptendon - Lemeiywet rd To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,742,792.00 Kapsoit Feedback
Soliat primary-kamugesh-primary school Road 2.7km Kapnogiro-karapkeino Road 0.8km, salgaa-kaaplachelemei-kongereen dip Road 2.3 km ,kongeren river -kabingoi Road 0.8km To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,496,880.51 Soliat Feedback
Proposed Construction of 600mm culverts at Kipchimchim-Kipsakwa – Kipchimchim Sec -Baraka – Kapcherongos -Kimeswon Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 765,693.00 Kipchimchim Feedback
Tegat Junior Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 6,496,000.00 Cheplanget Feedback
Proposed Completion and extension of Laboratory at Fort-Tenan Sub County Hospital To expand laboratory space for better diagnostic capacity. Health Services Completed 3,986,676.00 Chilchila Feedback
Lower Kiplogoi Water Project To provide safe, reliable, and sustainable water supply to the target community through construction of a gravity main, installation of a storage tank, and establishment of communal water points. Water, Environment, Energy and Natural Resources Completed N/A Soliat Feedback
B1-Sachangwan-Chepkurbet Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,234,180.00 Kapsoit Feedback
Construction of Kapseger- sailo Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 5,800,000.00 Chepseon Feedback
Water tank - Sachangwan - Ngecherok AGC - Off B1 - Sachangwan - Chepkubet pry sch; Off B1 - Full Gospel Church - Samutet central; Off B1 - Kongosiet - Siitotwet; Sitotwet - Jordan rd; Off B1 - Chepsoo rd To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 207,600.00 Kapsoit Feedback
Gravelling For Kapsimba-Chesiche Church Road; Chesiche-Chesiche Ecd Road; Chesiche Ecd-Kaptala Road; Chesiche-Kabokyek Ecd-Kaptala Road;Chesiche-Kabokyek Cattle Dip Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,214,963.00 Soliat Feedback
Proposed Construction of Twin 900mm to Koibarak- Lamaiyat Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 545,171.00 Chepseon Feedback
Chebakal Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 2,016,000.00 Litein Feedback
Proposed Completion of Surgical ward at Fort-Tenan Sub County Hospital To enhance surgical service capacity at the sub-county level. Health Services Completed 3,794,057.00 Chilchila Feedback
Otui Borehole Water Project To provide a safe, reliable, and sustainable source of water for domestic, institutional, and community use through borehole drilling and development. Water, Environment, Energy and Natural Resources Completed N/A Kapsaos Feedback
Cherandas-Kapsaiah Round To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 981,893.00 Kapsoit Feedback
Construction of Off B1-Sabunit Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,933,500.00 Chepseon Feedback
Water tank - Sachangwan - Ngecherok AGC - Off B1 - Sachangwan - Chepkubet pry sch; Off B1 - Full Gospel Church - Samutet central; Off B1 - Kongosiet - Siitotwet; Sitotwet - Jordan rd; Off B1 - Chepsoo rd To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 4,890,916.00 Kapsoit Feedback
Construction of Chepsengeny-Kwandap Mosong road;Kwandap Mosong-Kaplelach Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 4,153,380.00 Soin Feedback
Proposed Construction of Chesire Box Culvert To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 725,300.00 Chilchila Feedback
Kiptenden Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 2,240,000.00 Litein Feedback
Proposed construction of four doors pit latrine with urinal at Songonyet Dispensary To improve sanitation standards for patients and staff. Health Services Completed 3,396,524.00 Chilchila Feedback
Rehabilitation of Lelaitich Boiyon Water Project To restore and expand access to safe and reliable water supply through repair of the pump motor and extension of last mile connectivity to underserved households and institutions. Water, Environment, Energy and Natural Resources Completed 1,225,000.00 Waldai Feedback
Kapsoit Disp-Sitotwet Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,276,650.00 Kapsoit Feedback
Kipchawir-Leberer Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,400,000.00 Chepseon Feedback
Kichinjet - Kaboswa rd; Karap Tergei - Chepsoo rd; Kamundu rd; Samutet pry - Chemobei rd; Samutet - Kappeter rd; Karap Teregei rd; Tiles - Karap Barjwot rd; Toro - Kameshak rd; Sitotwet - Kirongishet rd; Koitabai rd; Karap Tererei - Gable rd To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,320,760.00 Kapsoit Feedback
Proposed Construction of Twin 900mm Cross Culverts To Kapjonah - Bagao Road (5Km); Ainamoi bridge – Maseriat AGC Road (2km) To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,494,177.52 Ainamoi Feedback
Proposed Consrtuction of Concrete Box Culvert at Kamtego Box River To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 752,782.00 Kamasian Feedback
Nyambolosa Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 2,240,000.00 Litein Feedback
Proposed Construction of Four door toilet at Sereng Dispensary To improve hygiene and sanitation within the health facility. Health Services Completed 560,000.00 Chilchila Feedback
Sombicho Water Project To expand water supply coverage by connecting unserved households, schools, and institutions to the existing water distribution network under the Last Mile Connectivity initiative. Water, Environment, Energy and Natural Resources Completed 1,225,000.00 Soliat Feedback
C35-Kiboibey Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,842,288.80 Kapsoit Feedback
Kolonget-kipchawir Road, Monori-Sailo Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,800,000.00 Chepseon Feedback
Sailo-Chepcholiet Road; Chesumei-Tugunon Road; Sebere-Chesumei Road; Kapsegut- Nyambuko Road; Cherendet-Kiptenden Road. To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 5,048,400.00 Chepseon Feedback
Propsoed Construction of Kokwet Box Culvert To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,252,491.52 Chilchila Feedback
Proposed construction of Cross Pipe Culverts at Sebetet - Kap Kones Quarry Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 787,234.00 Cheplanget Feedback
Kisutuk/tepkutwet Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 1,120,000.00 Cheboin Feedback
Proposed installation of an electrical panel at Fort Tenan subcounty Hospital and 3 dispensaries. To improve electrical distribution and safety in hospital facilities. Health Services Completed 2,160,000.00 Chilchila Feedback
Sullivan/Annex Spring Protection To expand water supply coverage by connecting unserved households, schools, and institutions to the existing water distribution network under the Last Mile Connectivity initiative. Water, Environment, Energy and Natural Resources Completed 1,225,000.00 Kapkugerwet Feedback
Kaboswa Centre-Kaboswa Tbc To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 696,843.00 Kapsoit Feedback
Tilito-chesumot Road, Chebwagan-kaptenet Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,971,577.84 Chepseon Feedback
Mandera-Kipketes Road; Chepcholiet-Tugunon Road; Leberer-Mile Tano; Kamachungwa-Factory Road; Momoniat-Chepchabai Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 4,236,820.00 Chepseon Feedback
Proposed Construction & Rehabilitation of Nyageito Foot Bridge (42.75M ) at Kipsonoi River To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 549,894.00 Cheplanget Feedback
Kimolwet Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 1,120,000.00 Cheboin Feedback
Construction of Tingatella Dispensary To expand access to healthcare through establishment of a new dispensary. Health Services Completed 627,908.00 Kamasian Feedback
Tulwapmoi Water Project To improve water conveyance and expand access to safe and reliable water for the community through the construction of a 2.5KM, 4" gravity main. Water, Environment, Energy and Natural Resources Completed 138,859,917.00 Chilchila Feedback
Telanet Watar Tank-Ngecherok-Kabaruso Tbc Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,258,724.85 Kapsoit Feedback
Construction of Off B1-Chepsir Deliverance church Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,722,878.00 Chepseon Feedback
Kiptenden - Kamarus Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,320,760.00 Chepseon Feedback
Proposed Construction of Twin 900mm of 14m to Cheptigit Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,249,535.00 Litein Feedback
Kapsogut Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 2,800,000.00 Cheboin Feedback
Completion of Lelu Dispensary To finalize pending works for full functionality. Health Services Completed 615,000.00 Kamasian Feedback
Chesire Water Project To provide sustainable, safe, and reliable water supply to the community through spring protection, construction of storage and regulation structures, and establishment of a distribution system Water, Environment, Energy and Natural Resources Completed 97,700,768.00 Soliat Feedback
Ngecherok Agc-TBC Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,201,313.15 Kapsoit Feedback
Lambel Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,937,040.00 Kedowa/Kimugul Feedback
Kaptenet - Chebwareng - Kipchorian Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,433,480.00 Chepseon Feedback
Proposed Construction of 2*900mm Cross Culverts and two lines of 600mm at Chepkonye River To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 860,627.25 Kisiara Feedback
Kamachumo Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 7,840,000.00 Kapkatet Feedback
Proposed Construction of toilets at Tingatella Dispensary To enhance sanitation within the facility. Health Services Completed 4,095,000.00 Kamasian Feedback
Off C35- Kabaruso TBC Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,989,884.57 Kapsoit Feedback
Construction of Kapchongoti Farm - Tuiyobei Bridge Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,648,747.00 Kedowa/Kimugul Feedback
Kaptenet - Fredrick Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,761,840.00 Chepseon Feedback
Proposed Construction of Three Lines of 900mm Cross Culverts at Ngeny-Cheboriot River To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 850,490.00 Tebesonik Feedback
Chematich Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 994,750.00 Kapkatet Feedback
Proposed Construction of toilets at Lelu Dispensary To improve sanitation and hygiene standards. Health Services Completed 3,345,079.00 Kamasian Feedback
Kapsoit Sec- Off C35 Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,430,580.00 Kapsoit Feedback
Construction of Delivarance -Ngatumek Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,850,742.40 Kedowa/Kimugul Feedback
Kapsokwe - De;iverance - Kipyoptop Road; Kaptenet - Fredrick - Scheme Road; Kapeli - Tilito - Kaisugu Road; Kapfredrick - Ketienya - Chebochok Road; Kapketungor - Maseti Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 4,758,660.00 Chepseon Feedback
Proposed Construction of 24m of 900mm Cross Culvert to Simbi- Emitiot Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 850,850.00 Soin Feedback
Kaptebengwet Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 504,560.00 Kapkatet Feedback
Proposed Completion of OPD at Lelu Dispensary To improve outpatient service delivery through OPD completion. Health Services Completed 4,191,360.00 Kamasian Feedback
Masaita Borehole Water To provide a safe, reliable, and sustainable source of water for domestic, institutional, and community use through borehole drilling and development. Water, Environment, Energy and Natural Resources Completed 949,680.40 Tendeno/Sorget Feedback
Cheribo Sign Post- Kapjob Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,250,000.00 Kapsoit Feedback
Culverts Installation to Ewat-Kap Maxwell Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,900,080.80 Kedowa/Kimugul Feedback
Off B1 Wima Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,924,540.00 Chepseon Feedback
Routine Maintenance of Elite primary school-Chebangang road Potholes patched, ,surface grading completed. Public Works, Roads and Transport Completed 1,429,178.00 Londiani Feedback
Proposed Construction andRehabilitation of Samutet Dispensary -Kaptungu Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,132,630.00 Kapsoit Feedback
Kaptebengwet Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 2,669,700.00 Kapkatet Feedback
Proposed completion of OPD at Tingatella Dispensary To operationalize the dispensary through OPD completion. Health Services Completed 1,680,000.00 Kamasian Feedback
Chesino Water Supply To expand water supply coverage by connecting unserved households, schools, and institutions to the existing water distribution network under the Last Mile Connectivity initiative. Water, Environment, Energy and Natural Resources Completed 1,297,650.00 Soin Feedback
E22-Torsogek Pry To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,980,000.00 Kapsoit Feedback
Ndarugu-Kedowa Centre;Kedowa Centre access roads To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,403,239.72 Kedowa/Kimugul Feedback
Tenbwet - Complex Road; Kiprengwe - Miti mbali Road; Kipsigori - Kiprengwe corner Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 742,000.00 Chepseon Feedback
Routine Maintenance of Barotion sawmill-Lelsotet road Potholes patched, ,surface grading completed. Public Works, Roads and Transport Completed 975,030.00 Londiani Feedback
Proposed Construction and Rehabilitation of Mosore Dip-Mosore Quarry Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,181,512.50 Kisiara Feedback
Roronya Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 1,353,625.00 Kapkatet Feedback
Proposed completion of staff House at Kasheen Dispensary To improve staff accommodation and service availability. Health Services Completed 4,859,466.00 Kamasian Feedback
Rehabilitation of Ngeny Koiborot School Borehole To restore and enhance the functionality of an existing borehole in order to provide reliable and safe water supply for the community. Water, Environment, Energy and Natural Resources Completed 964,555.00 Soin Feedback
Kapsoit Police-Dumpsite To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,190,728.00 Kapsoit Feedback
Construction of Kapmaxwel-Ewat Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,955,739.20 Kedowa/Kimugul Feedback
Siwot - Motanya; Cheboror;Kondamet/ Mutanya - Kapkawa Road ; C woRoad - Ka[somting - Kiptenden Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,520,940.00 Chepseon Feedback
Routine Maintenance of Slaughter house-Towet bridge-Marindany forest road Potholes patched, ,surface grading completed. Public Works, Roads and Transport Completed 1,120,200.00 Tendeno/Sorget Feedback
Proposed Construction and Rehabilitation of Chemabei Pry- Samutet Dispensary Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,300,000.00 Kapsoit Feedback
Ketigoi/charera Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 2,003,400.00 Kisiara Feedback
Proposed Fencing and gate to Tingatella Dispensary To enhance compound security and access control. Health Services Completed 5,043,060.00 Kamasian Feedback
Kapsoroget-Kapkutei Lastmile Connectivity Water Project To expand water supply coverage by connecting unserved households, schools, and institutions to the existing water distribution network under the Last Mile Connectivity initiative. Water, Environment, Energy and Natural Resources Completed 850,540.00 Cheptororiet/Seretut Feedback
Kenegut-Lemeiywet To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,788,080.00 Kapsoit Feedback
Tuiyobei-Kedowa river-Kimaut Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,345,078.63 Kedowa/Kimugul Feedback
Siwot Motanya To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,434,480.00 Chepseon Feedback
Routine Maintenance of Murau centre-Bakery road Potholes patched, ,surface grading completed. Public Works, Roads and Transport Completed 1,034,595.00 Kamasian Feedback
Proposed Maintenance and Rehabilitation of Kedowa-Darugo Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,197,549.00 Kedowa/Kimugul Feedback
Ngainet Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 4,495,250.00 Kisiara Feedback
construction of Tuiyobei Dispensary To increase healthcare access for the local community. Health Services Completed 3,290,008.24 Kipkelion Feedback
Chesilot Water Project To improve water storage and expand distribution capacity for the community through rehabilitation of an existing 25m ground level masonry tank and construction of new distribution pipelines. Water, Environment, Energy and Natural Resources Completed 946,699.20 Kapsoit Feedback
Kiboiybei-Kimasian To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,298,951.60 Kapsoit Feedback
AGC Karanja-Simotwet-Kiptenden Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,423,090.00 Kedowa/Kimugul Feedback
B1-Kedowa-Ewat road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,371,330.00 Kedowa/Kimugul Feedback
Construction of Off 222- Munai Road 2.4Km, Off 222- Dairy- Kipsotet-Chumo Road 1.7Km, Chepnyonyo-Toror Factory-Boita PAG Church- E222 Road 2.9Km, Off E222- Sepet Pry School Road 0.5km, E222-Kimeswon Road 1.9km To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 668,285.00 Kipchimchim Feedback
Proposed Maintenance of Kap Frank - Sachangwan Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,299,200.00 Kaplelartet Feedback
Kolonget Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 5,395,400.00 Kisiara Feedback
Construction of Surgical Kipkelion Surgical wards To improve surgical capacity and patient care in Kipkelion. Health Services Completed 980,000.00 Kipkelion Feedback
Upper Sombicho Water Project To improve water storage and expand distribution capacity for the community through rehabilitation of an existing 25m ground level masonry tank and construction of new distribution pipelines. Water, Environment, Energy and Natural Resources Completed 1,297,140.00 Soliat Feedback
Telanet-Kipkutuny Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,994,272.00 Kapsoit Feedback
Kamwingi two- Shabaa Road,kamwingi center keringet pry, forest Road, Kap pilot -kapkiron Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,676,607.60 Londiani Feedback
Kedowa River farm-Kimaut-Barngoror Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 4,313,920.00 Kedowa/Kimugul Feedback
Construction of Kipchimchim- Kipsotet-Kimeswon Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,507,786.00 Kipchimchim Feedback
Proposed Construction and Rehabilitation of Kibulgong-Tiriitab Eito- Kap Emmanuel Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,272,201.00 Tebesonik Feedback
Chelelaibei Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 4,636,000.00 Chemosot Feedback
Completion of staff house at Kapkwen Dispensary To improve health worker welfare through adequate housing. Health Services Completed 1,041,000.00 Kipkelion Feedback
Chesire Water Project Solarization To provide sustainable and reliable water supply to the community through the supply and installation of a pump, adoption of solar energy, and protection of water infrastructure. Water, Environment, Energy and Natural Resources Completed 1,132,630.00 Soliat Feedback
Kapsoit-Kaboswa Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 4,000,000.00 Kapsoit Feedback
Kamwingi two- Shabaa Road,kamwingi center keringet pry, forest Road, Kap pilot -kapkiron Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,803,131.00 Londiani Feedback
Ewat - Forest Road; Ndarugu - Kapchebotibiot - Timbilet Road; Kiprengwe - Miti moja - Kapmabwai Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 4,313,920.00 Kedowa/Kimugul Feedback
Construction Of Kapsaino-Chebitet Road, Kapshifta-Chebitet Road, Kapchamgei-Koibarak Road, Chilichila-Koibarak Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,277,574.20 Chepseon Feedback
Proposed Construction and Rehabilitation of Off E252-Kipkering-Arap Moso - Kipsinende Institute - Murgut Junction Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,185,869.00 Chilchila Feedback
Cheborema Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 3,483,800.00 Chemosot Feedback
Construction of Kimologit Dispensary To provide primary healthcare access to underserved areas. Health Services Completed 1,465,692.00 Kipkelion Feedback
Masarian -Samiyutik Water Project Water Project To expand water supply coverage by connecting unserved households, schools, and institutions to the existing water distribution network under the Last Mile Connectivity initiative. Water, Environment, Energy and Natural Resources Completed 1,335,252.80 Kapsuser Feedback
Cheribo Sign Post -Ack Church Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 498,820.00 Kapsoit Feedback
Kaphilemon Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,510,347.00 Londiani Feedback
Kipyemit Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,524,060.00 Kedowa/Kimugul Feedback
Construction Of Chemaluk-Cheptembe Road 1.2km,Chesunet-Kapsigowo Road 1.7km,Chebaron-Kapsorok Day Sec Road 1.9km To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,626,668.00 Soliat Feedback
Proposed Construction and Rehabilitation of Kimasian Technical Institute Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,198,877.00 Kedowa/Kimugul Feedback
Chesingoro Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 1,001,700.00 Chemosot Feedback
Construction of Toilets at Kalyet Dispensary To improve sanitation for patients and staff. Health Services Completed 1,503,401.00 Kipkelion Feedback
Chesiche Water Project To enhance sustainable access to safe and reliable water for the Kaborok community through construction and rehabilitation of key water infrastructure. Water, Environment, Energy and Natural Resources Completed 1,132,202.92 Soliat Feedback
Cherire-Sda Church To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,589,051.52 Kapsoit Feedback
Construction of Kamaina-Sachangwan-Lemotit-Tarmasang Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,403,636.40 Londiani Feedback
Off B1 - Tulwap Road; Road Unit - Kolonget Road; Nyakinywa Roads To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 5,702,561.00 Kedowa/Kimugul Feedback
Construction Of Kamasega Sda-Kasegut-Kiptugumo Pry Sch Rd 4km,Kiptugumo Dispensary-Tamarson Rd 2.5km To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,397,000.00 Soliat Feedback
Proposed Construction and Rehabilitation of Kaborus-Kesengit- Tiriita Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,212,068.34 Cheboin Feedback
Siritiet Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 2,003,400.00 Tebesonik Feedback
Proposed Completion of OPD at Kimologit Dispensary To enhance patient flow and service delivery through OPD completion. Health Services Completed 3,994,220.00 Kipkelion Feedback
Chepsoo - Kapsasur water project To provide safe, reliable, and sustainable water for domestic and livestock use through protection of springs, construction of conveyance and storage infrastructure, and establishment of distribution outlets Water, Environment, Energy and Natural Resources Completed 1,333,490.00 Kapsoit Feedback
Cheplel Tbc-Kipmwogoi To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 786,072.00 Kapsoit Feedback
Construction of Kapfinch-Sotik-Tachasis-Kaplimo-Chumba Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,780,440.00 Londiani Feedback
Kaap Nashon - Kipkoiyo pry (3km); Off C35 - Wispers - Kiptenden Road (2.5km) To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,099,500.00 Kedowa/Kimugul Feedback
Rehabilitation and Construction Drainage Strutures and Tarmacking of 936 Town To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,700,240.00 Kedowa/Kimugul Feedback
Proposed Construction and Rehabilitation of Off B1-Nunda River- Kipteran ECDE- Ndonyomare Pry-Off B1 Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 933,628.50 Soin Feedback
Litiik Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 4,114,970.00 Tebesonik Feedback
Proposed Construction and completion of two doors pit latrine at Kalyet Dispensary To improve sanitation and hygiene for facility users. Health Services Completed 1,364,160.50 Kipkelion Feedback
Cherire Solarization Water Project To enhance sustainable and reliable access to water by installing a solar-powered submersible pump, necessary accessories, and securing the water infrastructure through fencing. Water, Environment, Energy and Natural Resources Completed 920,000.00 Sigowet Feedback
Kapbese-Church God,I, To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 668,884.00 Kapsoit Feedback
Construction of Nyairobi - Saramek centre- Shabaa Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,414,374.00 Londiani Feedback
Lembel Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 830,400.00 Londiani Feedback
Rehabilitation and Construction of Drainage Structures at Brooke Centre To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,524,060.00 Kapkugerwet Feedback
Proposed Construction and Rehabilitation of Kamasian-Tulwet - Nyasakia Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 938,440.00 Kamasian Feedback
Kenene Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 2,731,500.00 Tebesonik Feedback
Kevoko water project To improve access to safe and sustainable drinking water for the community by protecting natural springs and establishing reliable water points. Water, Environment, Energy and Natural Resources Completed 5,948,016.00 Kapkugerwet Feedback
Itanda Extension Pipeline To expand water supply coverage by connecting unserved households, schools, and institutions to the existing water distribution network under the Last Mile Connectivity initiative. Water, Environment, Energy and Natural Resources Completed 1,050,960.00 Waldai Feedback
Cheplel Tbc-Cheplel Pry Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 798,892.00 Kapsoit Feedback
Construction of Kondamet - Chelalang Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,446,341.00 Londiani Feedback
Jagoror center- Kerembe road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 5,162,200.00 Londiani Feedback
Construction Of Ainamoi Centre- Town Roads To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 7,475,676.00 Ainamoi Feedback
Proposed Construction and Rehabilitation of Arap Yegon Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 913,122.42 Londiani Feedback
Kamugenik/tiriitabmoita Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 1,113,000.00 Tebesonik Feedback
Chelogon Spring Protection Water Project To improve access to safe and sustainable drinking water for the community by protecting natural springs and establishing reliable water points. Water, Environment, Energy and Natural Resources Completed 1,561,824.00 Kapkugerwet Feedback
Cheptarit Water Project To restore and improve the efficiency, reliability, and sustainability of the water supply system through rehabilitation of critical infrastructure, desilting of the dam, and protection of facilities. Water, Environment, Energy and Natural Resources Completed 1,246,758.00 Sigowet Feedback
Kapmrefu-Samutet Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 595,480.00 Kapsoit Feedback
Construction of Hill- tea - Wambare Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,403,551.68 Tendeno/Sorget Feedback
Jagoror center-Cypress Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 6,727,576.00 Londiani Feedback
Construction of Kap Sigilai- Ainamoi River- Kapcheluguma Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,516,740.00 Ainamoi Feedback
Proposed Construction and Rehabilitation of Tektek-Julima- Chepsait Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 986,349.00 Kunyak Feedback
Kaminjeiwa Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 1,020,600.00 Tebesonik Feedback
Ainamoi Water project To enhance access to clean and sustainable water supply by constructing and installing water infrastructure such as pipelines, water tanks, spring protection systems, and associated fittings, ensuring reliable water delivery to the target community Water, Environment, Energy and Natural Resources Completed 4,371,460.00 Ainamoi Feedback
Kapcheluch water Project To expand water supply coverage by connecting unserved households, schools, and institutions to the existing water distribution network under the Last Mile Connectivity initiative. Water, Environment, Energy and Natural Resources Completed 1,197,103.00 Kabianga Feedback
Arap Mojoh-Kapjog To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 739,906.00 Kapsoit Feedback
Construction of Eastleigh-Independent- Forest Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,982,880.00 Tendeno/Sorget Feedback
Off C35 - AIC 936 Academy-Lolongbei Pry Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,272,000.00 Londiani Feedback
Routine Maintenance of Bundalangi- Bechulelach Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,520,400.00 Ainamoi Feedback
Proposed Construction and Rehabilitation of Chemaluk-Gladys Canteen Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,070,688.00 Soin Feedback
Ochi pry Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 1,112,400.00 Tebesonik Feedback
Kimigik water Project To enhance access to clean and sustainable water supply by constructing pipelines ensuring reliable water delivery to the target community Water, Environment, Energy and Natural Resources Completed 4,095,960.00 Ainamoi Feedback
Reresik Water Project To improve water conveyance and expand access to safe and reliable water supply through the construction of a transmission pipeline from Chemaluk spring to Reresik. Water, Environment, Energy and Natural Resources Completed 1,590,592.00 Ainamoi Feedback
Arap Siele-Kapbulit Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 804,877.60 Kapsoit Feedback
Construction of Subukia-Mugumoini Road,Mugumoini-Kamuogo Road,Kamwingi-Miti Tatu Road,Subukia-wambare Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,395,805.00 Tendeno/Sorget Feedback
off C35 -Engineer Rotich-Nukiat-Link 35 Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,639,820.00 Londiani Feedback
Construction of 28m of 600mm and twin 900mm Cross Culvert at Chepkemel Cetre- Arap Cheruiyot- Sumeek Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 7,602,908.00 Kaplelartet Feedback
Proposed Maintenance of Off Chesingoro -Menet TBC - Kapsenetwet Primary School Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 938,440.00 Chemosot Feedback
Lalwat ecde Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 1,020,600.00 Kisiara Feedback
Kaplutiet Borehole Project To provide a safe, reliable, and sustainable source of water for domestic, institutional, and community use through borehole drilling and development. Water, Environment, Energy and Natural Resources Completed 1,396,002.00 Kabianga Feedback
E22-Kiptegan Pry Muiywek Tbc-Koisomoi Pry Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 743,100.00 Kapsoit Feedback
Mugumoini-Independent Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,496,861.00 Tendeno/Sorget Feedback
Kabarak ECDE - Sachangwan Road 2.8km; Off D 254 -Gishorio Road 1.5km; Kapsenda - Lolonbbei Road 1.3km; Kapchepkorio - Quarry Road0.4km; Kapsenda Dispensary - Chebaraa Road 1.7km; Satek - Langat Road 1.4km To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 5,541,324.00 Londiani Feedback
Construction of Centre Juu Quarry- AGC- Kap Stephano- Kaptebe- Ngeno- Borchole Road 4.5Km, Bartera Pry Sch-Centre Juu Road 2Km To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 4,961,208.00 Kamasian Feedback
Proposed Construction and Rehabilitation of Chebigen Sec- Samaria Nursery School Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 938,440.00 Kapsaos Feedback
Ngesumin Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 560,000.00 Litein Feedback
Sumeiyon Water Project To enhance access to clean and sustainable water supply by constructing pipelines ensuring reliable water delivery to the target community Water, Environment, Energy and Natural Resources Completed 4,551,535.76 Kapkugerwet Feedback
Chepkoinik Kirukto Water Project To provide sustainable and reliable water supply to Chepkoinik Primary School and the surrounding community through solarisation, construction of a distribution pipeline, and protection of water infrastructure. Water, Environment, Energy and Natural Resources Completed 1,495,550.00 Kapsoit Feedback
Itibet-Chepkuk-Cheplel-Cherire,C35-Cheplel Pry,C35-Kipmwogoi,C35-Itibet To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,083,300.80 Kapsoit Feedback
Subukia-Kaburi-Mugumoini Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,462,262.36 Tendeno/Sorget Feedback
Barotion pry - Lelsotet Road; Barotion pry - Arap Chief Road; Kaptien - Sorget Road; Miti mingi - Kwa DC - Kaptich Road; To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 5,913,048.00 Londiani Feedback
Construction Of Kapetero Bridge-Annah Tinga-Kapchebos Road 2.5Km, Brenda Shop-Off B1-Sombicho-OFF B1 Road 1.7Km To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,958,857.28 Soliat Feedback
Proposed Construction and Rehabilitation of Kaminjeiwa Pry School-Boroiwek TBC-Asururiet Bridge Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 999,387.00 Cheplanget Feedback
Rwandet Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 3,217,100.00 Kisiara Feedback
Magiroi Spring Protection Project To improve access to safe and sustainable drinking water for the community by protecting natural springs and establishing reliable water points. Water, Environment, Energy and Natural Resources Completed 4,042,594.08 Kapkugerwet Feedback
Rehabilitation of Kericho Town Dumpsite To improve solid waste management and enhance environmental health by relocating existing garbage heaps to create additional dumping space. Water, Environment, Energy and Natural Resources Completed 886,379.00 Kipchebor Feedback
Ketitui Sign-Ketitui Sec-Kapchesitgei, To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 697,113.00 Kapsoit Feedback
Kipteris-Korosiot-Tindiret Forest Road; Siret Centre- Siret Factory-Boror Bridge Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,337,339.70 Chilchila Feedback
Sirako - Jerusalem Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,163,400.00 Londiani Feedback
Construction of Chemaluk- Cheptembe Road 1.2Km, Chesunet- Kapsigowo Road 1.7Km, Chebaran- Kapsorok Day School Road 1.9Km To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 4,310,320.58 Soliat Feedback
Victors Academy – Sumeiyon – Boito Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,496,331.27 Kapkugerwet Feedback
Kapnyagoba/tetile Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 3,254,200.00 Cheboin Feedback
Kiptegan/Kipkaganit water project To provide safe and potable water to the community by constructing effective water treatment works. Water, Environment, Energy and Natural Resources Completed 1,021,960.00 Kapsaos Feedback
Rehabilitation of Londiani Dumpsite To improve solid waste management and enhance environmental health by relocating existing garbage heaps to create additional dumping space. Water, Environment, Energy and Natural Resources Completed N/A Londiani Feedback
Off E22-Sugutek Pry Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 760,018.00 Kapsoit Feedback
Forternan Town Road; Koisagat-Mategee Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,348,409.00 Chilchila Feedback
Chinese - Kapsegut Road; Lalanggbei Road; Kapjunior - Kiplangat Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 5,814,156.00 Londiani Feedback
Proposed Construction and Rehabilitation of Sachangwan- Ainapptibik- Kaplegeny- Kapsegut Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,493,940.00 Soliat Feedback
Ochi Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 3,323,100.00 Tebesonik Feedback
Lelaigoin, Itoibei and Chemasimba Springs Protection Water Project To improve access to safe and sustainable drinking water for the community by protecting natural springs and establishing reliable water points. Water, Environment, Energy and Natural Resources Completed 3,978,600.00 Kapsaos Feedback
Kericho Town Dumpsite weighbridge offices To strengthen solid waste management operations in Kericho Town by establishing weighbridge container offices at the dumpsite for improved monitoring, control, and staff welfare. Water, Environment, Energy and Natural Resources Completed N/A Kipchebor Feedback
Kaboswa- Kiboibei Slaughter House Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,198,600.00 Kapsoit Feedback
Sereng-Chebululu-Boror Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,391,310.00 Chilchila Feedback
Chinese - Kapsegut Road; Lalanggbei Road; Kapjunior - Kiplangat Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 5,589,548.00 Londiani Feedback
Construction Of Soliat Dispensary-Mogonjet Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,874,254.92 Soliat Feedback
Proposed Construction of cross pipe culverts to Kwa Shabaa access roads in 939 To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,702,100.00 Tendeno/Sorget Feedback
Ainamoi/shinners Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 4,264,445.00 Chemosot Feedback
Otui/Buchenge/Manyoror Water Supply Rehabilitation Project To improve water supply reliability and coverage through the rehabilitation of existing pipeworks and construction of extension pipelines. Water, Environment, Energy and Natural Resources Completed 1,842,486.00 Kapsaos Feedback
Mjini/Kisima Water Project To secure, rehabilitate, and enhance access to clean and safe water for the community through spring protection, rehabilitation works, construction of public water points, and fencing. Water, Environment, Energy and Natural Resources Completed 1,494,920.00 Kipchebor Feedback
Kapkitany-Koisagat-Noah Too Road, To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 831,950.00 Kapsoit Feedback
Cherara Centre-Kamiwa-Coffee Factory Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,686,859.18 Chilchila Feedback
Tegat - Lelsotet Road; Dr Ngeno-Roadunit To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,520,400.00 Londiani Feedback
Construction Of Kapkisai- Simbi Road 2.5Km, Kapkisai Society- Simbi River Road 1.0Km, Simbi- Chemengeng iver- Emitiot Road 0.5km, Kapkigoro Junction- Kap Pastor Road 1.4km, Chepsegeny Academy- Senetwet- Nyaberi Road 2.5km To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,575,038.00 Soin Feedback
Proposed Construction of cross pipe culverts to Cheres- Kap Mathayo road in 939 To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,492,113.00 Tendeno/Sorget Feedback
Tegat junior Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 1,788,371.00 Tebesonik Feedback
Chepngobob Borehole Solarisation To improve sustainable access to safe and reliable water in Chepngobob by solarizing the existing borehole system. Water, Environment, Energy and Natural Resources Completed 4,376,651.00 Kapsaos Feedback
Birirbei Water Project Phase II To expand access to safe and reliable water supply by constructing a rising main, installing UPVC storage tanks, and providing public water points for community use Water, Environment, Energy and Natural Resources Completed 1,411,987.00 Kipchebor Feedback
Kapnyanya - Kapchesitkei Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,092,502.00 Kapsoit Feedback
Timbilil-Tegat-Kaplogoro Kamotos Road; Tunnel - Chembek - Mogoywet - Kiptenden Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,253,031.11 Chilchila Feedback
Turienga - Barotion boRoader Road; Off Lemotit Road - Njia Mpya - Link C35 Road; Kapcheplanga sec sch - Kapcheplanga pry - Kap Musa - Good luck Academy Road; Kap matthew - Kamaritim Road; Kapkondoo Junction - Kapcentre quarry Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,252,418.00 Tendeno/Sorget Feedback
Construction of Gokul-Kamelilo box culvert To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,500,972.52 Ainamoi Feedback
Proposed Construction of twin 900mm cross pipe culvert to Kwa Noah-Kivuno Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,493,950.00 Tendeno/Sorget Feedback
Chebakal Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 1,853,243.00 Litein Feedback
Otui/Buchenge Phase 2 To improve water supply reliability and coverage through the construction of extension pipelines. Water, Environment, Energy and Natural Resources Completed 13,623,698.88 Kapsaos Feedback
Kimologit–KasongochoWater Project To enhance water supply coverage and reliability by supplying and installing HDPE pipes and fittings for extension pipelines to underserved areas. Water, Environment, Energy and Natural Resources Completed 1,500,445.00 Kamasian Feedback
Kapsoit Disp-Cheptingting Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,984,960.00 Kapsoit Feedback
Yalla-Kipteres-Tinderet Road; Mogire Sec- Teldet - Kiptenden Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,180,625.61 Chilchila Feedback
Turienga - Barotion boRoader Road; Off Lemotit Road - Njia Mpya - Link C35 Road; Kapcheplanga sec sch - Kapcheplanga pry - Kap Musa - Good luck Academy Road; Kap matthew - Kamaritim Road; Kapkondoo Junction - Kapcentre quarry Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,815,400.00 Tendeno/Sorget Feedback
Construction of Precast culverts at Kapfinch-Sotik Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,400,367.12 Londiani Feedback
Proposed Construction of twin 900mm cross pipe culvert across Lelechwet river To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,552,467.00 Londiani Feedback
Kiptenden Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 4,773,882.00 Litein Feedback
Chepkoinik/Kirukto Water project To enhance access to safe, reliable, and sustainable water supply through spring protection, improved storage, infrastructure rehabilitation, and expanded distribution. Water, Environment, Energy and Natural Resources Completed 9,773,380.00 Kapsoit Feedback
Kabosenywo Water Project To expand water supply coverage by connecting unserved households, schools, and institutions to the existing water distribution network under the Last Mile Connectivity initiative. Water, Environment, Energy and Natural Resources Completed 1,191,350.00 Soliat Feedback
Kapsoit Disp-Simotwet Nursery-Sitotwet- Deliverance Church To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,985,644.00 Kapsoit Feedback
Cheborus-Kaptuiya-Korosyot Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,375,135.00 Chilchila Feedback
Tendeno dip-Kariuki Road;Tumaini sec-Kericho boRoader-Nominated MCA Road;Kienyere Road-Ndoiro Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 5,601,180.00 Tendeno/Sorget Feedback
Construction of Chepkemel- Arap Cheruiyot-Sumeek Road twin 900mm Cross Culvert at Kululut River To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,576,239.36 Kaplelartet Feedback
Proposed Construction of cross pipe culverts to Mumetet-Macheisok road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,498,113.90 Kipkelion Feedback
Kimolwet Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 3,311,220.00 Cheboin Feedback
Kenegut Water supply To restore or enhance water pumping capacity for reliable water delivery through the supply and installation of a new pumpset. Water, Environment, Energy and Natural Resources Completed 13,263,522.36 Kapsoit Feedback
Katet Water Project To provide sustainable and reliable water supply through solarisation, installation of a pumpset, and protection of water infrastructure Water, Environment, Energy and Natural Resources Completed 1,207,980.00 Londiani Feedback
Kapsoit Main Road Jnt- Kiptenden- Kiboibei Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,969,322.80 Kapsoit Feedback
Yalla-Kipteres-Tinderet Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,596,586.00 Chilchila Feedback
Centre one-Cheborge Road;CheborgeMarsin Road;Miti tatu-Lovito-Kolonget Road;Kongoni dispensary-Chepkok Road;Singoi-Gwitu pry Road;Ayondi-Atiokigit river Road;Chabaya-Kichagi Road;Chabaya-KiMuremi Munga Road;Leltae-Kosigu-Captain Road;Towet-Kimager Road;Cheriro-wokter-mokiolok Road; E254-kk-Mwano-Muoroto-Siangatia Road;Chege-Wamutu-Wamagi Road;Zakao-kag church Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,578,400.00 Tendeno/Sorget Feedback
Construction of Sombicho Twin 900mm Cross Culverts To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 4,988,069.60 Soliat Feedback
Proposed backfilling of Koweek river box culvert and opening approach roads To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,501,828.80 Cheboin Feedback
Kapsogut Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 4,786,045.00 Cheboin Feedback
Kipkutuny Springs To improve access to safe and sustainable drinking water for the community by protecting natural springs and establishing reliable water points. Water, Environment, Energy and Natural Resources Completed 6,848,869.29 Kapsoit Feedback
Kaplaba Borehole To provide a safe, reliable, and sustainable source of water for domestic, institutional, and community use through borehole drilling and development. Water, Environment, Energy and Natural Resources Completed 1,449,676.00 Kipkelion Feedback
Kapsoit-Telanet Road Grading And Gravel Spreading To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 7,805,790.00 Kapsoit Feedback
Chepkendi -11 - Kapkures - Serenge Road; Kositany - Sombo Road;Koisagat - Kamiwa Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,745,730.45 Chilchila Feedback
Kapsabet-Bagdad Road;Muikamba-David Mtaro Road;Emmanuel-PCA Road-Kaburi Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,602,720.00 Tendeno/Sorget Feedback
Construction of Kipaiwa Twin 900mm Cross Culverts To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,880,149.00 Soliat Feedback
Proposed construction of twin 900mm pipe culvert to Kondamet- Jordan road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,499,699.00 Kapsoit Feedback
Kamachumo Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 2,583,000.00 Kapkatet Feedback
Ogirgir/Kinyose water projects To restore and expand access to safe, reliable, and sustainable water supply for communities served by the Kinyose and Ogirgir water projects. Water, Environment, Energy and Natural Resources Completed 4,474,120.00 Kapsoit Feedback
Tingoro Borehole Water Project To provide a safe, reliable, and sustainable source of water for domestic, institutional, and community use through borehole drilling and development. Water, Environment, Energy and Natural Resources Completed 1,204,250.00 Kipkelion Feedback
Kenegut C-Chepkuk- Kiptegan-Kisaibei Pry-Kenegut Centre- Chepkuk Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 980,292.80 Kapsoit Feedback
Kaplelit- Kamotos Road and Kamiwa- Kamotos Rod To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,253,031.11 Chilchila Feedback
Tendeno-SubukiaRoad;Subukia-Wambare Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 4,807,140.00 Tendeno/Sorget Feedback
Routine Maintenance of Off D314-Mutanya road Potholes patched, ,surface grading completed. Public Works, Roads and Transport Completed 3,609,015.20 Chepseon Feedback
Proposed Construction of cross pipe culverts to Kedowa Kimugul and its environs in 937 To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,504,470.00 Kedowa/Kimugul Feedback
Chematich Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 2,786,700.00 Kapkatet Feedback
Koisamoi water project To improve access to safe and adequate water supply through the development of a spring source, construction of a storage tank, and installation of a distribution pipeline. Water, Environment, Energy and Natural Resources Completed 6,736,120.00 Kapsoit Feedback
Simotwo Borehole Water Project To provide a safe, reliable, and sustainable source of water for domestic, institutional, and community use through borehole drilling and development. Water, Environment, Energy and Natural Resources Completed 1,335,728.00 Kipkelion Feedback
Kenegut Centre- Kipmwagoi Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 770,727.20 Kapsoit Feedback
Kamiwa Factory-Cherara Kamaget;Kenegut Mkt--Kisebei Pry Sch. Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,596,000.00 Chilchila Feedback
Miti - tatu - Benditai Road; Chebusit main road - JXN road; Chemororen - Kamau Nubery Road; Rajab - CHEMWOKTER ROAD; Chebaibai - Kapkimoi nRoad; Kimoi - Kamaua; Rajab - Busara Road; Chebaibai - Ximboiyo Road; Cheborgei - Seronei Road; Seronei - Benditai BoaRoader Road; Mikingo - Bridge Road; Maritim - Kimoi Road; Sach 4 - Barno Road; Bitok - Yegen Selim -KAcheyat Road; KAptembwo - Forest Road; Maranget - Chemwokter Road; Chebubto - Cheriro Road ; Chebaibai - Louito Road and Simboiyon Sach 4 Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 7,999,960.00 Tendeno/Sorget Feedback
Routine Maintenance of Koitamat Pry Sch- Quarry Laliat -Dip Road 1.5Km; Sachangwan- Koitamat-Chepngetuny Road 2Km To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 4,461,729.90 Ainamoi Feedback
Proposed Construction of Concrete Box Culvert across Daraja mbili road in 940 To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,480,682.00 Kunyak Feedback
Roronya Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 3,425,028.00 Kapkatet Feedback
Ogirgir/Koisamoi To restore and expand access to safe, reliable, and sustainable water supply for communities served by the Kinyose and Ogirgir water projects. Water, Environment, Energy and Natural Resources Completed 3,665,948.00 Kapsoit Feedback
Kipkoyo Water Project To expand water supply coverage by connecting unserved households, schools, and institutions to the existing water distribution network under the Last Mile Connectivity initiative. Water, Environment, Energy and Natural Resources Completed 1,499,170.00 Kedowa/Kimugul Feedback
Kenegut-Kisabei,Ketitui Sach Somok Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 646,816.00 Kapsoit Feedback
Road Opening Opening Of Kokwet-Toroton-Tombiret-Kipsasur Road. (15km) To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,412,942.14 Chilchila Feedback
Kahuho Road; Tumaini Road; Kaigemi Ak foRoad Road; Wangare- MCA Road; Mukamba - mulkaroubo Road; Mahinga - Borchek Road; Subukia - Independent Road; Mburu - Dave Road; Independent - Isili - Tendeno pry Road; Nginga - Kamwingi Road; Independent church - Nginga Jxn Road; Micheal JXN- Mwangi Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,175,040.00 Tendeno/Sorget Feedback
Construction of Off E222- Ainamoi AIC- Chepngetuny Road 1.7km; Off E222-Chepngetuny-Koitamat Road 2.2Km To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,697,732.00 Ainamoi Feedback
Proposed Construction and Rehabilitation of 600mm culverts to Ngororga Treatment Works - Chepngobob Pry-Maso centre road in 949 To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 936,550.00 Kapsaos Feedback
Ketigoi/tulwet Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 1,537,000.00 Kisiara Feedback
Melit 2/Kimungen and Ainapbon springs To improve access to safe and sustainable drinking water for the community by protecting natural springs and establishing reliable water points. Water, Environment, Energy and Natural Resources Completed 1,501,883.55 Kipchebor Feedback
Sugutek Borehole Water Project To provide a safe, reliable, and sustainable source of water for domestic, institutional, and community use through borehole drilling and development. Water, Environment, Energy and Natural Resources Completed 1,497,473.00 Kipkelion Feedback
Kiptegan- Kisabei- Kenegut Tbc Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,852,636.00 Kapsoit Feedback
Tunnel-Chepkosa Nyanza Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 4,144,958.40 Chilchila Feedback
Construction of Kamwingi II - Kiangundo Road;Kamwingi pry - KIMARI - Singati Road; Centre 1 - Majani Road; Taarifa corner Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,575,028.00 Chilchila Feedback
Constructionof Off Main Road- Metro Pry Sch- Metro Box Culvert-Metro AIC Church Road 2.7Km; Chepsetyion Main Road- Kipchorian Bridge- Bishop Okoth Secondary School Road 2.5Km To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 4,516,993.60 Ainamoi Feedback
Proposed Construction and Rehabilitation of 600mm culverts to Cereal-Mjini-Kwa Reuben-Cherote-Kipkeles- Nyagacho road in 947 To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 600,000.00 Kipchebor Feedback
Ngainet Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 700,000.00 Kisiara Feedback
Ainabon Water Project To enhance access to clean and reliable water supply for the targeted community through the use of appropriate, sustainable, and low-maintenance technologies. Water, Environment, Energy and Natural Resources Completed 2,403,495.00 Kipchebor Feedback
Kesabo Water Project To expand water supply coverage by connecting unserved households, schools, and institutions to the existing water distribution network under the Last Mile Connectivity initiative. Water, Environment, Energy and Natural Resources Completed 1,101,658.00 Kedowa/Kimugul Feedback
Chesilot Sign-Sugutek Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,791,022.60 Kapsoit Feedback
Kasheen - Borowet - Morau Pry Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,984,082.64 Kamasian Feedback
Kaigai Road; UPC raod; Majani sawmil Awii; Amos Saiz Road; Independent church - Dam Road; Catholic main -Cherer diversion Road; Macam Milka - Koigo Road; Cheres Road; Chebangang Road; Josh dam Road; Chane rs; Upendo Road; Akimani Road; Zakayo Road; Mama Mike Road; Mrs Langat - Forest Road; Botpla Road; Mama wangari cam Daniel Road; Speaker Kipronon Road; Kwa Daniel Road; Daniel Forest Road; Centaa Roads; Kipkelion works; Barsiele Road; Mau Road; Power Road; owet Guito Road; Ngingo - highway Road; Peters - gwitu Road; Bungowma - Roisili Road; Assembly Church Bridge - Bridge cheres Road; Bridge Road; Assembly Church - bridge Road; Cheres - Bridge Road; Mama chelimo Al shabaab Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,473,400.00 Chilchila Feedback
Routine Maintenance of Off E222- Koitamat Pry School Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,634,000.00 Ainamoi Feedback
Proposed Construction of twin 900mm across Maburo river in 956 To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 987,000.00 Kapkatet Feedback
Kolonget Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 3,593,180.00 Kisiara Feedback
Kisima water project To improve access to safe and sustainable drinking water for the community by protecting natural springs and establishing reliable water points. Water, Environment, Energy and Natural Resources Completed 5,099,733.96 Kipchebor Feedback
Simotwet Borehole Solarization To enhance access to sustainable and safe water supply through borehole equipping, solarisation, installation of storage tanks, and construction of a distribution pipeline Water, Environment, Energy and Natural Resources Completed 1,350,082.00 Kunyak Feedback
Ogirgir Jxn-Kisabei Bridge Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,294,999.68 Kapsoit Feedback
Kasheen-Kapluso-Chemonge Road;Lelu-Central-Nyairobi Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,900,420.00 Kamasian Feedback
Kwa Chief-Jagoror Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,363,196.00 Chilchila Feedback
Construction Of Tendwet-Kapsilangwa-Ainapsososiot Road 4Km, Kimuitiony-Kapriwet Road 1.8Km To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,587,396.24 Kapsaos Feedback
Kapsuser Market To improve sanitation facilities at Kapsuser Market Trade, Industrialization, Cooperative Development, Tourism and Wildlife Completed 940,000.00 Kapsuser Feedback
Chelelaibei Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 2,060,640.00 Chemosot Feedback
Dionysoet Water Catchment Rehabilitation To restore and protect the Dionysoet water catchment area to ensure sustainable water supply, enhance biodiversity, and prevent land degradation. Water, Environment, Energy and Natural Resources Completed 1,908,944.49 Kipchebor Feedback
Chemutian Water Project Phase II To provide sustainable and reliable access to safe water through installation of a submersible pumpset, solar power system, construction of a masonry storage tank, and supporting pipework Water, Environment, Energy and Natural Resources Completed 1,772,596.00 Soliat Feedback
Kiptenden Tbc-Kapsoit Centre To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,080,000.00 Kapsoit Feedback
Kapkures-Nyasakia Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 4,739,902.68 Kamasian Feedback
Kokwet-Toroton-Kipsasur Road;Bomore-Kap Chapati Road;Kokwet Centre Road;Momugut-Kapinguron;Chemunyala-Store Road;Sachangwan-Kapchorua Road;Burutu-Kapkesee Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 5,847,512.00 Chilchila Feedback
Construction Of Manyoror Dip- Kamungei Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 4,972,406.00 Kapsaos Feedback
Brooke Market To enhance hygiene and sanitation at Brooke Market Trade, Industrialization, Cooperative Development, Tourism and Wildlife Completed 881,200.00 Kapsaos Feedback
Cheborema Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 7,001,400.00 Chemosot Feedback
Rehabilitation of recreational park (Moi garden) To enhance the safety, functionality, and aesthetic appeal of the garden area by constructing a secure perimeter wall, installing access control through steel gates, and providing durable seating for visitors Water, Environment, Energy and Natural Resources Completed 2,009,120.00 Kipchebor Feedback
Rehabilitation of Kabokyek Secondary School Borehole To restore and improve the performance of an existing borehole by conducting flushing works and rehabilitating the submersible pump for reliable and sustainable water supply Water, Environment, Energy and Natural Resources Completed 1,419,388.00 Soliat Feedback
Off E22- Kaboswa-Kaptoimen Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,689,518.00 Kapsoit Feedback
Kasheen-Borowet Road 6km) To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 6,155,122.40 Kamasian Feedback
Off Chilchila Sch.-Kapedo Road-Chepkendi Dispensary-Railway Chemunyala Factory-Nyanza Road;Chepkendi-Kapkures Road;Cherara-Kamaget-Murgut Road;Kaplelit-Kishara-Kamatos Road;Kaplelit-Tegat-Timbil Road;Yala-Teldet Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 5,942,132.00 Chilchila Feedback
Construction Of Tabet- Koigaron- Mureret Road 3.7Km To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,535,559.36 Kapsaos Feedback
Sondu Market To provide adequate sanitation for traders and customers Trade, Industrialization, Cooperative Development, Tourism and Wildlife Completed 890,950.00 Kaplelartet Feedback
Chesingoro Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 1,370,580.00 Chemosot Feedback
Rehabilitation of recreational park (Moi garden) To improve accessibility and recreational opportunities within the facility by constructing a parking yard for visitors and installing diverse, child-friendly playground equipment to promote social interaction, physical activity, and community engagement Water, Environment, Energy and Natural Resources Completed 2,023,341.60 Kipchebor Feedback
Chepkurbet – Kewasco Lastmile Connectivity Water Project To expand water supply coverage by connecting unserved households, schools, and institutions to the existing water distribution network under the Last Mile Connectivity initiative. Water, Environment, Energy and Natural Resources Completed 1,178,864.00 Kapsoit Feedback
Off B1-Grassland-Telanet,Ngecherok Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,572,601.06 Kapsoit Feedback
Kasheen-Borowet Road 6km;Leldet-Kipsegi Road 4km;Kwa Mutai-Tingatela 6km Kasheen Quarry To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,728,298.00 Kamasian Feedback
Ndubusat-Kaburenik Forest Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,102,860.00 Chilchila Feedback
Construction of Tabet – Koigaron – Mureretv Road 2.2km To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 4,945,000.00 Kapsaos Feedback
Kapkelek Market To enhance market security and boundary control Trade, Industrialization, Cooperative Development, Tourism and Wildlife Completed 890,000.00 Cheptororiet/Seretut Feedback
Geterwetecdetoilet Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 4,752,420.00 Chemosot Feedback
Solid waste management infrastructure To enhance the operational efficiency and capacity of infrastructure development and maintenance works by acquiring a multi-purpose wheel loader for earthmoving, loading, and material handling tasks Water, Environment, Energy and Natural Resources Completed 3,139,632.80 Kipchebor Feedback
Cherotuk Chebululu Water Project To expand water supply coverage by connecting unserved households, schools, and institutions to the existing water distribution network under the Last Mile Connectivity initiative. Water, Environment, Energy and Natural Resources Completed 1,101,658.00 Kipkelion Feedback
B1-Sachangwan-Chepkutbei Pry Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 653,000.00 Kapsoit Feedback
Mtaragon-Kawangware Road;Chebirirmoi-Kimologit Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,934,395.20 Kamasian Feedback
Murgut Pry Sch.- Nyanza Boundary Road (1.3km); Off E 250 - Karap Murel Road (0.6km); Koisagat - Kapchebere - Morombit Road (0.8km) To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,670,580.00 Chilchila Feedback
Constuction Of Baraka-Kamungei 1.6km, Off C23-Lamaiyat Primary- Torochgaa Box Culvert 2.5 Km Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,799,080.00 Kapsoit Feedback
Fortenan Museum To improve sanitation standards for visitors and staff Trade, Industrialization, Cooperative Development, Tourism and Wildlife Completed 739,094.00 Chilchila Feedback
Construction of a toilet at Ririat ECDE Centre Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 969,900.00 Cheboin Feedback
Solid waste management infrastructure To improve solid waste management, cleanliness, and public hygiene by strategically placing durable waste bins in high-traffic and public areas to reduce littering and encourage responsible waste disposal Water, Environment, Energy and Natural Resources Completed 2,168,620.00 Kipchebor Feedback
Chepkoiyo Water Project To strengthen water supply infrastructure and improve access to safe and reliable water through construction of a gravity main and installation of storage tanks on raised platforms. Water, Environment, Energy and Natural Resources Completed 1,511,890.00 Ainamoi Feedback
Ngecherok-Fgck-Sosit Pry Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,045,550.00 Kapsoit Feedback
Railway - Kipchorian; River Losirwo - Kipchorian Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,556,047.00 Kipkelion Feedback
Morombit - Morombinyik To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,082,780.00 Chilchila Feedback
Construction Of NCPB-Jua Kali Road 1.2Km,Mjini Highlands Road 3.5,Kenya Highlands 2.6Km,Kipochebor Primary Access Roads 1.5Km,Kimungen-Kamasian AGC Road 1Km To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,283,699.20 Kipchebor Feedback
Gikomba Market To enhance hygiene and sanitation through modern toilet facilities Trade, Industrialization, Cooperative Development, Tourism and Wildlife Completed 158,020.00 Kapkugerwet Feedback
Construction of ECDE classroom at Tuiyobei ECDE Centre Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 1,344,080.00 Cheboin Feedback
Solid waste management infrastructure Improve Waste Collection Efficiency,Support Clean and Sustainable Urban Environments Water, Environment, Energy and Natural Resources Completed 1,586,518.08 Kipchebor Feedback
Enginit Borehole Water Project To provide sustainable and reliable access to clean water for domestic and livestock use through solarisation, installation of a pumpset and storage tank, construction of communal water points and cattle trough, and securing of water infrastructure. Water, Environment, Energy and Natural Resources Completed 1,420,628.00 Londiani Feedback
Soundcity-Keltabeliot River To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,946,750.00 Kapsoit Feedback
Railway - Kipchorian Roads; Siret Pry Road; Chemager -Siret Quarry Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,698,992.00 Kipkelion Feedback
Tendwet - Yalla - Kipteres Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,147,363.00 Chilchila Feedback
Construction Of Market-Cereal-Cementry Road 1.7Km,Melit-Milimani Road 0.2Km,Melit-Zion Assembly Church Road 0.2Km,Melit-Kenya Highlands 0.4Km, Police Station Satellite Road 0.5Km,Nya=Gacho Stage-Tegek Road 0.5 Km To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 4,769,530.00 Kipchebor Feedback
Kipsitet Market To promote hygiene and sanitation for traders and customers Trade, Industrialization, Cooperative Development, Tourism and Wildlife Completed 1,421,000.00 Soin Feedback
Construction of a twin Workshop at Chemosot VTC Phase I Expand Practical Training Capacity. Support Youth Empowerment and Employability Education, Youth Affairs, Sports, Culture and Social Services Completed 1,647,240.00 Chemosot Feedback
Kipsotet Water Project To enhance access to safe, reliable, and sustainable water supply through spring protection, improved storage, infrastructure rehabilitation, and expanded distribution. Water, Environment, Energy and Natural Resources Completed 1,134,108.80 Kipchimchim Feedback
Lelaitich IDP Water Project To expand water supply coverage by connecting unserved households, schools, and institutions to the existing water distribution network under the Last Mile Connectivity initiative. Water, Environment, Energy and Natural Resources Completed 1,258,900.00 Soin Feedback
Sound City-Grassland Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 627,000.00 Kapsoit Feedback
Segetet Junction-Kaplabotwo Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,196,586.40 Kipkelion Feedback
Teldet Centre - Kortende - Forest Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,426,690.00 Chilchila Feedback
Construction of Mjini Access Road 1.7Km; Kwa Taa- Mombasa Ndogo Road 0.5Km; Light and Life Church Road 0.3Km; Barabara Mpya-Nursery School Road 0.7Km; Riverside-Kitu Road 0.9Km; Melit-Mliminai Road 0.3Km; Kipcheobr Pry-Kamasian AGC Road 1Km To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 4,371,524.96 Kipchebor Feedback
Kapsaos Market To improve sanitation facilities through sustainable solutions Trade, Industrialization, Cooperative Development, Tourism and Wildlife Completed 585,590.00 Kapsaos Feedback
Construction of a pit latrine at Nganaset ECDE Centre Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 4,107,220.00 Kapkatet Feedback
Kaptoroi Water Project To enhance access to safe, reliable, and sustainable water supply through spring protection, improved storage, infrastructure rehabilitation, and expanded distribution. Water, Environment, Energy and Natural Resources Completed 1,167,840.00 Kipchimchim Feedback
Rehabilitation of Chepkurbet Water Supply To expand water supply coverage by connecting unserved households, schools, and institutions to the existing water distribution network under the Last Mile Connectivity initiative. Water, Environment, Energy and Natural Resources Completed 1,297,940.00 Kapsoit Feedback
Sitotwet-Samutet Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 692,264.80 Kapsoit Feedback
Cheboit-Tingoro Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,849,252.00 Kipkelion Feedback
Chepkechei - Kaplekwa - Kipteris FGIK Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 4,872,280.00 Chilchila Feedback
Construction Of Sinonin-Itondo AGC 2Km To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,849,885.00 Kabianga Feedback
Tuiyo Market To promote environmental health and sanitation Trade, Industrialization, Cooperative Development, Tourism and Wildlife Completed 407,500.00 Kunyak Feedback
Construction of a 3 door pit latrine at Lalwat ECDE Centre Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 1,810,500.00 Kisiara Feedback
Kipchimchim/Lower Kinyose/Kipsotet Water Projects To improve water access and distribution efficiency by installing a reliable pipeline network for the targeted service area.systems, and associated fittings, ensuring reliable water delivery to the target community Water, Environment, Energy and Natural Resources Completed 1,486,226.80 Kipchimchim Feedback
Tree seedlings/ fencing To support sustainable tree nursery development and environmental conservation by supplying, delivering, and installing UPVC storage tanks for reliable water access. Water, Environment, Energy and Natural Resources Completed 1,528,100.00 Kipkelion Feedback
Soet- Itibet Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,945,620.00 Kapsoit Feedback
Siret Centre-Siret Factory- Boror Bridge Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,738,050.00 Kipkelion Feedback
Chepkitar Centre - Toroton Boundary - Yalla Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,251,040.00 Chilchila Feedback
Construction Of Dispensary Sanga- Kap Senetor Road 2.6km, Kapmawei Dispensary- Kiptome Road 1.5Km To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,854,254.28 Kabianga Feedback
Roret Market To improve hygiene standards for traders and users Trade, Industrialization, Cooperative Development, Tourism and Wildlife Completed 1,339,075.00 Kisiara Feedback
Construction of a 3 door pit latrine with urinal at Cheptagum ECDE Centre Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 3,999,900.00 Tebesonik Feedback
Kiboet Borehole water project To provide a reliable and efficient submersible pump system capable of meeting the site’s water supply or dewatering needs. Water, Environment, Energy and Natural Resources Completed 1,407,544.00 Cheptororiet/Seretut Feedback
Solarization of Chebilawa water supply To provide sustainable and reliable water supply through solarisation, installation of a pump, and construction of a control house for secure and efficient system operation Water, Environment, Energy and Natural Resources Completed 1,772,596.00 Chemosot Feedback
Masaita Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 925,343.60 Londiani Feedback
Siret-Tuiyobei Road,Off C35-Chemagel-Quarry Road,Kaborok-Kipchorian Road, Kaborok Tuiyobei To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,889,822.80 Kipkelion Feedback
Toroton - Tulwapmoi Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,282,200.00 Chilchila Feedback
Construction Of Kap Peter- Masarian Pry- Masombok- Kap Joshua Road 2.5Km To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 4,965,900.00 Kapsuser Feedback
Chesigot FCs To support coffee storage and quality management Trade, Industrialization, Cooperative Development, Tourism and Wildlife Completed 1,010,130.00 Kunyak Feedback
Kabusienduk Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 3,348,608.00 Tebesonik Feedback
Cheptororiet Borehole Water Project To procure and deliver high-quality drilling materials that meet the technical and operational requirements of the project. Water, Environment, Energy and Natural Resources Completed 4,095,960.00 Cheptororiet/Seretut Feedback
Last mile Connectivity in Ainamoi ward To expand water supply coverage by connecting unserved households, schools, and institutions to the existing water distribution network under the Last Mile Connectivity initiative. Water, Environment, Energy and Natural Resources Completed 1,504,550.00 Ainamoi Feedback
Baration Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 821,551.44 Londiani Feedback
Sugutek-Kalyet Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,445,996.00 Kipkelion Feedback
Chilchila Quarry(Tinderet Forest Road) To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 5,007,926.00 Kamasian Feedback
Construction Of Jericho-Master Seed- Kapzablon-Pentagon-Chemosi-Sesga Road 1.8 Km To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 4,165,000.00 Kapsuser Feedback
Kosiachtany FCs To reduce milk spoilage and improve quality Trade, Industrialization, Cooperative Development, Tourism and Wildlife Completed 398,500.00 Sigowet Feedback
Kenene Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 4,739,032.00 Tebesonik Feedback
Cheptororiet borehole water project To equip an existing borehole with all necessary components to enable a sustainable and efficient water supply system. Water, Environment, Energy and Natural Resources Completed 3,013,332.00 Cheptororiet/Seretut Feedback
Rehabilitation of Kipngetuny Water Project To expand water supply coverage by connecting unserved households, schools, and institutions to the existing water distribution network under the Last Mile Connectivity initiative. Water, Environment, Energy and Natural Resources Completed 1,386,498.00 Kapsuser Feedback
Sereng-Chemosogon Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,525,543.80 Chilchila Feedback
Railway - Kipchorian River; Lesirwo - Kipchorian Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,875,885.00 Kipkelion Feedback
Tendwet - Malinja - Magire Dispensary Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 5,942,712.00 Kamasian Feedback
Construction Of Sesgaa-Kapsoiyo Primary School-Kipkoiyan Corner Road 5Km To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,513,640.00 Kapsuser Feedback
Kipagenge FCs To enhance milk distribution efficiency Trade, Industrialization, Cooperative Development, Tourism and Wildlife Completed 1,049,670.00 Litein Feedback
Construction of an ECDE classroom at Chepkong'ony ECDE Centre Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 4,231,788.00 Chemosot Feedback
Seretut 1 To provide communities with improved access to clean and safe water through the extension of the water distribution network. Water, Environment, Energy and Natural Resources Completed 3,000,000.00 Cheptororiet/Seretut Feedback
Sosiot Water Project Lastmile Connectivity To expand and improve the existing water supply system through the extension of the distribution pipeline and rehabilitation of existing storage infrastructure, ensuring increased water access and reliability for the target population Water, Environment, Energy and Natural Resources Completed 1,850,028.00 Waldai Feedback
Morombit-Maji Moto Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,362,594.00 Chilchila Feedback
Kapkwen-Chesonoi-Kabirong Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,712,048.00 Kunyak Feedback
Misoi-Chumba Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 4,191,360.00 Kamasian Feedback
Construction Of Kaptebeswet-Kigorwet AGC-Mosombok Stream 1.9Km, Kiboito TBC-Kapchogeka-Kiboei AGC- Sachoran Road 5.5Km, Bot Musa Road 0.1Km To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 4,219,000.00 Kapsuser Feedback
Support to Cooperatives To digitize cooperative operations and record management Trade, Industrialization, Cooperative Development, Tourism and Wildlife Completed 289,120.00 Soliat Feedback
Construction of Pit latrine at Bargiro ECDE Centre Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 8,172,396.00 Chemosot Feedback
Seretut Borehole Water Project To provide all required drilling materials that meet industry standards and project specifications for water borehole drilling or geotechnical investigations. Water, Environment, Energy and Natural Resources Completed 7,168,974.00 Cheptororiet/Seretut Feedback
Kiptuigo-koiyet rd To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,643,870.80 Cheboin Feedback
Tunnel Centre-Chepkosa Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 4,988,144.00 Chilchila Feedback
Koteteni-Chepsil,Girimori-Urafiki Factory To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,973,507.00 Kunyak Feedback
Kipsongol-Kap Luso-Chemongen Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,952,704.00 Kamasian Feedback
Construction Of Off Chebungungon Road-Kesagetiet TBC Road 1.8Km, Kapelexanda-Chemosn-Kapstephano-Kapturmesendo-Brazil Road 4Km/3.7km, Kap Mathayo-Chepngetuny Road 1.4Km To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,680,313.00 Cheptororiet/Seretut Feedback
Support to Cooperatives To improve milk handling and hygiene Trade, Industrialization, Cooperative Development, Tourism and Wildlife Completed 879,630.00 Kapsoit Feedback
Construction of pit latrine at Kabartegan ECDE Centre Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 1,865,596.00 Chemosot Feedback
Seretut Primary and Chemogoriet AIC Water Tanks To enhance access to safe, reliable, and sustainable water supply through improved storage, infrastructure rehabilitation, and expanded distribution. Water, Environment, Energy and Natural Resources Completed 1,842,486.00 Cheptororiet/Seretut Feedback
Spencon- KapChebo School Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,387,548.00 Cheboin Feedback
Mendera Dispensary- Kiptenden-Kipchorian Footh Bridge Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,232,400.00 Chilchila Feedback
Girimori-Chesonoi Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 7,495,838.80 Kunyak Feedback
Kasheen-Morao Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 5,459,964.00 Kamasian Feedback
Construction Of Chemoson - Kapturmesedet- Kap Stephano- Brazil Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,688,508.80 Cheptororiet/Seretut Feedback
Fortenan Museum To enhance comfort for visitors and promote tourism Trade, Industrialization, Cooperative Development, Tourism and Wildlife Completed 2,596,808.96 Chilchila Feedback
Construction of a pit latrine at Kapkusum ECDE Centre Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 6,905,292.00 Chemosot Feedback
Cheptororiet Borehole Water Project (Extension) To enhance access to safe, reliable, and sustainable water supply through improved storage, infrastructure rehabilitation, and expanded distribution. Water, Environment, Energy and Natural Resources Completed 2,088,000.00 Cheptororiet/Seretut Feedback
Ngororga-cheptigit sachangwan rd To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,483,941.35 Cheboin Feedback
Kamiwa-Kamotos Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,300,008.00 Chilchila Feedback
Girimori-Urafiki Factory;Kotetni-Chepsil Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,411,314.00 Kunyak Feedback
Kimeto-Kaplaba Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,704,032.00 Kamasian Feedback
Construction Of Greenfield -Sambeek Clinic- Kapcheren- Ainapkoi Road 3Km; Kipsolu Agc- Kibaraa Road 1.6Km; Chepkoton Bridge- Milimani TBC- Maina Road 2Km To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 4,163,155.55 Cheptororiet/Seretut Feedback
Sosiot Market To improve sanitation and hygiene Trade, Industrialization, Cooperative Development, Tourism and Wildlife Completed 3,996,353.70 Waldai Feedback
Construction of a toilet at Nyambolosa ECDE Centre Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 3,229,712.00 Litein Feedback
Tea Farm To provide communities with improved access to clean and safe water through the extension of the water distribution network. Water, Environment, Energy and Natural Resources Completed 4,141,200.00 Kabianga Feedback
chakoror-chematui rd To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,279,516.00 Cheboin Feedback
Koisegem- Nyanza Boundary Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,645,049.00 Chilchila Feedback
Kenegut-Tumoek-Kapkurin Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,969,654.01 Kunyak Feedback
Kasheen-Borowet-Murau Pry Sch. Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 6,553,241.00 Kamasian Feedback
Construction Of Kesagetiet Tbc-Kiptserten; Kap Mathayo – Chepngetuny Pri-Arap Koech Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,150,478.80 Cheptororiet/Seretut Feedback
Tebesonik Market To promote market hygiene and sanitation Trade, Industrialization, Cooperative Development, Tourism and Wildlife Completed 4,855,760.00 Tebesonik Feedback
Construction of a classroom at Kapsogeruk ECDE centre Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 2,724,750.00 Litein Feedback
Kapcheluch Borehole Water Project To procure and deliver high-quality drilling materials that meet the technical and operational requirements of the project. Water, Environment, Energy and Natural Resources Completed 4,617,960.00 Kabianga Feedback
Off C23-chemosot- Chebulu TBC-Chereres - kaminjeiwet Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 9,963,559.04 Cheboin Feedback
Kimugul Dispensary- Kapcheplanget Railways Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,158,216.00 Chilchila Feedback
Nyanza-Girimori-Kapwen Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,952,210.00 Kunyak Feedback
Muharate-Nyairobi-Jagoror Road;Jagoror-Some Road;Jagoror-Kap Sharack Road;Makutano-Nyairobi Sec Road-Kiplaba-Kimologitbridge Road-Kap Sugurup-Greenland Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,134,000.00 Kamasian Feedback
Construction Of Sosiot-Chepkoin 3.6Km, Cheimen- Barabu TBC Road 1.4Km To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,687,577.25 Waldai Feedback
Litein Market To expand and modernize market facilities Trade, Industrialization, Cooperative Development, Tourism and Wildlife Completed 3,651,596.00 Litein Feedback
Construction of a pit latrine at Kibolgong Ecde Centre Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 3,229,712.00 Tebesonik Feedback
Kapcheluch borehole water Project Construct a modern and hygienic ablution block to improve sanitation and convenience for users. Water, Environment, Energy and Natural Resources Completed 2,976,560.00 Kabianga Feedback
Chemosit - chebarema - kabitungu rd To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 19,780,000.00 Chemosot Feedback
Three Ways- Kap Micheal Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,490,313.48 Chilchila Feedback
Kenegut-Kapkurin Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,253,487.00 Kunyak Feedback
Lelu Centre-Corner Junction Road 3.7KM;Kamtego-Monastry Road 1.2km;Of D312 -Lelu Dispensary Road 15km To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,116,050.00 Kipkelion Feedback
Construction Of Cheptenye Sign Post-Nukiat Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,499,503.00 Waldai Feedback
Chepngisiriet Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 5,220,424.00 Waldai Feedback
Koisegem ECDE Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 3,064,048.00 Chilchila Feedback
Kapcheluch borehole water Project Reliable Water Supply System, Safe and Accessible Water Distribution,Equipping of Borehole,Installation of Water Storage Tank on Painted Steel Tower Water, Environment, Energy and Natural Resources Completed 2,883,760.00 Kabianga Feedback
Awrorwet TBC- Bargiro Primary- Kiptyemat River Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 420,000.00 Chemosot Feedback
Yala- Chepkitar Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 882,783.20 Chilchila Feedback
Asenewet - Judo - Kipsitet Highway; Rai Cement - Kaplelach Pry Road; Rai Cement - Kaplelach - Kisumu Concrete; Cheptagum- Chebirech Road; Kapsombich-Kaptalamwa To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,850,742.40 Soin Feedback
Kapsugurup - Greenland - Kichagi Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,450,064.00 Kipkelion Feedback
Construction Of Off Cheribo-Chemoroch Road 3Km To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,704,086.04 Waldai Feedback
Mereonik Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 2,043,959.00 Kapsuser Feedback
Toroton Polytechnic (1 Workshop) To provide accessible, practical, and industry-relevant technical education and vocational training. Education, Youth Affairs, Sports, Culture and Social Services Completed 544,460.00 Chilchila Feedback
Kapcheluch To provide communities with improved access to clean and safe water through the extension of the water distribution network. Water, Environment, Energy and Natural Resources Completed 1,046,871.00 Kabianga Feedback
Chebotawa- Getarwet- Samuget Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 6,192,474.40 Chemosot Feedback
Makire- Or Tenden- Teldet Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 587,604.00 Chilchila Feedback
Rai Cement-Kaplelach Pry-KSM Concrete ;Cheptagum-Chebirir Road,Kipkombich-Kiptalamwama Road,Kapchebwai-Kapnyoge Road,Kejiriet Dip-Cheptililik Pry;Asenetwet-Judo-Kipsitet-Dip Bridge Road,Cheptililik Pry-Kipsitetet Ngerermwo Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,900,080.80 Soin Feedback
Siret Centre-Siret Quarry; Chemager Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 6,553,241.00 Kipkelion Feedback
Construction of Chesingei – Cheptalus Road 0.4km; Atebwo TBC – Koweek River Road 0.7km; Kwa Aurelius – Tuiyobei Kapstanley Road 1.5km To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,959,472.00 Cheboin Feedback
Samiytuk Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 1,703,504.60 Kapsuser Feedback
Workshop Kipsimbol Polytechnic To provide accessible, practical, and industry-relevant technical education and vocational training. Education, Youth Affairs, Sports, Culture and Social Services Completed 2,572,995.00 Kipkelion Feedback
Kibingei To enhance access to clean and reliable water supply for the targeted community through the use of appropriate, sustainable, and low-maintenance technologies. Water, Environment, Energy and Natural Resources Completed 2,270,140.00 Kabianga Feedback
Rutheren kiletien rd To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,820,000.00 Chepseon Feedback
Yala- Kipteres- Kap Meshack Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,399,700.00 Chilchila Feedback
Bokwo - Kapchebwai Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,986,676.00 Soin Feedback
AGC-Machilil Road; Tuiyobei- Arap Ngeno-Tilolwet Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,134,000.00 Kipkelion Feedback
Construction of Cllr Jane- Dip – Kimwogit Kongasis Road 1km; Cheptinet – Kapchebo Road 1.9km; Kaptangul – Kapcheluget Road 5.5km To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,701,897.00 Cheboin Feedback
Kapsisiywo Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 2,321,351.00 Kabianga Feedback
Construction of an ECDE classroom and pit latrine at Magire ECDE Centre Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 2,654,708.00 Chilchila Feedback
Rising main overhaul To provide communities with improved access to clean and safe water through the extension of the water distribution network. Water, Environment, Energy and Natural Resources Completed 2,392,780.20 Kabianga Feedback
Off-B1 - Chepsir - kipkeremwo rd To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 729,988.00 Chepseon Feedback
Kaplelit- Cherara Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,413,692.00 Chilchila Feedback
Cheptilili-Chebotot-Ngeremwo Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,810,349.20 Soin Feedback
Faith Church-Arap Moi Road;Chepkei-Chepkolon Road;Chepkiber-Kaplekwa-Kapkiyao Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 6,069,688.00 Kipkelion Feedback
Construction of Kapdaut – Kiptewit Dispensary Road 1.5km; Chebaibai – Tetile Road1.5km; Kapkitende – Birirbei Road 0.5km To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,999,158.00 Cheboin Feedback
Kapchebet Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 2,196,614.00 Kabianga Feedback
Construction of Toilet at Murao/ Kapluso ECDE Centre Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 2,015,955.00 Kamasian Feedback
Ainaptuga springs To improve access to safe and sustainable drinking water for the community by protecting natural springs and establishing reliable water points. Water, Environment, Energy and Natural Resources Completed 3,219,541.26 Kapsuser Feedback
kapkatunga - kaplamboi To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,818,781.00 Chepseon Feedback
Junction Nyairobi- Karap Siongok Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 751,680.00 Chilchila Feedback
Kipkombich-Kaptalamwa Road;Cheptagum-Chebirech Road;Chepterwo-Chebirech Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,400,000.00 Soin Feedback
Quarry -Fuko Coffee Society Road; Quarry - KitobenRoad To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,242,810.00 Kipkelion Feedback
Construction of Chematui – Bosco – Korongoi Girls Road 2.3km To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,359,288.00 Cheboin Feedback
Mobego centre Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 2,175,120.00 Kabianga Feedback
Construction of an ECDE classroom and at Chebitet ECDE Centre Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 2,189,313.00 Kamasian Feedback
Cheptingit Project To enhance access to safe, reliable, and sustainable water supply through spring protection, improved storage, infrastructure rehabilitation, and expanded distribution. Water, Environment, Energy and Natural Resources Completed 3,717,180.75 Kapsuser Feedback
Kaplelit - kamiwa - Kapkese rd To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,281,220.00 Chilchila Feedback
Chepkechei- Songonyet Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 458,500.00 Chilchila Feedback
Kaplengeny - Sachangwan - Kiplogoi Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,045,772.16 Soliat Feedback
AGC - Kipchorian - Machilil Road; Tuiyobei - Arap Ngeno - Tilolwet Road; Barsiele Centre - Chorwet Pry - Sugutek Road; Trailor - Kapsoheria Road; Cereal - Magunia Road; Sachwangan - Belsoi Road; Katepia - Mama Major Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,618,532.00 Kipkelion Feedback
Construction of Kipwastuiyo-Asururiet Bridge Road 1.2Km, Lelach Junction-Lelach Girls Road 0.7Km, Joyland Academy-Chesanga Pry Shool Road 0.3Km, Asururiet Bridge- Masubeti Pry School Road 1.2Km, Kipwastuiyo Mkt- Kenene Quarry Road 2Km (Grading Only) To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 6,222,555.00 Cheplanget Feedback
Kesegetiet ecde centre Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 853,300.00 Cheptororiet/Seretut Feedback
Construction of twin workshop at Kiptere VTC Phase I To provide accessible, practical, and industry-relevant technical education and vocational training. Education, Youth Affairs, Sports, Culture and Social Services Completed 4,457,140.00 Kaplelartet Feedback
Cheptingit Water Project (Masonry Tank) Provide and install a Horizontal or Vertical Centrifugal Pump capable of meeting the required flow rate and head Water, Environment, Energy and Natural Resources Completed 6,265,337.25 Kapsuser Feedback
Kabianga girls - maranata To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 899,928.00 Kabianga Feedback
Ndubusat- Kaptuiya- Chepkechei- Kipteris Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,240,000.00 Chilchila Feedback
Kapsegut Quarry For Gravelling Kapsimba - Chesiche Road; Chesiche - Kabokyek Road; Chesiche - Tuiyobei Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,432,128.00 Soliat Feedback
Kobiro-Macheisok Road 5km;Miti Moja-Blue Hills Dip Road 3km; Kimologit-Blus Hilss Road 5km To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,217,234.00 Kipkelion Feedback
Construction of Mosore Dip- Kap Daktari Road 1.6Km; Sachangwan- Roret ICT Road 2Km; Tendwet- Arap Leitich Road 1.5Km To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,517,289.28 Kisiara Feedback
Kiboet ecde centre Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 3,945,879.20 Cheptororiet/Seretut Feedback
Siritiet Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 2,391,476.00 Tebesonik Feedback
Sosiot Water Supply Ensure a reliable water intake system and efficient filtration to enhance water quality and supply reliability, Install an Elevated Backwash TankIntegrate Essential Accessories and FittingsTesting and Commissioning Water, Environment, Energy and Natural Resources Completed 4,752,200.00 Waldai Feedback
Kabianga bridge -Chepnyogaa Jnc - Mobego rd To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,500,000.00 Kabianga Feedback
Toroton-Malinja- Yalla- Tulwab Moi Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 4,499,124.00 Chilchila Feedback
Chesiche-Kabokyek Cattle Dip, Tuiyobei Pry-Kapsimba Road,Kaprero-Chesiche Pry Road,Kaptala-Chesiche Academy Road, Kap Elisha-Tenduet- Tuiyobei Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,492,554.16 Soliat Feedback
Agc - Kipchorian - Machilil To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,614,693.00 Kipkelion Feedback
Construction of Mosore Dip- Kap Daktari Road 1.6Km; Sachangwan- Roret ICT Road 2Km; Tendwet- Arap Leitich Road 1.5Km To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,705,025.00 Kisiara Feedback
Kiletien Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 5,303,172.00 Kabianga Feedback
Construction of a toilet at Tiriitab Eito ECDE Centre Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 2,168,937.00 Tebesonik Feedback
Cheribo springs To improve access to safe and sustainable drinking water for the community by protecting natural springs and establishing reliable water points. Water, Environment, Energy and Natural Resources Completed 4,420,005.00 Waldai Feedback
Kaptembwo - Leldet - polythcnic - kipsegi rd To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 836,875.00 Kamasian Feedback
Koiset- Kutung Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 4,051,518.00 Kamasian Feedback
Soko Huru Kapsogut Road, Shauri-Kinoyo Road, Posta-Chemutian Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,870,815.50 Soliat Feedback
Tuiyobei - Arap Ngeno - Tilolwet Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,134,000.00 Kipkelion Feedback
Routine Maintenance of Kabianga University- Chematich- Kaptirbet Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,020,573.84 Kapkatet Feedback
Kapkonga/kiptenden Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 3,500,000.00 Waldai Feedback
Kaminjeiwa Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 4,099,400.00 Tebesonik Feedback
Chepkoin To improve access to safe and sustainable drinking water for the community by protecting natural springs and establishing reliable water points. Water, Environment, Energy and Natural Resources Completed 1,435,397.92 Waldai Feedback
kerio valley - Nyairobi zongonyet rd To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,791,761.00 Kamasian Feedback
Morau Centre- Morau Sec School- Karap Ng'eny Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 802,005.44 Kamasian Feedback
Tuiyobei Bridge-Soliat-JoRoadan Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed N/A Soliat Feedback
Barsiele Centre – Kipchorian – Machilil Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,493,844.00 Kunyak Feedback
Construction of Kap Johna-Cheribo Road 2Km; 954Mission-Arap Lele Road 1Km; Nyambolosa-Kipkurgat Road 0.6Km; Kipkuna- Chebwagan TBC Road 2Km; Lebekwet-Kolonget Road 0.7Km; Kap Bembe-Munywet Road 0.2Km To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,387,763.68 Litein Feedback
Chepkutbei Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 3,335,863.04 Cheptororiet/Seretut Feedback
Construction of a pit latrine at Kusumek ECDE Centre Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 3,896,440.00 Chemosot Feedback
Kiptaldal To improve access to safe and sustainable drinking water for the community by protecting natural springs and establishing reliable water points. Water, Environment, Energy and Natural Resources Completed 4,963,970.00 Waldai Feedback
Kaptirbet-Kaptich-Kabianga University Campus rd To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 357,375.20 Kapkatet Feedback
Kosongocho- Chepkunyuk Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 925,035.04 Kamasian Feedback
Chesiche Pri-Kamugut Road;Soko Ndizi-Kapchebungei Road,Kapchangarie- Kaplengei Road,Sombicho-Kipkecheiyet Road,Sombicho-Samutet Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,900,037.16 Soliat Feedback
Off Main Road - Chemagel Road; Siret Centre Coffee Factory Road; Kimologit Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,763,520.00 Kunyak Feedback
Construction of Kaptibin- Kap Chief- Tabet Road 1.5Km, Barotion- Kiptongit- Kapkarin Road 3.2Km, Chebwagan AIC_ Kipkuna Road 1.5Km To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,941,176.68 Litein Feedback
Chepkoson/ ngainet Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 3,800,000.00 Waldai Feedback
Construction of a pit latrine at Kamenjo ECDE Centre Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 3,598,436.00 Tebesonik Feedback
Musumen To improve access to safe and sustainable drinking water for the community by protecting natural springs and establishing reliable water points. Water, Environment, Energy and Natural Resources Completed 3,222,037.87 Waldai Feedback
ainapkarik bridge-mabwaita TBC road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 740,875.00 Kapkatet Feedback
Off D312-Nyasakia-Kapkures Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,547,711.20 Kamasian Feedback
Kabokyek-Chesiche-Tuiyobei-Motero-Kiptenten Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,352,380.00 Soliat Feedback
Kiptenden Kapkurin Road; Kapkurin-Kamiron Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 6,561,740.00 Kunyak Feedback
Kaptebengwet-Inat Road 1.9km,Chemobei-Kapjohnstone-Nyamanga Road 2km,Nairobi-Kaptebengwo Road 0.4km To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,523,634.48 Tebesonik Feedback
Chepngisiriet Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 1,223,300.00 Waldai Feedback
Construction of a 3 door pit latrine at Kaptirbet ECDE Centre Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 4,097,537.60 Kapkatet Feedback
sosiot water supply project To provide communities with improved access to clean and safe water through the extension of the water distribution network. Water, Environment, Energy and Natural Resources Completed 1,904,140.00 Waldai Feedback
Keongo-st jpsephs catholic –prison To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,750,048.00 Kapkugerwet Feedback
Kipkelion- Kap Laban To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,530,388.00 Kipkelion Feedback
Kaitui Center-Birirbei-Chemutian Dip Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 937,535.20 Soliat Feedback
Nyanza- Girimori - Kapkwen Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 6,071,160.00 Kunyak Feedback
Kaptebengwo- Innat Road 1.7Km, And Chemobei- Kap Johnstone-Nyammaganga Road 1.8Km, Nairobi- Kaptebengwet Road 0.4Km To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,697,524.28 Tebesonik Feedback
Turguito Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 1,282,800.00 Waldai Feedback
Construction of a classroom at Kimugul ECDE Centre Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 4,495,710.85 Kapkatet Feedback
Itanda masonry Tank To enhance access to safe, reliable, and sustainable water supply through improved storage, infrastructure rehabilitation, and expanded distribution. Water, Environment, Energy and Natural Resources Completed 1,419,341.20 Waldai Feedback
Main Junction-Kaboloin Dispensary culverts To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,895,000.00 Kapsaos Feedback
Manyanni- Kitobe Nursery Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,157,216.00 Kipkelion Feedback
Arap Ngeny-Brendashop Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,089,611.20 Soliat Feedback
Kapkwen - Chesonoi - Kabirong - Kapkurin - Kiptenden Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,086,463.00 Kunyak Feedback
Proposed Routine Maintenance of Ngoina Agc- Kipsamoi Cattle Dip Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,727,312.56 Tebesonik Feedback
Mereonik Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 997,600.00 Kapsuser Feedback
Construction of a classroom at Chebagal ECDE centre Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 4,491,520.00 Litein Feedback
Ainamoi Water Project Lot 1 To enhance access to clean and sustainable water supply by constructing pipelines ensuring reliable water delivery to the target community Water, Environment, Energy and Natural Resources Completed 1,796,770.40 Ainamoi Feedback
Lemeiywet - Kenegut rd To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 404,989.00 Kapsoit Feedback
Kimologit- Kware Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 498,200.00 Kipkelion Feedback
Shauri Yako-Kaitui Mkt Road,Kaitui Bridge-Coffee Factory Road,Sombicho Highway-Brenda Shop Road,Ngeny Road,Sombicho Pry-Samutet Road,Sombicho Pry - Kipkecheiyet Road,Kapchangarie-Kaplengei Road,Chesiche- Kapsimba Road,Chesiche -AGC Road,Chesiche-Kabokyek Road,Chesiche -Tuiyobei Road., To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,500,000.00 Soliat Feedback
Minihaha - Sirgoi Pry Sch Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,438,585.00 Kunyak Feedback
Proposed Routine Maintenance Cheptagum-Kibirech Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,620,249.57 Tebesonik Feedback
Samiytuk Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 3,642,600.00 Kapsuser Feedback
Construction of a classroom at Nyambolosa ECDE centre Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 3,499,752.48 Litein Feedback
Ainamoi Water Project Lot 2 To enhance access to clean and sustainable water supply by constructing pipelines ensuring reliable water delivery to the target community Water, Environment, Energy and Natural Resources Completed 1,686,292.00 Ainamoi Feedback
Masarian AGC - Borborwet TBC RD To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 7,907,735.08 Kapsuser Feedback
Chumba- Chupait Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,273,580.00 Kipkelion Feedback
Keteswa-Mwebe-Chepngoror Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,299,969.86 Sigowet Feedback
Dip - Kolonget - Ngebebo Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 6,210,708.00 Kunyak Feedback
Kap Joseph Maritm- Kap57-Kap George Mutai- Kipkeles Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,700,246.80 Tebesonik Feedback
Sanga Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 3,305,600.00 Kabianga Feedback
Construction of pit latrine at Kelunet ECDE Centre Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 3,097,880.00 Tebesonik Feedback
Kaborus water project To enhance access to clean and sustainable water supply by constructing pipelines, water tanks & associated fittings ensuring reliable water delivery to the target community Water, Environment, Energy and Natural Resources Completed 3,445,258.00 Ainamoi Feedback
Kapnandet -kapnandet- kakiptui dispensary TG49 rd To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 612,248.00 Kapsuser Feedback
Chumba- Sachangwan Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 687,085.00 Kipkelion Feedback
Kipranye-Kabasweti-Mindililwet Road;Cheptuiyet Centre-Chemanget Road;Cheptuiyet Girls-Kululut River Road ;Kapeli Pry-Sigowet KMTC ROAD;Lutheran Church -Sigowet-Cheptembe Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,002,379.24 Sigowet Feedback
Kotetni - Chemunyala - Cherara Road 4.5km; Chepsii - Kapsale Pry - Chemunyala Road 3.2km; Chelalo - Kilengel Road 3.1km; Timbilil - Ngola Road 2km; Kabirong - Kapkwen Road 3.5km To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,630,143.00 Kunyak Feedback
Construction Of Kamiwa-Kamotos Road 4.1Km To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,145,560.40 Chilchila Feedback
Kapchebet Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 3,755,738.00 Kabianga Feedback
Kiboito Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 4,676,770.00 Kapsuser Feedback
Kimigik Water project To enhance access to clean and sustainable water supply by constructing pipelines ensuring reliable water delivery to the target community Water, Environment, Energy and Natural Resources Completed 1,529,919.82 Ainamoi Feedback
Lelsotet - tegat rd To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,136,858.00 Kedowa/Kimugul Feedback
Sachangwan- Kanaan Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 611,024.00 Kipkelion Feedback
Cherote - Kigomba Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 4,859,466.20 Sigowet Feedback
Kipsitet-Mbasa Road; Kipsitet bridge-Kaplabotwo Road; Ngeremwo-Kipsitet dip Road; Nunda-Kipteran Road; Kipteran-Nyaberi Road-Laitigo pry-Maemba Road; Laitigo pry- kapsermi Road; Kapsimingoi-Ndanyomare Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 6,467,128.00 Soin Feedback
Construction Of Chemosogon- Kipsegi- Kimologit Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,495,922.16 Chilchila Feedback
Chemoson Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 1,986,036.00 Cheptororiet/Seretut Feedback
Chesiche Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 1,553,000.00 Kaplelartet Feedback
Senetwet/Ketipyese water project. To strengthen water supply infrastructure by providing durable pipes and fittings for construction, rehabilitation, and extension of distribution networks. Water, Environment, Energy and Natural Resources Completed 1,110,013.28 Ainamoi Feedback
Kabasenwo-Senetwet(Kamusar) Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 527,100.00 Soin Feedback
Chepkemel Shopping Centre - Arap Cheruiyot- Chepkwer- Sumeek Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,781,416.00 Kaplelartet Feedback
Kabore-Cheptililik Road; Cheptililik-Kapkatit Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 5,882,330.00 Soin Feedback
Construction Of Chemosogon- Kipsegi- Kimologit Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,205,365.36 Chilchila Feedback
Construction of a four-door toilet Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 2,346,120.00 Cheptororiet/Seretut Feedback
Tabet/sosur Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 119,000,000.00 Kaplelartet Feedback
Seretut Borehole Water Project(Equipping) To equip an existing borehole with all necessary components to enable a sustainable and efficient water supply system. Water, Environment, Energy and Natural Resources Completed 1,343,653.60 Waldai Feedback
Kimungen- kwa oriango- kipkeles- kwa sambu- kap eli road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 820,875.00 Kipchebor Feedback
Kapingok-Kapchepkaigat - Kurabei- Chesunet Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 518,552.00 Soliat Feedback
Cherote-Obot Recho-Kap Kapkamano-Cherote Sondu Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 936,463.12 Kaplelartet Feedback
Ngeremwo-Chebotot Road; Maemba Road; Mbasa Road; Asenwet Road; Cheptagum Road; Laitigo primary Road; Koitaburot Road; Kapkatit Road; Cheptililik Road; Cheptororwo Road; - kipteran-Chepsengeny Sch; ndonyomare Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 5,145,134.00 Soin Feedback
Construction Of Burutu Junction- Kapkese Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,613,823.82 Chilchila Feedback
Korosiot Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 2,180,619.04 Cheptororiet/Seretut Feedback
Kaplelartet Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 1,594,500.00 Kaplelartet Feedback
Sosiot Pipeline Extension To enhance access to clean and sustainable water supply by constructing pipelines ensuring reliable water delivery to the target community Water, Environment, Energy and Natural Resources Completed 2,025,295.04 Waldai Feedback
Kapkwen Tbc- Ainamoi Quarry To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,800,000.00 Kipchimchim Feedback
Kipkecheiyet-Baregeiwet Bridge-Baregeiwet Pry Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 521,083.50 Soliat Feedback
Gravelling of Simbi Box Culvert and Simbi Pry Sch Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,403,551.86 Soin Feedback
Tobentai-Kipyoren-Kapkormom Road;Moetik-Tobentai;Kap Macharia-Kipyoren Road,Kap Gravel-Chemaluk Road;Kaplelach-Kwondop Morsong-kaplelach Bridge -Chepsengeny Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed N/A Soin Feedback
Construction Of Barsiele Centre-CDA Road 3.9Km, Off C35-Sugutet Primary-Kalyet Road 0.9Km To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,486,994.72 Kipkelion Feedback
Kiboetedce toilet Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 1,341,934.40 Cheptororiet/Seretut Feedback
Kamolok Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 820,000.00 Kaplelartet Feedback
Sosiot Pipeline Maintenance and Rehabilitation To enhance access to clean and sustainable water supply by constructing pipelines ensuring reliable water delivery to the target community Water, Environment, Energy and Natural Resources Completed 1,221,255.00 Waldai Feedback
Kapkwen - Keldabeliot Rd To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 745,218.00 Kipchimchim Feedback
Kapkawa Shops -Kapkawa Bridge-Chemutian Dip Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 348,280.00 Soliat Feedback
Construction of Off Kabore- Kipsitet Pry School Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,500,000.00 Soin Feedback
Ngeremwo-Chebotot Road (6km) and Kwa Michael -Laitigo (4km) To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,989,046.20 Soin Feedback
Construction of Kapchepkeber-Faith Church Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,884,334.24 Kipkelion Feedback
Gesagetiet ECDE Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 1,357,238.28 Cheptororiet/Seretut Feedback
Ihanja/kabasweti Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 1,598,865.00 Sigowet Feedback
Sosiot Pipeline Extension To enhance access to clean and sustainable water supply by constructing pipelines ensuring reliable water delivery to the target community Water, Environment, Energy and Natural Resources Completed 1,059,671.60 Waldai Feedback
Sukutek - Kalyet Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 964,837.50 Kipkelion Feedback
Kaitui Centre-Birirbei-Chemutian Dip Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 701,834.00 Soliat Feedback
Construction of Kapkormom Pry- Kapkormom Junction Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,915,864.16 Soin Feedback
Kapkormom Pry - Kapkormom Dispensary Road - Kejiryet - Kaplaboitwa- Sideways - Kapchoge - Laitigo-Ngeremwo Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,588,980.00 Soin Feedback
Construction of Ngendalel Centre-Kipsimbol ECDE Centre-Kamachungwa Bridge Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,024,934.00 Kipkelion Feedback
Chebirirbei Polytechnic To provide accessible, practical, and industry-relevant technical education and vocational training. Education, Youth Affairs, Sports, Culture and Social Services Completed 2,261,536.00 Kabianga Feedback
Kibirirgut Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 19,670,000.00 Sigowet Feedback
Sosiot Pump repair To provide a reliable and efficient Horizontal Multistage Centrifugal Pump capable of meeting the site’s water supply or dewatering needs. Water, Environment, Energy and Natural Resources Completed 1,155,637.24 Waldai Feedback
Kaproret-Rwandit AIC Church rd To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 756,875.00 Kisiara Feedback
Kaitui Pentacostal-Sauri Yako Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,677,180.00 Soliat Feedback
Routine Maintenance of Kiptenten-Kapkurin Road Potholes patched, ,surface grading completed. Public Works, Roads and Transport Completed 1,260,746.00 Kunyak Feedback
Kongeren river- Birirbei-Kapchelemei Road; Arap Chebochok-Arap Chepkoit; Kongeren pry Road; Kap Ingok-Birirbei Road; Chepkoson Road; Chepkoson-Kapsigilai Road; Kapchesilim-Kabokyek cattle dip road; Arap Seronik-sesgaa Road-Sesgaa-Kapsegut Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 4,043,160.00 Soliat Feedback
Construction of Off C35-Kap Zephania Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 4,364,937.32 Kipkelion Feedback
Community Empowerment Enable communities to identify their needs, mobilize resources, and implement solutions independently Education, Youth Affairs, Sports, Culture and Social Services Completed 2,904,460.00 Chaik Feedback
Kipsamoi Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 5,250,000.00 Sigowet Feedback
Litein Water Supply To provide communities with improved access to clean and safe water through the extension of the water distribution network. Water, Environment, Energy and Natural Resources Completed 1,155,513.12 Soliat Feedback
Chamamanik - kelelwa culvert installation To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,802,524.00 Kisiara Feedback
Kaitui Dispensary-Kapkawa Bridge Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 470,960.00 Soliat Feedback
Itibet - Bagao- Deliverance Church Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 10,338,300.00 Ainamoi Feedback
Soliat corner-Kiptugumo pry Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed N/A Soliat Feedback
Construction of Kimologit Quary- Kimologit Coffee Factory Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,182,900.80 Kipkelion Feedback
Construction of a 3 door pit latrine at Kaplemeiywet Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 645,500.00 Kapsuser Feedback
Kipranye Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 9,499,848.00 Sigowet Feedback
Chepkosa Spring rehabilitation To improve access to safe and sustainable drinking water for the community by protecting natural springs and establishing reliable water points. Water, Environment, Energy and Natural Resources Completed 947,789.20 Soliat Feedback
Sireret B Kotetni-Kapkoros-Mlango Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 6,204,439.00 Kunyak Feedback
Chemutian Dip-Kibaiywo Factory-Kaitui Bridge Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 370,410.00 Soliat Feedback
Kiburet- Factory- Yasomok Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,205,220.00 Ainamoi Feedback
Kaplaba-kiptare-Kapcheptoo Road-kapkenyele Road;Kurabei-koyabeyon Road;Kurabei-Chesunut-Kapsigowo Road;Kapsigowo-Malanylem Road;Chesunut-Kapcherinyit Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 6,572,000.00 Soliat Feedback
Construction of Lesirwo- Chewen Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,609,099.84 Kipkelion Feedback
Renovation of ECDE classroom at Susumwet ECDE Centre Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 736,020.00 Kapsuser Feedback
Kibioren ecde centre Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 4,967,300.00 Sigowet Feedback
Ngororga Borehole Water Project To procure and deliver high-quality drilling materials that meet the technical and operational requirements of the project. Water, Environment, Energy and Natural Resources Completed 920,250.21 Soliat Feedback
Isacco-Lalagin Rd To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,081,000.00 Litein Feedback
Taprason-Kiptugumo Pry-Ainaitik Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,563,500.00 Soliat Feedback
Kap Zakayo- Ainamoi Polythecnic Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,307,200.00 Ainamoi Feedback
Tabrason-Kiptugumo Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 6,459,424.00 Soliat Feedback
Construction of Chamngei-Tingoro Road 1.4Km, Siret- Bakao Nursery Road 0.7Km, Siret-Kamachungwa- Chemengon-Kipchorian Bridge Road 1.7Km, Ngendalel-Kamcahungi-Kapkimolwo Road 1.2Km, Cheptole-Kamusa Road 1km, Segete-Kitoben- Karap Bore Road 2Km, Quarry-Kitoben Road 1.5Km, Kitoben Nursery-Segetet Road 1Km To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 4,479,558.08 Kipkelion Feedback
Construction of a pit latrine at Chekutung ECDE Centre Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 890,010.00 Kapsuser Feedback
Mindililwet Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 8,999,940.00 Sigowet Feedback
Tiroto, Lelach and Birirbei springs To improve access to safe and sustainable drinking water for the community by protecting natural springs and establishing reliable water points. Water, Environment, Energy and Natural Resources Completed 1,200,101.20 Soliat Feedback
Kapkitony banda-kapsimet river rd To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,858,915.00 Litein Feedback
Ainapitik-Sachangwan-Kiplogoi Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,449,950.00 Soliat Feedback
Nyinyitiet- Chemorir Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 560,000.00 Ainamoi Feedback
Kaboykek cattle dip - Kimugul Road; Kimugul koi Barak Road; kapsiongori - Arap ngeny Road; jolydab academy - kaprero Road; Arap Chepsengeny - Chemaluk Road; Chemaluk - Cheptembe Road; Kap injelio - Kap George Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,443,664.00 Soliat Feedback
Construction Of Kijawir-Kolonget-Arap Cheres -Tata Road 1.6Km To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,826,637.19 Chepseon Feedback
Construction of a pit latrine at Masarian ECDE Centre Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 750,000.00 Kapsuser Feedback
Kipkok Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 850,210.00 Kaplelartet Feedback
Ainap Kirgit Water Project to enhance water storage capacity, improve distribution efficiency, and increase community access to clean water, Water, Environment, Energy and Natural Resources Completed 1,225,699.62 Soliat Feedback
Lalagin junction-Lalagin sec. rd To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,600,800.00 Litein Feedback
Kapasweti- Kipranye- Mindililwet Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 733,840.00 Sigowet Feedback
Kiburet- Nyinyitiet Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 420,000.00 Ainamoi Feedback
Seska- Arap Seronik -Arap Chepsegeny- Chemaluk Rad; Jolydab- Kap Rero Road; Chemaluk Church of Christ- Kapsegut Pry- Cheptembe Road; Kapkingok- Birirbei- Chepkoson Road; Koibarak-Kimgul Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 5,471,400.00 Soliat Feedback
Construction Of Kapchief-Kamarus Annex Road 2.1Km,Mile 4-Kondamet Road 2.8Km,Chetite-Sachangwan Road 0.7Km,Full Gospel-Rita Road0.25Km,FFPK Church-Kap Brook Road 0.5 Km,Kap Ezekiel-Kamkamba Road 0.4Km,Mile 4 AIC Church Road 0.35Km,Cherukechuu-Kapsingen Road 0.5Km To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,588,160.72 Chepseon Feedback
Construction of pit latrine at Cheronget ECDE Centre Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 697,009.20 Waldai Feedback
Seronik Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 1,526,010.00 Kaplelartet Feedback
Proposed Kipkobob Water Project Secure and Efficient Water Intake and Storage,Optimize Water Distribution,Modernize and Protect Infrastructure Water, Environment, Energy and Natural Resources Completed 1,376,978.00 Chemosot Feedback
Ngesumin girls - kipsamoi river ngeny pry junction- pry sch To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,000,000.12 Litein Feedback
Itibet - Bagao- Deliverance Church Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,505,055.00 Ainamoi Feedback
Duka Moja- Kiparao Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 5,409,180.00 Kapkugerwet Feedback
Kurabei - Mogonjet ; Kurabei/Arap Ngeno - Chepkoson; Soliat Dispensary/boys -Chepkoson Road; Soliat Boys Sec School -Soliat AGC road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 7,529,400.00 Soliat Feedback
Construction Of Kapchemusian Road 2.7Km, Chepsain Road 2.1Km, Chepcholliet Road 2Km, Chepsir Road 0.1km To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,552,923.36 Chepseon Feedback
Construction of a pit latrine at Kabirer ECDE Centre Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 3,588,808.00 Waldai Feedback
Chemogoch Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 4,982,000.00 Kaplelartet Feedback
Chelelachbei Springs To improve access to safe and sustainable drinking water for the community by protecting natural springs and establishing reliable water points. Water, Environment, Energy and Natural Resources Completed 2,014,862.00 Chemosot Feedback
Offd314-Mashariki To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 7,481,327.00 Londiani Feedback
Kiburet- Factory- Yasomok Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,492,799.00 Ainamoi Feedback
Sumeiyon- Chelogoi Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,038,000.00 Kapkugerwet Feedback
AGC Chesunet - Kapchesengeny Road; Motero pry - Kapkitandyus Road; Kapcherunyit - Kurabei Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,724,052.00 Soliat Feedback
Construction Of Mile Nne- Momoniat Road 1.5Km; Sigowet- Cheboror Road 5.5Km To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,148,468.48 Chepseon Feedback
Construction of a pit latrine at Kaborok ECDE Centre Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 456,067.92 Waldai Feedback
Kapsorok Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 1,484,335.00 Kaplelartet Feedback
Chepkutut ndisiot Springs To improve access to safe and sustainable drinking water for the community by protecting natural springs and establishing reliable water points. Water, Environment, Energy and Natural Resources Completed 1,330,400.00 Chemosot Feedback
Elite Primary -E254 Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 8,288,487.55 Londiani Feedback
Duka Moja- Saptet- Kwa Micheal Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,178,060.00 Kapkugerwet Feedback
Kapriwet- Arap Nyige To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,747,300.00 Kapsaos Feedback
Kapingok-Kapchepkaigat -Kurabei road; Arap Chebochok-Arap chepkoit road: Kapchelemei-Kongeren river-Salgaa road: Soliat Boys Sec School-Turguito bridge road: Kongeren pry – Mirmiro: Kapshongiroi - Arap Ngeny: Kaboykek cattle dip - Kapchesilim - Kapsigilai Road : Kaptelo – Chelogong Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,352,400.00 Soliat Feedback
Construction of Off Main Road- Chepsir-Melile River Bridge Road 3.2Km To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,010,128.00 Chepseon Feedback
Construction of ECDE classroom at Koitalel ECDE Centre Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 743,600.00 Waldai Feedback
Kechiriet Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 670,000.00 Sigowet Feedback
Kabitungu/ Kapkalia Springs To improve access to safe and sustainable drinking water for the community by protecting natural springs and establishing reliable water points. Water, Environment, Energy and Natural Resources Completed 1,058,455.92 Chemosot Feedback
Michingilwet-Chesagat To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,435,000.00 Cheptororiet/Seretut Feedback
Kericho Toyota- Lavington Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,850,000.00 Kapkugerwet Feedback
Manyoror Sign Post- Manyoror Sec- Off Kapsaos Ainamoi Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,316,250.00 Kapsaos Feedback
Seska- Arap Seronik -Arap Chepsegeny- Chemaluk Rad; Jolydab- Kap Rero Road; Chemaluk Church of Christ- Kapsegut Pry- Cheptembe Road; Kapkingok- Birirbei- Chepkoson Road; Koibarak-Kimgul Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,211,800.00 Soliat Feedback
Construction Of Sally Bii- Julius Road 1.2Km, Kap Tirop- Kap Eldoret Road 0.3Km, Chebewor-Muratit Road 0.35Km, World Wide Road 0.4Km, Transomi- Stano-Chebewor Pry Road 0.8Km, Kapcheres-Kiplekwa- Kona Shop Road 0.7Km, Ndiwa Roads 2.5Km To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,589,520.01 Kedowa/Kimugul Feedback
Mindililwet Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 3,485,336.00 Sigowet Feedback
Ngeremi/tabaita Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 648,664.00 Sigowet Feedback
Kaptangut Springs To improve access to safe and sustainable drinking water for the community by protecting natural springs and establishing reliable water points. Water, Environment, Energy and Natural Resources Completed 1,832,829.98 Chemosot Feedback
Kibaraa- Kapsimotwet- Bae To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 12,208,403.76 Cheptororiet/Seretut Feedback
Off Binyiny -Kaboloin Signpost ROAD, Chebigen- Manyoror Dispensary Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,952,415.00 Kapsaos Feedback
Torochgaa- Koigaron- Tegunot Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,393,784.00 Kapsaos Feedback
Kapnyakitari Centre - Kiptugumo Dispensary Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 5,893,600.00 Soliat Feedback
Chemogoch Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 2,702,800.00 Kaplelartet Feedback
Chepterwo/kipsitet Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 649,000.00 Sigowet Feedback
Mosombet Springs To improve access to safe and sustainable drinking water for the community by protecting natural springs and establishing reliable water points. Water, Environment, Energy and Natural Resources Completed 1,138,598.00 Chemosot Feedback
Sisionik Tumoiyot Rd To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 7,776,976.40 Sigowet Feedback
Sachangwan- Kamungei Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,059,000.00 Kapsaos Feedback
Kosisit Primary- Kap Abinwas- Arap Rugut To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,300,452.00 Kapsoit Feedback
Kaplengeny - Kiptugumo Road; Tabrasin - Kiptugumo dispensary Road; Kapneesoi - Highway - Moretik - Arap Tuei Road; Soliat Boys - Kongeren river- Kapchelemei Road; Kongeren pry - Mirmiro Road; Siriat – Kapsisirwo Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,384,000.00 Soliat Feedback
Kapsorok Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 1,926,600.00 Kaplelartet Feedback
Cheramor Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 664,000.00 Kaplelartet Feedback
Arokyet Borehole Water Project To procure and deliver high-quality drilling materials that meet the technical and operational requirements of the project. Water, Environment, Energy and Natural Resources Completed 1,571,834.80 Cheplanget Feedback
kamaget - tamboiyot –kapchanga To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,435,000.00 Sigowet Feedback
Samutet Pry.Sch Junction-Cattle Dip- JoRoadan Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,900,000.00 Kapsoit Feedback
Off B1- Chepsoo Pry School Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,890,404.00 Kapsoit Feedback
Shauri Yako - Kapkenyelo - Kipcheiyet Road; Kapkara - Karap Cheruiyot Road; Kapchesengeny - Chepyegon - Kapchepchilat Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 4,969,156.00 Soliat Feedback
Construction of Cherote-Kapkamano Road 2.3Km, Kap Pastor-Kapkatet TBC Road 2.3Km To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,212,472.64 Kaplelartet Feedback
Kaplelach Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 2,806,680.00 Sigowet Feedback
Chesiche Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 710,170.00 Kaplelartet Feedback
Londiani Water Supply Project To enhance reliable access to safe water for the community through the supply and installation of a pumpset and development of a distribution pipeline Water, Environment, Energy and Natural Resources Stalled N/A Londiani Feedback
Barrit-Kaplelechon To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Stalled 102,407,437.60 Kedowa/Kimugul Feedback
Sigowet Water Supply To restore and enhance the functionality, reliability, and sustainability of the Sigowet Water Supply system in order to improve access to safe and adequate water for households, institutions, and businesses within Sigowet area Water, Environment, Energy and Natural Resources 880,000.00 Sigowet Feedback