LIST OF ALL FINANCIAL YEAR PROJECTS

- Active Projects-

Project Objective Department Status Budget(Kshs) Ward
Kabartegan-Ainapkoroitik Water Project To provide sustainable, safe, and reliable water supply to the Kabartegan–Ainapkoroitik community through equipping and solarisation of the spring source, construction of a masonry storage tank, rising main and distribution pipelines, and associated infrastructure Water, Environment, Energy and Natural Resources On-Going 1,292,385.00 Chemosot Feedback
Enginit Borehole Water Project To increase access to safe and reliable water supply for the Enginit community through borehole drilling, development, and associated infrastructure Water, Environment, Energy and Natural Resources On-Going 1,424,526.40 Londiani Feedback
Jagoror Borehole Water Project To provide a safe, reliable, and sustainable source of water for domestic, institutional, and community use through borehole drilling and development. Water, Environment, Energy and Natural Resources On-Going N/A Londiani Feedback
Construction of Off B1-Kaitui bridge-kiptugumo pry sch Road; Kamasenga-Soliat Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport On-Going 3,695,760.00 Soliat Feedback
Segetet-Siranga Road (7m, 900MM); Chebirir-Sachangwan Road (7m, 600MM); Kaula-Kapsoton Road (14m, 600MM) To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport On-Going 616,804.48 Kipkelion Feedback
Supply, Delivery, And Installation Of Kivuno-Korori Road;Mugumoini-Centre Road;Subukia-Centre Road;Centre One -Gwitu Farm Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport On-Going 2,007,746.56 Tendeno/Sorget Feedback
Proposed Culverts Installation To Bosuben Junction-Tanguret Road,Kipteran-Kapsinendet Church Of Christ Road,Kap Petero-Kapsimbiri Dip Road,Kapsimbor-Kap Mosonik Shops,Arokyet Tinga-Kap Cape Town Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport On-Going 1,900,928.54 Cheplanget Feedback
Supply,delivery and installation of culverts at Chebinyiny-Kenene rd,Mobet-tabut rd,mobet-keregut road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport On-Going 1,847,972.80 Cheplanget Feedback
Routine Maintenance of Silva junction-Siongi-Kampala road Potholes patched, ,surface grading completed. Public Works, Roads and Transport On-Going 3,640,590.40 Tebesonik Feedback
Proposed Construction of 600mm 28m of culverts at 938 complex-Keta Academy Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport On-Going 1,039,934.20 Chepseon Feedback
Proposed Construction of Kaptebengwet- Cheptangulgei River Box Culvert To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport On-Going 1,409,706.24 Kapkatet Feedback
Proposed construction of storm water drainage facilities (Phase 2 – World Bank Funded) To reduce and manage flooding in the project area by channeling storm water through an effective and well-designed drainage system. Lands, Housing and Physical Planning On-Going 1,487,440.80 Kapkugerwet Feedback