2023/2024 FINANCIAL YEAR PROJECTS

Department: Water, Environment, Energy and Natural Resources

- Completed Projects-
Go back

Project Objective Department Status Budget(Kshs) Ward
Ainabon water project in Kipchebor ward To expand access to safe, reliable, and sustainable water supply for the Ainabon community in Kipchebor Ward through the supply and installation of a hydrum pump, construction of a 23.4m? steel elevated water tower, and laying of a 2 km distribution pipeline Water, Environment, Energy and Natural Resources Completed 1,488,973.00 Kipchebor Feedback
Kapkatet Water Spring Protection To improve access to safe and sustainable drinking water for the community by protecting natural springs and establishing reliable water points. Water, Environment, Energy and Natural Resources Completed 1,650,044.00 Kapkatet Feedback
Kibaraa Water Project To provide sustainable, reliable, and affordable access to safe water for the Kibaraa community through solarisation, pump set installation, pipework, and UPVC tank installation Water, Environment, Energy and Natural Resources Completed 1,372,402.00 Waldai Feedback
Kaitui Water Project To improve access to safe, reliable, and sustainable water supply for the Kaitui community in 964 through the construction of a water distribution pipeline Water, Environment, Energy and Natural Resources Completed 1,782,177.00 Soliat Feedback
Mabasi Water Project To enhance access to safe, reliable, and sustainable water for the Mabasi community in Bureti’s Kisiara Ward through equipping and solarisation of the intake, installation of submersible motor, construction of rising main and distribution pipelines, and installation of UPVC storage tanks Water, Environment, Energy and Natural Resources Completed 1,476,427.00 Kisiara Feedback
Mtaragon Water Project To increase access to safe, reliable, and sustainable water for the Mtaragon community in Kamasian Ward through construction of a masonry storage tank, installation of UPVC tank, distribution pipelines, communal water points, and fencing of the spring source. Water, Environment, Energy and Natural Resources Completed 1,381,574.00 Kamasian Feedback
Londiani Water Supply Intake and Gravity Mains Project To improve water supply reliability and coverage for the Londiani community through supply, delivery, and excavation of gravity main, construction of a weir, and fencing of intake works. Water, Environment, Energy and Natural Resources Completed 1,392,197.00 Kedowa/Kimugul Feedback
Sosur Borehole Water Project To increase access to safe, reliable, and sustainable water supply for the Sosur community in Kaplelartet Ward through drilling and development of a borehole. Water, Environment, Energy and Natural Resources Completed 623,565.00 Kaplelartet Feedback
Chemutian Water Project To provide safe, reliable, and sustainable water supply for the Chemutian community in 964 through construction of a 50m? ground-level masonry storage tank, protection of two springs, and development of gravity mains and distribution pipelines. Water, Environment, Energy and Natural Resources Completed 686,210.00 Soliat Feedback
Purchase of Land for Litein Municapal Water & Sewarage Treatment Plant To secure adequate land for the establishment of a modern water and sewerage treatment plant in Litein Municipality, aimed at improving access to safe water, sanitation, and hygiene services for residents, institutions, and businesses. Water, Environment, Energy and Natural Resources Completed 1,341,139.00 Kisiara Feedback
Chepkosilen Secondary Borehole Water Project To improve access to safe, reliable, and sustainable water supply for Chepkosilen Secondary School and the surrounding community through borehole drilling and development. Water, Environment, Energy and Natural Resources Completed 1,104,543.00 Cheptororiet/Seretut Feedback
Kipsolu Pipeline Water Project To expand and improve the existing water supply system through the extension of the distribution pipeline and rehabilitation of existing storage infrastructure, ensuring increased water access and reliability for the target population Water, Environment, Energy and Natural Resources Completed 1,019,845.00 Cheptororiet/Seretut Feedback
Maso-Kewasco Lastmile Connectivity Water Project To expand and improve the existing water supply system through the extension of the distribution pipeline and rehabilitation of existing storage infrastructure, ensuring increased water access and reliability for the target population Water, Environment, Energy and Natural Resources Completed 1,080,000.00 Kapkugerwet Feedback
Kendabei Water Project Extension To expand and improve the existing water supply system through the extension of the distribution pipeline and rehabilitation of existing storage infrastructure, ensuring increased water access and reliability for the target population Water, Environment, Energy and Natural Resources Completed 500,000.00 Kabianga Feedback
Matobo Kewasco Water Supply Project Last Mile Connectivity To expand and improve the existing water supply system through the extension of the distribution pipeline and rehabilitation of existing storage infrastructure, ensuring increased water access and reliability for the target population Water, Environment, Energy and Natural Resources Completed 2,500,000.00 Kipchebor Feedback
Tegat Sachangwan,Choruet Water Project To expand and improve the existing water supply system through the extension of the distribution pipeline and rehabilitation of existing storage infrastructure, ensuring increased water access and reliability for the target population Water, Environment, Energy and Natural Resources Completed 800,000.00 Kapsuser Feedback
Borborwet Water Project To expand and improve the existing water supply system through the extension of the distribution pipeline and rehabilitation of existing storage infrastructure, ensuring increased water access and reliability for the target population Water, Environment, Energy and Natural Resources Completed 1,200,000.00 Kapsuser Feedback
Cheptagum Borehole Water Project To provide a safe, reliable, and sustainable source of water for domestic, institutional, and community use through borehole drilling and development. Water, Environment, Energy and Natural Resources Completed 1,200,000.00 Kaplelartet Feedback
Kebimbir Borehole Water To provide a safe, reliable, and sustainable source of water for domestic, institutional, and community use through borehole drilling and development. Water, Environment, Energy and Natural Resources Completed 2,500,000.00 Soin Feedback
Nyairobi-Sogonyeti Pipeline To expand and improve the existing water supply system through the extension of the distribution pipeline and rehabilitation of existing storage infrastructure, ensuring increased water access and reliability for the target population Water, Environment, Energy and Natural Resources Completed 1,100,000.00 Kamasian Feedback
Kipkelion Health Centre Borehole Distribution Pipeline To expand and improve the existing water supply system through the extension of the distribution pipeline and rehabilitation of existing storage infrastructure, ensuring increased water access and reliability for the target population Water, Environment, Energy and Natural Resources Completed 1,100,000.00 Kipkelion Feedback
Sasuriet Water Project Last Mile Connectivity To expand water supply coverage by connecting unserved households, schools, and institutions to the existing water distribution network under the Last Mile Connectivity initiative. Water, Environment, Energy and Natural Resources Completed 1,100,000.00 Ainamoi Feedback
Chepngobob-Kiptegan Water Project last Mile Connectivity To expand water supply coverage by connecting unserved households, schools, and institutions to the existing water distribution network under the Last Mile Connectivity initiative. Water, Environment, Energy and Natural Resources Completed 1,800,000.00 Kapsaos Feedback
Taiwet Water Project To expand water supply coverage by connecting unserved households, schools, and institutions to the existing water distribution network under the Last Mile Connectivity initiative. Water, Environment, Energy and Natural Resources Completed 1,370,993.00 Kipchimchim Feedback
Kabarak Borehole Water Project To provide sustainable, safe, and reliable water supply to the target community through borehole equipping, solarisation, installation of storage infrastructure, and source protection Water, Environment, Energy and Natural Resources Completed 5,400,735.00 Londiani Feedback
Kenegut-Koisagat Water Project To enhance access to safe, reliable, and sustainable water supply for the Kenegut–Koisagat community through construction of a masonry storage tank, rising main, and distribution pipeline Water, Environment, Energy and Natural Resources Completed 1,408,270.00 Kapsoit Feedback
Koitatui Water Project To expand water supply coverage by connecting unserved households, schools, and institutions to the existing water distribution network under the Last Mile Connectivity initiative. Water, Environment, Energy and Natural Resources Completed 840,980.00 Soin Feedback
Gwitu Borehole Water Project To provide a safe, reliable, and sustainable source of water for domestic, institutional, and community use through borehole drilling and development. Water, Environment, Energy and Natural Resources Completed 804,550.00 Tendeno/Sorget Feedback
Ainabon Water Project Phase 11 To provide sustainable, reliable, and safe water supply to the target community through construction of a sump, solarisation of the pumping system, installation of storage tanks, and development of a distribution pipelin Water, Environment, Energy and Natural Resources Completed 1,846,760.00 Kipchebor Feedback
Borowet-Kasheen Water Project To expand water supply coverage by connecting unserved households, schools, and institutions to the existing water distribution network under the Last Mile Connectivity initiative. Water, Environment, Energy and Natural Resources Completed 1,515,000.00 Kamasian Feedback
Enhancement of Ngendalel, Kalyet, Masibun and Simchorwet water project To expand water supply coverage by connecting unserved households, schools, and institutions to the existing water distribution network under the Last Mile Connectivity initiative. Water, Environment, Energy and Natural Resources Completed 1,500,000.00 Kipkelion Feedback
Jagoror - Kapsimotwo Water Project To improve access to safe, reliable, and sustainable water for the community through spring protection, construction of a clear water sump, solarisation, and development of a distribution pipeline. Water, Environment, Energy and Natural Resources Completed 2,987,603.00 Londiani Feedback
Kapkatet Spring Rehabilitation To secure and improve access to clean, safe, and sustainable water for the community through construction of a spring protection system Water, Environment, Energy and Natural Resources Completed 102,000,000.00 Kapkatet Feedback
Kapkondor/Cheusi/Setek/Itoik Water Project To expand water supply coverage by connecting unserved households, schools, and institutions to the existing water distribution network under the Last Mile Connectivity initiative. Water, Environment, Energy and Natural Resources Completed 1,225,000.00 Londiani Feedback
Kapkongoni Water Project To expand water supply coverage by connecting unserved households, schools, and institutions to the existing water distribution network under the Last Mile Connectivity initiative. Water, Environment, Energy and Natural Resources Completed 51,782,168.00 Soliat Feedback
Kapkwen Borehole Water Project To provide a safe, reliable, and sustainable source of water for domestic, institutional, and community use through borehole drilling and development. Water, Environment, Energy and Natural Resources Completed N/A Londiani Feedback
Kapruben Water Project To enhance access to safe and reliable water supply for learners and the community through construction of distribution return lines to Kaplengeywo ECD and Kapriro Primary School. Water, Environment, Energy and Natural Resources Completed 3,906,180.00 Kabianga Feedback
Fortenan-Koisagat water supply To expand water supply coverage by connecting unserved households, schools, and institutions to the existing water distribution network under the Last Mile Connectivity initiative. Water, Environment, Energy and Natural Resources Completed N/A Chilchila Feedback
Lower Kipkecheiyet Water Project To expand water supply coverage by connecting unserved households, schools, and institutions to the existing water distribution network under the Last Mile Connectivity initiative. Water, Environment, Energy and Natural Resources Completed 3,920,264.00 Soliat Feedback
Lower Kiplogoi Water Project To provide safe, reliable, and sustainable water supply to the target community through construction of a gravity main, installation of a storage tank, and establishment of communal water points. Water, Environment, Energy and Natural Resources Completed N/A Soliat Feedback
Otui Borehole Water Project To provide a safe, reliable, and sustainable source of water for domestic, institutional, and community use through borehole drilling and development. Water, Environment, Energy and Natural Resources Completed N/A Kapsaos Feedback
Rehabilitation of Lelaitich Boiyon Water Project To restore and expand access to safe and reliable water supply through repair of the pump motor and extension of last mile connectivity to underserved households and institutions. Water, Environment, Energy and Natural Resources Completed 1,225,000.00 Waldai Feedback
Sombicho Water Project To expand water supply coverage by connecting unserved households, schools, and institutions to the existing water distribution network under the Last Mile Connectivity initiative. Water, Environment, Energy and Natural Resources Completed 1,225,000.00 Soliat Feedback
Sullivan/Annex Spring Protection To expand water supply coverage by connecting unserved households, schools, and institutions to the existing water distribution network under the Last Mile Connectivity initiative. Water, Environment, Energy and Natural Resources Completed 1,225,000.00 Kapkugerwet Feedback
Tulwapmoi Water Project To improve water conveyance and expand access to safe and reliable water for the community through the construction of a 2.5KM, 4" gravity main. Water, Environment, Energy and Natural Resources Completed 138,859,917.00 Chilchila Feedback
Chesire Water Project To provide sustainable, safe, and reliable water supply to the community through spring protection, construction of storage and regulation structures, and establishment of a distribution system Water, Environment, Energy and Natural Resources Completed 97,700,768.00 Soliat Feedback
Masaita Borehole Water To provide a safe, reliable, and sustainable source of water for domestic, institutional, and community use through borehole drilling and development. Water, Environment, Energy and Natural Resources Completed 949,680.40 Tendeno/Sorget Feedback
Chesino Water Supply To expand water supply coverage by connecting unserved households, schools, and institutions to the existing water distribution network under the Last Mile Connectivity initiative. Water, Environment, Energy and Natural Resources Completed 1,297,650.00 Soin Feedback
Rehabilitation of Ngeny Koiborot School Borehole To restore and enhance the functionality of an existing borehole in order to provide reliable and safe water supply for the community. Water, Environment, Energy and Natural Resources Completed 964,555.00 Soin Feedback
Kapsoroget-Kapkutei Lastmile Connectivity Water Project To expand water supply coverage by connecting unserved households, schools, and institutions to the existing water distribution network under the Last Mile Connectivity initiative. Water, Environment, Energy and Natural Resources Completed 850,540.00 Cheptororiet/Seretut Feedback
Chesilot Water Project To improve water storage and expand distribution capacity for the community through rehabilitation of an existing 25m ground level masonry tank and construction of new distribution pipelines. Water, Environment, Energy and Natural Resources Completed 946,699.20 Kapsoit Feedback
Upper Sombicho Water Project To improve water storage and expand distribution capacity for the community through rehabilitation of an existing 25m ground level masonry tank and construction of new distribution pipelines. Water, Environment, Energy and Natural Resources Completed 1,297,140.00 Soliat Feedback
Chesire Water Project Solarization To provide sustainable and reliable water supply to the community through the supply and installation of a pump, adoption of solar energy, and protection of water infrastructure. Water, Environment, Energy and Natural Resources Completed 1,132,630.00 Soliat Feedback
Masarian -Samiyutik Water Project Water Project To expand water supply coverage by connecting unserved households, schools, and institutions to the existing water distribution network under the Last Mile Connectivity initiative. Water, Environment, Energy and Natural Resources Completed 1,335,252.80 Kapsuser Feedback
Chesiche Water Project To enhance sustainable access to safe and reliable water for the Kaborok community through construction and rehabilitation of key water infrastructure. Water, Environment, Energy and Natural Resources Completed 1,132,202.92 Soliat Feedback
Chepsoo - Kapsasur water project To provide safe, reliable, and sustainable water for domestic and livestock use through protection of springs, construction of conveyance and storage infrastructure, and establishment of distribution outlets Water, Environment, Energy and Natural Resources Completed 1,333,490.00 Kapsoit Feedback
Cherire Solarization Water Project To enhance sustainable and reliable access to water by installing a solar-powered submersible pump, necessary accessories, and securing the water infrastructure through fencing. Water, Environment, Energy and Natural Resources Completed 920,000.00 Sigowet Feedback
Itanda Extension Pipeline To expand water supply coverage by connecting unserved households, schools, and institutions to the existing water distribution network under the Last Mile Connectivity initiative. Water, Environment, Energy and Natural Resources Completed 1,050,960.00 Waldai Feedback
Cheptarit Water Project To restore and improve the efficiency, reliability, and sustainability of the water supply system through rehabilitation of critical infrastructure, desilting of the dam, and protection of facilities. Water, Environment, Energy and Natural Resources Completed 1,246,758.00 Sigowet Feedback
Kapcheluch water Project To expand water supply coverage by connecting unserved households, schools, and institutions to the existing water distribution network under the Last Mile Connectivity initiative. Water, Environment, Energy and Natural Resources Completed 1,197,103.00 Kabianga Feedback
Reresik Water Project To improve water conveyance and expand access to safe and reliable water supply through the construction of a transmission pipeline from Chemaluk spring to Reresik. Water, Environment, Energy and Natural Resources Completed 1,590,592.00 Ainamoi Feedback
Kaplutiet Borehole Project To provide a safe, reliable, and sustainable source of water for domestic, institutional, and community use through borehole drilling and development. Water, Environment, Energy and Natural Resources Completed 1,396,002.00 Kabianga Feedback
Chepkoinik Kirukto Water Project To provide sustainable and reliable water supply to Chepkoinik Primary School and the surrounding community through solarisation, construction of a distribution pipeline, and protection of water infrastructure. Water, Environment, Energy and Natural Resources Completed 1,495,550.00 Kapsoit Feedback
Rehabilitation of Kericho Town Dumpsite To improve solid waste management and enhance environmental health by relocating existing garbage heaps to create additional dumping space. Water, Environment, Energy and Natural Resources Completed 886,379.00 Kipchebor Feedback
Rehabilitation of Londiani Dumpsite To improve solid waste management and enhance environmental health by relocating existing garbage heaps to create additional dumping space. Water, Environment, Energy and Natural Resources Completed N/A Londiani Feedback
Kericho Town Dumpsite weighbridge offices To strengthen solid waste management operations in Kericho Town by establishing weighbridge container offices at the dumpsite for improved monitoring, control, and staff welfare. Water, Environment, Energy and Natural Resources Completed N/A Kipchebor Feedback
Mjini/Kisima Water Project To secure, rehabilitate, and enhance access to clean and safe water for the community through spring protection, rehabilitation works, construction of public water points, and fencing. Water, Environment, Energy and Natural Resources Completed 1,494,920.00 Kipchebor Feedback
Birirbei Water Project Phase II To expand access to safe and reliable water supply by constructing a rising main, installing UPVC storage tanks, and providing public water points for community use Water, Environment, Energy and Natural Resources Completed 1,411,987.00 Kipchebor Feedback
Kimologit–KasongochoWater Project To enhance water supply coverage and reliability by supplying and installing HDPE pipes and fittings for extension pipelines to underserved areas. Water, Environment, Energy and Natural Resources Completed 1,500,445.00 Kamasian Feedback
Kabosenywo Water Project To expand water supply coverage by connecting unserved households, schools, and institutions to the existing water distribution network under the Last Mile Connectivity initiative. Water, Environment, Energy and Natural Resources Completed 1,191,350.00 Soliat Feedback
Katet Water Project To provide sustainable and reliable water supply through solarisation, installation of a pumpset, and protection of water infrastructure Water, Environment, Energy and Natural Resources Completed 1,207,980.00 Londiani Feedback
Kaplaba Borehole To provide a safe, reliable, and sustainable source of water for domestic, institutional, and community use through borehole drilling and development. Water, Environment, Energy and Natural Resources Completed 1,449,676.00 Kipkelion Feedback
Tingoro Borehole Water Project To provide a safe, reliable, and sustainable source of water for domestic, institutional, and community use through borehole drilling and development. Water, Environment, Energy and Natural Resources Completed 1,204,250.00 Kipkelion Feedback
Simotwo Borehole Water Project To provide a safe, reliable, and sustainable source of water for domestic, institutional, and community use through borehole drilling and development. Water, Environment, Energy and Natural Resources Completed 1,335,728.00 Kipkelion Feedback
Kipkoyo Water Project To expand water supply coverage by connecting unserved households, schools, and institutions to the existing water distribution network under the Last Mile Connectivity initiative. Water, Environment, Energy and Natural Resources Completed 1,499,170.00 Kedowa/Kimugul Feedback
Sugutek Borehole Water Project To provide a safe, reliable, and sustainable source of water for domestic, institutional, and community use through borehole drilling and development. Water, Environment, Energy and Natural Resources Completed 1,497,473.00 Kipkelion Feedback
Kesabo Water Project To expand water supply coverage by connecting unserved households, schools, and institutions to the existing water distribution network under the Last Mile Connectivity initiative. Water, Environment, Energy and Natural Resources Completed 1,101,658.00 Kedowa/Kimugul Feedback
Simotwet Borehole Solarization To enhance access to sustainable and safe water supply through borehole equipping, solarisation, installation of storage tanks, and construction of a distribution pipeline Water, Environment, Energy and Natural Resources Completed 1,350,082.00 Kunyak Feedback
Chemutian Water Project Phase II To provide sustainable and reliable access to safe water through installation of a submersible pumpset, solar power system, construction of a masonry storage tank, and supporting pipework Water, Environment, Energy and Natural Resources Completed 1,772,596.00 Soliat Feedback
Rehabilitation of Kabokyek Secondary School Borehole To restore and improve the performance of an existing borehole by conducting flushing works and rehabilitating the submersible pump for reliable and sustainable water supply Water, Environment, Energy and Natural Resources Completed 1,419,388.00 Soliat Feedback
Chepkurbet – Kewasco Lastmile Connectivity Water Project To expand water supply coverage by connecting unserved households, schools, and institutions to the existing water distribution network under the Last Mile Connectivity initiative. Water, Environment, Energy and Natural Resources Completed 1,178,864.00 Kapsoit Feedback
Cherotuk Chebululu Water Project To expand water supply coverage by connecting unserved households, schools, and institutions to the existing water distribution network under the Last Mile Connectivity initiative. Water, Environment, Energy and Natural Resources Completed 1,101,658.00 Kipkelion Feedback
Chepkoiyo Water Project To strengthen water supply infrastructure and improve access to safe and reliable water through construction of a gravity main and installation of storage tanks on raised platforms. Water, Environment, Energy and Natural Resources Completed 1,511,890.00 Ainamoi Feedback
Enginit Borehole Water Project To provide sustainable and reliable access to clean water for domestic and livestock use through solarisation, installation of a pumpset and storage tank, construction of communal water points and cattle trough, and securing of water infrastructure. Water, Environment, Energy and Natural Resources Completed 1,420,628.00 Londiani Feedback
Lelaitich IDP Water Project To expand water supply coverage by connecting unserved households, schools, and institutions to the existing water distribution network under the Last Mile Connectivity initiative. Water, Environment, Energy and Natural Resources Completed 1,258,900.00 Soin Feedback
Rehabilitation of Chepkurbet Water Supply To expand water supply coverage by connecting unserved households, schools, and institutions to the existing water distribution network under the Last Mile Connectivity initiative. Water, Environment, Energy and Natural Resources Completed 1,297,940.00 Kapsoit Feedback
Tree seedlings/ fencing To support sustainable tree nursery development and environmental conservation by supplying, delivering, and installing UPVC storage tanks for reliable water access. Water, Environment, Energy and Natural Resources Completed 1,528,100.00 Kipkelion Feedback
Solarization of Chebilawa water supply To provide sustainable and reliable water supply through solarisation, installation of a pump, and construction of a control house for secure and efficient system operation Water, Environment, Energy and Natural Resources Completed 1,772,596.00 Chemosot Feedback
Last mile Connectivity in Ainamoi ward To expand water supply coverage by connecting unserved households, schools, and institutions to the existing water distribution network under the Last Mile Connectivity initiative. Water, Environment, Energy and Natural Resources Completed 1,504,550.00 Ainamoi Feedback
Rehabilitation of Kipngetuny Water Project To expand water supply coverage by connecting unserved households, schools, and institutions to the existing water distribution network under the Last Mile Connectivity initiative. Water, Environment, Energy and Natural Resources Completed 1,386,498.00 Kapsuser Feedback