| Ainamoi Water Project Lot 1 |
To enhance access to clean and sustainable water supply by constructing pipelines ensuring reliable water delivery to the target community |
Water, Environment, Energy and Natural Resources |
Completed
|
1,796,770.40 |
Ainamoi |
Feedback |
| Ainamoi Water Project Lot 2 |
To enhance access to clean and sustainable water supply by constructing pipelines ensuring reliable water delivery to the target community |
Water, Environment, Energy and Natural Resources |
Completed
|
1,686,292.00 |
Ainamoi |
Feedback |
| Kaborus water project |
To enhance access to clean and sustainable water supply by constructing pipelines, water tanks & associated fittings ensuring reliable water delivery to the target community |
Water, Environment, Energy and Natural Resources |
Completed
|
3,445,258.00 |
Ainamoi |
Feedback |
| Kimigik Water project |
To enhance access to clean and sustainable water supply by constructing pipelines ensuring reliable water delivery to the target community |
Water, Environment, Energy and Natural Resources |
Completed
|
1,529,919.82 |
Ainamoi |
Feedback |
| Senetwet/Ketipyese water project. |
To strengthen water supply infrastructure by providing durable pipes and fittings for construction, rehabilitation, and extension of distribution networks. |
Water, Environment, Energy and Natural Resources |
Completed
|
1,110,013.28 |
Ainamoi |
Feedback |
| Seretut Borehole Water Project(Equipping) |
To equip an existing borehole with all necessary components to enable a sustainable and efficient water supply system. |
Water, Environment, Energy and Natural Resources |
Completed
|
1,343,653.60 |
Waldai |
Feedback |
| Sosiot Pipeline Extension |
To enhance access to clean and sustainable water supply by constructing pipelines ensuring reliable water delivery to the target community |
Water, Environment, Energy and Natural Resources |
Completed
|
2,025,295.04 |
Waldai |
Feedback |
| Sosiot Pipeline Maintenance and Rehabilitation |
To enhance access to clean and sustainable water supply by constructing pipelines ensuring reliable water delivery to the target community |
Water, Environment, Energy and Natural Resources |
Completed
|
1,221,255.00 |
Waldai |
Feedback |
| Sosiot Pipeline Extension |
To enhance access to clean and sustainable water supply by constructing pipelines ensuring reliable water delivery to the target community |
Water, Environment, Energy and Natural Resources |
Completed
|
1,059,671.60 |
Waldai |
Feedback |
| Sosiot Pump repair |
To provide a reliable and efficient Horizontal Multistage Centrifugal Pump capable of meeting the site’s water supply or dewatering needs. |
Water, Environment, Energy and Natural Resources |
Completed
|
1,155,637.24 |
Waldai |
Feedback |
| Litein Water Supply |
To provide communities with improved access to clean and safe water through the extension of the water distribution network. |
Water, Environment, Energy and Natural Resources |
Completed
|
1,155,513.12 |
Soliat |
Feedback |
| Chepkosa Spring rehabilitation |
To improve access to safe and sustainable drinking water for the community by protecting natural springs and establishing reliable water points. |
Water, Environment, Energy and Natural Resources |
Completed
|
947,789.20 |
Soliat |
Feedback |
| Ngororga Borehole Water Project |
To procure and deliver high-quality drilling materials that meet the technical and operational requirements of the project. |
Water, Environment, Energy and Natural Resources |
Completed
|
920,250.21 |
Soliat |
Feedback |
| Tiroto, Lelach and Birirbei springs |
To improve access to safe and sustainable drinking water for the community by protecting natural springs and establishing reliable water points. |
Water, Environment, Energy and Natural Resources |
Completed
|
1,200,101.20 |
Soliat |
Feedback |
| Ainap Kirgit Water Project |
to enhance water storage capacity, improve distribution efficiency, and increase community access to clean water, |
Water, Environment, Energy and Natural Resources |
Completed
|
1,225,699.62 |
Soliat |
Feedback |
| Proposed Kipkobob Water Project |
Secure and Efficient Water Intake and Storage,Optimize Water Distribution,Modernize and Protect Infrastructure |
Water, Environment, Energy and Natural Resources |
Completed
|
1,376,978.00 |
Chemosot |
Feedback |
| Chelelachbei Springs |
To improve access to safe and sustainable drinking water for the community by protecting natural springs and establishing reliable water points. |
Water, Environment, Energy and Natural Resources |
Completed
|
2,014,862.00 |
Chemosot |
Feedback |
| Chepkutut ndisiot Springs |
To improve access to safe and sustainable drinking water for the community by protecting natural springs and establishing reliable water points. |
Water, Environment, Energy and Natural Resources |
Completed
|
1,330,400.00 |
Chemosot |
Feedback |
| Kabitungu/ Kapkalia Springs |
To improve access to safe and sustainable drinking water for the community by protecting natural springs and establishing reliable water points. |
Water, Environment, Energy and Natural Resources |
Completed
|
1,058,455.92 |
Chemosot |
Feedback |
| Kaptangut Springs |
To improve access to safe and sustainable drinking water for the community by protecting natural springs and establishing reliable water points. |
Water, Environment, Energy and Natural Resources |
Completed
|
1,832,829.98 |
Chemosot |
Feedback |
| Mosombet Springs |
To improve access to safe and sustainable drinking water for the community by protecting natural springs and establishing reliable water points. |
Water, Environment, Energy and Natural Resources |
Completed
|
1,138,598.00 |
Chemosot |
Feedback |
| Arokyet Borehole Water Project |
To procure and deliver high-quality drilling materials that meet the technical and operational requirements of the project. |
Water, Environment, Energy and Natural Resources |
Completed
|
1,571,834.80 |
Cheplanget |
Feedback |
| Kaminjeiwa Borehole Water Project |
to supply, deliver, install, test, and commission a submersible pump set to enhance water extraction and distribution from the designated water source |
Water, Environment, Energy and Natural Resources |
Completed
|
3,179,333.44 |
Cheplanget |
Feedback |
| Litein Water Supply |
To enhance access to clean and sustainable water supply by constructing and installing water infrastructure such as pipelines, water tanks, spring protection systems, and associated fittings, ensuring reliable water delivery to the target community |
Water, Environment, Energy and Natural Resources |
Completed
|
1,348,680.00 |
Cheplanget |
Feedback |
| Kaminjeiywa Borehole –Tegat |
To enhance access to clean and sustainable water supply by constructing and installing water infrastructure such as pipelines, water tanks, spring protection systems, and associated fittings, ensuring reliable water delivery to the target community |
Water, Environment, Energy and Natural Resources |
Completed
|
2,119,039.00 |
Cheplanget |
Feedback |
| Kaminjeiywa- Mobwo Borehole Water Project |
To enhance access to clean and sustainable water supply by constructing and installing water infrastructure such as pipelines, water tanks, spring protection systems, and associated fittings, ensuring reliable water delivery to the target community |
Water, Environment, Energy and Natural Resources |
Completed
|
1,796,770.40 |
Cheplanget |
Feedback |
| Kipsonoi/Cheplanget Water Project |
To enhance water supply reliability, storage efficiency, and infrastructure security through the construction and electrification of a control panel house, rehabilitation of a 100 m3 water tank, installation of a rising main, and fencing of critical installations |
Water, Environment, Energy and Natural Resources |
Completed
|
1,589,077.04 |
Cheplanget |
Feedback |
| Kapkatet springs and Litein water supply |
to enhance water storage capacity, improve distribution efficiency, and increase community access to clean water, |
Water, Environment, Energy and Natural Resources |
Completed
|
1,408,258.56 |
Kapkatet |
Feedback |
| Litein water supply |
To enhance access to clean and sustainable water supply by constructing and installing water infrastructure such as pipelines, water tanks, spring protection systems, and associated fittings, ensuring reliable water delivery to the target community |
Water, Environment, Energy and Natural Resources |
Completed
|
1,853,100.00 |
Kapkatet |
Feedback |
| Kapkatet (Segerwer) Hospital Water Project |
To enhance access to clean and sustainable water supply by constructing and installing water kiosk, 200m3 water tanks, and associated fittings, ensuring reliable water delivery to the target community |
Water, Environment, Energy and Natural Resources |
Completed
|
1,273,146.40 |
Kapkatet |
Feedback |
| Segerwer extension pipeline |
To enhance access to clean and sustainable water supply by constructing and installing water infrastructure such as pipelines, water tanks, , and associated fittings, ensuring reliable water delivery to the target community |
Water, Environment, Energy and Natural Resources |
Completed
|
1,189,694.00 |
Kapkatet |
Feedback |
| Chebirirbei water project |
To improve access to safe and sustainable drinking water for the community by protecting natural springs and establishing reliable water points. |
Water, Environment, Energy and Natural Resources |
Completed
|
1,133,426.72 |
Kisiara |
Feedback |
| Koituk Borehole Water Project |
To procure and deliver high-quality drilling materials that meet the technical and operational requirements of the project. |
Water, Environment, Energy and Natural Resources |
Completed
|
2,291,348.00 |
Kisiara |
Feedback |
| Koituk Primary School Borehole |
To equip an existing borehole with all necessary components to enable a sustainable and efficient water supply system. |
Water, Environment, Energy and Natural Resources |
Completed
|
1,603,824.68 |
Kisiara |
Feedback |
| Roret Pineapple Processing Plant |
To enhance access to clean and sustainable water supply by constructing and installing water infrastructure such as pipelines, water tanks, , and associated fittings, ensuring reliable water delivery to the target community |
Water, Environment, Energy and Natural Resources |
Completed
|
1,316,850.56 |
Kisiara |
Feedback |
| Koituk Primary School Borehole Water Project |
To enhance access to clean and sustainable water supply by constructing and installing water infrastructure such as pipelines, water tanks, , and associated fittings, ensuring reliable water delivery to the target community |
Water, Environment, Energy and Natural Resources |
Completed
|
1,479,754.14 |
Kisiara |
Feedback |
| Tulwet Borehole water Project |
To equip an existing borehole with all necessary components to enable a sustainable and efficient water supply system. |
Water, Environment, Energy and Natural Resources |
Completed
|
1,153,282.90 |
Kisiara |
Feedback |
| Chebwagan-Kalacha Dispensary Water Project |
To enhance access to clean and sustainable water supply by constructing and installing water infrastructure such as pipelines, water tanks, and associated fittings, ensuring reliable water delivery to the target community |
Water, Environment, Energy and Natural Resources |
Completed
|
1,501,622.78 |
Kisiara |
Feedback |
| Litein Water Supply |
To enhance access to safe, reliable, and sustainable water supply through improved storage, infrastructure rehabilitation, and expanded distribution. |
Water, Environment, Energy and Natural Resources |
Completed
|
1,561,202.00 |
Kisiara |
Feedback |
| Sachangwan Cheribo Line Extension |
To enhance access to clean and sustainable water supply by constructing and installing water infrastructure such as pipelines, water tanks, spring protection systems, and associated fittings, ensuring reliable water delivery to the target community |
Water, Environment, Energy and Natural Resources |
Completed
|
1,956,125.31 |
Kisiara |
Feedback |
| Chemitan Water Project |
To establish a sustainable and efficient water supply system that secures natural water sources, enhances storage capacity, and improves community access through effective distribution. |
Water, Environment, Energy and Natural Resources |
Completed
|
1,427,681.60 |
Kisiara |
Feedback |
| Chemitan Solarisation |
To establish a sustainable and efficient water supply system that secures natural water sources, and improves community access through effective distribution. |
Water, Environment, Energy and Natural Resources |
Completed
|
1,259,540.76 |
Kisiara |
Feedback |
| Cheptenybei Spring Protection |
To improve access to safe and sustainable drinking water for the community by protecting natural springs and establishing reliable water points. |
Water, Environment, Energy and Natural Resources |
Completed
|
1,379,003.36 |
Kisiara |
Feedback |
| Kapkisiara Borehole Water Project |
To restore or enhance water pumping capacity for reliable water delivery through the supply and installation of a new pumpset. |
Water, Environment, Energy and Natural Resources |
Completed
|
1,231,889.00 |
Tebesonik |
Feedback |
| Kapkisiara Water Project |
To enhance access to safe, reliable, and sustainable water supply through improved storage, infrastructure rehabilitation, and expanded distribution. |
Water, Environment, Energy and Natural Resources |
Completed
|
1,102,400.20 |
Tebesonik |
Feedback |
| Kapkisiara Water Project |
To enhance access to clean and sustainable water supply by constructing pipelines, water tanks, and associated fittings, ensuring reliable water delivery to the target community |
Water, Environment, Energy and Natural Resources |
Completed
|
1,346,017.60 |
Tebesonik |
Feedback |
| Kibugat Borehole Water Project |
To procure and deliver high-quality drilling materials that meet the technical and operational requirements of the project. |
Water, Environment, Energy and Natural Resources |
Completed
|
2,200,056.00 |
Tebesonik |
Feedback |
| Kibugat borehole Water Project |
To equip a borehole, extend power supply, and develop key water infrastructure that supports reliable water extraction, storage, and distribution for the community. |
Water, Environment, Energy and Natural Resources |
Completed
|
1,662,032.22 |
Tebesonik |
Feedback |
| Kiptome Borehole Water Project |
To procure and deliver high-quality drilling materials that meet the technical and operational requirements of the project. |
Water, Environment, Energy and Natural Resources |
Completed
|
1,139,510.92 |
Tebesonik |
Feedback |
| Kaptaragon Borehole Water Project |
To procure and deliver high-quality drilling materials that meet the technical and operational requirements of the project. |
Water, Environment, Energy and Natural Resources |
Completed
|
1,613,832.88 |
Chepseon |
Feedback |
| Chepseon Polytechnic Borehole |
To procure and deliver high-quality drilling materials that meet the technical and operational requirements of the project. |
Water, Environment, Energy and Natural Resources |
Completed
|
1,624,649.60 |
Chepseon |
Feedback |
| Kaplelachbei water project |
Increase Water Storage Capacity, Enhance Water Intake Efficiency, Improve Water Distribution |
Water, Environment, Energy and Natural Resources |
Completed
|
1,494,486.00 |
Chepseon |
Feedback |
| Chilchilla Pan Rehabilitation |
Increase Water Storage Capacity, Enhance Water Intake Efficiency, Improve Water Distribution |
Water, Environment, Energy and Natural Resources |
Completed
|
1,386,788.17 |
Chepseon |
Feedback |
| Chepsain Water Project |
Increase Water Storage Capacity, Enhance Water Intake Efficiency, ,Enhance Security and Reduce Contamination |
Water, Environment, Energy and Natural Resources |
Completed
|
1,893,521.36 |
Chepseon |
Feedback |
| Chepseon Water projects (Tugunon Water project) |
To enhance access to clean and sustainable water supply by constructing pipelines, , and associated fittings, ensuring reliable water delivery to the target community |
Water, Environment, Energy and Natural Resources |
Completed
|
1,138,236.54 |
Chepseon |
Feedback |
| Londiani water supply |
To enhance access to clean and sustainable water supply by constructing pipelines, , and associated fittings, ensuring reliable water delivery to the target community |
Water, Environment, Energy and Natural Resources |
Completed
|
1,375,551.20 |
Kedowa/Kimugul |
Feedback |
| Rehabilitation of Tulwapsigis Pan |
Increase Water Storage Capacity, Enhance Water Intake Efficiency, Improve Water Distribution |
Water, Environment, Energy and Natural Resources |
Completed
|
1,725,152.00 |
Kedowa/Kimugul |
Feedback |
| Kapkeri Water Project |
To enhance access to clean and sustainable water supply by constructing pipelines, , and associated fittings, ensuring reliable water delivery to the target community |
Water, Environment, Energy and Natural Resources |
Completed
|
1,129,751.40 |
Kedowa/Kimugul |
Feedback |
| Katet Borehole Water project |
To provide sustainable and reliable water access through the drilling and equipping of a borehole, supported by power infrastructure and secure water storage |
Water, Environment, Energy and Natural Resources |
Completed
|
1,453,619.20 |
Londiani |
Feedback |
| Kiptangit Water project Phase 1 |
To restore efficient water transmission from the source (e.g., borehole, treatment plant) to the storage facility or distribution network, minimizing losses and ensuring reliable water supply. |
Water, Environment, Energy and Natural Resources |
Completed
|
1,009,391.08 |
Londiani |
Feedback |
| Kiptangit Water Project Phase II |
to enhance water supply reliability and accessibility through the completion of the Rising Main Rehabilitation, Pipeline Extension, Establishment of Communal Water Points, and Installation of Water Meters |
Water, Environment, Energy and Natural Resources |
Completed
|
1,141,788.00 |
Londiani |
Feedback |
| Masaita Borehole Water Projects |
To procure and deliver high-quality drilling materials that meet the technical and operational requirements of the project. |
Water, Environment, Energy and Natural Resources |
Completed
|
871,160.00 |
Londiani |
Feedback |
| Barotion Water Project |
To provide communities with improved access to clean and safe water through the extension of the water distribution network. |
Water, Environment, Energy and Natural Resources |
Completed
|
1,559,712.80 |
Londiani |
Feedback |
| Kamwingi II Water Project |
To ensure reliable water extraction and supply through the Supply and Installation of a Borehole Pump. |
Water, Environment, Energy and Natural Resources |
Completed
|
2,621,429.48 |
Tendeno/Sorget |
Feedback |
| Benditai Water Project. |
To increase water collection, storage capacity, and distribution efficiency through the Expansion of Intake Works, Construction of a 100m Masonry Storage Tank, and Extension of the Distribution Pipeline. |
Water, Environment, Energy and Natural Resources |
Completed
|
2,613,029.92 |
Tendeno/Sorget |
Feedback |
| Kivuno Borehole Water Project |
To procure and deliver high-quality drilling materials that meet the technical and operational requirements of the project. |
Water, Environment, Energy and Natural Resources |
Completed
|
2,114,104.64 |
Tendeno/Sorget |
Feedback |
| Jagoror Water Project |
To secure and optimize water collection, storage, and distribution through the Spring Protection, Construction of a Distribution Pipeline, and Installation of a Masonry Water Tank. |
Water, Environment, Energy and Natural Resources |
Completed
|
1,618,340.32 |
Tendeno/Sorget |
Feedback |
| Kiploikyi water project- solar |
to enhance water supply reliability and accessibility through the completion of the intake weir, Pipeline Extension, |
Water, Environment, Energy and Natural Resources |
Completed
|
2,069,115.20 |
Tendeno/Sorget |
Feedback |
| Fort Tenan Health Centre Water Project |
To enhance water storage, purification, and distribution through the Construction of 3 No. 25 m Ground Level Masonry Tanks, a Composite Filtration Unit, and a Gravity Pipeline. |
Water, Environment, Energy and Natural Resources |
Completed
|
2,898,190.40 |
Chilchila |
Feedback |
| Ndubusat Water Project |
To restore and expand water supply infrastructure through the Rehabilitation of the Gravity Main, Construction of a 50 m (50,000 liters) Storage Tank at Nyairobi, and Extension of the Distribution Line. |
Water, Environment, Energy and Natural Resources |
Completed
|
2,800,472.00 |
Chilchila |
Feedback |
| Teldet Water Project |
To restore and enhance water transmission, storage, and distribution through the Rehabilitation of the Gravity Main, Construction of a 50 m Storage Tank, and Extension of the Distribution Line. |
Water, Environment, Energy and Natural Resources |
Completed
|
1,102,324.70 |
Chilchila |
Feedback |
| Cherara-Kaplelit-Kapkese water project |
To Construct Gravity Main and enhance water transmission, |
Water, Environment, Energy and Natural Resources |
Completed
|
1,698,000.69 |
Chilchila |
Feedback |
| Kipsinende Water Project |
to enhance water storage capacity and supply reliability through the Construction of a 100 M3 (100,000 liters) Ground Level Masonry Water Tank. |
Water, Environment, Energy and Natural Resources |
Completed
|
972,010.40 |
Chilchila |
Feedback |
| Ndubusat Water Project Phase 2 |
to enhance water storage capacity and supply reliability through the Construction of a 2no. 50M3 Ground Level Masonry Water Tank. |
Water, Environment, Energy and Natural Resources |
Completed
|
1,307,210.00 |
Chilchila |
Feedback |
| Leldet borehole Water Project |
To ensure reliable water extraction and supply through the Supply and Installation of a Borehole Pump. |
Water, Environment, Energy and Natural Resources |
Completed
|
1,561,202.00 |
Kamasian |
Feedback |